CN101135190A - Method for preparing plate assembly composite spliced beam - Google Patents

Method for preparing plate assembly composite spliced beam Download PDF

Info

Publication number
CN101135190A
CN101135190A CNA2007101315723A CN200710131572A CN101135190A CN 101135190 A CN101135190 A CN 101135190A CN A2007101315723 A CNA2007101315723 A CN A2007101315723A CN 200710131572 A CN200710131572 A CN 200710131572A CN 101135190 A CN101135190 A CN 101135190A
Authority
CN
China
Prior art keywords
rod member
member single
plane
superimposed
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101315723A
Other languages
Chinese (zh)
Inventor
陈志君
马立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MEIKAILONG STEEL INDUSTRY Co Ltd
Original Assignee
JIANGSU MEIKAILONG STEEL INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MEIKAILONG STEEL INDUSTRY Co Ltd filed Critical JIANGSU MEIKAILONG STEEL INDUSTRY Co Ltd
Priority to CNA2007101315723A priority Critical patent/CN101135190A/en
Publication of CN101135190A publication Critical patent/CN101135190A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to manufacture process of large span superposed beam of spliced plates. The present invention features that H-shaped monospars are first made through cutting one H-shaped web as the upper spar, cutting one other H-shaped web as the lower spar into the shape fitting to the upper spar, and welding wing plates to two webs to form two, one upper and one lower, H-shaped monospars, and then superposed and connected through fitting drilled holes. The present invention has high in-situ assembling efficiency and high product quality.

Description

Method for preparing plate assembly composite spliced beam
Technical field
The present invention relates to a kind of plate and piece together large span load-bearing stoplog preparation method, especially a kind of superposed surfaces planeness height, and can realize the 100% large span method for preparing plate assembly composite spliced beam of boring a hole.
Background technology
Steel construction piece wide span bearing plate assembly composite spliced beam (Fig. 1), heavy duty boiler framework top board stoplog for example, because of load 5000T greatly for example, span reaches greatly about 30-45 rice, about 5500mm~8000mm,, be usually designed to two H type rod member beam A up and down by carrying designing requirement depth of beam owing to be subjected to transporting the limit for height restriction, carry out superimposed assembling by the scene again, connect two H rod members, one wing plate fixed combination up and down by bolt.For improving the bearing capacity of stoplog, H type rod member all designs and produces into little arch structure up and down.H type rod member is stressed evenly up and down in order to make, and improves combination back bulk strength, and the smooth of H rod member two superposed surfaces is necessary up and down, usually flatness required to be controlled at 1mm/M 2In, can effectively guarantee enough CONTACT WITH FRICTION between the stoplog bonding surface up and down like this.
The preparation of prior art stoplog is to make H type rod member single-beam A up and down earlier respectively, and respectively in upper and lower H type rod member single-beam superposed surfaces line, boring 4, penetrates bolt by the superimposed assembling in scene again and be combined into stoplog.The preparation of little arch H rod member single-beam, be earlier 2 H bar web plate 1 and 2 to be cut the formation two sides with arch 1.1,1.2,2.1,2.2 (Fig. 2) in both sides up and down, at web both sides arch face welding wing plate 3.1,3.2 about in the of 1,2, form the two sides then with little arch H type rod member single-beam.Yet because the upper and lower wing plate 3.1,3.2 of single H member of forming stoplog uniform thickness, also not wide not, and differ greatly, be dissymmetrical structure up and down; Secondly, two H rod member single-beam superposed surfaces connecting holes more than 4 have 2000-3000 hole usually; Besides, by weighted design, whole arch camber requires about 15-20mm.Above-mentioned H rod member single-beam web up and down cuts into the two sides arch, the welding wing plate is made the H rod member, and rule in superposed surfaces respectively, boring method, because the plate welding connects the arch camber respectively of H rod member single-beam, add not uniform thickness of lower wing plate, not wide, inevitably temperature distortion in welding process, be difficult to effectively guarantee the planeness of H rod member single-beam superposed surfaces up and down, and the distortion post-equalization is very difficult, not only the bulk strength of stoplog is made up in influence, and separately line of H rod member single-beam superposed surfaces up and down, punching, there is error in itself, superposed surfaces out-of-flatness in addition, make the requirement that is difficult to reach perforated percentage 100% after superimposed, carry out the bore hole correction in the time of can only on-the-spotly making up, the assembled on site difficulty is big, and work efficiency is low.
Summary of the invention
The objective of the invention is to overcome the deficiency of above-mentioned prior art, a kind of superposed surfaces planeness height up and down is provided, superimposed back perforated percentage height can reach 100% method for preparing plate assembly composite spliced beam of boring a hole.
The object of the invention realizes, the main improvement is that H rod member single-beam is up and down made superposed surfaces is the plane, and another side is domes in the same way, again after the superimposed plane drilling of a H rod member beam, H rod member beam two planes are superimposed up and down then, join and bore another H rod member superposed surfaces connecting hole, thereby overcome the deficiencies in the prior art, the gained stoplog, superposed surfaces planeness height not only, and on-the-spot superimposed installation can realize 100% perforated percentage, greatly reduces the assembling difficulty, realized goal of the invention.Specifically, method for preparing plate assembly composite spliced beam of the present invention, comprise that making the plate that is little arch respectively pieces together H type rod member single-beam, hole in H type rod member superposed surfaces, it is characterized in that making H type rod member single-beam is: the H web top of putting the beams in place is cut into set the arch limit earlier, bottom cuts into flat side, the H web bottom of underbeam cut into last web in the same way indent with the camber arch, the top cuts into flat side, respectively at the both sides up and down of two webs welding wing plate, making superposed surfaces is the type of the H up and down rod member single-beam of the monolateral arch in the same way in plane then; Again the superimposed plane of a H rod member single-beam wing plate punching; H rod member single-beam is superimposed by the plane up and down at last, joins and bores another superimposed plane of H rod member single-beam wing plate connecting hole.
For being reduced at another H rod member single-beam superposed surfaces drilling, the present invention is a kind of better to be the superimposed plane of H rod member single-beam wing plate punching on stoplog earlier, and H rod member single-beam is superimposed by the plane up and down then, joins and bores H rod member single-beam plane wing plate connecting hole down.
Method for preparing plate assembly composite spliced beam of the present invention, gained H rod member single-beam superposed surfaces is a flat face, the planeness height, easier being guaranteed of H rod member single-beam superposed surfaces planeness so up and down, the plane cooperates tight, and the superposed surfaces gap is little, combination stoplog bulk strength height; Another H rod member single-beam superposed surfaces connecting hole for superimposed back is the drilling of mould to hole, it is hereby ensured underbeam superposed surfaces 100% perforated percentage, thereby has improved assembled on site efficient greatly, has not only guaranteed the perforation quality but also saved operation.The compound stoplog of the inventive method preparation, the straight not arch camber of H rod member single-beam superposed surfaces up and down (being the only monolateral arch camber of H web), and the equal arch camber in both sides up and down of prior art H rod member single-beam web, this is that the inventive method is different from art methods feature place.
Below in conjunction with a specific embodiment, further specify the inventive method.
Description of drawings
Fig. 1 is the plate assembly composite spliced beam schematic cross-section.
Fig. 2 is that prior art for preparing H rod member single-beam has cut the soffit plate schematic diagram.
Fig. 3 prepares H rod member single-beam cutting web schematic diagram for the inventive method.
The H rod member upper beam schematic diagram that Fig. 4 makes for the inventive method.
The H rod member underbeam schematic diagram that Fig. 5 makes for the inventive method.
The specific embodiment
Embodiment: referring to Fig. 3,4,5, cut each steel plate by designing requirement, the H bar web plate of wherein putting the beams in place 1 cutting on one side is flat side 1.3, cut into evagination on one side and set arch limit 1.1, underbeam H bar web plate 2 cutting on one side is flat side 2.3, sets arch limit 2.2 Yi Bian cut into the indent similar shape, respectively at the both sides up and down of two webs welding wing plate (two superposed surfaces welding small wing) 3.1 and 3.2, obtain two monolateral arch cambers, on one side straight H type rod member single-beam.In the straight small wing 3.2 line borings of last H rod member beam, H type rod member single-beam is fitted together in advance by plane (small wing) is superimposed up and down at last, is the drill jig hole according to the upper beam hole, joins and bores underbeam small wing 3.2 connecting hole groups then.

Claims (2)

1. method for preparing plate assembly composite spliced beam, comprise that making the plate that is little arch respectively pieces together H type rod member single-beam, hole in H type rod member superposed surfaces respectively, it is characterized in that making H type rod member single-beam is: the H web top of putting the beams in place is cut into set the arch limit earlier, bottom cuts into flat side, the H web bottom of underbeam cut into last web in the same way indent with the camber arch, the top cuts into flat side, respectively at the both sides up and down of two webs welding wing plate, making superposed surfaces is the type of the H up and down rod member single-beam of the monolateral arch in the same way in plane then; Again the superimposed plane of a H rod member single-beam wing plate punching; H rod member single-beam is superimposed by the plane up and down at last, joins and bores another superimposed plane of H rod member single-beam wing plate connecting hole.
2. according to the described method for preparing plate assembly composite spliced beam of claim 1, it is characterized in that the superimposed plane of H rod member single-beam wing plate punching on stoplog earlier, H rod member single-beam is superimposed by the plane up and down then, joins and bores H rod member single-beam plane wing plate connecting hole down.
CNA2007101315723A 2007-09-03 2007-09-03 Method for preparing plate assembly composite spliced beam Pending CN101135190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101315723A CN101135190A (en) 2007-09-03 2007-09-03 Method for preparing plate assembly composite spliced beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101315723A CN101135190A (en) 2007-09-03 2007-09-03 Method for preparing plate assembly composite spliced beam

Publications (1)

Publication Number Publication Date
CN101135190A true CN101135190A (en) 2008-03-05

Family

ID=39159496

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101315723A Pending CN101135190A (en) 2007-09-03 2007-09-03 Method for preparing plate assembly composite spliced beam

Country Status (1)

Country Link
CN (1) CN101135190A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102717112A (en) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 Large plate girder laminated surface perforation method
CN102767262A (en) * 2012-07-18 2012-11-07 天津二十冶建设有限公司 Laminated surface reversible deformation method for large-span laminated plate beam
CN104400327A (en) * 2014-10-08 2015-03-11 九冶建设有限公司 Method for prefabricating camber of large-scale steel laminated beam web
CN104551508A (en) * 2015-01-13 2015-04-29 山东丰汇设备技术有限公司 Welding fixture and method for steel structure board girder of power station boiler
CN105945531A (en) * 2016-06-30 2016-09-21 浙江东南网架股份有限公司 Process method for increasing punching rate of end part bolt holes of large-section H-shaped steel component
CN107326818A (en) * 2017-08-08 2017-11-07 正升环境科技股份有限公司 Integral type sound absorbing-insulating baffle
CN109403543A (en) * 2018-11-28 2019-03-01 东方电气集团东方锅炉股份有限公司 A kind of large-sized station boiler large girder end shear connections structure and its assembly method
CN109590675A (en) * 2018-10-30 2019-04-09 上海建工(江苏)钢结构有限公司 A kind of tower boiler steelframe superposed type large girder production method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102717112A (en) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 Large plate girder laminated surface perforation method
CN102717112B (en) * 2011-03-31 2016-01-20 上海宝冶集团有限公司 Large girder superposed surfaces method for punching
CN102767262A (en) * 2012-07-18 2012-11-07 天津二十冶建设有限公司 Laminated surface reversible deformation method for large-span laminated plate beam
CN104400327A (en) * 2014-10-08 2015-03-11 九冶建设有限公司 Method for prefabricating camber of large-scale steel laminated beam web
CN104400327B (en) * 2014-10-08 2016-04-06 九冶建设有限公司 The method of prefabricated Large Steel stoplog web camber
CN104551508A (en) * 2015-01-13 2015-04-29 山东丰汇设备技术有限公司 Welding fixture and method for steel structure board girder of power station boiler
CN105945531A (en) * 2016-06-30 2016-09-21 浙江东南网架股份有限公司 Process method for increasing punching rate of end part bolt holes of large-section H-shaped steel component
CN105945531B (en) * 2016-06-30 2018-09-28 广州五羊钢结构有限公司 Improve the process of big section H profile steel component ends bolt hole punching rate
CN107326818A (en) * 2017-08-08 2017-11-07 正升环境科技股份有限公司 Integral type sound absorbing-insulating baffle
CN107326818B (en) * 2017-08-08 2023-09-19 正升环境科技股份有限公司 Integrated sound absorption and insulation barrier plate
CN109590675A (en) * 2018-10-30 2019-04-09 上海建工(江苏)钢结构有限公司 A kind of tower boiler steelframe superposed type large girder production method
CN109403543A (en) * 2018-11-28 2019-03-01 东方电气集团东方锅炉股份有限公司 A kind of large-sized station boiler large girder end shear connections structure and its assembly method

Similar Documents

Publication Publication Date Title
CN101135190A (en) Method for preparing plate assembly composite spliced beam
JP2021510784A (en) Assembled wood steel composite node
JP2008297701A (en) Trussed frame of steel structure
CN103233551A (en) Fabricated honeycomb web steel beam
CN104947803A (en) Prefabricated slab and column mortise and tenon type connecting joint and installation method
CN103132649A (en) Steel box girder matched with cellular steel web plate
CN102966033A (en) Multi-joint chord member of all-welded railway continuous steel truss girder, and manufacturing method of multi-joint chord member
CN202658724U (en) Full-bolt connecting node structure of H-shaped steel beam and H-shaped steel column
CN103498529B (en) A kind of prefabricated PC honeycombed ribbing web combination beam
CN110541478A (en) Steel pipe column and steel beam connecting joint with internally inserted connecting piece
KR20110054497A (en) Manufacturing method of beam having large opening in the web
JP2006200137A (en) H-section steel for steel house beam, steel house framework structure, and steel house
CN109372170B (en) Assembled sound insulation floor system and manufacturing method thereof
CN215211573U (en) Connecting joint for penetrating through cylinder by steel structure cantilever beam
CN207268020U (en) The connection structure of improved H profile steel beam and steel column
CN214657821U (en) H-shaped steel support and crossbeam assembled connection structure
CN109386071B (en) Industrialized steel plate shear wall composed of Z-shaped steel
CN207620250U (en) A kind of assembling type steel structure stair node being connect with interlayer beam
JP2012188816A (en) Metal fixture for rigid joint of wooden structure
KR20170082391A (en) Steel and precast concrete hybrid beam
CN111519772A (en) Light steel structure with joggled connection nodes
CN215167175U (en) H-shaped steel with splitting and assembling functions
CN216428718U (en) Steel shell composite building board
CN221374159U (en) Non-welding high-strength connecting node device
CN102653960A (en) All-bolt connection node structure of H-shaped steel beam and H-shaped steel column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication