CN101077935A - Process for preparing high elasticity modified asphalt - Google Patents

Process for preparing high elasticity modified asphalt Download PDF

Info

Publication number
CN101077935A
CN101077935A CN 200710027545 CN200710027545A CN101077935A CN 101077935 A CN101077935 A CN 101077935A CN 200710027545 CN200710027545 CN 200710027545 CN 200710027545 A CN200710027545 A CN 200710027545A CN 101077935 A CN101077935 A CN 101077935A
Authority
CN
China
Prior art keywords
weight
asphalt
matrix pitch
modified asphalt
sbs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710027545
Other languages
Chinese (zh)
Inventor
张肖宁
陈伟三
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG LUXIANG CO Ltd
Original Assignee
GUANGDONG LUXIANG CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG LUXIANG CO Ltd filed Critical GUANGDONG LUXIANG CO Ltd
Priority to CN 200710027545 priority Critical patent/CN101077935A/en
Publication of CN101077935A publication Critical patent/CN101077935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The process of producing high elasticity modified asphalt includes the following steps: mixing matrix asphalt, arene oil in 0.5-20 wt% of the asphalt and furfural oil in 1-10 wt% of the asphalt at 100-140 deg.c; adding SBS in 6-10 wt% of the asphalt and heating to 160-200 deg.c to react for 100-150 min; adding stabilizer comprising sulfur 40-60 wt% and dicumyl peroxide 40-60 wt% and in 0.1-1.6 wt% of the asphalt to react for 30-60 min; and high speed shearing for 10-60 min each ton. The technological process of the present invention has sufficient reaction of the components and high product quality, and the product has excellent high temperature and low temperature performance and powerful elastic recovery capacity.

Description

A kind of production technique of high elasticity modified asphalt
Technical field
The present invention relates to a kind of production technique of high elasticity modified asphalt.
Background technology
When present old cement pavement adopts flexible overlay or old asphalt pavement to adopt the asphalt overlay technology, may cause that asphaltum concrete cover-layer produces reflection crack or reflection crack because of the disease defective or the old cement concrete slab seam of underlying stratum; Cause that because of drying shrinkage, the temperature of semi-rigid material contracts basic unit produces the crack when semi-rigid type base is adopted on new road, and reflex on the asphalt roofing.In order to solve reflection crack, usually adopt the stress absorbing layer technology, high elasticity modified asphalt is the agglutinate that is applied to antireflection crack stress absorbing layer, have higher high-temperature viscosity and low-temperature ductility, promptly compare and have better high-temperature stability, low temperature anti-fatigue performance and elastic recovery capability with plain asphalt or modifying asphalt commonly used.
The patent No. is that (publication number: Chinese invention patent CN1247741C) discloses a kind of method for preparing modifying asphalt with high aromatic oil to ZL03109584.4, this method adopts 10~25wt% high aromatic oil, the frivolous oil of the propane deasphalting of 65~85wt% is extracted the vacuum residuum of oil and 5~10wt% out or is adopted 10~40wt% high aromatic oil, 30~45wt% oxidized bitumen oil and 30~45wt% vacuum residuum, under 100~160 ℃, through static mixer, mix and stirred 20~80 minutes, preparation blending matrix pitch; Adopt the matrix pitch of 92~97wt% and the SBS of 3~8wt%, at 170~240 ℃ of down cuts, velocity of shear is 2500~6000 rev/mins, and shear time is 20~150 minutes, obtains the modifying asphalt that low-temperature ductility and softening temperature all are better than plain asphalt.The shortcoming of this method at first need to be to concoct the preparation matrix pitch with high aromatic oil and the asphalt stock through selecting, according to the description of this patent document as can be known, adopt the asphalt stock of this patented method to only limit to third diasphaltene or oxidized bitumen, make its range of application very narrow, be unfavorable for industrialized production.Secondly, this patented method is mixed direct shear afterwards with matrix pitch with SBS, can make that the reaction of matrix pitch and SBS is insufficient, and promptly SBS disperses inhomogeneously in pitch, influences the stability of product.
Number of patent application is that 200410053771.3 (publication number: Chinese invention patent application CN1733832A) discloses a kind of memory type SBS modifying asphalt and production method, this product is formed by SBS modified asphalt agglomerate 3~8%, matrix pitch 90~95%, chemical stabilizer 0.1~2% uniform mixing at least, wherein, SBS modified asphalt agglomerate component is: SBS 60~90%, thermoplastic resin PE 5~30%, phase solvent 5~30%; Chemical stabilizer is selected polysulfide or peroxide compound for use, technical process is earlier with SBS, PE, phase solvent extruding pelletization on twin screw extruder proportionally, then SBS modified asphalt agglomerate 3~8%, matrix pitch 90~95%, chemical stabilizer 0.1~2% are mixed at stirring cleavage reaction still, processing condition are 150~170 ℃ of temperature, the stirring velocity of shear is 120~1440rpm, 20~60 minutes time.The technical process of this patent application is to make modified asphalt agglomerate earlier, again with master batch and matrix pitch, that chemical stabilizer stirs shear-mixed is even, technology is more loaded down with trivial details, and the sufficient reacting whether in technical process of the multiple composition in the modified asphalt agglomerate, also can influence final quality product.
Summary of the invention
The object of the present invention is to provide a kind of production technique of high elasticity modified asphalt, this process application scope is wide, and each component reaction is abundant, and product high temperature, low-temperature performance are superior, and elastic recovery capability is strong.
The present invention adopts following steps to realize:
Step 1: 100~140 ℃ matrix pitches and fragrant hydrocarbon ils, furfural extract oil are mixed in proportion stirring, and the weight of fragrant hydrocarbon ils is equivalent to 0.5~20% of matrix pitch weight, and the weight of furfural extract oil is equivalent to 1~10% of matrix pitch weight; Add the SBS mixing that is equivalent to matrix pitch weight 6~10% again, be warming up to 160~200 ℃, 100~150 minutes reaction times;
Step 2: add the stablizer that is equivalent to matrix pitch weight 1~16% ‰, reacted 30~60 minutes, the compositions in weight percentage of stablizer is:
Sulphur 40~60%
Dicumyl peroxide 40~60%;
Step 3: reacted material is carried out high speed shear form.
Preferred shearing rate is 10~60 minutes/ton, fragrance divides content greater than 50% in the fragrance hydrocarbon ils, 100 ℃ of viscosity are 10~200cp, and the molecular weight ranges of SBS is more than 100000, and its structure comprises the mixture of line style, star-like or several styrene-butadiene-styrene block copolymers.
The present invention adopts fragrant hydrocarbon ils, furfural extract oil and SBS and the matrix pitch mixing of macromolecule, improved the intermiscibility of SBS and matrix pitch, SBS can be scattered in the pitch preferably, the needs of having avoided low molecular weight solvent to bring reclaim solvent, long, the residue problem of technical process, and technology of the present invention is applicable to various matrix pitches, have wide range of applications, be beneficial to industrialized production.Technology of the present invention has been added chemical stabilizer after SBS and matrix pitch mixing, make the out-phase chemically crosslinked takes place between polymkeric substance and the pitch, can improve the stability of modifying asphalt greatly.The Production Flow Chart of technology of the present invention makes each component reaction abundant, has guaranteed quality product, makes product high temperature, low-temperature performance superior, and elastic recovery capability is strong.
According to the modifying asphalt that the present invention produces, estimate its every index such as following table by analysis:
Project Index
Penetration degree (25 ℃ of 100g 5s) 0.1mm <70
Softening temperature ℃ >65
Ductility (5 ℃ of 5cm/min) cm >50
Solubleness % >99
Viscosity (135 ℃) pa.s <3.5
Flash-point ℃ >230
Recovery of elasticity (in the 5min, 25 ℃) >95%
Segregation (48h) <6℃
Residue behind the rotating thin film baking oven
Mass loss % <1.0
Ductility (5 ℃ of 5cm/min) cm >30
Penetration ratio (25 ℃) % >60
Recovery of elasticity (in the 5min, 25 ℃) >75%
Embodiment
Embodiment 1~4
Numbering Matrix pitch The fragrance hydrocarbon ils Furfural extract oil (SBS) Mixed stabilizer
1 1 4% 0 8% 0.35%
2 1 4% 2% 8% 0.35%
3 1 4% 3% 8% 0.35%
4 1 4% 4% 8% 0.35%
Annotate: the consumption of mixed stabilizer, styrene-butadiene block copolymer (SBS) and fragrant hydrocarbon ils is benchmark with the matrix pitch.
Matrix pitch uses No. 70 pitches of Tai Puke, and Sulfur in the mixed stabilizer and dicumyl peroxide respectively account for 50%, and SBS uses LGS01.Technical process is: the matrix pitch of certain mass is injected reactor, be warming up to 120 ℃.Add furfural extract oil in last table ratio, 4% fragrant hydrocarbon ils, the SBS of adding 8% is heated to 180 ℃, swelling 120 minutes, the mixed stabilizer of adding 0.35% was sheared 30 minutes, and reheat stirred 30 minutes, obtained finished product.Its key technical indexes is as follows:
Numbering Softening temperature/℃ Penetration degree/0.1mm 5 ℃ of ductility/cm 5 minutes recovery of elasticity 5 minutes recovery of elasticity (the aging back of TFOT)
1 96 52.2 47 85 73
2 96.4 58.2 42.4 95 77
3 89.4 64.5 65 96 79
4 95 63 60 97 80
Embodiment 5~6
Numbering Matrix pitch The fragrance hydrocarbon ils Furfural extract oil (SBS) Mixed stabilizer
5 1 4% 2% 7% 0.35%
6 1 4% 2% 8.5% 0.35%
Annotate: the consumption of mixed stabilizer, styrene-butadiene block copolymer (SBS) and fragrant hydrocarbon ils is benchmark with the matrix pitch.
Matrix pitch uses No. 70 pitches of Tai Puke, and Sulfur in the mixed stabilizer and dicumyl peroxide respectively account for 50%, and SBS uses LG501.Technical process is: the matrix pitch of certain mass injected reactor, is warming up to 120 ℃ and adds 2% furfural extract oil, and 4% fragrant hydrocarbon ils.Add SBS in last table ratio, be heated to 180 ℃, swelling 120 minutes, the mixed stabilizer of adding 0.35% was sheared 30 minutes, and reheat stirred 30 minutes, obtained finished product.
Its key technical indexes is as follows:
Numbering Softening temperature/℃ Penetration degree/0.1mm 5 ℃ of ductility/cm 5 minutes recovery of elasticity 5 minutes recovery of elasticity (the aging back of TFOT)
5 85 62.3 45 95 75
6 100 64 56 96 78
Embodiment 7
Numbering Matrix pitch The fragrance hydrocarbon ils Furfural extract oil (SBS) Mixed stabilizer
7 1 4% 2% 7% 0.4%
Annotate: the consumption of mixed stabilizer, styrene-butadiene block copolymer (SBS) and fragrant hydrocarbon ils is benchmark with the matrix pitch.
Matrix pitch uses No. 70 pitches of Tai Puke, and Sulfur in the mixed stabilizer and dicumyl peroxide respectively account for 50%, and SBS uses LG501.Technical process is: the matrix pitch of certain mass injected reactor, is warming up to 120 ℃ and adds 2% furfural extract oil, and 4% fragrant hydrocarbon ils.Add 7%SBS, be heated to 180 ℃, swelling 120 minutes, the mixed stabilizer of adding 0.4% was sheared 30 minutes, and reheat stirred 30 minutes, obtained finished product.
Its key technical indexes is as follows:
Numbering Softening temperature/℃ Penetration degree/0.1mm 5 ℃ of ductility/cm 5 minutes recovery of elasticity 5 minutes recovery of elasticity (the aging back of TFOT)
7 92 61.6 48.5 95 76

Claims (4)

1, a kind of production technique of high elasticity modified asphalt is characterized in that: adopt following steps
Step 1: 100~140 ℃ matrix pitches and fragrant hydrocarbon ils, furfural extract oil are mixed in proportion stirring, and the weight of fragrant hydrocarbon ils is equivalent to 0.5~20% of matrix pitch weight, and the weight of furfural extract oil is equivalent to 1~10% of matrix pitch weight; Add the SBS mixing that is equivalent to matrix pitch weight 6~10% again, be warming up to 160~200 ℃, 100~150 minutes reaction times;
Step 2: add the stablizer that is equivalent to matrix pitch weight 1~16 ‰, reacted 30~60 minutes, the compositions in weight percentage of stablizer is:
Sulphur 40~60%
Dicumyl peroxide 40~60%;
Step 3: reacted material is carried out high speed shear form.
2, the production technique of a kind of high elasticity modified asphalt according to claim 1 is characterized in that: the shearing rate of step 3 is 10~60 minutes/ton.
3, the production technique of a kind of high elasticity modified asphalt according to claim 1 is characterized in that: fragrance branch content is 10~200cp greater than 50%, 100 ℃ of viscosity in the described fragrant hydrocarbon ils.
4, the production technique of a kind of high elasticity modified asphalt according to claim 1, it is characterized in that: the molecular weight ranges of described SBS is more than 100000, and its structure comprises the mixture of line style, star-like or several styrene-butadiene-styrene block copolymers.
CN 200710027545 2007-04-13 2007-04-13 Process for preparing high elasticity modified asphalt Pending CN101077935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710027545 CN101077935A (en) 2007-04-13 2007-04-13 Process for preparing high elasticity modified asphalt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710027545 CN101077935A (en) 2007-04-13 2007-04-13 Process for preparing high elasticity modified asphalt

Publications (1)

Publication Number Publication Date
CN101077935A true CN101077935A (en) 2007-11-28

Family

ID=38905615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710027545 Pending CN101077935A (en) 2007-04-13 2007-04-13 Process for preparing high elasticity modified asphalt

Country Status (1)

Country Link
CN (1) CN101077935A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457023B (en) * 2007-12-12 2010-11-03 中国石油天然气股份有限公司 Method for preparing polymer modified asphalt by one-step method
CN102040848A (en) * 2010-12-27 2011-05-04 路翔股份有限公司 SBS modified asphalt prepared from low aromatics content petroleum asphalt and preparation method thereof
CN102391612A (en) * 2011-10-20 2012-03-28 河南万里路桥集团有限公司 Anionic aqueous colorized road surface crack sealing material and preparation process thereof
CN103044933A (en) * 2011-10-17 2013-04-17 中国石油天然气股份有限公司 Polymer modified asphalt stabilizer composition
CN103044930A (en) * 2011-10-17 2013-04-17 中国石油化工股份有限公司 Aging-resistant caulking filling material and preparation method thereof
CN103044932A (en) * 2011-10-17 2013-04-17 中国石油天然气股份有限公司 Method for preparing modified asphalt by using raw material with low asphaltene content
CN103374229A (en) * 2012-04-13 2013-10-30 中国石油天然气股份有限公司 Stabilizer for SBS modified asphalt and preparation method thereof
CN103374230A (en) * 2012-04-13 2013-10-30 中国石油天然气股份有限公司 Preparation method of SBS modified asphalt
WO2014029372A3 (en) * 2012-08-22 2014-04-10 Corporacion Para La Investigacion Y Desarrollo De Asfaltos En El Sector Transporte E Industrial-Corasfaltos Asphalt modified with an sbs/mmwcnt nanocomposite and production method thereof
CN108530923A (en) * 2018-04-28 2018-09-14 广东诚泰投资有限公司 A kind of high-temperature stability pitch
CN108690359A (en) * 2018-06-04 2018-10-23 长安大学 A kind of response type SBS compounding high-viscosity high-elasticity modified pitch and preparation method
CN108948753A (en) * 2017-05-17 2018-12-07 中路高科(北京)公路技术有限公司 A kind of warm mix high adhered modification pitch and its preparation and application
CN111218121A (en) * 2018-11-23 2020-06-02 中国石油天然气股份有限公司 Polymer modified asphalt cement and preparation method thereof

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457023B (en) * 2007-12-12 2010-11-03 中国石油天然气股份有限公司 Method for preparing polymer modified asphalt by one-step method
CN102040848B (en) * 2010-12-27 2014-01-08 路翔股份有限公司 SBS modified asphalt prepared from low aromatics content petroleum asphalt and preparation method thereof
CN102040848A (en) * 2010-12-27 2011-05-04 路翔股份有限公司 SBS modified asphalt prepared from low aromatics content petroleum asphalt and preparation method thereof
CN103044932A (en) * 2011-10-17 2013-04-17 中国石油天然气股份有限公司 Method for preparing modified asphalt by using raw material with low asphaltene content
CN103044933A (en) * 2011-10-17 2013-04-17 中国石油天然气股份有限公司 Polymer modified asphalt stabilizer composition
CN103044930A (en) * 2011-10-17 2013-04-17 中国石油化工股份有限公司 Aging-resistant caulking filling material and preparation method thereof
CN103044933B (en) * 2011-10-17 2015-05-13 中国石油天然气股份有限公司 Polymer modified asphalt stabilizer composition
CN103044932B (en) * 2011-10-17 2015-08-19 中国石油天然气股份有限公司 Method for preparing modified asphalt by using raw material with low asphaltene content
CN102391612B (en) * 2011-10-20 2013-03-13 许昌金欧特沥青股份有限公司 Anionic aqueous colorized road surface crack sealing material and preparation process thereof
CN102391612A (en) * 2011-10-20 2012-03-28 河南万里路桥集团有限公司 Anionic aqueous colorized road surface crack sealing material and preparation process thereof
CN103374230B (en) * 2012-04-13 2015-09-23 中国石油天然气股份有限公司 Preparation method of SBS modified asphalt
CN103374229A (en) * 2012-04-13 2013-10-30 中国石油天然气股份有限公司 Stabilizer for SBS modified asphalt and preparation method thereof
CN103374230A (en) * 2012-04-13 2013-10-30 中国石油天然气股份有限公司 Preparation method of SBS modified asphalt
CN103374229B (en) * 2012-04-13 2015-09-23 中国石油天然气股份有限公司 Stabilizer for SBS modified asphalt and preparation method thereof
WO2014029372A3 (en) * 2012-08-22 2014-04-10 Corporacion Para La Investigacion Y Desarrollo De Asfaltos En El Sector Transporte E Industrial-Corasfaltos Asphalt modified with an sbs/mmwcnt nanocomposite and production method thereof
US9353292B2 (en) 2012-08-22 2016-05-31 Corporacion Para La Investigacion Y Desarrollo De Asfaltos En El Sector Transporte E Industrial-Corasfaltos Asphalt modified with an SBS/MMWCNT nanocomposite and production method thereof
CN108948753A (en) * 2017-05-17 2018-12-07 中路高科(北京)公路技术有限公司 A kind of warm mix high adhered modification pitch and its preparation and application
CN108948753B (en) * 2017-05-17 2021-03-16 中路高科(北京)公路技术有限公司 Warm-mixed high-viscosity modified asphalt and preparation and application thereof
CN108530923A (en) * 2018-04-28 2018-09-14 广东诚泰投资有限公司 A kind of high-temperature stability pitch
CN108690359A (en) * 2018-06-04 2018-10-23 长安大学 A kind of response type SBS compounding high-viscosity high-elasticity modified pitch and preparation method
CN111218121A (en) * 2018-11-23 2020-06-02 中国石油天然气股份有限公司 Polymer modified asphalt cement and preparation method thereof

Similar Documents

Publication Publication Date Title
CN101077935A (en) Process for preparing high elasticity modified asphalt
CN100543114C (en) A kind of production technique of high-viscosity modified asphalt
CN100595234C (en) Bitumen compositions and preparation method thereof
US5719215A (en) Treatment of rubber to form bituminous compositions
CN103773008B (en) A kind of high-viscosity modified asphalt and preparation method thereof
CN102660125B (en) Preparation method of waste rubber modified emulsified asphalt
CN104693819A (en) Composite-SBS (Styrene Butadiene Styrene block polymer)-particle asphalt modifier with storage stability and aging resistance and preparation method thereof
CN101074321A (en) Road-surface asphalt modified additive at normal temperature and its production
CN104591605A (en) Warm-mix asphalt mixture and preparation method thereof
CN104497598B (en) A kind of paste rubber and the preparation method of SBS composite modified asphalt
CN103773009B (en) A kind of preparation method of high-viscosity modified asphalt
CN104710134B (en) A kind of stable storing, ageing-resistant particle modified bituminous concretes of composite S BS and preparation method thereof
CN1213106C (en) Modified asphalt and preparing method thereof
CN1986646A (en) Asphalt composition and its preparing method
CN104693821A (en) Bituminous mixture using DVS (direct vat set) high-adhesion modifier and preparation method thereof
CN110922775A (en) Buton rock asphalt modifier based on environment-friendly rubber powder and preparation method and application thereof
CN109467945A (en) A kind of high viscous extraordinary composite modified asphalt lotion and preparation method thereof
CN104693823A (en) Direct-vat type high-adhesion bituminous mixture modifier and preparation method thereof
CN102443239A (en) Oil-resistant road asphalt modifier and preparation method thereof
CN109593371A (en) Road asphalt modifier and modified pavement asphalt and preparation method thereof and asphalt
CN112898595B (en) Anionic emulsified asphalt and preparation method thereof
CN1896143A (en) Thermal-storage-stabilized rubber-powdery asphalt composition and its preparation
CN1765964A (en) Normal temperature modification additive for pavement asphalt and its preparation method and uses
CN1342726A (en) Method for preparing modified coal tar pitch road building oil
CN114213852B (en) Waste HIPS (high impact polystyrene) -based regenerated alloy material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20071128