CN100516458C - Zonation method of thin interbed in low infiltration of fracturing layer segment - Google Patents

Zonation method of thin interbed in low infiltration of fracturing layer segment Download PDF

Info

Publication number
CN100516458C
CN100516458C CNB2006101500518A CN200610150051A CN100516458C CN 100516458 C CN100516458 C CN 100516458C CN B2006101500518 A CNB2006101500518 A CN B2006101500518A CN 200610150051 A CN200610150051 A CN 200610150051A CN 100516458 C CN100516458 C CN 100516458C
Authority
CN
China
Prior art keywords
interlayer
gamma
low
discharge capacity
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006101500518A
Other languages
Chinese (zh)
Other versions
CN1959062A (en
Inventor
张传绪
柴立新
于永波
尹喜永
丛德军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CNB2006101500518A priority Critical patent/CN100516458C/en
Publication of CN1959062A publication Critical patent/CN1959062A/en
Application granted granted Critical
Publication of CN100516458C publication Critical patent/CN100516458C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)
  • Railway Tracks (AREA)

Abstract

The present invention relates to a low permeable thin-interbedding fractured interval layering method. Said method includes the following steps: (1) defining effective barrier bed; (2) making restraining barrier protection, adopting low-displacement variable-displacement and low thickener concentration fracture treatment; and (3) making separate layer fracturing treatment. Said method can utilize interbed property, interbed thickness and core intersection to make division of fractured interval and can make the layer whose restraining barrier and oil layer earth stress difference value is greater than 4 MPa and restraining barrier thickness is greater than 2 m implement separate layer fracturing treatment.

Description

Zonation method of thin interbed in low infiltration of fracturing layer segment
Technical field:
The present invention relates to oil field a kind of fracturing process that recovers the oil, especially a kind of Zonation method of thin interbed in low infiltration of fracturing layer segment.
Background technology:
The low permeability oil field oil reservoir mostly is thin interbed, oil reservoir not only thinner thickness and also the layer with layer between interlayer also thinner, brought certain degree of difficulty to the separate stratum fracfturing transformation, have a strong impact on fracturing effect.Carrying out interlayer and block the judgement of effect and stitch high control and seem even more important, also is that pressure break well and story selecting, interval are divided and the difficult point and the key of optimal design.Former fractured interval layered approach, the general massive hydraulic fracturing of requirement to compartment thickness during small volume hydraulic fracture should be greater than 15m, small scale fracturing should be greater than 5m, under be limited to 4m, being lower than 4m generally can not separate stratum fracfturing, can only be stuck in one section pressure break by a plurality of substratums, usually can only press off part layer, other laminations are not opened, and cause the generation of losing layer phenomenon.In addition, if the ability of blocking of interlayer is judged inaccurate, can cause the pressure break scale out of control, build bottom if the crack extends into too much, yield poorly after will causing pressure, it is fast to successively decrease, and period of validity is short, thereby influences the pressing crack construction effect; For the leptophragmata layer, if the fractured well section is close to high aquifer, interlayer is blocked the effect overestimate, pressure is worn interlayer and will be caused water logging; If to interlayer to block capabilities low excessively, will limit pressure break well and story selecting scope again, make some well layers lose the transformation apparatus meeting.
Summary of the invention:
In order to overcome disadvantages of background technology, the invention provides a kind of Zonation method of thin interbed in low infiltration of fracturing layer segment, this method is carried out the division of fractured interval with reference to interlayer character, thickness of interlayer, core intersection, changed in the past merely method by the compartment thickness layering, widen separate stratum fracfturing well and story selecting scope, improved the validity of scheme and the transformation degree of oil reservoir.
Technical scheme of the present invention is: this Zonation method of thin interbed in low infiltration of fracturing layer segment comprises the following steps:
(1), determine effective barrier bed:
A, according to the gamma logging curve, find out the interlayer of gamma value 〉=120API;
B, according to the gamma logging curve, find out not perforation position interlayer gamma value peak and oil reservoir gamma value minimum point, satisfy the two difference 〉=40API;
C, above-mentioned thickness of interlayer are greater than 2.2~4m;
D, according to the acoustic variable density log curve, the cement sheath cementation factor of above-mentioned interlayer wants 〉=0.9;
(2), carry out the interlayer protection:
Take low discharge capacity, become discharge capacity, hang down thickening agent concentration pressure break;
(3), carry out separate stratum fracfturing:
According to interlayer card packer, carry out single deck tape-recorder separate stratum fracfturing construction.
The present invention has following beneficial effect: the present invention adopts technique scheme, carry out the division of fractured interval with reference to interlayer character, thickness of interlayer, core intersection, changed in the past merely method by the compartment thickness layering, broken through the boundary that the separate stratum fracfturing compartment thickness is not less than 4m, make interlayer and oil reservoir geostatic stress difference greater than 4MPa, compartment thickness can be realized separate stratum fracfturing greater than the layer of 2m, widen separate stratum fracfturing well and story selecting scope, improved the validity of scheme and the transformation degree of oil reservoir.Site test results shows that the layer that blocking property of low permeability oil field interlayer is better and the cement sheath bonding quality is good can be realized separate stratum fracfturing; Interlayer is during greater than 2 meters, and the cement sheath bonding quality is good, continuously blocking property of mud stone preferably layer the chance that realizes the general pressure of layering is arranged, but, have certain risk because influence factor is more, need take comparatively effectively control seam high-technology; Interlayer realizes under the prior art condition that the chance of separate stratum fracfturing is less during less than 2 meters.
Description of drawings;
Fig. 1 is embodiment 1 a gamma logging curve;
Fig. 2 is embodiment 1 an acoustic variable density log curve;
Fig. 3 is embodiment 2 gamma logging curves;
Fig. 4 is embodiment 2 acoustic variable density log curves;
Fig. 5 is embodiment 3 gamma logging curves;
Fig. 6 is embodiment 3 acoustic variable density log curves.
The specific embodiment:
The invention will be further described below in conjunction with embodiment: this Zonation method of thin interbed in low infiltration of fracturing layer segment comprises the following steps:
(1), determine effective barrier bed:
A, according to the gamma logging curve, find out the interlayer of gamma value 〉=120API, this interlayer is the higher interlayer of shale content, promptly finds the standard compliant layer of lithology.
B, according to the gamma logging curve, find out high point of perforation position interlayer gamma value and oil reservoir gamma value low spot, the two difference 〉=40API is the higher interlayer of shale content, finds the layer that meets the difference value standard.
C, according to the characteristic in different oil fields, the thickness of interlayer that meets above-mentioned two conditions is greater than 2.2~4m, finds out wherein effectively to block thickness layer up to standard.
D, according to the acoustic variable density log curve, effectively the cement sheath cementation factor of barrier bed wants 〉=0.9, promptly cementing quality is excellent, meets the cementing quality standard.Reservoir thickness is more little, and the seam height is wayward more, and for oil sheet, factor affecting such as cement sheath bonding quality increase gradually.
(2), carry out the interlayer protection:
According to the interlayer condition, in pressing crack construction process, take 2~2.5m 3The low discharge capacity of/min becomes discharge capacity, low thickening agent concentration is carried out pressure break, the control vertical extension in crack, protection interlayer.Become discharge capacity and promptly adopt 2~2.5m in the prepad fluid stage 3/ min is low, and discharge capacity is made seam, adopts 3m 3The above high discharge capacity of/min adds sand, increases sanding concentration.Low thickening agent concentration is that thickening agent concentration is between 0.2~0.4% in the fracturing fluid, and low sticking fracturing fluid can reduce fluid net pressure in the seam.
In pressing crack construction process, the fracture propagation pressure maximum around the pit shaft, thereby press easily at the construction initial stage and to wear barrier bed.And after carrying proppant, proppant itself can play the effect of blocking.Thereby, adopt low discharge capacity to make seam in the prepad fluid stage, the control vertical extension in crack; Adopt high discharge capacity to add sand, increase sanding concentration, guarantee fracturing effect.The sand liquor ratio is high more, then stitches height and is easy to control more; Otherwise be difficult to control more.Major advantage is that flow conductivity height, period of validity are long, the leak-off injury is little, overcome the influence of non-darcy stream, effectively the control seam is high.
(3), carry out separate stratum fracfturing:
According to interlayer card packer, carry out single deck tape-recorder separate stratum fracfturing construction.
Embodiment 1, Y51-4-S8 well, GIV6-10 be totally 6 substratums, oil reservoir span 21.9m, and wherein maximum interlayer is 3.1m.Can not separate stratum fracfturing according to the routine techniques standard, see Table 1.
Y51-4-S8 well pressure break layer data table table 1
According to Fig. 1 gamma logging curve, five interlayer gamma values are respectively 130,160,120,160 from bottom to top, 130API, 〉=120API, and shale content is higher.
According to Fig. 1 gamma logging curve, high point of five interlayer gamma values and oil reservoir gamma value low spot, the two difference is equal 〉=40API, shale content is higher.
According to the characteristic in English 51 block oil fields, the thickness of interlayer that meets above-mentioned two conditions is greater than 2m, and according to Fig. 1 gamma logging curve, effectively to block thickness be 2.5m to interlayer between GIV8 and the GIV9.
According to the acoustic variable density log curve, the cement sheath cementation factor of interlayer is 1.0 between GIV8 and the GIV9.
Fracturing technique scheme: adopt GIV6-8 and two sections separate stratum fracfturings of GIV9-10, press GIV9-10 earlier,, take the low discharge capacity control vertical extension in crack, discharge capacity 2.5m according to the interlayer condition 3/ min, protection interlayer average sand be than 27.7%, high sand ratio 45%, adding ceramic 12m 3Upper lifting pipe post pressure break GIV6-8, discharge capacity 2.5m 3/ min, average sand be than 26.2%, high sand ratio 45%, adding ceramic 6m 3Separate stratum fracfturing success prove that the 3.1m interlayer blocks successfully, and two intervals single deck tape-recorder pressure break respectively make a plurality of substratums obtain transformation, and the oily 3.9t that increases day by day after the pressure obtains better effects.
Embodiment 2:L12-10 well, SI1~SI2-4+5 be 5 substratum altogether, oil reservoir span 15.1m, and wherein maximum interlayer is 2.2m, can not separate stratum fracfturing according to the routine techniques standard, see Table 2.
Table 2L12-10 well pressure break layer data table
According to the gamma logging curve, four interlayer gamma values are respectively 124,127,136 from bottom to top, 150API, 〉=120API, and lithology is all eligible.
According to the gamma logging curve, high point of four interlayer gamma values and oil reservoir gamma value low spot, the two difference is equal 〉=40API, meet the difference value standard
According to the characteristic that dragon and tiger is steeped high estrade layer, the thickness of interlayer that meets above-mentioned two conditions is greater than 2m, and according to the gamma logging curve, interlayer effectively blocks thickness 2.2m between SI1 and SI4+5, meets and effectively blocks thickness calibration, and remainder layer is all ineligible.
According to the acoustic variable density log curve, effectively the cement sheath cementation factor of barrier bed is 1.0, meets the cementing quality standard.
Fracturing technique scheme: adopt SI1 and two sections separate stratum fracfturings of SI2-SI4+5, press SI2-SI4+5 earlier,, take the low discharge capacity control vertical extension in crack, discharge capacity 2.0m according to the interlayer condition 3/ min, protection interlayer, average sand be than 28.7%, adding ceramic 13m 3Upper lifting pipe post pressure break SI1, discharge capacity 2.0m 3/ min, average sand squeezes sour 2m than 28.3% 3, adding ceramic 5m 3
Separate stratum fracfturing success, fracture pressure reaches 13MPa and 27MPa respectively, prove that the 2.2m interlayer blocks successfully, and two intervals single deck tape-recorder pressure break respectively make a plurality of substratums obtain transformation, and the oily 4.5t that increases day by day after the pressure obtains better effects.
Oblique 10 wells of embodiment 3:Y51-10-, F4~F5 are 3 substratum altogether, oil reservoir span 12.5m, and wherein maximum interlayer is 3.5m, can not separate stratum fracfturing according to the routine techniques standard, see Table 3.
The oblique 10 well pressure break layer data table tables 3 of Y51-10-
According to the gamma logging curve, two interlayer gamma values are respectively 160 from bottom to top, 200API, 〉=120API, and lithology is all eligible.
According to the gamma logging curve, high point of two interlayer gamma values and oil reservoir gamma value low spot, the two difference is equal 〉=40API, meet the difference value standard
According to the characteristic in English 51 block oil fields, the thickness of interlayer that meets above-mentioned two conditions is greater than 2m, and according to the gamma logging curve, interlayer effectively blocks thickness 3.3m between F4 and F5, meets and effectively blocks thickness calibration, and remainder layer is all ineligible.
According to the acoustic variable density log curve, effectively the cement sheath cementation factor of barrier bed is 1.0, meets the cementing quality standard.
Fracturing technique scheme: adopt F4 and two sections separate stratum fracfturings of F5, press F5 earlier,, take the low discharge capacity control vertical extension in crack, discharge capacity 2.5m according to the interlayer condition 3/ min, protection interlayer, average sand be than 26.8%, adding ceramic 8m 3Upper lifting pipe post pressure break F4, discharge capacity 2.5m 3/ min, average sand be than 26.9%, adding ceramic 5m 3
Separate stratum fracfturing success, fracture pressure reaches 50MPa and 52MPa respectively, prove that the 3.5m interlayer blocks successfully, and two intervals single deck tape-recorder pressure break respectively make a plurality of substratums obtain transformation, and the oily 6.4t that increases day by day after the pressure obtains better effects.

Claims (1)

1, a kind of Zonation method of thin interbed in low infiltration of fracturing layer segment is characterized in that: comprise the following steps:
(1), determine effective barrier bed:
A, according to the gamma logging curve, find out the interlayer of gamma value 〉=120API;
B, according to the gamma logging curve, find out not perforation position interlayer gamma value peak and oil reservoir gamma value minimum point, satisfy the two difference 〉=40API;
C, above-mentioned thickness of interlayer are greater than 2.2m;
D, according to the acoustic variable density log curve, the cement sheath cementation factor of above-mentioned interlayer wants 〉=0.9;
(2), carry out the interlayer protection:
Take 2~2.5m 3/ min discharge capacity, become discharge capacity, the thickening agent concentration pressure break of concentration between 0.2~0.4%;
(3), carry out separate stratum fracfturing:
According to interlayer card packer, carry out single deck tape-recorder separate stratum fracfturing construction.
CNB2006101500518A 2006-10-25 2006-10-25 Zonation method of thin interbed in low infiltration of fracturing layer segment Expired - Fee Related CN100516458C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101500518A CN100516458C (en) 2006-10-25 2006-10-25 Zonation method of thin interbed in low infiltration of fracturing layer segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101500518A CN100516458C (en) 2006-10-25 2006-10-25 Zonation method of thin interbed in low infiltration of fracturing layer segment

Publications (2)

Publication Number Publication Date
CN1959062A CN1959062A (en) 2007-05-09
CN100516458C true CN100516458C (en) 2009-07-22

Family

ID=38070902

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101500518A Expired - Fee Related CN100516458C (en) 2006-10-25 2006-10-25 Zonation method of thin interbed in low infiltration of fracturing layer segment

Country Status (1)

Country Link
CN (1) CN100516458C (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134986B (en) * 2011-04-29 2014-07-02 中国石油集团川庆钻探工程有限公司 Production-increasing method by water-plugging and fracturing
CN102852509B (en) * 2012-09-04 2014-12-24 中国石油天然气股份有限公司 Method for facture of coal bed methane reservoir of high-level coal
CN103615230B (en) * 2013-10-26 2017-03-15 中国石油化工集团公司 A kind of method for establishing double-shale-indicatwateractor wateractor saturation model
CN103912255B (en) * 2014-03-18 2017-01-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of Oil/gas Well hydraulic oscillation fracturing technology
CN106555576A (en) * 2015-09-24 2017-04-05 中国石油化工股份有限公司 Suitable for the fracturing process of thin layer
CN109779611A (en) * 2019-02-21 2019-05-21 中陕核工业集团地质调查院有限公司 Application of the petroleum hole cementing concrete ring property parameters in the amendment of old well gamma repetition measurement coefficient
CN110644966A (en) * 2019-09-19 2020-01-03 大庆油田有限责任公司 Method for selecting wells and layers by means of large-dose oil-displacement liquid injection measure of oil production well with production and without injection
CN111396014B (en) * 2020-03-16 2021-07-23 中国石油大学(北京) Thin interbed reservoir reformation method, device and equipment
CN111425192A (en) * 2020-04-02 2020-07-17 大庆油田有限责任公司 Thin-layer low-permeability oil field hard-to-compress reservoir identification method
CN114458267A (en) * 2020-10-21 2022-05-10 中国石油化工股份有限公司 Method for preventing slipping, fracture and slippage in hot dry rock thermal storage transformation and application
CN115680591B (en) * 2021-07-27 2024-06-18 大庆油田有限责任公司 Chemical flooding three-dimensional fracturing process suitable for thin and thick oil layers to be distributed alternately

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
双河油田压裂薄夹层厚度的选择. 郝立军,刘欣,林景禹,陶良军,赵德勇,靳彦华.石油钻采工艺,第27卷第1期. 2005
双河油田压裂薄夹层厚度的选择. 郝立军,刘欣,林景禹,陶良军,赵德勇,靳彦华.石油钻采工艺,第27卷第1期. 2005 *
河南油田老区压裂界限研究. 刘欣,郝立军,林景禹,陶良军,刘洪涛,李彦平.河南石油,第19卷第1期. 2005
河南油田老区压裂界限研究. 刘欣,郝立军,林景禹,陶良军,刘洪涛,李彦平.河南石油,第19卷第1期. 2005 *

Also Published As

Publication number Publication date
CN1959062A (en) 2007-05-09

Similar Documents

Publication Publication Date Title
CN100516458C (en) Zonation method of thin interbed in low infiltration of fracturing layer segment
CN103089228B (en) Sand acid fracturing method is taken in the acid of a kind of argillaceous dolomite ground surface crosslinking
CN103967471B (en) By the fracturing technology that stereo staggered oriented perforating technology is realized stitching individual layer more
CN102733789A (en) Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer
CN105604534A (en) Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir
CN109812247A (en) A kind of perforation and fracturing process improving fine and close grease horizontal well transformation degree
CN107654215B (en) A method of coal bed gas well is transform as coal measures gas well
CN103089224A (en) Fracturing method for comprehensively controlling fracture height
CN100999990A (en) Low permeating oil layer vertical crack directional perforating crushing method
CN110259421A (en) A kind of broken up compact oil reservoir water filling supplement ENERGY METHOD
CN114075960B (en) Shale reservoir hydraulic fracturing reverse-sequence multistage sand adding process
RU2683453C1 (en) Method of improving the efficiency of developing low-permeable oil collectors
CN105297736B (en) Sequential deepening grouting construction technology and device for soil covering layer on karst cave in karst area
CN109577938A (en) A kind of compact oil reservoir horizontal well wears lamination cracking method
CN106372377B (en) A kind of fine silt oil reservoir filling anti-sand method
CN102364041A (en) Oil extraction method for establishing oil permeable water stop sieve by filling fusheng sand in horizontal well fracture
CN104632173B (en) Fracture-network fracturing layer selection method for non-natural fracture tight reservoir
CN208763042U (en) Pebble layer dewatering well
RU2282023C1 (en) Development method for oil deposit having oil-water zones
RU2290493C1 (en) Method for extracting multi-bed oil deposit
RU2528757C1 (en) Development of low-permeability oil deposits by horizontal wells under natural conditions
CN115952620A (en) Shale reservoir fracturing prevention construction method and key fracture control material
RU2526037C1 (en) Development of fractured reservoirs
CN114165201A (en) Pressure flooding water injection method
CN106049508B (en) A kind of swag type depression earth rock placement structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090722

Termination date: 20201025