CN101188599B - 发电厂电气监控前置***负荷均衡设计的实现方法 - Google Patents

发电厂电气监控前置***负荷均衡设计的实现方法 Download PDF

Info

Publication number
CN101188599B
CN101188599B CN2007101786685A CN200710178668A CN101188599B CN 101188599 B CN101188599 B CN 101188599B CN 2007101786685 A CN2007101786685 A CN 2007101786685A CN 200710178668 A CN200710178668 A CN 200710178668A CN 101188599 B CN101188599 B CN 101188599B
Authority
CN
China
Prior art keywords
data
passage
data source
path
end system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007101786685A
Other languages
English (en)
Other versions
CN101188599A (zh
Inventor
楚彦君
刘刚
焦邵华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
Original Assignee
BEIJING SIFANG BONENG AUTOMATION EQUIPMENT Co Ltd
Beijing Sifang Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING SIFANG BONENG AUTOMATION EQUIPMENT Co Ltd, Beijing Sifang Automation Co Ltd filed Critical BEIJING SIFANG BONENG AUTOMATION EQUIPMENT Co Ltd
Priority to CN2007101786685A priority Critical patent/CN101188599B/zh
Publication of CN101188599A publication Critical patent/CN101188599A/zh
Application granted granted Critical
Publication of CN101188599B publication Critical patent/CN101188599B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Safety Devices In Control Systems (AREA)

Abstract

本发明涉及电力***中的电力通讯的方法,公开了一种前置通讯***负荷均衡设计的实现方法。本方法中前置***由多台前置机(4)组成,每台前置通过若干通道(2)接收和发送数据,每个RTU(数据源)(1)通过路径(3)与相应的通道相连,构成了数据流的线路。各个前置之间通过各自的控制中心同步RTU、路径和通道状态,维护动态和静态参数区,控制通道的数据处理和相互协调主备切换等功能。前置***的如此划分可以很容易的实现多种运行模式组合,实现数据的分散采集,实现多机热备、多通道热备。采用此负荷均衡的方法可以,均衡***负荷,提高并行处理能力和负载能力,提高了前置***的可靠性和稳定性。

Description

发电厂电气监控前置***负荷均衡设计的实现方法
技术领域
本发明属于电力***自动控制领域,应用在发电厂电气自动化控制***(FECS)中,该方法使用在通讯前置机中,是一种处理数据负荷均衡的实现方法。
技术背景
数据服务一直都是监控***的灵魂,在***中起到桥梁和枢纽的作用。CSPA2000-V1分布式电气主站***(FECS《发电厂自动化***》***主站部分)中前置***就是CSPA2000-V1***数据服务器,是监控***与数据源之间的枢纽和处理数据的核心。
前置***与数据源之间的接口方式多种多样:以太网;串口232,485;Profibus-DP、CAN-BUS、Lonwork等总线网;GPRS无线网络等。
前置***与数据源之间采用的规约方式也多种多样,既有纯问答,也有主动上送方式,还有主动上送与问答相结合的方式。比如:IEC608-70-5-101(DL/T 634.5101),IEC608-70-5-104(DL/T 634.5104),部颁CDT规约,DNP,MODBUS/TCP等。
前置***支持各种数据类型,支持电力***四遥数据,保护信息,文件流,媒体流等。
前置作为监控***的枢纽,前置的稳定性、可靠性、准确性,实时性是监控***的本质要求。作为走在我国科技创新前列的四方继保自动化有限公司,从我国电厂ECS***的实际需求出发,发明一种具有自己知识产权的能够适应发电厂运行需要的基于RTU负荷均衡模式的前置***。
实现负荷均衡模式前置***的关键:能够实现前置多采集组运行;组内可以实现任务分流;实现多通道相互备用(多类型通道备用);前置***运行模式可配置(读线程,写线程,解释线程的灵活配置,以及轮询和事件触发方式的灵活选择)
发明内容
本发明提供一种前置通讯***负荷均衡设计的实现方法,该方法包括:将数据源分成若干采集组,每个前置***对应不同的采集组,所述前置***包括若干台前置机,每台前置机进行相互的备份和任务分流,可以将前置***数据源分散到几个前置机中进行并行处理,同时各个前置机又能够相互备份;每台前置机通过若干通道接收和发送数据,每个数据源通过路径与相应的通道相连,构成数据流线路;所述各个前置机还具有各自的控制中心,其特征在于:从所述数据源可以通过多个所述通道将数据传输到所述前置***中;所述路径是指从所述数据源出发指向某一通道的一条数据流向,每个数据源可以配置多个路径到一条通道,每个路径可以配置优先级别,实现多通道互备、多种类型通道互备;数据分布在多台所述前置机内运行;所述数据源通过不同的路径连接到需要的通道上,并根据需要通过多条通道连接到不同的前置机,根据所述数据源类型和数据流量灵活的配置前置***的运行模式。
本发明还包括以下几个方面:
(1)前置***多采集组运行
每个前置***属于不同的采集组,在大型监控***中下面挂接的装置可能有数千台,测点数万个,此时单前置***压力非常的大,可以采用不同的采集组的方式,将数据源分成若干组来采集和处理,均衡***负荷,提高并行处理能力和负载能力。
(2)采集组内多台前置运行
在一个采集组内部可以有数台前置机运行,每台前置机进行相互的备份和任务分流,可以将前置***数据源分散到几个前置机中进行并行处理,同时各个前置机又能够起到相互备份的作用。
(3)基于RTU的主备机制和数据机制
***中将所有的RTU、FTU、模拟屏、子站,单个装置,转发***等都作为同等的可通信设备对待,通讯规约中只要能唯一确定测点,即可抽象为RTU。RTU在***中抽象为基本的通讯数据源。前置***中的数据流向无一例外的以RTU为起点通过路径向四处辐射。
(4)引入路径概念
引进路径的概念,路径是指从RTU(数据源)出发指向某一通道的一条数据流向。每个RTU可以配置多个路径(每个路径可以配置优先级别)到通道,实现多通道互备、多种类型通道互备。
(5)灵活配置***的运行模式
前置***的运行模式可以灵活配置,根据不同的数据源类型和数据量进行运行模式的选择,以便更好的支撑各种应用场合。***采用多线程技术,线程数量灵活配置,读线程、写线程、解释线程灵活配置,读线程到解释线程可事件触发和定时处理,到写线程可事件触发和定时处理。
在具体实现(2)(3)(4)(5)中,该实现方法还包括:
Figure G2007101786685D00021
每个通道独立的接收发送缓冲区动态管理(包括动态创建和动态回收);
共享内存技术(静态参数区、动态数据区),用来提供给各前置***的工具使用;
Figure G2007101786685D00031
采用***内部的规约和通讯机制实现前置间的数据同步,实现RTU、路径和通道等运行状态的同步,以及切换时SOE、变化遥信、保护事件的数据同步;
附图说明
图1是前置处理数据类型图
图2是前置***采集组结构图
图3是前置***通道负荷均衡示意图
图4是前置***路由决策和同步信息示意图
图5是前置线程运行模式图
具体实施方式
本申请中用到的专门术语:
FEP:front-end processor前置机
通道:指为数据流提供载体的隧道(可以是虚拟的)
RTU:是指连接于通道的通讯管理机或者控制设备,亦可为子站***
ROUTE:每个RTU所连接通道的路径。
RTDB:实时数据库
图1示意了前置机中能够处理的数据类型,前置机可以处理文件流、媒体流和保护信息流;按照电力***数据类型分可以处理电力***的4遥数据,遥测、遥信、遥脉、遥控。
图2示意了前置区分采集组的结构图。在电厂的应用中由于数据量非常大,实时性要求比较高,因此将所有的数据分成n个采集组(Groupl---Groupn);每组内最多可配置4台前置机,这4台前置机分担该采集组所采集数据的负荷(具体的见示意图3),同时该4台前置机还有互相备份的作用。
参照图2的前置***采集组结构图。
对于发电厂***中,发电厂厂用电设备往往有上千台,因此通讯压力比较大,此时可以采用不同的采集组的方式,将数据源分成若干组来采集和处理,均衡***负荷,提高并行处理能力和负载能力。由图可以看出,前置可以分成若干的采集组,采集组内可以有几台前置机(目前设计可以1至4台前置机相互备用)。所有的数据处理后进入实时数据库。
图3示意了一个通讯采集组内部中的各个前置机负荷均衡的原理,从示意图中可以看出6个RTU(数据源)分散到了3台前置机中去处理,同时各个前置机又起到相互备份的作用,提高了***数据处理的并行性、实时性和可靠性,有效地减轻了每台前置机的数据负荷。
参照图3的前置***通道负荷均衡示意图。
图中简化了通道备用方式,一般每个前置中都有RTU的三个通道,为了更清晰的说明问题,本图中采用一个前置中只有RTU的一个通道
图中配置如下:
FEP1
RTU1→路径11→通道11
RTU2→路径21→通道21
RTU3→路径31→通道31
RTU4→路径41→通道41
RTU5→路径51→通道51
RTU6→路径61→通道61
FEP2
RTU1→路径12→通道12
RTU2→路径22→通道22
RTU3→路径32→通道32
RTU4→路径42→通道42
RTU5→路径52→通道52
RTU6→路径62→通道62
FEP3
RTU1→路径13→通道13
RTU2→路径23→通道23
RTU3→路径33→通道33
RTU4→路径43→通道43
RTU5→路径53→通道53
RTU6→路径63→通道63
由此结合图中可以看出,6个RTU可以通过不同的路径指向3个前置机的不同通道。
Figure G2007101786685D00041
每条通道可以指定运行于哪一个前置节点,这样在初始化时,该条通道优先处理数据,当通道出现问题时,通道再自动切换。
Figure G2007101786685D00042
每条路径可以设置优先权,这样处理的好处是可以选择通讯稳定和高速的通道,比如,RTU采用串口、CAN和以太网3通道相互备份,则可以将指向以太网的路径优先权置成最高、CAN网置成次高,这样***会优先采用以太网方式,然后是CAN网,在两者均出问题时采用串口方式。
Figure G2007101786685D00051
如图所示,根据配置前置***运行后,每个前置机的6个通道中各有两个通道在做数据处理,其余4个通道热备用。当处理数据的通道状态发生了问题后,自动切换到其他前置的通道处理数据,起到了均衡负荷的作用。
Figure G2007101786685D00052
前置之间同步RTU状态、通道状态、路径状态以及路由决策策略。如图4所示。前置机中有静态数据区和动态数据区,分别存放前置通讯参数、配置参数和运行参数。
图4示意了前置***路由决策和同步信息的处理,每个采集组内的各台前置机同步通道和RTU状态,以提供给前置机中的路由决策模块。
图5示意了前置机中线程运行图。前置***的运行方式可以根据不同应用环境进行配置。通道读线程、写线程和解释线程的数目可配,到读线程事件触发、到写线程事件触发、读线程到解释线程事件触发可配,也可采用定时方式。
参照图5的前置线程运行模式图。
前置***的运行方式可以根据不同应用环境进行配置。通道读线程、写线程和解释线程的数目可配,到读线程事件触发、到写线程事件触发、读线程到解释线程事件触发可配,也可采用定时方式。

Claims (5)

1.一种发电厂电气监控前置***负荷均衡设计的实现方法,该方法包括:
将数据源分成若干采集组,每个前置***对应于不同的采集组,所述前置***包括若干台前置机,每台前置机进行相互的备份和任务分流,能够将前置***数据源分散到几个前置机中进行并行处理,同时各个前置机又能够相互备份;每台前置机通过若干通道接收和发送数据,每个数据源通过路径与相应的通道相连,构成数据流线路;所述各个前置机还具有各自的控制中心,其特征在于:
从所述数据源能够通过多个所述通道将数据传输到所述前置***中;
所述路径是指从所述数据源出发指向某一通道的一条数据流向,每个数据源能够配置多个路径到一条通道,每个路径能够配置优先级别,实现多通道相互备份、多种类型通道相互备份;
数据分布在多台所述前置机内运行;所述数据源通过不同的路径连接到需要的通道上,并根据需要通过多条通道连接到不同的前置机,根据数据源类型和数据流量灵活地配置前置***的运行模式。
2.如权利要求1所述的方法,所述通道的类型有多种:以太网;串口232、串口485;Profibus-DP、CAN-BUS、Lonwork总线网;GPRS无线网络;通道能够绑定多种规约:IEC608-70-5-101、IEC608-70-5-104、部颁CDT规约、DNP、MODBUS/TCP。
3.如权利要求1所述的方法,所述前置***可以单通道、双通道、多通道收发同一数据源的数据,当双通道或多通道备份时,通道的链路类型能够不同,前置***能够通过路径配置的优先权设置运行通道。
4.如权利要求1所述的方法,所述前置***的运行模式能够根据应用的情况进行灵活的配置,配置采集组数量、每个采集组内前置机数量、通道数量、路径数量;有选择地配置所述前置机中读线程、写线程、解释线程,有选择地配置读线程、写线程、解释线程的处理方式。
5.如权利要求1所述的方法,还包括如下步骤:
每个所述通道独立地接收发送缓冲区动态创建和动态回收信息;
共享静态参数区及动态数据区的数据,以用来提供给各前置***的工具使用;
采用***内部的规约和通讯机制实现所述前置机间的数据同步,实现数据源、路径和通道的运行状态的同步,以及切换时SOE、变化遥信、保护事件的数据同步。
CN2007101786685A 2007-12-04 2007-12-04 发电厂电气监控前置***负荷均衡设计的实现方法 Active CN101188599B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101786685A CN101188599B (zh) 2007-12-04 2007-12-04 发电厂电气监控前置***负荷均衡设计的实现方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101786685A CN101188599B (zh) 2007-12-04 2007-12-04 发电厂电气监控前置***负荷均衡设计的实现方法

Publications (2)

Publication Number Publication Date
CN101188599A CN101188599A (zh) 2008-05-28
CN101188599B true CN101188599B (zh) 2010-06-23

Family

ID=39480789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101786685A Active CN101188599B (zh) 2007-12-04 2007-12-04 发电厂电气监控前置***负荷均衡设计的实现方法

Country Status (1)

Country Link
CN (1) CN101188599B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895429A (zh) * 2010-07-28 2010-11-24 新太科技股份有限公司 一种基于消息机制的分布式监控***设计方法
CN109753355A (zh) * 2018-12-06 2019-05-14 积成电子股份有限公司 智能管理单元多通道连接实现自适应负载均衡的方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101588295B (zh) * 2009-04-22 2011-09-07 北京四方继保自动化股份有限公司 电力自动化前置***通道级的分层动态路由方法
CN102158387A (zh) * 2010-02-12 2011-08-17 华东电网有限公司 基于动态负载均衡与互相热备的保护故障信息处理***
US8799226B2 (en) 2010-09-28 2014-08-05 International Business Machines Corporation Prioritization of data items for backup in a computing environment
US8499190B2 (en) * 2011-03-09 2013-07-30 I/O Interconnect Inc. Portable device and backup method thereof
CN102436399A (zh) * 2011-07-29 2012-05-02 青岛海信网络科技股份有限公司 一种负载均衡的采集方法
CN102522826B (zh) * 2011-12-29 2014-10-08 国网信息通信有限公司 一种控制用电负荷的***及方法
CN103716336A (zh) * 2014-01-23 2014-04-09 国家电网公司 一种基于电力可信计算平台通信安全通信***及其方法
CN106412036B (zh) * 2016-09-18 2019-06-25 国电南瑞科技股份有限公司 一种用于电力调度自动化***的混合多源数据采集方法
CN111797167B (zh) * 2020-07-02 2023-05-16 中国联合网络通信集团有限公司 数据同步***及方法、数据处理中心
CN114726673B (zh) * 2022-03-22 2023-10-31 深圳渊联技术有限公司 Modbus TCP协议通信方法及通信***

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997004321A1 (de) * 1995-07-21 1997-02-06 Siemens Aktiengesellschaft Elektrizitätszähler
CN2250526Y (zh) * 1996-02-06 1997-03-26 清华大学 大型发电机安全监视装置
WO2000070571A1 (en) * 1999-05-17 2000-11-23 Cellnet Data Systems, Inc. System for remote data collection
CN1463062A (zh) * 2003-06-20 2003-12-24 营口供电公司 利用远动通道实现rtu和通道远方故障诊断方法
CN1518803A (zh) * 2001-04-19 2004-08-04 ��ϵͳ��ƹ�˾ 在电网上的点到多点***中用于多路访问和传输的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997004321A1 (de) * 1995-07-21 1997-02-06 Siemens Aktiengesellschaft Elektrizitätszähler
CN2250526Y (zh) * 1996-02-06 1997-03-26 清华大学 大型发电机安全监视装置
WO2000070571A1 (en) * 1999-05-17 2000-11-23 Cellnet Data Systems, Inc. System for remote data collection
CN1518803A (zh) * 2001-04-19 2004-08-04 ��ϵͳ��ƹ�˾ 在电网上的点到多点***中用于多路访问和传输的方法
CN1463062A (zh) * 2003-06-20 2003-12-24 营口供电公司 利用远动通道实现rtu和通道远方故障诊断方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
李超英 等.多通道、多终端配电变压器负荷监测***的集成应用.电力信息化 10.2006,(11),全文.
李超英等.多通道、多终端配电变压器负荷监测***的集成应用.电力信息化 10.2006,(11),全文. *
杨军锋 等.电厂监控***多通道故障录波器设计.测控技术 10.2000,(11),全文.
杨军锋等.电厂监控***多通道故障录波器设计.测控技术 10.2000,(11),全文. *
罗念华.一体化电能及负荷采集***规划设计.电力信息化 11.2006,(11),全文.
罗念华.一体化电能及负荷采集***规划设计.电力信息化 11.2006,(11),全文. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895429A (zh) * 2010-07-28 2010-11-24 新太科技股份有限公司 一种基于消息机制的分布式监控***设计方法
CN109753355A (zh) * 2018-12-06 2019-05-14 积成电子股份有限公司 智能管理单元多通道连接实现自适应负载均衡的方法
CN109753355B (zh) * 2018-12-06 2020-10-30 积成电子股份有限公司 智能管理单元多通道连接实现自适应负载均衡的方法

Also Published As

Publication number Publication date
CN101188599A (zh) 2008-05-28

Similar Documents

Publication Publication Date Title
CN101188599B (zh) 发电厂电气监控前置***负荷均衡设计的实现方法
Wu et al. Rethinking the architecture design of data center networks
CN104734998B (zh) 一种网络设备及信息传输方法
CN108616376B (zh) 一种fc网络***故障动态重构方法
CN103297055A (zh) 一种采用fpga实现多路串行adc同步的装置
CN102932261A (zh) 一种基于智能型高速路由器的星上载荷信息流管理***
CN1937782B (zh) 一种机框设备及其报文发送方法
CN202772914U (zh) 一种通用通信接口互联***
CN105138494A (zh) 一种多路计算机***
CN102217327B (zh) 一种电路业务与分组业务混传桥接方法、装置与***
CN101146240A (zh) 一种共享总线的分布式交叉装置
CN207588877U (zh) 电力数据传输设备
CN101604270B (zh) 基于vxworks操作***的ARINC429通信冗余方法
CN110492908B (zh) 一种基于区块链技术的电力通讯管理机
CN110676818B (zh) 一种基于星型网络拓扑的就地化母线保护方法与***
CN202310005U (zh) 一种带语音程控交换功能的多业务通信装置
EP3363211B1 (en) Data center network node
CN101145857B (zh) 一种节省核心路由器端口的业务汇聚***
CN101001108A (zh) 一种多业务配置平台***集成板卡装置
CN1662894B (zh) 包括时隙总线和若干缓冲器的交换装置
CN101207491B (zh) 用于以太网***的带宽自适应切换装置和方法
CN105530556A (zh) 电力调度交换***
CN205453733U (zh) 基于双端***换机的sdn多域网络装置
CN101127992B (zh) 多业务并发执行的实现方法及实现该方法的移动终端
CN2884710Y (zh) 一种带虚拟网功能的提供多种接口的交换式远程网桥设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING SIFANG AUTOMATION CO. LTD.

Free format text: FORMER OWNER: SUNFAR ELECTRIC (GROUP) CO., LTD.

Effective date: 20100421

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100085 NO.9, STREET 4, SHANGDI INFORMATION INDUSTRY BASE, HAIDIAN DISTRICT,BEIJING CITY TO: 100084 BUILDING 6, YARD 1, NONGDA SOUTH ROAD, HAIDIAN DISTRICT, BEIJING CITY

TA01 Transfer of patent application right

Effective date of registration: 20100421

Address after: 100084, No. 6 building, No. 1, Nongda South Road, Beijing, Haidian District (bright city, Silicon Valley)

Applicant after: Beijing Sifang Jibao Automation Co., Ltd.

Applicant after: Beijing Sifang Boneng Automation Equipment Co., Ltd.

Address before: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Applicant before: Sifang Electric (Group) Co., Ltd.

Applicant before: Beijing Sifang Boneng Automation Equipment Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: BEIJING SIFANG BONENG AUTOMATION EQUIPMENT CO., LTD.

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100084 HAIDIAN, BEIJING TO: 100085 HAIDIAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20110819

Address after: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Patentee after: Beijing Sifang Jibao Automation Co., Ltd.

Address before: 100084, No. 6 building, No. 1, Nongda South Road, Beijing, Haidian District (bright city, Silicon Valley)

Co-patentee before: Beijing Sifang Boneng Automation Equipment Co., Ltd.

Patentee before: Beijing Sifang Jibao Automation Co., Ltd.