CN100445021C - Welding repair method for specific steel and its welding wire - Google Patents

Welding repair method for specific steel and its welding wire Download PDF

Info

Publication number
CN100445021C
CN100445021C CNB2006101070990A CN200610107099A CN100445021C CN 100445021 C CN100445021 C CN 100445021C CN B2006101070990 A CNB2006101070990 A CN B2006101070990A CN 200610107099 A CN200610107099 A CN 200610107099A CN 100445021 C CN100445021 C CN 100445021C
Authority
CN
China
Prior art keywords
welding
repair welding
repair
wire
welding wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006101070990A
Other languages
Chinese (zh)
Other versions
CN1943963A (en
Inventor
董运生
李大营
勾洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006101070990A priority Critical patent/CN100445021C/en
Publication of CN1943963A publication Critical patent/CN1943963A/en
Application granted granted Critical
Publication of CN100445021C publication Critical patent/CN100445021C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arc Welding In General (AREA)

Abstract

The present invention discloses welding repair method and welding wire for steel rail, Bell frog and switch rail. The welding wire contains C 0.3-0.7 wt%, B 1.5-3.5 wt%, Ni 3-5 wt%, Cr 0.6-2 wt%, Si 3-4 wt%, Mo 3-7 wt% and Fe for the rest. The welding repair method includes burning off the hardened layer, oxidized layer and fine crack in the welding repair part with gas welding torch; heating the welding repair part to 1500-1700 deg.c to melt while heating the welding wire to melt, welding repairing, local quenching with water after the welded part is cooled to 400-500 deg.c, and polishing the welded part with a polisher. The present invention can welding repair steel rail, Bell frog and switch rail, has fast welding repair speed and low welding wire cost, and is suitable for in-situ operation.

Description

The repair welding method and the welding wire thereof of special steel
One, technical field:
The present invention relates to the repair welding method and the welding wire thereof of special steel, particularly relate to the repair welding method and the welding wire thereof of rail, Bel's frog and tongue.
Two, technical background: along with high speed, the heavy duty of China Railway, the damage of rail is on the rise.The main cause of rail failure has two kinds: the one, because the damage that the weight of rail self causes, this damage not only seriously jeopardizes traffic safety, and can not repair, and can only more renew rail; The 2nd, to be rail produce in normal operation in quite a few damage, as peeling off of the abrasion of rail part, rail level scratch, rail-head quenching layer etc.Train by the time huge impact load also accelerated the development of hurt position crackle and formed the horizontal fatigue crack of rail head, reduce line quality, influence traffic safety.So must carry out field maintenance to rail at any time, make rail level keep the good technical state, prolong the useful life of rail, reduce the maintenance work amount of circuit, give full play to and excavate the use potentiality of circuit,, increase economic efficiency to guarantee safety and normal transport.
Rail comprises common rail, Bel's frog and tongue, and they all belong to special steel.The method of present common rail repair welding mainly contains surfacing and arc welding, and the repair welding technology of Bel's frog and tongue is not also launched at present at home.Bel's frog is a kind of novel alloy steel assembly unit track switch that Zhejiang Bel group develops in recent years, and this track switch is different fully with original manganese steel track switch, and its welding repairing process is also different with manganese steel track switch.Because do not have the repair welding technology of Bel's frog, in a single day this track switch has the damage of critical traffic safety, has only replacing.At this situation, we develop the welding wire and the welding repairing process of a kind of energy repair welding Bel frog, tongue and rail on the basis of original repair welding technology and solder flux, filled up the blank of Bel's frog and tongue repair welding.
Three, summary of the invention:
Purpose of the present invention: welding wire and welding repairing process that a kind of energy repair welding Bel frog, tongue and rail are provided.
Technical scheme of the present invention:
A kind of welding wire that is used for the special steel repair welding is represented with percentage by weight, contains carbon 0.3~0.7% in the composition of composition welding wire, boron 1.5~3.5%, and nickel 3~5%, chromium 0.6~2%, silicon 3~4%, molybdenum 3~7%, surplus is an iron.
In the described welding wire, carbon 0.3~0.7%, boron 1.5~2.5%, nickel 3~5%, chromium 1~2%, silicon 3~4%, molybdenum 5~7%, surplus is an iron.
Carbon 0.3~0.7% in the described welding wire, boron 2.5~3.5%, and nickel 3~5%, chromium 0.6~1%, silicon 3~4%, molybdenum 3~5%, surplus is an iron.
Carbon 0.3~0.7% in the described welding wire, boron 2~3%, and nickel 3~5%, chromium 1~1.5%, silicon 3~4%, molybdenum 4~6%, surplus is an iron.
Described special steel is Bel's frog with steel or sharp rail steel.
A kind of repair welding method of special steel comprises the preceding preparation of weldering, repair welding and postwelding finishing technique, and its technology is:
(1) pre-preceding the preparation removed hardened layer, oxide layer and the blind crack sintering on surface, repair welding position with gas welding torch,
(2) repair welding is heated to 1500~1700 ℃ with the repair welding position, makes the surface of the work fusing; The special steel welding wire also is heated to molten state, and workpiece is repaiied in welding wire fusing of marginization, side weld during repair welding,
(3) after quenching treated that the repair welding position naturally cools to 400~500 ℃, the selective hardening processing was carried out in the water gradation,
(4) postwelding arrangement postwelding adopts sander suitable to repair welding position sanding of flat.
After the postwelding arrangement,, then need to correct in the described repair welding method if the welding district is cooled to the low phenomenon of collapsing occur behind the normal temperature.
In the described repair welding method, special steel is Bel's frog with steel or sharp rail steel.
Described welding wire production method is: with industrial converter iron is melted earlier, add compositions such as carbon, boron, nickel, chromium, silicon and molybdenum again, after continuing to be heated to fusing, go into die casting and become mother metal, mechanical stretching becomes the round steel of 5~6mm again; Cutting into 0.5~1 meter long welding wire at last gets final product.
Ultrasonic examination is adopted at postwelding repair welding position, measures hardness with portable Rockwell hardness tester, requires the layer Rockwell hardness to reach 39~42, just meets the requirements.
The present invention has following advantage:
1. welding wire of the present invention and welding repairing process can not only the common rail of repair welding, and can repair welding Bel's frog and tongue, filled up the blank that Bel's frog and tongue in the past can not repair weldings.
2. novel welding wire of the present invention contains multiple trace alloying elements such as Mn, Cr, Mo, Ni, has good welding repairing process performance, postwelding tissue intensity height, and good toughness, wearability are good, have good cracking resistance and serviceability; And this welding wire cost is low, 4.3 yuan of per kilograms, and about 80 yuan of original rail solder flux per kilograms, and single solder flux calculates the repair welding cost and reduces nearly 20 times.If a workshop section is by annual repair welding 1000 places, every place needs 3 kilograms of solder flux to calculate, and every year, only one of solder flux can be saved more than 20 ten thousand yuan of costs.
3. by repair welding method of the present invention original damage discarded Bel's frog and tongue are utilized again, can save a large amount of production costs.Before this invention, as long as the hurt of train operating safety appears jeopardizing in Bel's frog and tongue, as occur crackle, cracked, fall breakage such as piece, just must change.Suppose that a workshop section is annual if need to change 200 groups of Bel's frogs, 100 tip of a root rails, wherein Bel's frog is by every group of 2.7 ten thousand yuan of calculating, and tongue is by every 0.8 ten thousand yuan of calculating, by repair welding Bel frog and tongue, can save more than 600 ten thousand yuan every year, remarkable in economical benefits, it is bigger to promote the use of prospect.
4. adopt welding wire of the present invention and welding repairing process, operating efficiency improves greatly.Originally the damage of rail repair welding one director 300mm, dark 20mm needs 6~7 hours consuming time, now adopt method of the present invention only to need 1 hour can finish repair welding, saved most of repair welding time, alleviated labour intensity, be subjected to liking of repair welding field worker deeply, this method is more suitable for the on-the-spot repair welding operation of current busy trunk railway.
5. adopt welding wire of the present invention and welding repairing process, through facts have proved, repair welding is respond well.
At new He Xianchangyuan station 11# switch blade rail root the piece that falls of one long 80mm, dark 30mm was arranged once, and adopted method of the present invention behind repair welding in March, 2003, and can continue normally to run, when need more renew rail in May, 2006, the tongue of this repair welding ability was normally changed.Good through the tongue part operational effect of repair welding during this period, any problem does not appear.
At new lotus line K104, No. 40 rail, once found to have the piece that falls of a long 50mm, dark 20mm, wide 65mm, detected a flaw to severely injured, after adopting method repair welding of the present invention in March, 2002, this section operation is so far, and is respond well.
At the up 8# track switch in new station, lotus line Dongming County, be the steel alloy track switch that Zhejiang Bel group produces, change less than one-year age, find partly to occur the piece that falls of a long 300mm, dark 30mm at heart rail.After adopting method repair welding of the present invention on June 24th, 2006, this section operation is respond well so far.
Four, the specific embodiment:
The welding repairing process and the welding wire thereof of embodiment one, Bel's frog, tongue and rail
1. repair welding facility:
(1) polishing facility
Adopt GM-6 rail electrodynamic type sander, or portable abrasive machine (supporting with the F150 generating set), the grinding wheel material is No. 250 white fused aluminas, granularity is 24~28.
(2) gas welding facility and pertinent instruments
H-2 type single hole gas welding torch, SGJ-60 type correcting instrument, oxygen cylinder (interior dress oxygen), oxygen regulator, acetylene gas bottle (interior dress acetylene), acetylene regulator;
1 meter straight steel ruler of special use, clearance gauge, portable timepiece millet cake temperature meter, supersonic detector, portable Rockwell hardness tester, cleansing pin, burning torch, stopwatch, rail temperature meter etc.
(3) welding wire
Wire composition: carbon 0.3%, boron 3.5%, nickel 5%, chromium 0.6%, silicon 4%, molybdenum 3%, surplus is an iron.
The welding wire production method: with industrial converter iron is melted earlier, add compositions such as carbon, boron, nickel, chromium, silicon and molybdenum again, continue to be heated to and go into die casting after the fusing and become mother metal, mechanical stretching becomes the round steel of 5~6mm again; Being cut into 0.5~1 meter long welding wire at last gets final product.
2. welding repairing process
The welding repairing process of Bel's frog, tongue and rail
(1) prepares to unclamp the bolt for the treatment of on three adjacent under welding zone cement pillows before the weldering, take out rubber cushion, change the iron chair suitable into (on thick 8~10mm) pads of iron chair, with anti-deformation with rubber cushion thickness.
With gas welding torch hardened layer, oxide layer and the blind crack sintering on surface, repair welding position are removed, the length at preliminary treatment repair welding position generally should be less than 300 millimeters.When the repair welding position was long, sectional was handled.
(2) repair welding is heated to 1500~1700 ℃ with the oxy arc of welding gun with the repair welding position, makes the surface of the work fusing; The special steel welding wire also is heated to molten state, and workpiece is repaiied in welding wire fusing of marginization, side weld during repair welding, requires welding wire can not leave the molten bath all the time.Heating-up temperature requires to keep the viscosity and the flowability of welding wire in the molten bath, the oxidized and low excessively phenomenon of temperature in repair welding position must not occur.
When treating that the repair welding position naturally cools to 400~500 ℃, the gradation water carries out selective hardening to be handled, and determines each water consumption according to the repair welding area, generally divides 3~7 quenchings, and temperature is reduced to below 200 ℃ until the repair welding position.
(3) postwelding arrangement postwelding adopts the GM-6 sander that repair welding position sanding of flat is suitable, and the input of giving of emery wheel can not be excessive during polishing, the royal purple color spot can not occur during polishing.Till polishing was extremely smooth-going, requiring the rail surface smoothness was 0~0.3mm.
(4) correct if the welding district is cooled to occur caving in behind the normal temperature (available 1 meter straight steel ruler is measured), need to correct with SGJ-60 type correcting instrument.
Antidote: correct in vertical corresponding flange of rail both sides, welding district, temperature is controlled between 600~723 ℃ during rectification.Once correct undesirablely, can divide 2~3 rectifications, till the leveling.The rectification scope must not surpass the welding scope.
Embodiment two, welding repairing process and embodiment one are basic identical, and difference is:
The composition of forming welding wire: carbon 0.7%, boron 1.5%, nickel 3%, chromium 0.6%, silicon 3%, molybdenum 7%, surplus is an iron.
All the other steps no longer repeat with embodiment one.
Embodiment three, welding repairing process and embodiment one are basic identical, and difference is:
The composition of forming welding wire: carbon 0.5%, boron 2.0%, nickel 4%, chromium 0.8%, silicon 3.5%, molybdenum 4%, surplus is an iron.
All the other steps no longer repeat with embodiment one.
Embodiment four, welding repairing process and embodiment one are basic identical, and difference is:
The composition of forming welding wire: carbon 0.6%, boron 3.0%, nickel 4%, chromium 1.5%, silicon 3.5%, molybdenum 6%, surplus is an iron.
All the other steps no longer repeat with embodiment one.

Claims (8)

1. welding wire that is used for the special steel repair welding is characterized in that: represents with percentage by weight, forms in the composition of welding wire and contain carbon 0.3~0.7%, and boron 1.5~3.5%, nickel 3~5%, chromium 0.6~2%, silicon 3~4%, molybdenum 3~7%, surplus is an iron.
2. welding wire according to claim 1 is characterized in that: carbon 0.3~0.7% in the wire composition, boron 1.5~2.5%, and nickel 3~5%, chromium 1~2%, silicon 3~4%, molybdenum 5~7%, surplus is an iron.
3. welding wire according to claim 1 is characterized in that: carbon 0.3~0.7% in the wire composition, boron 2.5~3.5%, and nickel 3~5%, chromium 0.6~1%, silicon 3~4%, molybdenum 3~5%, surplus is an iron.
4. welding wire according to claim 1 is characterized in that: carbon 0.3~0.7% in the wire composition, boron 2~3%, and nickel 3~5%, chromium 1~1.5%, silicon 3~4%, molybdenum 4~6%, surplus is an iron.
5. welding wire according to claim 1 is characterized in that: described special steel for Bel's frog with steel or sharp rail steel.
6. the repair welding method of a special steel comprises the preceding preparation of weldering, repair welding and postwelding finishing technique, it is characterized in that:
(1) pre-preceding the preparation removed hardened layer, oxide layer and the blind crack sintering on surface, repair welding position with gas welding torch,
(2) repair welding is heated to 1500~1700 ℃ with the repair welding position, makes the surface of the work fusing; The described welding wire of claim 1 also is heated to molten state, and workpiece is repaiied in the side weld of welding wire fusing of margin during repair welding,
(3) after quenching treated that the repair welding position naturally cools to 400~500 ℃, the selective hardening processing was carried out in the water gradation,
(4) postwelding arrangement postwelding adopts sander suitable to repair welding position sanding of flat.
7. repair welding method according to claim 6 is characterized in that: after the postwelding arrangement, if the welding district is cooled to the low phenomenon of collapsing occur behind the normal temperature, then need to correct in the described repair welding method.
8. repair welding method according to claim 6 is characterized in that: described special steel for Bel's frog with steel or sharp rail steel.
CNB2006101070990A 2006-09-25 2006-09-25 Welding repair method for specific steel and its welding wire Expired - Fee Related CN100445021C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101070990A CN100445021C (en) 2006-09-25 2006-09-25 Welding repair method for specific steel and its welding wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101070990A CN100445021C (en) 2006-09-25 2006-09-25 Welding repair method for specific steel and its welding wire

Publications (2)

Publication Number Publication Date
CN1943963A CN1943963A (en) 2007-04-11
CN100445021C true CN100445021C (en) 2008-12-24

Family

ID=38043732

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101070990A Expired - Fee Related CN100445021C (en) 2006-09-25 2006-09-25 Welding repair method for specific steel and its welding wire

Country Status (1)

Country Link
CN (1) CN100445021C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103785924A (en) * 2014-01-21 2014-05-14 首钢总公司 Method for bead welding repair of high manganese steel cast steel frog and steel rail
CN113664455B (en) * 2021-07-15 2023-10-20 中钢集团邢台机械轧辊有限公司 Method for repairing abrasion of guide rail of machine tool body

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221294A (en) * 1990-01-23 1991-09-30 Kobe Steel Ltd Mig wire for high tensile steel
JPH03294084A (en) * 1990-04-12 1991-12-25 Daido Steel Co Ltd Welding wire for high-hardness build-up welding
US6852940B1 (en) * 2004-02-23 2005-02-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Welding device
CN1727108A (en) * 2004-05-18 2006-02-01 株式会社神户制钢所 Welding wire for modified 9Cr-1Mo steel, and submerged-arc welding material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221294A (en) * 1990-01-23 1991-09-30 Kobe Steel Ltd Mig wire for high tensile steel
JPH03294084A (en) * 1990-04-12 1991-12-25 Daido Steel Co Ltd Welding wire for high-hardness build-up welding
US6852940B1 (en) * 2004-02-23 2005-02-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Welding device
CN1727108A (en) * 2004-05-18 2006-02-01 株式会社神户制钢所 Welding wire for modified 9Cr-1Mo steel, and submerged-arc welding material

Also Published As

Publication number Publication date
CN1943963A (en) 2007-04-11

Similar Documents

Publication Publication Date Title
CN109468634B (en) Process method for recovering precision of rolling mill step pad by laser cladding technology
RU2485187C2 (en) Cooling method of rail welding zone, cooling device for rail welding zone, and weld joint of rail
CN103668184B (en) The laser repairing process of the vehicle mould of microstructure of surface cladding layer good uniformity
CN109590668A (en) A kind of steam turbine cylinder sealing surface renovation technique
CN104878380B (en) The laser remanufacturing and intensifying method of mine tram wheel pair
CN102430839B (en) Method for manufacturing composite straightening roll by overlaying
CN104148806B (en) A kind of cast steel with high chromium roll top layer fatigue statistic rapid laser repair method
CN112281082A (en) Laser cladding material and train rail laser cladding repair process
JP5531845B2 (en) Post-heat treatment method near the flash butt weld
CN109706449B (en) Coating material for repairing main bearing of shield tunneling machine and process method
CN102941394A (en) Method for overlaying welding of duplex stainless steel
CN111440979A (en) High-wear-resistance cladding metal ceramic powder for surface strengthening and use method thereof
CN106544671A (en) A kind of renovation technique of automobile die
CN105297009A (en) Laser-cladding repairing process for centering roller
CN104250806A (en) Method for preparing wear resistant coating on bar material KOCKS sizing mill clamping chuck surface through laser cladding
CN102848049A (en) Surfacing method of repairing leveling roll with envelope curved surface
CN100445021C (en) Welding repair method for specific steel and its welding wire
CN101381867A (en) Laser remelted alloy powder for repairing surface of high-carbon alloy steel workpieces and method for making same
CN109868469A (en) A kind of dusty material and its manufacturing method for laser manufacture mill housing and roll chock composite liner
CN111424220B (en) Tool apron material in tunnel boring machine tool box, preparation method thereof and tool box
CN101549425B (en) Bell combined frog repair welding technique
CN110666386B (en) Research method for improving performance parameters of argon arc welding surfacing process
CN103668180B (en) With the laser repairing process of the compact vehicle mould in die wear position
CN106086597B (en) A kind of method based on cobalt-chromium-tungsten alloy accumulation molding mill guide wheel
CN104451660A (en) Method for repairing transmission gear of axial flow fan

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: LI DAYING GOU YANG

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110420

Address after: Changyuan County, Henan province 453400 Di Xiang Zhao Zhao Di Cun

Patentee after: Dong Yunsheng

Address before: Changyuan County, Henan province 453400 Di Xiang Zhao Zhao Di Cun

Co-patentee before: Li Daying

Patentee before: Dong Yunsheng

Co-patentee before: Gou Yang

ASS Succession or assignment of patent right

Owner name: HAO JUNQING YANG XIANPING ZHANG MING GUO CHUANWEI

Effective date: 20121205

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121205

Address after: Han Chao Cun, Neihuang County town of East Henan province 453400 No. 216

Patentee after: Dong Yunsheng

Patentee after: Hao Junqing

Patentee after: Yang Xianping

Patentee after: Zhang Ming

Patentee after: Guo Chuanwei

Address before: Changyuan County, Henan province 453400 Di Xiang Zhao Zhao Di Cun

Patentee before: Dong Yunsheng

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160330

Address after: Han Chao Cun, Neihuang County town of East Henan province 453400 No. 216

Patentee after: Dong Yunsheng

Patentee after: Zhang Ming

Address before: Han Chao Cun, Neihuang County town of East Henan province 453400 No. 216

Patentee before: Dong Yunsheng

Patentee before: Hao Junqing

Patentee before: Yang Xianping

Patentee before: Zhang Ming

Patentee before: Guo Chuanwei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081224

Termination date: 20210925