CN100554642C - 一种长壁综采回收房式开采煤柱的方法 - Google Patents

一种长壁综采回收房式开采煤柱的方法 Download PDF

Info

Publication number
CN100554642C
CN100554642C CNB200710132573XA CN200710132573A CN100554642C CN 100554642 C CN100554642 C CN 100554642C CN B200710132573X A CNB200710132573X A CN B200710132573XA CN 200710132573 A CN200710132573 A CN 200710132573A CN 100554642 C CN100554642 C CN 100554642C
Authority
CN
China
Prior art keywords
coal column
fully
mechanized mining
coal
mining working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB200710132573XA
Other languages
English (en)
Other versions
CN101126316A (zh
Inventor
张吉雄
巨峰
陈中伟
刁乃勤
黄艳利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CNB200710132573XA priority Critical patent/CN100554642C/zh
Publication of CN101126316A publication Critical patent/CN101126316A/zh
Application granted granted Critical
Publication of CN100554642C publication Critical patent/CN100554642C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

一种长壁综采回收房式开采煤柱的方法,在综采工作面的第一排煤柱以及进风巷和回风巷两侧的煤柱间吊挂挡风帘,形成一个可进行长壁综采的通风***;在综采工作面布置综采设备;在综采工作面前方30m范围内用单体支柱或木垛对进风巷和回风巷的顶板进行超前支护;沿综采工作面推进方向前方5m的煤房内布置一排高支护阻力液压支架,而后进行第一排煤柱的回收;在回收煤柱过程中沿下一排综采工作面的煤柱与煤柱之间吊挂挡风帘,保证回收下一排煤柱时形成通风***;高支护阻力液压支架随综采工作面液压支架移动而移动,二者始终保持5m左右的距离,从而不断回收煤柱。本方法可回收房式开采留设的永久煤柱85%以上,其方法简便,具有广泛的应用性。

Description

一种长壁综采回收房式开采煤柱的方法
技术领域
本发明涉及煤矿回收房式开采煤柱的方法,尤其是采用长壁综采回收房式开采煤柱的方法。
背景技术
房式开采后留设煤柱已成为我国西部煤矿生产所面临的一大难题。房式采煤方法使得大量的煤炭以残留煤柱的形式被遗留在井下,煤炭采出率仅有30%左右,造成煤炭资源的严重浪费。随着能源的日益紧张,如何回收房式开采留设的煤柱成为非常紧迫的任务。这种状况如得不到有效解决,不但会造成极大的资源浪费、矿井服务年限大大缩短,同时也给国家带来就业、稳定等一系列社会问题。
目前国外关于房式开采煤柱回收的方式主要有:劈柱式、仓翼式、外进式和开端式。国内的关于回收房式开采煤柱的实践有:泰丰煤矿为回收房式开采留设煤柱,利用泰安煤机厂与北京煤科院设计的ZZ10000/32/62型支撑掩护式非机采自移液压支架,综采工作面所需支架23架,采场超前支护所需支架30架。煤柱回收采用钻机打眼、深孔***的方法落煤(炮采)。但以上这些实践和尝试其机械化程度相对较低、生产效率差、规模小或部分处于研究阶段。研究一种成熟的、机械化程度高的房式煤柱回收技术已成为房式开采矿井亟待解决的重大技术难题。
发明内容
技术问题:本发明的目的是提供一种机械化程度高,生产效率高的长壁综采回收房式开采煤柱的方法。
技术方案:本发明的长壁综采回收房式开采煤柱的方法:
a.在综采工作面的第一排煤柱与煤柱之间吊挂挡风帘;在进风巷和回风巷两侧的煤柱与煤柱之间吊挂挡风帘,形成综采工作面的通风***;
b.沿综采工作面布置综采设备;
c.对进风巷和回风巷进行超前支护,同时沿综采工作面推进方向的煤柱与煤柱之间设置高支护阻力液压支架,该高支护阻力液压支架随综采工作面的综采液压支架的移动而移动,二者距离始终保持一致;
d.对综采工作面的第一排煤柱进行回收,同时对综采工作面下一排的煤柱与煤柱之间吊挂挡风帘,以保证综采工作面在回收煤柱过程中始终形成通风***;
当煤层还原样与氧化样之差为小于15,着火温度小于300℃时,需对采空区和煤柱易燃地点实施黄泥灌浆、注氮气阻燃措施,以防止煤的自燃;
当顶板较坚硬且厚度较大时,综采工作面每推5~15m采取钻孔放炮强制放顶措施,使采空区顶板冒落,以保证生产的安全;
e.第一排煤柱综采回收完毕后,将综采设备和高支护阻力液压支架向前推进至下一排煤柱,并对进风巷和回风巷进行超前支护,进行下一排煤柱的回收;
f.重复上述过程,不断回收煤柱,直至煤柱回收完毕。
所述单个煤柱与煤柱之间设置的液压支架为3~6个。
有益效果:本长壁综采回收房式开采煤柱的方法,在房式开采的煤柱之间吊挂挡风帘,使其形成可采用综采设备进行的综采工作面通风***,通过房式开采煤柱的回收,不仅延长了矿井的服务年限,而且可以为国民经济持续稳定增长提供重要的能源支持,同时也可以实现企业自身利益的最大化。与现有的房式采煤法相比,大幅度提高了煤炭资源的回收率,煤炭回收率由30%提高到85%以上,不仅解决了煤矿房式开采回采率低的问题,而且为类似条件矿区煤柱的回收提供了技术借鉴,其方法简便,易实施,具有广泛的应用性。
附图说明
附图是本发明综采工作面回收房式开采煤柱的综采工作面布置图。
图中:1-综采工作面,2-高支护阻力液压支架,3-综采液压支架,4-挡风帘,5-单体支柱和木垛,6-煤柱,8-进风巷,7-回风巷。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的说明:
以乌兰集团通富煤矿进行长壁综采回收煤柱为例,该矿位于东胜煤田东部,设计回收开采区域煤层,属于单一倾斜煤层倾角为1~3°,平均埋深为90m,平均厚度5.30m,开采煤房尺寸为7.5×9×4.5m,综采工作面留设煤柱尺寸为9×9×4.5m。按常规设计综采工作面长度为120m,综采工作面推进长度为1400m。
其综采回收房式开采煤柱的方法如下:
(1)在综采工作面1的第一排煤柱6与煤柱之间吊挂挡风帘4,在进风巷8和回风巷7两侧的煤柱与煤柱之间吊挂挡风帘4,如图中所示:新鲜风由“→”所示方向经进风巷8和综采工作面1,污风由
Figure C20071013257300041
所示从回风巷7流出,形成综采工作面1的通风***;
(2)沿综采工作面1方向布置综采设备,选用的综采液压支架型号为ZY9000/24/55,采煤机型号为MG500/1130-WD;在进风巷8内安设可伸缩胶带输送机,输送机型号为DSJ100/63/90×2;回收的煤炭沿
Figure C20071013257300051
所示方向运输至地面;
(3)在综采工作面1前方20m范围内,用单体支柱和木垛5对进风巷8和回风巷7进行超前支护;由于煤房尺寸为7.5×9×4.5m,同时考虑到要便于支架的移动,沿采煤工作1面推进方向的两个煤柱之间并排布置4个ZZ10000/32/62高支护阻力液压支架2,然后可进行第一排煤柱6的回收;
(4)煤房间的ZZ10000/32/62高支护阻力液压支架2随综采液压支架3的移动而移动,每次移动距离为0.6m(采煤机截深),二者始终保持5m左右的距离;
(5)在对综采工作面1回收第一排煤柱6的同时,在对下一排沿综采工作面的煤柱与煤柱之间吊挂挡风帘4,保证综采工作面1在回收下一排煤柱时能够形成通风***,布置挡风帘的顺序如附图所示A-B-C-D…;如有漏风严重地段需用水泥、粉煤灰等材料筑堵风墙封闭采空煤房,使长壁开采综采工作面形成一个封闭区域,以消除或降低漏风量;
由于该矿煤层还原样与氧化样之差小于15,着火温度小于300℃,需要对长壁综采回收房式煤柱后的采空区进行黄泥灌浆,防止其自燃,否则,则不需要采取此措施。具体措施是将一定量的土送入泥浆搅拌池,并加入一定量的水,由搅拌机搅拌制成泥浆,该泥浆再进人集浆池,经渣浆泵抽送至井下,土水比一般为1∶6~1∶8;
由于该矿煤层顶板岩性以泥质岩类为主,岩石自然状态单轴极限抗压强度为20~40MPa,属软弱~半坚硬岩石,岩层抗压强度低,稳固性差,但是由于在前期实施房式开采过程中,留设有0.8m的护顶煤,由于煤质比较坚硬,造成顶板难以垮落。因此需要采用全部垮落法的顶板管理方式,对顶板施行强制钻孔放炮放顶措施强制放顶。具体措施为:当综采工作面回收煤柱的推进距离达6m时,沿综采工作面单排布置***钻孔,孔间距8m,与水平线的仰角为35°,使用合金钢钻头,直径Φ=85mm,孔深15~20m;
(6)第一排煤柱6回收完毕后,将综采设备和高支护阻力液压支架2向前推进至下一排煤柱,并对进风巷8和回风巷7进行超前支护,进行下一排煤柱回收;
(7)重复上述过程,不断回收煤柱,直至煤柱回收完毕。

Claims (2)

1.一种采用长壁综采回收房式开采煤柱的方法,其特征在于:
a.在综采工作面(1)的第一排煤柱(6)的煤柱与煤柱之间吊挂挡风帘(4);在进风巷(8)和回风巷(7)两侧煤柱的煤柱与煤柱之间吊挂挡风帘(4),形成综采工作面(1)的通风***;
b.沿综采工作面(1)布置综采设备;
c.对进风巷(8)和回风巷(7)进行超前支护,同时沿综采工作面(1)推进方向的煤柱与煤柱之间布置高支护阻力液压支架(2),高支护阻力液压支架(2)随综采工作面(1)的综采液压支架(3)的移动而移动,二者距离始终保持一致;
d.对综采工作面(1)的第一排煤柱(6)进行综采回收,同时对综采工作面(1)下一排的煤柱与煤柱之间吊挂挡风帘(4),以保证综采工作面(1)在回收煤柱过程中始终形成通风***;
当煤层还原样与氧化样之差为小于15,着火温度小于300℃时,需对采空区和煤柱易燃地点实施黄泥灌浆、注氮气阻燃措施,以防止煤的自燃;
当顶板较坚硬且平均厚度为5.30m时,综采工作面每推5~15m采取钻孔放炮强制放顶措施,使采空区顶板冒落,以保证生产的安全;
e.第一排煤柱(6)回收完毕后,将综采设备和高支护阻力液压支架(2)向前推进至下一排煤柱,并对进风巷(8)和回风巷(7)用单体支柱和木垛(5)进行超前支护,进行下一排煤柱回收;
f.重复上述过程,不断回收煤柱,直至煤柱回收完毕。
2.根据权利要求1所述的长壁综采回收房式开采煤柱的方法,其特征在于:单个煤柱与煤柱之间设置的高支护阻力液压支架(2)为3~6个。
CNB200710132573XA 2007-09-19 2007-09-19 一种长壁综采回收房式开采煤柱的方法 Expired - Fee Related CN100554642C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710132573XA CN100554642C (zh) 2007-09-19 2007-09-19 一种长壁综采回收房式开采煤柱的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710132573XA CN100554642C (zh) 2007-09-19 2007-09-19 一种长壁综采回收房式开采煤柱的方法

Publications (2)

Publication Number Publication Date
CN101126316A CN101126316A (zh) 2008-02-20
CN100554642C true CN100554642C (zh) 2009-10-28

Family

ID=39094432

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710132573XA Expired - Fee Related CN100554642C (zh) 2007-09-19 2007-09-19 一种长壁综采回收房式开采煤柱的方法

Country Status (1)

Country Link
CN (1) CN100554642C (zh)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260805B (zh) * 2008-04-15 2011-05-11 吕平 综采工作面安全通过底板巷道岩柱的采矿方法
CN101858216B (zh) * 2010-04-22 2012-05-23 中国矿业大学 一种房式采煤法遗留的呆滞煤柱回收方法
CN101839134B (zh) * 2010-04-22 2012-04-04 中国矿业大学 一种房式采煤法遗留的不规则呆滞煤柱回收方法
CN101881167B (zh) * 2010-06-04 2012-01-11 山东华恒矿业有限公司 煤矿回采工作面小煤柱开采方法
CN102182460A (zh) * 2011-04-14 2011-09-14 山西晋城无烟煤矿业集团有限责任公司 高瓦斯多巷无煤柱开采法
CN102287212B (zh) * 2011-09-09 2014-03-26 兖州煤业股份有限公司 一种“y”型通风的方法
CN102418525B (zh) * 2011-10-28 2014-07-09 山西晋城无烟煤矿业集团有限责任公司 软煤层长壁大采高综合机械化采煤末采方法
CN102518456B (zh) * 2011-12-30 2013-05-22 大同煤矿集团有限责任公司 应力集中区域下复合层顶板维护方法
CN103174451A (zh) * 2013-01-08 2013-06-26 李继水 高瓦斯综放工作面悬顶状态易自燃煤层防灭火工艺
CN103133027A (zh) * 2013-01-25 2013-06-05 李继水 易自燃煤层工作面撤除及封闭期间防火防爆技术
CN105240014B (zh) * 2015-11-12 2017-09-15 中国矿业大学 一种充填再造护巷煤柱条带回收房式遗留煤柱的方法
CN107355224B (zh) * 2017-09-07 2023-08-11 中国矿业大学(北京) 一种钛铁矿和氦-3资源高效统一开采***及应用方法
CN108087021A (zh) * 2017-11-01 2018-05-29 中国矿业大学 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法
CN110410076B (zh) * 2019-08-16 2021-06-08 山东科技大学 一种用于老房柱采空区遗留煤柱回收的充填开采方法
CN111119895B (zh) * 2019-12-24 2022-01-11 中国矿业大学(北京) 金属矿残柱回收方法
CN112593940A (zh) * 2020-12-16 2021-04-02 中煤能源研究院有限责任公司 一种回采房式采煤法遗留煤柱和处理地面矸石的布置工艺
CN112943343B (zh) * 2021-03-17 2023-05-26 河南理工大学 煤矿采空区不同类型火灾地面钻孔高效快速灭火方法
CN113586054B (zh) * 2021-08-31 2023-08-25 新疆大学 一种巨厚煤层强弱分区充填上行分层开采方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695711A (en) * 1970-01-21 1972-10-03 Wintershall Ag Method of recovering underground deposits of soluble minerals, and apparatus for carrying out the method
US4017121A (en) * 1974-11-25 1977-04-12 Allied Chemical Corporation Longwall mining of trona with prefracturing to prevent slabbing
CN1221727C (zh) * 2002-09-09 2005-10-05 神华集团有限责任公司 连续采煤机房柱式短壁机械化采煤方法
CN1858401A (zh) * 2006-05-31 2006-11-08 段连权 柱式开采回收煤柱的采煤工艺
CN1865657A (zh) * 2005-05-19 2006-11-22 兖矿集团有限公司 长壁采煤法综采工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3695711A (en) * 1970-01-21 1972-10-03 Wintershall Ag Method of recovering underground deposits of soluble minerals, and apparatus for carrying out the method
US4017121A (en) * 1974-11-25 1977-04-12 Allied Chemical Corporation Longwall mining of trona with prefracturing to prevent slabbing
CN1221727C (zh) * 2002-09-09 2005-10-05 神华集团有限责任公司 连续采煤机房柱式短壁机械化采煤方法
CN1865657A (zh) * 2005-05-19 2006-11-22 兖矿集团有限公司 长壁采煤法综采工艺
CN1858401A (zh) * 2006-05-31 2006-11-08 段连权 柱式开采回收煤柱的采煤工艺

Also Published As

Publication number Publication date
CN101126316A (zh) 2008-02-20

Similar Documents

Publication Publication Date Title
CN100554642C (zh) 一种长壁综采回收房式开采煤柱的方法
CN101725352B (zh) 一种固体充填综采回收房式煤柱方法
CN103590831B (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN102619513B (zh) 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法
CN101509377B (zh) 急倾斜矿体房柱采矿方法
CN104481539B (zh) 自拉槽挤压***崩落采矿法
CN103075157B (zh) 缓倾斜矿体超前切顶无底部结构梯段落矿连续采矿法
CN102392678A (zh) 井上下联合压裂增透抽采瓦斯的方法
CN102352769A (zh) 高突矿井煤与瓦斯共采一体化开采方法
CN101302931B (zh) 一种仓房采煤后的复采和边角煤回采的方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN103527196B (zh) 一种黄土充填回收房式煤柱的方法
CN106089205A (zh) 一种适用于水体下极薄矿体的房柱法充填采矿方法
CN106499396B (zh) 一种中厚缓倾斜含废石夹层矿体房柱采矿法
CN101050709A (zh) 采区高水压疏堵开采方法
CN104975868A (zh) 基于定向钻进的顶板高位走向大直径长钻孔瓦斯抽采方法
CN102720500A (zh) 一种急倾斜薄矿体机械化地下开采方法
CN110714760B (zh) 一种煤铝共生分层诱导协同开采的采矿方法
CN105952450A (zh) 一种地下矿山井下双采场协同开采的新方法
CN102979526B (zh) 中深孔分段采矿出矿堑沟充填法构筑工艺
CN106223956A (zh) 中深孔天井采矿嗣后充填法
CN104453900A (zh) 一种近水平矿体充填采矿方法
CN105952453A (zh) 长壁前进式煤层工作面机械化无巷开采成套设备
CN201474347U (zh) 一种分段矿房
CN110173295A (zh) 一种利用顺层定向钻孔抽采瓦斯和防灭火的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091028