CN101173503A - Three-point walking single cable face cable-dragging suspension basket - Google Patents

Three-point walking single cable face cable-dragging suspension basket Download PDF

Info

Publication number
CN101173503A
CN101173503A CNA2007101902313A CN200710190231A CN101173503A CN 101173503 A CN101173503 A CN 101173503A CN A2007101902313 A CNA2007101902313 A CN A2007101902313A CN 200710190231 A CN200710190231 A CN 200710190231A CN 101173503 A CN101173503 A CN 101173503A
Authority
CN
China
Prior art keywords
longeron
guy rope
cable
traveling
lower transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101902313A
Other languages
Chinese (zh)
Inventor
陈长明
农代培
杨齐海
陆忠建
刘晓霞
戴宗诚
邱训兵
闵峰
唐绍华
彭鹏
胡东高
张建红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Co Ltd
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CNA2007101902313A priority Critical patent/CN101173503A/en
Publication of CN101173503A publication Critical patent/CN101173503A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a three-point travelling single-cable-plane guyed travelers, which is characterized in that: a top longitudinal beam is formed by assembling bailey beam and is arranged at a web plate at both sides of the top surface for main beam; the guyed longitudinal beam is a braced girder structure formed by assembling and welding profile steel and is arranged at the bottom part of central girder for the bridge; a travelling hanging frame is fixed on the top longitudinal beam which is connected with a front lower beam of the guyed longitudinal beam by the front suspension; shifting forward; horizontal jack is respectively arranged on two longitudinal beams and a guyed longitudinal beam, the three points are used for incremental launching. The invention has the advantages of realizing three point travelling using two front suspensions of the top longitudinal beam and the rear suspension of the guyed longitudinal beam, lowering structural facilities such as edge longitudinal beam specially designed for travelling, having small weight ratio for the travelers and the beam body section, having better economic index compared to the same kind of guyed travelers, using the rear suspension travelling frame arranged on the beam body completing pouring to support the guyed travelers, forming a stable three-point system due to two top longitudinal beams suspending the front lower beam, reaching stably and quickly shifting forward and decreasing the weight of the travelers.

Description

The three-point walking single cable face cable-dragging suspension basket
Technical field
What the present invention relates to is a kind of three-point walking single cable face cable-dragging suspension basket, belongs to the technical field of free cantilever casting bridge construction.
Background technology
Prior art, as denomination of invention is the utility model patent (ZL02289507) of the patent of single cable face cable-dragging suspension basket, structure is: the space stiffness combination steel work that its end basket adopts plate girder and shaped steel to be welded, comprise two main longitudinal griders that vertically place basket middle part, the end, vertically place two the limit longerons in two main longitudinal grider outsides, laterally place the front beam of basket front portion, the end, laterally place the rear cross beam at basket rear portion, the end, and place between main longitudinal grider and the limit longeron and the distribution longeron in the limit longeron outside, distribution crossbeam between the crossbeam of front and back, wherein main longitudinal grider is the plate girder that single box single chamber is combined into batten plate, its front end is arc head, the limit longeron is single case plate girder, its moving device comprises plate girder telephone-moving longeron, be located at the support roller of longeron bottom, limit, longeron rear end, limit is connected to anchor pole, front end hangs on the telephone-moving longeron by suspension rod and hanging wheel, and thrust brake is positioned at the main longitudinal grider rear end.
According to prior art, the single-point that the single cable face cable-dragging suspension basket front end only depends on single suspension cable guy rope to form supports, in the work progress because load loads symmetry fully, the easy torsional deflection of dragging suspension basket, all unfavorable to construction quality and control, single rope face Hanging basket on front support front end balance is poor, difficult, the preceding lower transverse beam of two side wing edge absolute altitudes control needs defectives such as big rigidity.Existing single rope face Hanging Basket is traveling and be provided with structures such as beam shifting machine, limit longeron separately, underuses single rope face Hanging Basket own characteristic, the structural system complexity.
Summary of the invention
Purpose of the present invention is intended at existing defective in the prior art, one is because the single-point support that the single cable face cable-dragging suspension basket front end only depends on single suspension cable guy rope to form, asymmetric about in work progress because during concreting, distortion back and forth about the beam body is to defectives such as the control of construction quality, beam body line style are all unfavorable; Its two, existing single rope face Hanging Basket is traveling and be provided with structures such as beam shifting machine, limit longeron separately, underuses single rope face Hanging Basket own characteristic, the structural system complexity.At above defective, a kind of job practices of three-point walking single cable face cable-dragging suspension basket is proposed.On girder two webs top the top longeron is set respectively one, when two edge of a wing absolute altitude adjustment difficulties when top longeron solves the single cable face cable-dragging suspension basket formwork erection in work progress, construction because of loading the asymmetric difficult problems such as Hanging Basket reverses, inclination that cause, the top longeron is also as the suspended basket nose girder simultaneously, improved the stress in the Hanging Basket reach process, therefore, in the suspended basket process, steady safety.Utilize 2 top longeron front ends to hang before the Hanging Basket at the bottom of the point and beam the guy rope at center and hang some composition three-point suspension suspended basket behind the Hanging Basket, reach the purpose of three-point walking dragging suspension basket, saved simultaneously and be both sides longeron at the bottom of the beam that suspended basket is provided with, and can effectively prevent reversing in the single cable face cable-dragging suspension basket concreting process.
Technical solution of the present invention: it is characterized in that by the top longeron, precedingly hang, the guy rope longeron, frame is hung in preceding traveling and level jack is formed that wherein the top longeron is arranged on the back two edges, on the web end face of girder limit; Anchored was on girder beam body after the guy rope longeron passed through anchoring in draw bar, the guy rope longeron, guy rope longeron, and preceding traveling is hung frame and is fixed on the longeron of top, and preceding hanging is connected the top longeron with preceding lower transverse beam; Level jack places on top longeron and the guy rope longeron; The top longeron is formed by shellfish thunder beam spelling, is arranged in web place, back both sides; The guy rope longeron is formed by the shaped steel assembly welding, is arranged in bridge center line beam bottom.By hanging the three-point walking Hanging Basket behind the guy rope longeron at the bottom of 2 preceding suspension centres of top longeron and the beam.
Advantage of the present invention:
(1) the present invention solves in the single cable face cable-dragging suspension basket construction because asymmetric stable problem and the control of two side wing edge line styles that causes Hanging Basket of upstream and downstream concreting.
(2) Hanging Basket and beam body section weight ratio are little.This bridge Hanging Basket and sections weight ratio are 160/370=0.43.
(3) has the better economic index with similar dragging suspension basket ratio.It is 288 * 470mm welding case beam that this dragging suspension basket removes that guy rope longeron and arc beam wind up, and lower edge is that last lower edge is connected with bolt with channel-section steel by angle steel outside the welding case beam of 284 * 320mm; The front and back lower transverse beam is the truss that channel-section steel is formed, and the new system steel work is less, and quick construction.
(4), guy rope longeron and top longeron in this dragging suspension basket utilization construction, carry out three-point walking.In the prior art, the limit longeron is inoperative to Hanging Basket in work progress, so cancelled huge limit longeron, utilize the guy rope longeron to hang the rear end dragging suspension basket during traveling, the top longeron is hung preceding lower transverse beam, form 3 stable systems, thereby reach steady reach, and alleviated Hanging Basket weight.Therefore the top longeron has played three effects in work progress: the one, during as suspended basket before the suspension centre spandrel girder, the 2nd, the inhomogeneous moment of torsion that topples of building generation of upstream and downstream not in the balance work progress, the 3rd, by construction control, transmitting portions beam body load.
(5), single cable face cable-dragging suspension basket is walked the line mode uniqueness.After this dragging suspension basket employing system converted, the traveling of top longeron elder generation put in place and anchoring, utilized the top longeron to hang preceding lower transverse beam 2 points then, and guy rope longeron traveling frame is set at the bottom of the guy rope longeron, and 3 are carried out suspended basket.Before the traveling with the logical pre-stretch-draw of traveling frame with itself and the anchoring of beam body, impel in the suspended basket frame traveling process and do not rock, simultaneously by level jack stretch-draw steel strand mode traveling Hanging Basket, guaranteed in the suspended basket process steadily, quick.
Description of drawings
Accompanying drawing 1 is the elevational schematic view of the present invention when using.
Accompanying drawing 2 is A-A, the B-B cut-away views among Fig. 1.
Among the figure, the 1st, guy rope longeron, the 2nd, arc beam, the 3rd, draw bar, the 4th, anchoring stretch-draw facility, the 5th, top longeron, the 6th, preceding lower transverse beam, the 7th, back lower transverse beam, the 8th, bed die, the 9th, bed die longeron, the 10th, side form, the 11st, anchoring in the guy rope longeron, the 12nd, anchoring behind the guy rope longeron, the 13rd, shearing resistance post, the 14th, thrust block, the 15th, frame, the 16th is hung in traveling before the guy rope longeron, frame, the 17th is hung in traveling behind the guy rope longeron, before hang, the 18th, anchoring behind the longeron of top.
The specific embodiment
Contrast Fig. 1,2, the three-point walking single cable face cable-dragging suspension basket, its structure by top longeron 5, precedingly hang, guy rope longeron 1, frame is hung in traveling and level jack is formed, wherein top longeron 5 is arranged on the back two edges, on the web end face of girder limit; Guy rope longeron 1, traveling are hung frame and are fixed on the top longeron 5, before hang top longeron 5 be connected with preceding lower transverse beam 6, level jack places on top longeron and the guy rope longeron, acts on the counter-force seat of top surface of the beam, by active force and reaction force, realize the reach of Hanging Basket.Top longeron 1 is formed by shellfish thunder beam spelling, is arranged in web place, back both sides; The guy rope longeron is formed by the shaped steel assembly welding, is arranged in bridge center line beam bottom.
The guy rope longeron 1 of centerline connects into an integral body with arc beam 2 at the bottom of the beam, become main bearing member, draw bar 3 is anchored at arc beam 2 by anchoring stretch-draw facility 4, thereby beam body load is passed on the king-tower by suspension cable, has improved the force-bearing situation of Hanging Basket front fulcrum.
Top longeron 5 and preceding lower transverse beam 6 on the web end face of girder limit, back lower transverse beam 7, bed die longeron 9, bed die 8, internal mold and side form 10 are formed bearing platform and template system, wherein side form 10, bed die 8 have constituted template system with internal mold, together support is on the bed die longeron, before hang, the back anchoring with top longeron 5, preceding lower transverse beam 6, back lower transverse beam 7, template system connect into an organic whole.Wherein side form 10, bed die 8 have constituted template system with internal mold, and together support is on the bed die longeron.Anchoring is guy rope longeron 1 behind anchoring in suspension cable, the guy rope longeron, the guy rope longeron, top longeron 5, and preceding lower transverse beam 6, back lower transverse beam 7, template system connect into an organic whole.
Before traveling hang frame 15, the primary structure that frame 16 and level jack have been formed the Hanging Basket reach is hung in the back traveling, wherein frame 15 is hung in 2 preceding travelings, the back traveling is hung frame 16 and formed 3 systems, when making the structure traveling steadily, quick.
The thrust system that is provided with in the guy rope longeron is made up of shearing resistance post 13, thrust block 14.
Preceding lower transverse beam 6, back lower transverse beam 7 are connected as a whole with the guy rope longeron.
In the work progress, part working load by anchoring 11 in back lower transverse beam 7, the guy rope longeron, guy rope longeron after anchoring 12 with force transmission to pouring into a mould on the beam section, part working load by guy rope longeron 1 and arc beam 2 with force transmission to king-tower, thereby make structure stress more reasonable.
The thrust system that is provided with in the guy rope longeron is made up of shearing resistance post 13, thrust block 14.In the main girder construction process, because the effect of suspension cable in the dragging suspension basket, its horizontal component acts on the Hanging Basket, moves trend after cradle structure is had, and therefore the thrust system is set.The shearing resistance post is installed in the hole that beam reserves, and thrust block is installed on the guy rope longeron of lower end of shearing resistance post, and its effect is that the shearing resistance post is played fixing and position-limiting action.
In the back two edges top longeron 5 is set, top longeron 5 is to be used for unbalanced load in the balance work progress, but top longeron 5 double as suspended basket nose girder also simultaneously.At the bottom of bridge center line beam, guy rope longeron 1 is set, shellfish thunder back longeron is set at web place, back both sides.Utilize before the longeron of top and hang the three-point walking Hanging Basket behind the guy rope longeron at the bottom of the suspension centre and beam.
In work progress, Hanging Basket top longeron plays balanced action, and by control top longeron front end suspension centre initial tensioning power, bears concrete beam body front end load jointly with suspension cable.Behind the beam body prestressed stretch-draw, the traveling of Hanging Basket top longeron elder generation put in place and fixing after, as the spandrel girder of suspension centre traveling before the Hanging Basket bottom die platform, hang at the bottom die platform front end.After the suspension cable system converts on the arc beam, the Hanging Basket bottom die platform is descended, front end is hung on the traveling basket on the longeron of top, traveling was hung on the frame after the guy rope longeron was dropped in the guy rope longeron rear end of centerline at the bottom of the beam, and hung the frame three-point suspension bottom die platform line slip Hanging Basket of going ahead before suspension centre before the longeron of top and the guy rope longeron.
Adopt lower support type dragging suspension basket form, except that the longeron of top, all the other structures all are arranged at the bottom of the cable-stayed bridge main-beam, and front fulcrum draws with suspension cable, and central bearing point and rear fulcrum then are anchored at and have watered box girder segment.The horizontal force that is caused by guy rope passes to by the thrust brake that is arranged on basket main longitudinal grider rear portion, the end and to water case beam base plate.In the girder casting process, can utilize repeatedly stretch-draw suspension cable of jack simultaneously, adjust cast-in-place beam section elevation absolute altitude, increase and lead cable force, control the stress and the line style of girder better.
Web respectively is provided with the top longeron one on girder end face both sides.Upstream and downstream loads the asymmetric difficult problems such as Hanging Basket is twisted tilted that cause when two edge of a wing absolute altitude adjustment difficulties when top longeron solves the single cable face cable-dragging suspension basket formwork erection in work progress, construction.Hanging Basket top longeron balanced action and control in its work progress by control top longeron front end suspension centre initial tensioning power and to bear concrete beam body front end load jointly in work progress with suspension cable.Behind the beam body prestressed stretch-draw, the traveling of Hanging Basket top longeron elder generation puts in place and fixes the spandrel girder of back as suspension centre traveling before the Hanging Basket bottom die platform, hangs the bottom die platform front end.After the suspension cable system converts on the arc beam, the Hanging Basket bottom die platform is descended, front end is hung on the traveling basket on the longeron of top, the guy rope longeron rear end at the place of offering, center is dropped on the traveling frame of back at the bottom of the beam, utilizes and hangs the frame three-point suspension bottom die platform line slip Hanging Basket of going ahead before the longeron of top behind the suspension centre and guy rope longeron.
Shellfish thunder back longeron is set at web place, back both sides.Upstream and downstream loads the asymmetric difficult problems such as Hanging Basket is twisted tilted that cause when two edge of a wing absolute altitude adjustment difficulties when top longeron solves the single cable face cable-dragging suspension basket formwork erection in work progress, construction.Utilize simultaneously before the longeron of top and hang the three-point walking Hanging Basket behind the guy rope longeron at the bottom of the suspension centre and beam, for traveling the top longitudinal beam structure is not set separately.
Embodiment
Girder standard knot segment length 6m, the heavily about 370t of standard sections.Suspension cable is arranged on the median strip, is anchored on the anchor beam in the beam body raising middle flask, and suspension cable adopts double layout, and rope is apart from being 6m on the beam, and two row's rope horizontal spacings are 1.1m.That girder is established is longitudinal and transverse, perpendicular three dimension prestressing.
The girder standard paragraphs adopts the construction of dragging suspension basket free cantilever casting.
(1), cradle structure
The Hanging Basket primary structure is: this dragging suspension basket is formed by being arranged at the bottom of top longeron on the web end face of girder limit, the beam guy rope longeron, front and back lower transverse beam, bottom die platform, side form and anchoring and the walking system of axis.See Fig. 1 for details.
Every group of Hanging Basket top longeron strengthened Bei Leiliang by four and formed long 18m.The long 16.3m of guy rope longeron, arc beam length 4.5m.
Lower edge adopts weldable steel case beam, the high 2.8m in purlin between last lower edge on the guy rope longeron.The front and back lower transverse beam is middle double-deck, the truss of individual layer on the limit, and rise of a truss 2.8m adopts channel-section steel and angle steel to connect by bolt.Before and after crossbeam pass on the guy rope longeron lower chord and with last lower chord welding.Bed die longeron on the lower transverse beam of front and back adopts the jack truss of channel bar and angle steel welding, rise of a truss 0.8m.Thrust brake is welded on guy rope longeron upper chord end face, and the shearing resistance post is a weldable steel case beam, passes at the bottom of the beam to the guy rope longeron from back and winds up.On-the-spot behaviour's pading plate between shearing resistance post and thrust brake.
(2), technological process
Sections girder dragging suspension basket construction sequence is seen flow chart.Its master operation is: suspended basket, lifting put in place → absolute altitude adjustment → reinforcing bar and the installation of prestress system installation → guy rope and adjustment absolute altitude → guy rope stretch-draw → sections 60% concrete spouting → guy rope stretch-draw → concrete curing and form removal → girder three dimension prestressing stretch-draw and mud jacking → system conversion → Hanging Basket demoulding → Hanging Basket reach.
After Hanging Basket installation (traveling) puts in place, utilize two suspension centres on the auxiliary top longeron, tentatively adjust basket by absolute altitude, locking is hung blue.Internal mold is installed in assembling reinforcement, suspension cable is installed and is carried out initial tensioning, and the Hanging Basket absolute altitude is lifted in advance to the monitoring absolute altitude, pours into a mould 60% beam body concrete, carries out suspension cable and transfers cable stretching, pours into a mould residual concrete at last.
The beam body vertically, laterally, behind the vertical prestressing, utilize guy rope that preceding lower transverse beam is hung temporarily; Unclamp suspension centre before the auxiliary top longeron, slippage Hanging Basket auxiliary top longeron forward, traveling puts in place and is fixing.Stay cable force is transformed into beam body and stretch-draw to monitoring Suo Li.Preceding lower transverse beam is by preceding hanging on the longeron of Hanging Basket top, hang after unclamping, hang on the traveling frame after the guy rope longeron dropped on the guy rope longeron, utilize longeron, three points of guy rope longeron traveling frame to prop up the support orchid, the jack pushing tow is set on top longeron, guy rope longeron hangs blue; Mobile bottom die platform to next sections continues cantilever construction.
(3), suspended basket action and job practices
After suspended basket put in place, suspension centre power was lifted Hanging Basket in advance by design elevation before adjusting, and internal mold is installed in assembling reinforcement, and suspension cable and stretch-draw are installed, and the Hanging Basket absolute altitude is lifted in advance to design attitude, pours into a mould 60% beam body concrete, and the stretch-draw suspension cable is poured into a mould residual concrete then.The beam body vertically, laterally, after the vertical prestressing stretch-draw, unclamp suspension centre before the longeron of top, preceding lower transverse beam is hung on guy rope; Slippage Hanging Basket top longeron forward, traveling put in place and are fixing; Preceding lower transverse beam is hung on the longeron of Hanging Basket top by hanging frame; Carry out the conversion of guy rope system; Hang after unclamping then, the guy rope longeron is dropped on the traveling frame; Utilize hang behind the suspension centre and guy rope longeron before two on the longeron of top on the frame a bit, 3 forward slippage Hanging Basket to next sections continue cantilever construction.
Hang the traveling frame after installing the guy rope longeron on the guy rope longeron, and anchoring.Unclamp and hang anchoring in the blue guy rope longeron, back anchoring, back lower transverse beam suspension centre, transfer synchronously hanging evenly in suspension centre before the Hanging Basket and the guy rope longeron synchronously with jack then.Transfer in the process, temporarily hanging as insurance on the preceding lower transverse beam also transferred synchronously.Hang orchid and after Hanging Basket is transferred on the traveling frame, (transfer highly about 20cm) by guy rope longeron traveling frame and the preceding suspension centre supported at three point of top longeron longeron, preceding lower transverse beam hung hanging temporarily, unclamp the preceding point on the longeron longeron of top, the support bar at the rear cross beam of jacking simultaneously reverse ejection device place, support bar top on the reverse ejection device is equipped with roller, so that roll during suspended basket thereupon, guarantee that rear cross beam traveling stabilizer holds out against the beam body, finish the preceding work of traveling.
On guy rope longeron top the counter-force seat is set.
Lower transverse beam suspension centre before the Hanging Basket is reinstalled on the top longeron longeron traveling frame.Guy rope longeron traveling frame is cleaned out, coated the skim butter and make sliding agent, frictional resistance when reducing suspended basket.Respectively establish 2 20t jack in the guy rope longeron main truss both sides of winding up, the jack that utilizes counter-force seat on the guy rope longeron and shearing resistance intercolumniation to be provided with, the traveling forward of pushing tow guy rope longeron; On the longeron longeron of top, establish and respectively establish a 20t jackscrew pushing tow and hang the traveling frame, lower transverse beam slippage forward before driving.Slowly forward suspended basket is put in place.Because top longeron longeron width is less, lateral stability is relatively poor, thus the guy that should establish splay configuration at its front end during the slippage thereon of current suspension centre traveling frame with its with pour into a mould girder and be connected and tighten up guy, guarantee that it stablizes.

Claims (6)

1. three-point walking single cable face cable-dragging suspension basket is characterized in that comprising the top longeron, precedingly hangs, guy rope longeron, preceding traveling hang frame and level jack that wherein the top longeron is formed by shellfish thunder beam spelling, is arranged on the back two edges, on the web end face of girder limit; Anchored was on girder beam body after the guy rope longeron passed through anchoring in draw bar, the guy rope longeron, guy rope longeron, and preceding traveling is hung frame and is fixed on the longeron of top, and preceding hanging is connected the top longeron with preceding lower transverse beam; Level jack places on top longeron and the guy rope longeron; The guy rope longeron is formed by the shaped steel assembly welding, is arranged in bridge center line beam bottom.
2. three-point walking single cable face cable-dragging suspension basket according to claim 1 is characterized in that the guy rope longeron and the arc beam of centerline connects into an integral body at the bottom of the beam, and draw bar is anchored on the arc beam by anchoring stretch-draw facility.
3. three-point walking single cable face cable-dragging suspension basket according to claim 1, it is characterized in that being arranged on top longeron and preceding lower transverse beam on the web end face of girder limit, back lower transverse beam, bed die longeron, bed die, internal mold and side form are formed bearing platform and template system, wherein side form, bed die and internal mold have constituted template system, together support is on the bed die longeron, anchoring is with the guy rope longeron behind anchoring in suspension cable, the guy rope longeron, the guy rope longeron, the top longeron, preceding lower transverse beam, back lower transverse beam, template system connect into an organic whole.
4. three-point walking single cable face cable-dragging suspension basket according to claim 1, frame is hung in traveling before it is characterized in that, frame is hung in the back traveling and level jack has been formed the primary structure that Hanging Basket moves forward, wherein frame is hung in 2 preceding travelings, the back traveling is hung frame and formed 3 systems, when making the structure traveling steadily, quick.
5. three-point walking single cable face cable-dragging suspension basket according to claim 1 is characterized in that being made of the thrust system that is provided with shearing resistance post, thrust block in the guy rope longeron.
6. three-point walking single cable face cable-dragging suspension basket according to claim 3 is characterized in that preceding lower transverse beam, back lower transverse beam are connected as a whole with the guy rope longeron.
CNA2007101902313A 2007-11-20 2007-11-20 Three-point walking single cable face cable-dragging suspension basket Pending CN101173503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101902313A CN101173503A (en) 2007-11-20 2007-11-20 Three-point walking single cable face cable-dragging suspension basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101902313A CN101173503A (en) 2007-11-20 2007-11-20 Three-point walking single cable face cable-dragging suspension basket

Publications (1)

Publication Number Publication Date
CN101173503A true CN101173503A (en) 2008-05-07

Family

ID=39422238

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101902313A Pending CN101173503A (en) 2007-11-20 2007-11-20 Three-point walking single cable face cable-dragging suspension basket

Country Status (1)

Country Link
CN (1) CN101173503A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845796A (en) * 2010-05-17 2010-09-29 广东省长大公路工程有限公司 Cable-stayed basket thrust device
CN102102342A (en) * 2010-12-30 2011-06-22 广东省航盛建设集团有限公司 Integral-structure type rear upper separator of diamond cradle
CN102230314A (en) * 2011-04-19 2011-11-02 中铁五局(集团)有限公司 Cable-stayed cradle structure
CN102230312A (en) * 2011-02-28 2011-11-02 中铁五局(集团)有限公司 Cable-stayed cradle cambered head
CN102505635A (en) * 2011-10-18 2012-06-20 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN103498426A (en) * 2013-10-17 2014-01-08 重庆城建控股(集团)有限责任公司 Construction method of super-tonnage single-cable-plane front fulcrum and back fulcrum combined type basket hanging system
CN104652289A (en) * 2015-03-20 2015-05-27 中建三局第三建设工程有限责任公司 Slipping installation method of guyed travelling carriage
CN105544413A (en) * 2015-12-11 2016-05-04 中铁大桥局集团有限公司 Stay rope type girder erection crane for erecting cable-stayed bridge steel truss girders and construction method
CN107747399A (en) * 2017-11-10 2018-03-02 湖南联智智能科技有限公司 A kind of Hanging Basket running gear and its method of work
CN108756328A (en) * 2017-10-13 2018-11-06 黄河科技学院 Structurally stable glass view platform
CN109853403A (en) * 2019-03-29 2019-06-07 中交路桥华南工程有限公司 Wide cut cantilever main girder construction Hanging Basket and its bottom basket system
CN110055904A (en) * 2019-06-03 2019-07-26 核工业长沙中南建设工程集团公司 Bridge construction device and method for bridge construction
CN110528401A (en) * 2019-09-02 2019-12-03 曾勇 Suspended pouring construction hanging basket system
CN112030786A (en) * 2020-09-30 2020-12-04 中交路桥华南工程有限公司 Portable bailey frame cradle
CN113914225A (en) * 2021-10-19 2022-01-11 安徽省公路桥梁工程有限公司 Longitudinal sliding vertical lifting construction method for main truss of large-tonnage guyed hanging basket
CN114164773A (en) * 2021-12-15 2022-03-11 中铁二十三局集团有限公司 Hanging basket structure
CN114541279A (en) * 2022-03-31 2022-05-27 中国建筑第四工程局有限公司 Novel forward moving construction method for hanging basket

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845796A (en) * 2010-05-17 2010-09-29 广东省长大公路工程有限公司 Cable-stayed basket thrust device
CN101845796B (en) * 2010-05-17 2012-08-01 广东省长大公路工程有限公司 Cable-stayed basket thrust device
CN102102342A (en) * 2010-12-30 2011-06-22 广东省航盛建设集团有限公司 Integral-structure type rear upper separator of diamond cradle
CN102230312A (en) * 2011-02-28 2011-11-02 中铁五局(集团)有限公司 Cable-stayed cradle cambered head
CN102230312B (en) * 2011-02-28 2012-08-15 中铁五局(集团)有限公司 Cable-stayed cradle cambered head
CN102230314A (en) * 2011-04-19 2011-11-02 中铁五局(集团)有限公司 Cable-stayed cradle structure
CN102505635A (en) * 2011-10-18 2012-06-20 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN102505635B (en) * 2011-10-18 2014-01-15 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN103498426A (en) * 2013-10-17 2014-01-08 重庆城建控股(集团)有限责任公司 Construction method of super-tonnage single-cable-plane front fulcrum and back fulcrum combined type basket hanging system
CN104652289A (en) * 2015-03-20 2015-05-27 中建三局第三建设工程有限责任公司 Slipping installation method of guyed travelling carriage
CN105544413A (en) * 2015-12-11 2016-05-04 中铁大桥局集团有限公司 Stay rope type girder erection crane for erecting cable-stayed bridge steel truss girders and construction method
CN108756328A (en) * 2017-10-13 2018-11-06 黄河科技学院 Structurally stable glass view platform
CN107747399A (en) * 2017-11-10 2018-03-02 湖南联智智能科技有限公司 A kind of Hanging Basket running gear and its method of work
CN107747399B (en) * 2017-11-10 2023-06-02 湖南联智智能科技有限公司 Hanging basket walking system and working method thereof
CN109853403A (en) * 2019-03-29 2019-06-07 中交路桥华南工程有限公司 Wide cut cantilever main girder construction Hanging Basket and its bottom basket system
CN110055904A (en) * 2019-06-03 2019-07-26 核工业长沙中南建设工程集团公司 Bridge construction device and method for bridge construction
CN110528401A (en) * 2019-09-02 2019-12-03 曾勇 Suspended pouring construction hanging basket system
CN112030786A (en) * 2020-09-30 2020-12-04 中交路桥华南工程有限公司 Portable bailey frame cradle
CN113914225A (en) * 2021-10-19 2022-01-11 安徽省公路桥梁工程有限公司 Longitudinal sliding vertical lifting construction method for main truss of large-tonnage guyed hanging basket
CN114164773A (en) * 2021-12-15 2022-03-11 中铁二十三局集团有限公司 Hanging basket structure
CN114541279A (en) * 2022-03-31 2022-05-27 中国建筑第四工程局有限公司 Novel forward moving construction method for hanging basket

Similar Documents

Publication Publication Date Title
CN101173503A (en) Three-point walking single cable face cable-dragging suspension basket
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN101935987B (en) Construction method for integrally sliding large-span steel pipe arch of curved bridge
CN108004927B (en) Double-limb triangular hanging basket and construction method for cantilever beam section of large-span continuous rigid frame bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN102535327B (en) Through prestress steel truss and concrete combined continuous steel structure bridge and construction method thereof
CN105568870B (en) For the triangle hanging basket method cantilever device and its construction method of cross-line bridge construction
CN101158146A (en) Cable-stayed bridge main-beam sliding form frame system and construction method
JP7429940B2 (en) Construction method of steel concrete main girder of cable-stayed bridge
CN107100074A (en) A kind of lower bearing arch bridge concrete bridge deck construction method
CN2597531Y (en) Single rope face tracting rope hanging cage
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN110453613A (en) A kind of cantilever method construction of Large span girder bridge box beam tunneling boring
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN1123861A (en) Construction of prestressed concrete stayed cable bridge
CN205242278U (en) A triangle string basket method is hanged and is watered device for deck bridge construction
CN208533370U (en) A kind of Bridge Erector of large span steel reinforced concrete combination beam erection construction
CN214362953U (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN109371852A (en) A kind of high-level bridge construction method across rail yard
CN112267390A (en) Single-column pier reinforcing structure for improving bridge anti-overturning capacity
CN110528401A (en) Suspended pouring construction hanging basket system
CN114164773B (en) Hanging basket structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication