CN101078195A CN 200710118164 CN200710118164A CN101078195A CN 101078195 A CN101078195 A CN 101078195A CN 200710118164 CN200710118164 CN 200710118164 CN 200710118164 A CN200710118164 A CN 200710118164A CN 101078195 A CN101078195 A CN 101078195A
Authority
CN
China
Prior art keywords
bridge
bridge pier
beam body
construction
ball pivot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710118164
Other languages
Chinese (zh)
Inventor
徐升桥
刘永锋
李国强
卢大兴
胡国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
China Railway Engineering Construction Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN 200710118164 priority Critical patent/CN101078195A/en
Publication of CN101078195A publication Critical patent/CN101078195A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a bridge and the construction method. The bridge comprises bridge pier and beam body. Horizontal rotary device is set between bridge pier and beam body. The method comprises manufacturing bridge pier, setting horizontal rotary device at the top of said bridge pier and accomplishing the construction for rotating beam body on the horizontal rotary device. By the technology project mentioned above, under the condition of higher bridge pier or larger cubage, the construction difficulty of bridge is decreased greatly and stability and safety of bridge construction can bridge rotation are guaranteed.

Description

Bridge and job practices thereof
Technical field
The present invention relates to a kind of bridge technology, relate in particular to a kind of rotating bridge and job practices thereof.
Background technology
Bridge may run into course lines such as highway in the operation, railway in erection process, therefore, in the bridge construction process, how need to solve under the situation that is not influencing highway, the normal operation of railway, finishes bridge erection.
At present, a kind of bridge is arranged, by the device of flatting turn being set between with bridge pier bottom and ground at the construction initial stage, make bridge pier and needing cross over the beam body in the course line zone beyond can be in the course line and finish construction in advance, rotate bridge pier and drive the beam body by the device of flatting turn then and rotate, cross over the course line, make the rotation place in place on the other end arrival opposite, course line of beam body, on permanent bridge pier or interim bridge pier, then, to flat turn device and to rotate the Liang Tiyi end at place in place fixing is finished bridge construction.
In realizing process of the present invention, the inventor finds that there is following problem at least in existing bridge construction:
1, because the bridge pier diameter is little, spandrel girder body, tower etc. to need the part of rotating, the pressure dispersal device need be set between bridge pier and tumbler, cause the bridge construction complexity, be unfavorable for construction;
When 2, the higher or bridge pier scale of construction was big when bridge pier, the weight of turning increased greatly, and causing rotating difficulty increases, and bridge pier is when higher, also can cause the poor stability of turning, and brought potential safety hazard for simultaneously the course line in the operation.
Summary of the invention
The purpose of the embodiment of the invention is the problem at the prior art existence, a kind of bridge and job practices thereof are proposed, with the bridge of realizing that a kind of beam body can rotate separately, guarantee higher at bridge pier or situation that the scale of construction is bigger under, stationarity and safety that the beam body rotates.
For achieving the above object, the embodiment of the invention provides a kind of bridge, comprises bridge pier and beam body, wherein, is provided with the device of flatting turn between described bridge pier and the beam body.By the technical program, bridge pier need not rotate, and only the beam body rotates around bridge pier, under or the situation that the scale of construction is bigger higher at bridge pier, greatly reduces the bridge construction difficulty, has guaranteed stationarity and safety that bridge construction and beam body rotate.
For achieving the above object, the embodiment of the invention also provides a kind of method for bridge construction, comprising:
The system bridge pier;
The device of flatting turn is set at described bridge pier top;
On the described device of flatting turn, finish the construction of waiting to change the beam body.
By the said method technical scheme, realized the preparation of the bridge that Liang Tike rotates separately, thereby guaranteed higher at bridge pier or situation that the scale of construction is bigger under, stationarity and safety that the beam body rotates.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Description of drawings
Fig. 1 is the structural representation of bridge embodiment of the present invention;
Fig. 2 is the structural representation of the device embodiment one that flats turn in the bridge of the present invention;
Fig. 3 is the top cross sectional view of Fig. 2;
Fig. 4 is the structural representation of the device embodiment two that flats turn in the bridge of the present invention;
Fig. 5 is the top cross sectional view of Fig. 4;
Fig. 6 is the flow chart of method for bridge construction of the present invention;
Fig. 7 is the bridge state variation schematic diagram in the method for bridge construction of the present invention.
Description of reference numerals:
1 Bridge pier 2 The beam body
21 Girder 22 Tower
3 The device of flatting turn 31 Sheave
32 Ball pivot 33 Segment
34a、34b Jack 35a、35b Drag cable counter-force seat
36 Locating shaft
41 Spike 42 Circuit
43 Jack counter-force seat
5 Drag cable 6 The course line
7 Ground 8 The closure section
81 Support 01~05 The bridge state
The specific embodiment
Fig. 1 is the structural representation of bridge embodiment of the present invention, bridge comprises bridge pier 1 and beam body 2, beam body 2 comprises girder 21 and tower 22, be provided with the device 3 of flatting turn between bridge pier 1 and the beam body 2, by the device 3 of flatting turn, beam body 2 can be to flat turn in the axle center with bridge pier 1, thereby under or the situation that the bridge pier scale of construction is bigger higher, only need the cant beam body, just can finish the bridge erection of top, course line at bridge pier, alleviated the scale of construction of turning greatly, thereby, under the situation that does not have the pressure dispersal device, guaranteed the safety of turning and rotating, simultaneously simplify bridge construction again, be convenient to the construction of bridge.
In the foregoing description, the beam body is different because of bridge type, and when bridge type was non-cable stayed bridge, the beam body only was a girder.
Fig. 2 is the structural representation of the device embodiment one that flats turn in the bridge of the present invention, and the device 3 of flatting turn comprises: sheave 31, ball pivot 32, segment 33, jack 34a, 34b, drag cable counter-force seat 35a, 35b, and locating shaft 36; Wherein, one group of jack 34a, drag cable counter-force seat 35a, one group of jack 34b, drag cable counter-force seat 35b, as shown in Figure 3.
Sheave 31 is fixed in beam body 2 bottoms, and sheave 31 bottoms are ball pivot 32 fixedly, and the convex surface of ball pivot 32 sinks in the segment 33; Locating shaft 36 is fixed in the center of the segment 33 at bridge pier 1 top, and ball pivot 32 is socketed on the locating shaft 36, can rotate around locating shaft 36; Jack 34a, 34b, drag cable counter-force seat 35a, 35b are fixed in the top of bridge pier 1, by starting jack 34a, the drag cable 5 of 34b traction casing on sheave 31, under the reaction force of drag cable counter-force seat 35a, 35b, pulling drag cable 5, under the pulling of drag cable, the ball pivot 32 of sheave 31 bottoms is that rotate in the axle center with locating shaft 31, and then drives sheave 31,2 rotations of beam body, has realized that the beam body rotates around bridge pier.
Fig. 4 is the structural representation of the device embodiment two that flats turn in the bridge of the present invention, in the present embodiment, the device of flatting turn also further comprises: spike 41, circuit 42, jack counter-force seat 43, and spike 41 is arranged at sheave 31 bottoms, has further increased the stability in beam body 2 rotation processes; Circuit 42 corresponding spikes 41 are arranged at the top of bridge pier 1, and as shown in Figure 5, circuit 42 has reduced the resistance that spike 41 rotation processes are subjected to through after lubricated; The place in place of flatting turn that pre-sets at bridge pier 1 top also can be provided with spacing Ka Liang, by moving ahead of prevention spike 41, and then stops sheave 31 to be rotated further, and makes beam body 2 stop at the position that pre-sets; Jack counter-force seat 43 is arranged at circuit 42 both sides, with auxiliary jack and the more accurate cant beam body of drag cable counter-force seat.
In the foregoing description, ball pivot is made up of the stack of polylith steel spherical plate, each spherical plate forms by the steel plate compacting, its back, the one side that promptly is fixed in sheave is provided with rib, prevented in processing, be out of shape in the transportation, and made things convenient for the location of ball pivot, strengthened being connected of ball pivot and surrounding concrete in beam body bottom.
In the foregoing description, the ball pivot surface also is inlaid with withstand voltage lubriation materials such as tetrafluoroethene sheet, and, also fill butter tetrafluoro powder between ball pivot and the segment, further reduce the coefficient of friction resistance of ball pivot in rotation process, increased the planarization or the harmony of segment load.
Fig. 6 is the flow chart of method for bridge construction of the present invention, and Fig. 7 is the bridge state variation schematic diagram in the method for bridge construction of the present invention, and wherein 01-05 is five different conditions in the bridge construction process.Build a bridge and cross over course line 6, specifically comprise:
Step 91, finish the construction of course line 6 outer bridge piers 1, the attitude 01 of seeing this;
Step 92, the device of flatting turn is set on bridge pier 1;
Step 93, on the device of flatting turn, set up beam body 2, the attitude 02 of seeing this, beam body 2 can be prefabricated, finished the construction of the bridge that beam body only can flat turn.
The beam body that sets up the bridge after finishing can be flatted turn and be crossed over course line 6, the attitude 03 of seeing this, and dismounting can be flatted turn behind the construction bracket that uses in the bridge construction process of beam body, and beam body 2 is across on the course line 6 by flatting turn; Further, before cant beam body 2, spacing Ka Liang is set on the device of flatting turn also, the position that Liang Tizai is pre-set stops operating; After beam body 2 turns to the position that pre-sets, the attitude 04 of seeing this, steel frame between welding sheave and the bridge pier top, and concreting is filled the space between the two, make the fixing no longer rotation of the device of flatting turn, and under the support of support 81, finish the construction of the closure section 8 of beam body 2 two ends and adjacent beams body, remove the suspension cable of beam body outermost end; The adjacent beams body is the 2 two ends load-bearing of beam body by suspension cable, striking 81, the attitude 05 of seeing this.
It should be noted last that, above embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not break away from the spirit and scope of technical solution of the present invention.

Claims (10)

1, a kind of bridge comprises bridge pier and beam body, it is characterized in that, is provided with the device of flatting turn between described bridge pier and the beam body.
2, bridge as claimed in claim 1 is characterized in that, the described device of flatting turn comprises:
One sheave is fixed in described beam body bottom;
One ball pivot is fixed in described sheave bottom;
One segment is arranged at described bridge pier top, and is corresponding with described ball pivot;
At least one group of jack and drag cable counter-force seat all are arranged at described bridge pier top;
One locating shaft is fixed in described bridge pier top, and is connected with described ball pivot is rotating.
3, bridge as claimed in claim 2 is characterized in that, described sheave bottom also is provided with a plurality of spikes.
4, bridge as claimed in claim 3 is characterized in that, described bridge pier top also is provided with a circuit, and is corresponding with described spike.
5, bridge as claimed in claim 3 is characterized in that, described bridge pier top also comprises and is provided with spacing Ka Liang.
6, bridge as claimed in claim 3 is characterized in that, the circuit both sides at described bridge pier top also are provided with jack counter-force seat.
As each described bridge of claim 3-6, it is characterized in that 7, described ball pivot is made up of the stack of polylith steel spherical plate, the one side that is fixed in sheave is provided with rib.
8, as each described bridge of claim 3-6, it is characterized in that, be filled with withstand voltage lubriation material between described ball pivot and the segment.
9, a kind of method for bridge construction is characterized in that, comprising:
The system bridge pier;
The device of flatting turn is set at described bridge pier top;
On the described device of flatting turn, finish the construction of waiting to change the beam body.
10, method for bridge construction as claimed in claim 9 is characterized in that, also comprises:
Remove construction bracket;
At described bridge pier top spacing Ka Liang is set;
Rotate the described device of flatting turn by trailer system, wait to change the beam body and turn to spacing Ka Liangchu described;
The fixing described device of flatting turn.
CN 200710118164 2007-06-29 2007-06-29 Bridge and construction method thereof Pending CN101078195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710118164 CN101078195A (en) 2007-06-29 2007-06-29 Bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710118164 CN101078195A (en) 2007-06-29 2007-06-29 Bridge and construction method thereof

Publications (1)

Publication Number Publication Date
CN101078195A true CN101078195A (en) 2007-11-28

Family

ID=38905839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710118164 Pending CN101078195A (en) 2007-06-29 2007-06-29 Bridge and construction method thereof

Country Status (1)

Country Link
CN (1) CN101078195A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031758A (en) * 2011-01-14 2011-04-27 中铁大桥局集团有限公司 Simply supported structure bridge horizontal swivel construction system and method
CN102808376A (en) * 2012-08-23 2012-12-05 新津腾中筑路机械有限公司 Bridge rotation construction support and bridge construction method
CN103243657A (en) * 2013-04-24 2013-08-14 中铁工程设计咨询集团有限公司 Pier-top rotator structure of bridge and method for constructing connector
CN104499436A (en) * 2014-12-23 2015-04-08 北京市市政工程设计研究总院有限公司 Anti-torque balancing pier for live load of swivel bridge
CN104562939A (en) * 2014-12-22 2015-04-29 中铁四局集团建筑工程有限公司 Membrane frame for constructing lower spherical segment of swivel bridge rotary table and construction method
CN107700334A (en) * 2017-10-23 2018-02-16 中国铁路设计集团有限公司 A kind of novel longitudinal constrains system
CN107964877A (en) * 2017-11-23 2018-04-27 中铁九局集团有限公司 The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage and its construction method
CN108677749A (en) * 2018-01-18 2018-10-19 重庆溢权科技发展有限公司 A kind of PLC frequency-changing control systems of Bridge Rotation Construction Technique
CN108774955A (en) * 2018-01-18 2018-11-09 重庆溢权科技发展有限公司 A kind of Bridge Rotation Construction Technique intelligence control system
CN113718664A (en) * 2021-09-15 2021-11-30 中铁一局集团有限公司 Construction method for constructing cross-business line cover beam top rotating body of unequal-span steel box girder cable-stayed bridge
CN113834678A (en) * 2021-09-23 2021-12-24 中铁十一局集团第一工程有限公司 Multipoint support type swivel bridge model test device and test method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031758A (en) * 2011-01-14 2011-04-27 中铁大桥局集团有限公司 Simply supported structure bridge horizontal swivel construction system and method
CN102031758B (en) * 2011-01-14 2013-02-13 中铁大桥局集团有限公司 Simply supported structure bridge horizontal swivel construction system and method
CN102808376A (en) * 2012-08-23 2012-12-05 新津腾中筑路机械有限公司 Bridge rotation construction support and bridge construction method
CN103243657A (en) * 2013-04-24 2013-08-14 中铁工程设计咨询集团有限公司 Pier-top rotator structure of bridge and method for constructing connector
CN104562939A (en) * 2014-12-22 2015-04-29 中铁四局集团建筑工程有限公司 Membrane frame for constructing lower spherical segment of swivel bridge rotary table and construction method
CN104562939B (en) * 2014-12-22 2016-08-24 中铁四局集团建筑工程有限公司 Under bridge turntable of turning segment construction tire film frame and construction method
CN104499436A (en) * 2014-12-23 2015-04-08 北京市市政工程设计研究总院有限公司 Anti-torque balancing pier for live load of swivel bridge
CN104499436B (en) * 2014-12-23 2016-03-30 北京市市政工程设计研究总院有限公司 The antitorque balance pier of swivel bridges mobile load
CN107700334A (en) * 2017-10-23 2018-02-16 中国铁路设计集团有限公司 A kind of novel longitudinal constrains system
CN107964877A (en) * 2017-11-23 2018-04-27 中铁九局集团有限公司 The asymmetric mixing girder stayed-cable bridge horizontal swing structure of super-tonnage and its construction method
CN108677749A (en) * 2018-01-18 2018-10-19 重庆溢权科技发展有限公司 A kind of PLC frequency-changing control systems of Bridge Rotation Construction Technique
CN108774955A (en) * 2018-01-18 2018-11-09 重庆溢权科技发展有限公司 A kind of Bridge Rotation Construction Technique intelligence control system
CN108677749B (en) * 2018-01-18 2024-02-06 中铁二十三局集团第二工程有限公司 PLC frequency conversion control system for bridge swivel construction
CN113718664A (en) * 2021-09-15 2021-11-30 中铁一局集团有限公司 Construction method for constructing cross-business line cover beam top rotating body of unequal-span steel box girder cable-stayed bridge
CN113718664B (en) * 2021-09-15 2023-03-03 中铁一局集团有限公司 Construction method for constructing cross-business line cover beam top rotating body of unequal-span steel box girder cable-stayed bridge
CN113834678A (en) * 2021-09-23 2021-12-24 中铁十一局集团第一工程有限公司 Multipoint support type swivel bridge model test device and test method
CN113834678B (en) * 2021-09-23 2023-10-24 中铁十一局集团第一工程有限公司 Multi-point support type swivel bridge model test device and test method

Similar Documents

Publication Publication Date Title
CN101078195A (en) Bridge and construction method thereof
CN1799983A (en) Method for kingsize gate-type crane translational transfer and its rotary device
US9003720B2 (en) Method and apparatus for lifting and leveling a concrete panel
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN102561217B (en) Old bridge transformation construction control method based on modular hydraulic lifting power flat car
US20100186313A1 (en) Slab Lift Bracket
CN101851965A (en) Reinforced concrete sway wall, sway wall assembly and production method thereof
CN1131975A (en) Concrete building frame construction method
JP6856284B2 (en) Replaceable high energy dissipation prefabricated prestressed shear wall with built-in steel braces
CN2719998Y (en) Climbing device of hydraulic automatic climbing imitation system
CN101078198A (en) Steel box beam erection method for self-anchored suspension bridge
CN203383221U (en) Foundation pit support structure formed by armoured concrete and steel structure
CN1082598C (en) Method for jacking and correcting deviation of building broken pillar
CN102787574A (en) Shallow foundation movable anticollision device
CN102635162A (en) Combined torsional reticulated shell and construction method thereof
CN103848333A (en) Portal hoisting system and application method thereof
CN2752372Y (en) Finit cohesive steel strand for integrated prestress assembling plate-column structure
EP4133130A1 (en) Method for producing a roadway deck for a bridge
CN112746559B (en) Road and bridge guard plate prefabricated structure, prefabricated unit and construction method
CN102311061B (en) Reaction wheel device and electric hoist using same
CN1073190C (en) Method of shifting frame house
CN2773222Y (en) Structural member for fixing heads of anchor or cable
CN1811130A (en) Controlled deformation method for double-layer structure circular tunnel
CN1916363A (en) Method of suiting to bulk value of differential settlement or slippage of stratum in use for shield tunnel
CN218454352U (en) Rotary system for driving rotary bridge to rotate by using gears

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20071128