CN101080082A - Device and method for switching control via joint detection of multiple cell load - Google Patents

Device and method for switching control via joint detection of multiple cell load Download PDF

Info

Publication number
CN101080082A
CN101080082A CNA2006100267751A CN200610026775A CN101080082A CN 101080082 A CN101080082 A CN 101080082A CN A2006100267751 A CNA2006100267751 A CN A2006100267751A CN 200610026775 A CN200610026775 A CN 200610026775A CN 101080082 A CN101080082 A CN 101080082A
Authority
CN
China
Prior art keywords
sub
district
overload
underload
network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006100267751A
Other languages
Chinese (zh)
Inventor
陶安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nokia Shanghai Bell Co Ltd
Original Assignee
Alcatel Lucent Shanghai Bell Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alcatel Lucent Shanghai Bell Co Ltd filed Critical Alcatel Lucent Shanghai Bell Co Ltd
Priority to CNA2006100267751A priority Critical patent/CN101080082A/en
Publication of CN101080082A publication Critical patent/CN101080082A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

This invention provides exchange equipment and a method for testing load of multiple local areas jointly to carry out load switch control in wireless network including: this invented exchange equipment jointly tests radio resource information of associated local areas of the network controllers belonging to it so as to carry out load switch control to its affiliated areas and realize intelligent control to the load of local areas.

Description

The a plurality of cell loads of joint-detection are to carry out the devices and methods therefor of switching controls
Technical field
The present invention relates to cordless communication network, relate in particular in cordless communication network, be used for to the sub-district load control switching equipment and method thereof.
Background technology
In cordless communication network, each switch has a plurality of subordinaties' base station sub-system (BSS), and each base station sub-system is being controlled a plurality of sub-districts under it.User terminal (MS) is enjoyed any wireless network services quiet or movingly in the sub-district, the switching on and shutting down of the moving of user, subscriber equipment etc. all bring variation on the load for the sub-district.
The traffic load of a sub-district (be in the sub-district assigned radio resource summation) in the short time of being everlasting because above-mentioned former thereby big statistics variations occurs, for example, in the regular hour, it is very busy that the business of certain sub-district becomes, and the sub-district that is adjacent also has a lot of idle Radio Resources (for example, channel).This just relates to the cell load control problem of wireless network.If it is let go unchecked, then the sub-district of heavy traffic may occur congestedly because of big load, and the sub-district of idle channel abundance then will keep very low traffic carrying capacity in a period of time, and this is unfavorable for distributing rationally of resource.Therefore, this problem has caused that industry pays close attention to widely.
In the prior art, main by the network controller in each base station sub-system, such as BSC (base station controller) independently carries out load sharing control to the sub-district under its control.When the too high situation of load appearred in BSC control sub-district down, BSC can switch to the business of the certain customers in this sub-district its another sub-district under controlling.The problem of this load controlling schemes is that before business was switched generation, BSC was also ignorant to the load condition of Target cell (accepting the sub-district from the customer service of other sub-district).So when there was the problem of loading too high equally in Target cell, the switching of above-mentioned customer service will be failed.
The above-mentioned defective of prior art makes it can't be competent at optimization utilization to Radio Resource, presses for a kind of new effective load sharing control method and solves wherein problem.
Summary of the invention
The present invention proposes in order to solve the aforementioned problems in the prior just.The object of the present invention is to provide and a kind ofly carry out joint-detection and analysis, thereby intelligently control switching equipment and method thereof that inter-cell traffic is switched by load condition to each sub-district of each network controller of subordinate.
According to a first aspect of the invention, a kind of method that is used for cell load control in the switching equipment of cordless communication network is provided, may further comprise the steps, reception is from the resource indicator message of one or more network controllers of its subordinate, and described every resource indicator message comprises the wireless resource information of a plurality of sub-districts of its corresponding network controller subordinate; Carry out joint-detection by wireless resource information, come the control of loading of described switching equipment subordinate's sub-district to each associated cell.
According to a second aspect of the invention, a kind of switching equipment that is used for cell load control in cordless communication network is provided, comprise: a receiving system, be used to receive the resource indicator message from one or more network controllers of described switching equipment subordinate, described every resource indicator message comprises the wireless resource information of a plurality of sub-districts of its corresponding network controller subordinate; A control device is used for carrying out joint-detection by the wireless resource information to each associated cell, comes the control of loading of described switching equipment subordinate's sub-district.
Adopt method provided by the invention and switching equipment, wireless resource allocation and utilization are optimized in the intellectuality control that can realize cell load is shared, and improve the professional success rate for switching of inter-cell user.
Description of drawings
Fig. 1 is the cordless communication network schematic diagram according to a specific embodiment of the present invention;
Fig. 2 is the method flow diagram that is used for cell load control in the switching equipment of cordless communication network according to a specific embodiment of the present invention;
Fig. 3 is the switching equipment block diagram that is used for cell load control in cordless communication network according to a specific embodiment of the present invention.
Identical Reference numeral is represented same or analogous parts in the accompanying drawing.
Embodiment
Describe the present invention below in conjunction with accompanying drawing.
Fig. 1 is the cordless communication network schematic diagram according to a specific embodiment of the present invention.
For simplicity's sake, only show the four sub-district Q of switching equipment 1, first base station controller 2, second base station controller 3 and 2 controls of the first base station controller first sub-district A, the second sub-district B, the 3rd sub-district P and second base station controller 3 down under controlling among the figure.Should be appreciated that a switching equipment can have a plurality of subordinaties' network controller (for example base station controller), and each network controller can there be a plurality of subordinaties' sub-district.Wherein, the first sub-district A and the second sub-district B some be overlapping.Under many circumstances, equally also may there be overlapped situation between heterogeneous networks controller subordinate's the sub-district, as the 3rd sub-district P under first base station controller, 2 controls among the figure and the 4th sub-district Q under 3 controls of second base station controller.
Share control method if adopt cell load of the prior art, (promptly the first sub-district A is in overload state to suppose the load peak to have occurred by the first sub-district A, its the distributing radio resource summation exceed a first threshold), first base station controller 2 can be unusual by each sub-district under its linchpin being monitored the load of finding and only pay close attention to the first sub-district A, and the business of the edge customer among the first sub-district A (being arranged in and the user of other sub-district as the second sub-district B lap) is switched to the neighbor cell (for example second sub-district B) of the first sub-district A.The Target cell of this switching is all adjacent with the overload sub-district usually and lap arranged, this is when carrying out the business switching betwixt because of the subscriber equipment that is arranged in the lap of Target cell and overload sub-district, two serving BS subsystems before and after its transmitting power can guarantee to switch (for this subscriber equipment provides the base station sub-system of communication service, comprising a base station controller respectively) can both receive the enough strong upward signal from this subscriber equipment.
This shows that in the prior art, described professional switching controls process does not have the participation of the Radio Resource relevant information of Target cell, promptly first base station controller 2 is not known the load condition of the second sub-district B.Therefore, when the load condition of the second sub-district B had not allowed it to accept extra customer service, above-mentioned switching will be failed.
Why above-mentioned switching can fail, pay close attention to the first unusual sub-district A of load exactly because carry out first base station controller 2 of load sharing control, there is very big blindness in this controlling schemes for the selection of the Target cell (the second sub-district B as the aforementioned) that business is switched isolatedly.
And when adopting cell load provided by the invention to share control method, switching equipment 1 is known the load condition of all sub-districts under its subordinate's each BSC (comprising first base station controller 2 and the second base station controller 2) control, that is to say, it belongs to the resource indicator message (comprising the wireless resource information of each sub-district, such as the allocation of radio resources situation of sub-district etc.) of the BSC of its compass of competency from each that comprises first base station controller 2 by joint-detection.Thus, switching equipment 1 can know that not only the first sub-district A is in overload state, and the load condition that can also know the sub-district of which related with the first sub-district A (for example, adjacent with the first sub-district A) meets the condition as the customer service switching target small area.Like this, just can carry out intelligentized control, switch also no longer blindly cell load.Preferably, above-mentioned switching not only can occur between the same BSC control sub-district down, can also occur between the sub-district of different B SC under controlling.
Fig. 2 is for being used for the flow chart of a plurality of cell loads of joint-detection with the method for carrying out switching controls according to a specific embodiment of the present invention in the switching equipment of cordless communication network.Below in conjunction with Fig. 2 and with reference to Fig. 1 this method is described in detail.
This method originates in step S101, in step S101, the resource indicator message that switching equipment 1 receives from one or more network controllers (comprising first base station controller 2 and second base station controller 3) of its subordinate, wherein every resource indicator message comprises the wireless resource information of a plurality of sub-districts of described network controller subordinate, for example: all sub-districts under this network controller.Preferably, described wireless resource information comprises that the Radio Resource of sub-district takies situation, and like this, switching equipment 1 can be learned the wireless resource information of all sub-districts of its subordinate, for its control of loading provides reliable basis.Should be appreciated that, can initiate the resource information query requests to each network controller of subordinate on one's own initiative, also can receive the resource indicator message that periodically sends by each network controller passively by switching equipment 1.
Then, in step S102, the wireless resource information that belongs to each sub-district that switching equipment 1 extracts in the resource indicator message that receives is used for follow-up analysis operation, and enters step S103;
In step S103, switching equipment 1 judges in each sub-district of its subordinate whether have one or more overloads sub-district according to its wireless resource information of extracting in step S102, the characteristics of this overload sub-district are that it is for to be operated in the Radio Resource summation of user equipment allocation wherein greater than a first threshold.This first threshold can preestablish in system, when the summation of assigned radio resource of a sub-district during greater than this threshold value, illustrates that then this sub-district is in overload state.
When judged result is, have one or more overloads sub-district in described a plurality of sub-district, also promptly wherein the assigned radio resource summation (be without loss of generality, suppose that this sub-district is the first sub-district A among Fig. 1 greater than a first threshold, switching equipment is switching equipment 1), enter step S104;
If there is no such overload sub-district illustrates that all cell loads that switching equipment 1 has under its command are in the state that normally (do not have overload), then continues to get back to step S101, receives the resource indicator message next time from network controller;
In step S104, switching equipment 1 is according to its wireless resource information that extracts in step S102, judge in each associated cell (for example each neighbor cell of the first sub-district A) of the first sub-district A whether have one or more underloads sub-district, the summation of assigned radio resource of described each underload sub-district is less than one second threshold value.In a preferred embodiment of the invention, this second threshold value is lower than above-mentioned first threshold.Second threshold value also preestablishes in system usually, when the Radio Resource summation of the distribution (promptly occupied) of a sub-district during less than this threshold value, illustrate that this cell load is lower, switching equipment 1 from the corresponding resource indicator message in this sub-district extract wireless resource information after, through judging, will find that this sub-district meets the condition as the underload sub-district;
When the result of further judgement is, there is one or more aforesaid underloads sub-district in each associated cell of the first sub-district A, also be, in the sub-district the assigned radio resource summation be lower than one second threshold value and (be without loss of generality, suppose that this underload sub-district is the second sub-district B), after this enter step S105, clearly, when the number of overload sub-district greater than 1 the time, switching equipment 1 will be the operation that S104 is repeated in each overload sub-district;
In step S105, switching equipment 1 is according to the wireless resource information of the first sub-district A and the second sub-district B, preferably, also according to described first, second threshold value, calculate a to be switched quantity, this to be switched quantity is used to indicate the dependency basis station control (in the present embodiment, first base station controller 2 is overload first sub-district A and publicly-owned base station controller as the underload second sub-district B of Target cell) business that is positioned among the first sub-district A with the subscriber equipment of the some of B overlapping region, second sub-district is switched to the second sub-district B, thus realize the purpose of load control.Optionally, to be switched quantity can be the number of users that need switch to the second sub-district B, also can be the traffic load quantity or the amount of radio resources that need switch to the second sub-district B.Preferably, when more than one of the Target cell of the first sub-district A, switching equipment 1 is that the first sub-district A can notify first base station controller 2 with the relevant information of the to be switched quantity corresponding with a plurality of Target cells and each Target cell in subsequent step, is selected which (a bit) sub-district is user's business switched in by first base station controller 2; Equally, switching equipment 1 can be according to the first sub-district A of overload and the wireless resource information of underload sub-district, select one or more Target cells, and in subsequent step, notify first base station controller 2 with the relevant information of Target cell with the corresponding to be switched quantity of each Target cell, first base station controller 2 need not selected, as long as switch according to the indication of switching equipment 1, through above-mentioned switching, the load of the first sub-district A or recover normal perhaps has certain decline (to should all underload sub-districts add the situation that all can not satisfy the switching demand of the first sub-district A together).Concrete, can be according to the overload sub-district take the to be switched quantity sum that difference that the Radio Resource summation exceeds first threshold is determined to each underload sub-district.Usually, this difference is big more, and then determined to be switched quantity sum should be big more.
Subsequently, enter step S106.In step S106, switching equipment 1 generates the corresponding business switch indicating information, the relevant information that described professional switch indicating information comprises described underload sub-district (for example, the load condition of cell ID and sub-district etc.), preferably, also comprise and the corresponding to be switched quantity in described underload sub-district, enter step S107;
In step S107, switching equipment 1 sends described professional switch indicating information to the network of relation controller, described network of relation controller comprise in overload sub-district and its associated cell determine as the underload sub-district of the Target cell network controller under separately, the network of relation controller comprises network controller and each the described network controller in underload sub-district under the overload sub-district, in the present embodiment, the network of relation controller is first base station controller 2.
According to a specific embodiment of the present invention, switching equipment 1 can select to skip described step S105, in step 104, judge corresponding to an overload sub-district, after having one or more described underloads sub-district, promptly enter step S106, send professional indication message to the network controller under the described first sub-district A, described professional handover information comprises the relevant information (for example, comprising cell ID, wireless resource information etc.) of described underload sub-district.Determine to switch how many users voluntarily to this one or more underloads sub-district by first base station controller 2, because first base station controller 2 has been known the load condition (comprising) of the overload first sub-district A in it sends to the resource indicator message of switching equipment 1.
According to a specific embodiment of the present invention, because there is adjacent even mutual partly overlapping situation in the minizone under the different BSC control, therefore, overload sub-district and underload sub-district can be in the control of different base station controller down.As, the overload sub-district is the 3rd sub-district P under 2 controls of first base station controller, the underload sub-district then be under the control of second base station controller 3 the 4th sub-district Q (we have supposed that these two sub-districts are adjacent) at this moment, 1 need of switching equipment send to second base station controller 3 simultaneously with professional switch indicating information and get final product (promptly in step S107, in the present embodiment, the network of relation controller comprises first base station controller 2 and second base station controller 2).
According to a preferred embodiment of the present invention, the base station controller that can only allow to control some popular sub-district (sub-district that the load peak often occurs) reports the wireless resource information of this hot topic sub-district and associated cell thereof, switching equipment only needs the report message of these wireless resource information is operated like this, the present invention is realized with lower complexity, correspondingly, can by switching equipment write down the overload peak appears and the sub-district relevant information (for example, the number of times on cell ID, appearance load peak etc.), upgrade popular sub-district whereby neatly.
Fig. 3 is for being used for the block diagram of a plurality of cell loads of joint-detection with the switching equipment that carries out switching controls according to a specific embodiment of the present invention in cordless communication network.Below in conjunction with Fig. 3 and with reference to Fig. 1 this switching equipment is described in detail.
This switching equipment 1 comprises a receiving system 101, a control device 102.Preferably, this control device 102 comprises: extraction element 1021, judgment means 1022, a switching instruction device 1023, this switching instruction device 1023 further comprise an Indication message generating apparatus 10231, a calculation element 10232 and an Indication message dispensing device 10233.
Described receiving system 101 is used to receive the resource indicator message of the one or more network controllers (comprising first base station controller 2 and second base station controller 3) from this switching equipment 1 subordinate, this resource indicator message comprises the wireless resource information of a plurality of sub-districts of described network controller subordinate, for example all sub-districts under network controller.Preferably, described wireless resource information comprises that the Radio Resource of sub-district takies situation, like this, switching equipment 1 can be learned the wireless resource information of all sub-districts of its subordinate, for its control of loading provides reliable basis, then, receiving system 101 passes to an extraction element 1021 with its resource indicator message that receives.Should be appreciated that, can initiate the resource information query requests to each network controller of subordinate on one's own initiative, also can receive the resource indicator message that periodically sends by each network controller passively by switching equipment 1.
Extraction element 1021 is used for extracting the wireless resource information that belongs to each sub-district from the resource indicator message that receives, and is used for follow-up analysis operation, and the wireless resource information that it extracts is sent to a judgment means 1022;
Described judgment means 1022 is used for judging according to the wireless resource information that its described extraction element 1021 extracts whether each sub-district of switching equipment 1 subordinate exists one or more overloads sub-district that the characteristics of this overload sub-district are that it is for to be operated in the Radio Resource summation of user equipment allocation wherein greater than a first threshold.This first threshold can preestablish in system, when the summation of assigned radio resource of a sub-district during greater than this threshold value, illustrates that then this sub-district is in overload state.
When judged result is, there is one or more overloads sub-district in described a plurality of sub-district, also promptly wherein the assigned radio resource summation (be without loss of generality greater than a first threshold, suppose that this sub-district is the first sub-district A among Fig. 1, switching equipment is switching equipment 1), judgment means 1022 is according to the wireless resource information that extracts before, judge in each associated cell (for example each neighbor cell of the first sub-district A) of the first sub-district A whether have one or more underloads sub-district, the summation of assigned radio resource of described each underload sub-district is less than one second threshold value.In a preferred embodiment of the invention, this second threshold value is lower than above-mentioned first threshold, and it also preestablishes in system usually.When the Radio Resource summation of distributing (promptly occupied) in the sub-district during less than second threshold value, illustrate that this cell load is lower, receiving system 101 from the corresponding resource indicator message in this sub-district extract wireless resource information after, judgment means 1022 will find that through judging this sub-district meets the condition as the underload sub-district;
When the result of further judgement is, there is one or more aforesaid underloads sub-district in each associated cell of the first sub-district A, its the assigned radio resource amount (be without loss of generality less than this second threshold value, suppose that this underload sub-district is the second sub-district B), judgment means 1022 passes to an Indication message generating apparatus 10231 with its judged result, preferably, in a preferred embodiment of the invention, this judged result passes to a calculation element 10232 simultaneously.Clearly, when having a plurality of overloads sub-district, judgment means 1022 will all be carried out the operation of " judge in the associated cell of overload sub-district and whether have the underload sub-district " for each overload sub-district;
Described calculation element 10232 is used for the wireless resource information according to the first sub-district A and the second sub-district B, preferably, also according to described first, second threshold value, calculate corresponding to be switched quantity, this to be switched quantity is used to indicate the dependency basis station control (in the present embodiment, first base station controller 2 is overload first sub-district A and publicly-owned base station controller as the underload second sub-district B of Target cell) business that is positioned among the first sub-district A with the subscriber equipment of the some of B overlapping region, second sub-district is switched to the second sub-district B, thus realize the purpose of load control.Optionally, to be switched quantity can be the number of users that need switch to the second sub-district B, also can be the traffic load quantity or the amount of radio resources that need switch to the second sub-district B.Preferably, when more than one of the Target cell of the first sub-district A, switching equipment 1 is that the first sub-district A can notify first base station controller 2 with the relevant information of the to be switched quantity corresponding with a plurality of Target cells and each Target cell in subsequent step, is selected which (a bit) sub-district is user's business switched in by first base station controller 2; Equally, switching equipment 1 can be according to the first sub-district A of overload and the wireless resource information of underload sub-district, select one or more Target cells, and in subsequent step, notify first base station controller 2 with the relevant information of Target cell with the corresponding to be switched quantity of each Target cell, first base station controller 2 need not selected, as long as switch according to the indication of switching equipment 1, through above-mentioned switching, the load of the first sub-district A or recover normal perhaps has certain decline (to should all underload sub-districts add the situation that all can not satisfy the switching demand of the first sub-district A together).Concrete, can be according to the overload sub-district take the to be switched quantity sum that difference that the Radio Resource summation exceeds first threshold is determined to each underload sub-district.Usually, this difference is big more, and then determined to be switched quantity sum should be big more.
After this, the calculation element 10232 to be switched quantity that will calculate passes to described Indication message generating apparatus 10231;
Described Indication message generating apparatus 10231 is used to " mistake/underload sub-district to " to generate the corresponding business switch indicating information, the relevant information that described professional switch indicating information comprises described underload sub-district (for example, the load condition of cell ID and sub-district etc.), preferably, also comprise and the corresponding to be switched quantity in described underload sub-district, the professional switch indicating information of its generation is passed to an Indication message dispensing device 10233;
Described Indication message dispensing device 10233 is used to send described professional switch indicating information and comprises network controller and each described network controller in underload sub-district under the overload sub-district to network of relation controller network of relation controller, in the present embodiment, comprise the common first affiliated base station controller 2 of the first sub-district A and the second sub-district B.
According to a specific embodiment of the present invention, described switching instruction device 1023 can not comprise described calculation element 10232, when judgment means 1022 judge have one or more described underloads sub-district corresponding to an overload sub-district after, be about to its judged result and pass to described Indication message generating apparatus 10231, Indication message generating apparatus 10231 correspondingly generates a professional indication message relevant with its Target cell with the first sub-district A, and transfer to Indication message dispensing device 10233, by it described professional switch indicating information is sent to first base station controller 2, described professional handover information comprises that the relevant information of described underload sub-district (for example, comprises cell ID, wireless resource information etc.).Which what determine voluntarily to switch user by first base station controller 2 to underload sub-district.
According to a specific embodiment of the present invention, because there is adjacent even mutual partly overlapping situation in the minizone under the different BSC control, therefore, overload sub-district and underload sub-district may be in the control of different base station controller down.As, the overload sub-district is the 3rd sub-district P under 2 controls of first base station controller, the underload sub-district then be under the control of second base station controller 3 the 4th sub-district Q (we have supposed that these two sub-districts are adjacent) at this moment, 1 need of switching equipment send to second base station controller 3 by Indication message dispensing device 10233 simultaneously with professional indication message and get final product, that is to say that the network of relation controller comprises that the network controller under the 3rd sub-district P (overload sub-district) is i.e. second base station controller 3 of the affiliated network controller of base station controller and the 4th sub-district Q (underload sub-district).
According to a preferred embodiment of the present invention, the base station controller that can only allow to control some popular sub-district (sub-district that the load peak often occurs) reports the wireless resource information of this hot topic sub-district and associated cell thereof, switching equipment only needs the report message of these wireless resource information is operated like this, the present invention is realized with lower complexity, correspondingly, can by switching equipment write down the overload peak appears and the sub-district relevant information (for example, the number of times on cell ID, appearance load peak etc.), upgrade popular sub-district whereby neatly.
More than specific embodiments of the invention are described.It will be appreciated that the present invention is not limited to above-mentioned specific implementations, those skilled in the art can make various distortion or modification within the scope of the appended claims.

Claims (12)

1. one kind is used for the method that cell load is controlled in the switching equipment of cordless communication network, may further comprise the steps:
A. receive the resource indicator message from one or more network controllers, described every resource indicator message comprises the wireless resource information of a plurality of sub-districts of its corresponding network controller subordinate;
B. carry out joint-detection by wireless resource information, come the control of loading of described switching equipment subordinate's sub-district to each associated cell.
2. method according to claim 1 is characterized in that, described step b comprises:
-the wireless resource information of the described a plurality of sub-districts of extraction from described resource indicator message;
-according to the wireless resource information of described a plurality of sub-districts, judge whether to exist one or more overloads sub-district, wherein the summation of assigned radio resource of each overload sub-district is greater than a first threshold;
If have one or more overloads sub-district in-described a plurality of sub-districts, then judge in each associated cell of described each overload sub-district whether have one or more underloads sub-district, wherein the summation of assigned radio resource of each underload sub-district is less than one second threshold value;
If have one or more underloads sub-district in-described each associated cell, then indicate the network of relation controller between described each overload sub-district and the described one or more underloads sub-district related, to carry out the switching of customer service with it.
3. method according to claim 2 is characterized in that, the switch step that described indication network controller carries out customer service comprises,
-generating a professional switch indicating information, wherein said professional switch indicating information comprises the relevant information of described underload sub-district;
-described professional switch indicating information is sent to described network of relation controller, described network of relation controller comprises the affiliated network controller of network controller and described underload sub-district under the described overload sub-district.
4. method according to claim 3 is characterized in that, described indication step also comprises:
-according to the wireless resource information of described overload sub-district and underload sub-district, calculate a to be switched quantity, its expression will be switched to the number of services of underload sub-district by described overload sub-district;
Wherein, described professional switch indicating information also comprises described to be switched quantity.
5. according to each described method among the claim 1-4, it is characterized in that,
Described each associated cell comprises and each sub-district that the sub-district is adjacent;
Described wireless resource information comprises the summation of assigned radio resource of sub-district.
6. according to each described method among the claim 1-5, it is characterized in that,
Described to be switched quantity will be for will be switched to the number of users of underload sub-district by described overload sub-district.
7. one kind is used for the switching equipment that cell load is controlled in cordless communication network, comprising:
A receiving system is used to receive the resource indicator message from one or more network controllers of described switching equipment subordinate, and described every resource indicator message comprises the wireless resource information of a plurality of sub-districts of its corresponding network controller subordinate;
A control device is used for carrying out joint-detection by the wireless resource information to each associated cell, comes the control of loading of described switching equipment subordinate's sub-district.
8. switching equipment according to claim 7 is characterized in that, described control device comprises:
An extraction element is used for from the wireless resource information of the described a plurality of sub-districts of described resource indicator message extraction;
A judgment means is used for the wireless resource information according to described a plurality of sub-districts, judges whether to exist one or more overloads sub-district, and wherein the summation of assigned radio resource of each overload sub-district is greater than a first threshold; Also be used for, when having one or more overloads sub-district in described a plurality of sub-districts, judge in each associated cell of described overload sub-district whether have one or more underloads sub-district, wherein the summation of assigned radio resource of each underload sub-district is less than one second threshold value;
A switching instruction device is used for when there is one or more underloads sub-district in described each associated cell, and indication network of relation controller carries out the switching of customer service in described overload sub-district with described one or more underloads minizone related with it.
9. switching equipment according to claim 8 is characterized in that,
Described switching instruction device comprises:
An Indication message generating apparatus is used to generate a professional switch indicating information, and wherein said professional switch indicating information comprises the relevant information of described underload sub-district;
An Indication message dispensing device is used for described professional switch indicating information is sent to described network of relation controller, and described network of relation controller comprises the affiliated network controller of network controller and described underload sub-district under the described overload sub-district.
10. switching equipment according to claim 9, it is characterized in that, calculation element of described switching indication, be used for wireless resource information according to described overload sub-district and underload sub-district, calculate a to be switched number of services, it will be for will be switched to the number of services of its related underload sub-district by each overload sub-district;
Wherein, described professional switch indicating information also comprises described to be switched number of services.
11. according to each described switching equipment among the claim 7-10, it is characterized in that,
Described each associated cell comprises and each sub-district that the sub-district is adjacent;
Described wireless resource information comprises the summation of assigned radio resource of sub-district.
12. according to each described switching equipment among the claim 7-11, it is characterized in that,
Described to be switched quantity will be for will be switched to the number of users of underload sub-district by described overload sub-district.
CNA2006100267751A 2006-05-22 2006-05-22 Device and method for switching control via joint detection of multiple cell load Pending CN101080082A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006100267751A CN101080082A (en) 2006-05-22 2006-05-22 Device and method for switching control via joint detection of multiple cell load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006100267751A CN101080082A (en) 2006-05-22 2006-05-22 Device and method for switching control via joint detection of multiple cell load

Publications (1)

Publication Number Publication Date
CN101080082A true CN101080082A (en) 2007-11-28

Family

ID=38907250

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006100267751A Pending CN101080082A (en) 2006-05-22 2006-05-22 Device and method for switching control via joint detection of multiple cell load

Country Status (1)

Country Link
CN (1) CN101080082A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012083666A1 (en) * 2010-12-23 2012-06-28 中兴通讯股份有限公司 Method and device for optimizing load balance
CN102685776A (en) * 2011-03-08 2012-09-19 中兴通讯股份有限公司 Method for reducing cell load through CoMP technology and cell
CN102740360A (en) * 2011-04-12 2012-10-17 中兴通讯股份有限公司 Cell load control method and apparatus thereof
CN103428856A (en) * 2012-05-21 2013-12-04 中兴通讯股份有限公司 Method and system for achieving continuity of multimedia broadcasting multicasting service

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012083666A1 (en) * 2010-12-23 2012-06-28 中兴通讯股份有限公司 Method and device for optimizing load balance
CN102685776A (en) * 2011-03-08 2012-09-19 中兴通讯股份有限公司 Method for reducing cell load through CoMP technology and cell
CN102740360A (en) * 2011-04-12 2012-10-17 中兴通讯股份有限公司 Cell load control method and apparatus thereof
CN102740360B (en) * 2011-04-12 2016-08-03 中兴通讯股份有限公司 A kind of cell load control method and device
CN103428856A (en) * 2012-05-21 2013-12-04 中兴通讯股份有限公司 Method and system for achieving continuity of multimedia broadcasting multicasting service
CN103428856B (en) * 2012-05-21 2018-03-30 中兴通讯股份有限公司 Realize the successional method and system of multimedia broadcast multi-broadcasting business

Similar Documents

Publication Publication Date Title
CN1096206C (en) Low traffic handoff method for CDMA cellular network using different frequencies among base stations
US7864727B2 (en) Congestion control method for wireless communication system and base station control apparatus
CN103167568B (en) Method for handover control and device, the network equipment
CN100466822C (en) Method and apparatus for selecting target cell
CN1232131C (en) Back-up method and device for base station controller in radio access network
EP0768011A2 (en) Subscriber paging control in a mobile communication system
CN1511138A (en) Access parameter adaptation and packet data resource management using detailed mobile status information
CN1239391A (en) Method for determining execution time of inter-frequency hard handoff and establishing hard handoff environment
CN101273556A (en) Mobile communications cell changing procedure
CN102595529B (en) Switching method and switching system based on multipoint coordination
CN100531464C (en) Method of implementing high speed downlink sharing channel co-frequency cell handoff
CN101296459A (en) Measurement control method, user terminal, network side equipment and system
CN101080082A (en) Device and method for switching control via joint detection of multiple cell load
CN1276953A (en) Method for distributing capacity of transmission system in base station network
CN101175322A (en) Subdistrict selection method
CN101562850A (en) Method for admitting judgment during switching process as well as system and device thereof
CN101626605B (en) Method, system and device for switching wireless system
CN102065478B (en) Automatic optimization method and device of network load regulation target
CN101035353A (en) Radio resource multiplexing method and allocation method in the radio mobile communication system
CN101111060B (en) Method for adjacent area configuration optimization in wireless network surroundings
CN101170751B (en) A processing method, device and system for cluster system performance parameters
CN100389625C (en) Method of gathering statistics of channel resource occupancy in mobile communication system
CN102655654A (en) Telephone traffic statistics method and device as well as networking method and device
CN1184763C (en) Method for optimizing transmission resource in CDMA system
CN100399860C (en) Service wireless network subsystem repositioning method involving user terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20071128