CN101071151B - Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method - Google Patents

Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method Download PDF

Info

Publication number
CN101071151B
CN101071151B CN2006100177539A CN200610017753A CN101071151B CN 101071151 B CN101071151 B CN 101071151B CN 2006100177539 A CN2006100177539 A CN 2006100177539A CN 200610017753 A CN200610017753 A CN 200610017753A CN 101071151 B CN101071151 B CN 101071151B
Authority
CN
China
Prior art keywords
zero
relay
reactor
turn
sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2006100177539A
Other languages
Chinese (zh)
Other versions
CN101071151A (en
Inventor
杨恢宏
张克元
张项安
李瑞生
郭宝甫
姚晴林
吴双惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuji Group Co Ltd
XJ Electric Co Ltd
Original Assignee
Xuji Group Co Ltd
XJ Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuji Group Co Ltd, XJ Electric Co Ltd filed Critical Xuji Group Co Ltd
Priority to CN2006100177539A priority Critical patent/CN101071151B/en
Publication of CN101071151A publication Critical patent/CN101071151A/en
Application granted granted Critical
Publication of CN101071151B publication Critical patent/CN101071151B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

This invention involves a ratio of the rate of zero-sequence direction relay measurement reactor inter-turn fault method, including the following steps: a. movement of tectonic relay function F1 constructed relay system Momentum function F2 ; b. Order F3 = F1 - F2; c. Measurement Reactor zero-sequence current I0 and into the function F; d.; judgment whether F3 >= 0 E. When F3> 0:00, concluded that inter-turn reactor fault relay action. By analyzing the invention reactor malfunctions zero sequence voltage and zero-sequence current phase, the rate of tectonic than zero sequence direction of Relay equation and tectonic movements than fixed-rate zero-sequence direction relay braking capacity equation, the method can Relay in a reactor internal inter-turn brake failure zero, movement of largeexternal reactor in single-phase ground fault occurred when braking tremendous volume of movements of zero, so as to solve the reactor failure in the inter-turn the sensitivity and reliability problems.

Description

Measure the method for inductor turn-to-turn fault than width of cloth formula zero sequence direction relay
Technical field
The present invention relates to electricity field, relate in particular to a kind of method of measuring inductor turn-to-turn fault than width of cloth formula zero sequence direction relay.
Background technology
Along with the electric pressure of transmission line of electricity is more and more higher; electric system is had higher requirement to the shunt reactor turn-to-turn fault protection of high pressure, extra high voltage network, and the zero sequence power direction of reactor protection at present can not satisfied the requirement of system to the inductor turn-to-turn fault protection aspect sensitivity and the reliability.
Summary of the invention
Task of the present invention is to propose a kind of method of measuring inductor turn-to-turn fault than width of cloth formula zero sequence direction relay, it is zero that this method can make relay braking amount when the inner generation of reactor turn-to-turn fault, actuating quantity is very big, the braking amount is very big when the outside generation of reactor singlephase earth fault, actuating quantity is zero, thus sensitivity and integrity problem when solving reactor generation turn-to-turn fault.
Operation equation of phase relation structure of residual voltage and zero-sequence current when to achieve the above object of the invention, the present invention utilizes inner turn-to-turn fault of reactor and outside singlephase earth fault than width of cloth formula zero sequence direction relay.Technical scheme of the present invention is: a kind of method than width of cloth formula zero sequence direction relay measurement inductor turn-to-turn fault, this method comprises the steps:
A. construct the actuating quantity function of relay F 1 = | 3 U · 0 + 3 I · 0 Z L 0 | , The braking flow function of structure relay F 2 = | 3 U · 0 + 3 I · 0 Z S 0 | ;
B. make F 3=F 1-F 2:
C. measure the zero-sequence current of reactor
Figure G2006100177539D00021
And bring function F into
D.: judge F 3〉=0?
E. work as F 3, conclude inductor turn-to-turn fault, the actuating of relay at>0 o'clock.
Than the operation equation of the width of cloth formula zero sequence direction relay Z that need adjust L0, Z S0, Z wherein L0Be the nameplate parameter of reactor, Z S0Be the zero-sequence reactance of system, generally adjusting is Z S0=(0-1.0) Z L0
The phase relation of residual voltage and zero-sequence current when the present invention passes through to analyze the reactor fault, structure moves zero sequence direction relay braking amount equation than width of cloth formula zero sequence direction relay actuating quantity equation and structure than width of cloth formula, it is zero that this method can make relay braking amount when the inner generation of reactor turn-to-turn fault, actuating quantity is very big, the braking amount is very big when the outside generation of reactor singlephase earth fault, actuating quantity is zero, thus sensitivity and integrity problem when having solved reactor generation turn-to-turn fault.
Description of drawings
Schematic diagram when Fig. 1 is inductor turn-to-turn fault;
Schematic diagram when Fig. 2 is reactor outside singlephase earth fault;
Fig. 3 is a process flow diagram of the present invention.
Embodiment
Method than width of cloth formula zero sequence direction relay measurement inductor turn-to-turn fault of the present invention, this method comprises the steps:
A. construct the actuating quantity function of relay F 1 = | 3 U · 0 + 3 I · 0 Z L 0 | , The braking flow function of structure relay F 2 = | 3 U · 0 + 3 I · 0 Z S 0 | ;
B. make F 3=F 1-F 2:
C. measure the zero-sequence current of reactor
Figure G2006100177539D00024
And bring function F into
D.: judge F 3〉=0?
E. work as F 3, conclude inductor turn-to-turn fault, the actuating of relay at>0 o'clock.
As seen, as follows than the operation equation of width of cloth formula zero sequence direction relay:
| 3 U · 0 - 3 I · 0 Z L 0 | ≥ | 3 U · 0 + 3 I · 0 Z S 0 |
| U · 0 - I · 0 Z L 0 | ≥ | U · 0 + I · 0 Z S 0 |
Following formula: left end is an actuating quantity, and right-hand member is the braking amount.
Figure G2006100177539D00033
Be added on three times of residual voltages of relay terminal,
Figure G2006100177539D00034
Figure G2006100177539D00035
Be added on three times of zero-sequence currents of relay terminal,
Figure G2006100177539D00036
Z L0: the every phase zero-sequence reactance of reactor, Z L0=Z ' L0+ Z " L0
Z S0: the every phase zero-sequence reactance of system.
Relay characteristic is analyzed:
A), the characteristic of relay during inner turn-to-turn fault
As shown in Figure 1 The direction of arrow is
Figure G2006100177539D00038
Positive dirction, this moment primary side
Figure G2006100177539D00039
Positive ends by TA flows into.
The following formula substitution is got than width of cloth formula action operation equation:
| - I · 0 Z S 0 - I · 0 Z L 0 | > | - I · 0 Z S 0 + I · 0 Z S 0 |
| - I · 0 ( Z S 0 + Z L 0 ) | > 0
Actuating quantity is very big, and the braking amount is zero, and the directional relay action is the sensitiveest.
B), relay characteristic during outside singlephase earth fault, as shown in Figure 2:
Figure G2006100177539D00041
Figure G2006100177539D00042
Leading in
Figure G2006100177539D00043
90 °.
The substitution operation equation gets: | I &CenterDot; 0 Z L 0 - I &CenterDot; 0 Z L 0 | < | I &CenterDot; 0 Z L 0 - I &CenterDot; 0 Z S 0 |
0 < | I . 0 ( Z L 0 + Z S 0 ) |
Actuating quantity is zero, and the braking amount is very big, and directional relay is failure to actuate the most reliably.
Fixed value adjusting:
Than the operation equation of the width of cloth formula zero sequence direction relay Z that need adjust L0, Z S0, Z wherein L0Be the nameplate parameter of reactor, Z S0Be the zero-sequence reactance of system, generally adjusting is Z S0=(0-1.0) Z L0

Claims (2)

1. the method than width of cloth formula zero sequence direction relay measurement inductor turn-to-turn fault is characterized in that this method comprises the steps:
A. construct the actuating quantity function of relay
Figure F2006100177539C00011
The braking flow function of structure relay
Figure F2006100177539C00012
Wherein
Figure F2006100177539C00013
For being added on three times of residual voltages of relay terminal,
Figure F2006100177539C00014
Figure F2006100177539C00015
For being added on three times of zero-sequence currents of relay terminal,
Figure F2006100177539C00016
Be the every phase zero-sequence current of reactor, Z S0Be the every phase zero-sequence reactance of system;
B. make F 3=F 1-F 2
C. measure the zero-sequence current of reactor
Figure F2006100177539C00017
And bring function F into 3
D. judge F 3>0?
E. work as F 3, conclude inductor turn-to-turn fault, the actuating of relay at>0 o'clock.
2. according to claim 1ly measure the method for inductor turn-to-turn fault, it is characterized in that, than the operation equation of the width of cloth formula zero sequence direction relay Z that need adjust than width of cloth formula zero sequence direction relay L0, Z S0, Z wherein L0Be the nameplate parameter of reactor, Z S0Be the zero-sequence reactance of system, generally adjusting is Z S0=(0-1.0) Z L0
CN2006100177539A 2006-05-08 2006-05-08 Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method Expired - Fee Related CN101071151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006100177539A CN101071151B (en) 2006-05-08 2006-05-08 Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006100177539A CN101071151B (en) 2006-05-08 2006-05-08 Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method

Publications (2)

Publication Number Publication Date
CN101071151A CN101071151A (en) 2007-11-14
CN101071151B true CN101071151B (en) 2010-04-21

Family

ID=38898471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100177539A Expired - Fee Related CN101071151B (en) 2006-05-08 2006-05-08 Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method

Country Status (1)

Country Link
CN (1) CN101071151B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630832B (en) * 2008-07-15 2012-07-04 许继集团有限公司 Method for judging single-phase earth fault of controllable high-voltage shunt reactor
CN105917539A (en) * 2013-11-13 2016-08-31 西门子公司 Method and apparatus of reactor turn-to-turn protection
CN103713234B (en) * 2013-12-31 2016-09-07 广州供电局有限公司 The recognition methods of a kind of Reactor Fault and device
CN105006802B (en) * 2015-07-15 2017-10-31 南京国电南自电网自动化有限公司 Reactor protection method based on electric current than width formula order components
CN112698145B (en) * 2020-11-11 2023-02-21 国电南瑞科技股份有限公司 Fault distance measuring method and device suitable for power transmission line containing series reactor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1282996A (en) * 2000-09-15 2001-02-07 北京电力设备总厂 Method and device for protecting dry hollow reactor
EP1475874A1 (en) * 2003-05-05 2004-11-10 Schneider Electric Industries SAS Device and method for detecting an earth fault and relay with such a device
CN1555116A (en) * 2003-12-24 2004-12-15 北京四方继保自动化有限公司 Fault-tolerant complex judging self adaption high voltage parallel reactor turn-to-turn protection
CN1695997A (en) * 2005-06-24 2005-11-16 王世午 System for monitoring lamps at signal locations of railroad and adjustment method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1282996A (en) * 2000-09-15 2001-02-07 北京电力设备总厂 Method and device for protecting dry hollow reactor
EP1475874A1 (en) * 2003-05-05 2004-11-10 Schneider Electric Industries SAS Device and method for detecting an earth fault and relay with such a device
CN1555116A (en) * 2003-12-24 2004-12-15 北京四方继保自动化有限公司 Fault-tolerant complex judging self adaption high voltage parallel reactor turn-to-turn protection
CN1695997A (en) * 2005-06-24 2005-11-16 王世午 System for monitoring lamps at signal locations of railroad and adjustment method

Also Published As

Publication number Publication date
CN101071151A (en) 2007-11-14

Similar Documents

Publication Publication Date Title
CN101814730B (en) Fault phase selection method of double transmission line protection on the same pole
CN102967842B (en) Method for on-line diagnosing gradually-changing fault of electronic current transformers
CN101071151B (en) Amplitude-comparison zero sequence direction relay reactor inter-turn fault measuring method
CN100449900C (en) High-voltage ac. controllable parallel-connection reactor high-differential protection method
CN100440672C (en) Relay protection method of the line single phase grounding failure affected by the distribution-resisting capacitance and current
CN100570791C (en) A kind of single phase ground fault relay protecting method based on the negative sequence reactance relay
CN101593964B (en) Method for longitudinal zero-sequence power direction protection of double circuit line on same pole
CN101404407B (en) Negative sequence direction pilot protection method for electric power transmission line in open-phase operation mode
CN101813739B (en) Adaptive three-phase symmetric fault phase selecting method for ultra high voltage transmission line
CN102707197A (en) Distance measuring method and type diagnostic method of single-phase grounding fault of electric transmission line
CN101651328B (en) Method and device for shunt reactor turn-to-turn protection
CN101291056B (en) Faulty phase selection method based on long wire model
CN100521436C (en) Transformer protection method based on double-side non-saturated region equivalent instantaneous inductor
CN103762554B (en) Three-phase three-winding transformer divides side winding failure detection method
CN102694375A (en) Ultra high-voltage alternating current transmission line protection method based on all-component differential coefficient matrix
CN103353568B (en) The system of selection of T link fault branch
CN101877479A (en) Method for comparing and judging phase of single-pole adaptive reclosure of electric transmission line
CN101614779B (en) Method for determining turn-to-turn short circuit, two-phase short circuit and single-phase short circuit of parallel reactors
CN102170114B (en) High-voltage direct-current transmission line low-voltage protective method
CN101789584B (en) Method for differential protection of sampling value of abrupt change and differential relays
CN101877480A (en) Method for judging voltage compensation of single-pole adaptive reclosure of electric transmission line
CN101673941A (en) Zero sequence current differential protection method
CN101478147B (en) Zero sequence synthetic impedance longitudinal linkage protection determination process
CN100536274C (en) A method for realizing transformer protection based on guiding nano principle
CN104049174A (en) Method for detecting short-circuit faults between windings of three-phase three-winding transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XUJI ELECTRIC CO., LTD. STATE GRID CORPORATION OF

Free format text: FORMER OWNER: XUJI ELECTRIC CO., LTD.

Effective date: 20121205

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121205

Address after: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Patentee after: Xuji Group Co., Ltd.

Patentee after: Xuji Electric Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 461000 No. 178, Jianshe Road, Henan, Xuchang

Patentee before: Xuji Group Co., Ltd.

Patentee before: Xuji Electric Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100421

Termination date: 20180508

CF01 Termination of patent right due to non-payment of annual fee