CN100429375C - Formworkfor elevator well of high rising building and construction method thereof - Google Patents

Formworkfor elevator well of high rising building and construction method thereof Download PDF

Info

Publication number
CN100429375C
CN100429375C CNB2007101303938A CN200710130393A CN100429375C CN 100429375 C CN100429375 C CN 100429375C CN B2007101303938 A CNB2007101303938 A CN B2007101303938A CN 200710130393 A CN200710130393 A CN 200710130393A CN 100429375 C CN100429375 C CN 100429375C
Authority
CN
China
Prior art keywords
controll block
steel support
track
mould
large form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007101303938A
Other languages
Chinese (zh)
Other versions
CN101113642A (en
Inventor
高秋利
何增仕
张冠峰
刘喜木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Hebei Construction Group Corp Ltd
Original Assignee
Tianjin University
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University, Hebei Construction Group Corp Ltd filed Critical Tianjin University
Priority to CNB2007101303938A priority Critical patent/CN100429375C/en
Publication of CN101113642A publication Critical patent/CN101113642A/en
Application granted granted Critical
Publication of CN100429375C publication Critical patent/CN100429375C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a formwork for construction and a construction method thereof, in particular to high-rise building elevator barrel formwork and a construction method thereof. The barrel formwork comprises an angle formwork and a large formwork; the large formwork is supported by an upper steel brace and a lower steel brace, the upper steel brace and the lower steel brace respectively meet an upper control block that controls the expansion of the upper steel brace and a lower control block that controls the expansion of the lower steel brace; the control block is provided with a track and a hole which goes through by the steel brace is arranged between the track and the side wall; the steel braces in the same vertical plane are in rigid connection through a fixed column; a pulley is arranged between the steel brace and the track and the upper part of the track of the upper control block inclines outward; the lower part of the lower control block inclines outside; threaded holes are positioned between the upper control block and the lower control block, the threaded hole of the upper control block is a right threaded hole, and the threaded hole of the lower control block is a left threaded hole, the upper control block and the lower control block are connected by a screw through the threaded holes and the upper part of the screw is in rigid connection with a wrench. The barrel formwork has easy production and operation, and reduces the cost and working hour.

Description

A kind of Formworkfor elevator well of high rising building and job practices thereof
Technical field
The present invention relates to a kind of building form and job practices thereof, more particularly relate to a kind of highrise building novel elevator shaft drum form and job practices thereof.
Background technology
Existing tube mould support system commonly used roughly is divided into two classes: triangle chain barrel mould and eight butt bolt moulds.These two kinds of tube mould support systems are made more complicated, need hinge to connect; Operating to turn a plurality of spanners simultaneously, and is not easy to adjust to vertical angle, needs more man-hour.
Summary of the invention
This real goal of the invention is the above-mentioned defective that has the tube mould now in order to overcome, and further reduces cost and increases the benefit, and provides a kind of being convenient to more to make, and cost reduces, and is convenient to more operate the elevator shaft mould of reducing work hours.
For realizing the purpose of invention, the technical solution adopted in the present invention is as follows:
A kind of Formworkfor elevator well of high rising building, comprise Angle formwork, large form, it is characterized in that large form by twice steel support support up and down, the upper steel support is intersected in the flexible last controll block of a control upper steel support, and the bottom steel supports and is intersected in the flexible following controll block of a control bottom steel support; Have track on the controll block, have the hole of passing for the steel support between track and the sidewall; Steel support in the same up and down vertical guide is rigidly connected by fixed leg; Be provided with pulley between steel support and the track, the track of last controll block ecto-entad from top to bottom tilts; The track of following controll block tilts from top to bottom from inside to outside; Have screwed hole in the middle of last controll block and the following controll block, last controll block screwed hole is a right-handed thread, and following controll block screwed hole is a left hand thread, and screw rod connects by screwed hole goes up controll block and following controll block, and screw rod top is right-handed thread, and the bottom is a left hand thread; A screw rod top and a spanner are rigidly connected;
Described Angle formwork and large form are connected with the tongue and groove form;
Described tube mould is combined by four Angle formworks and four large forms, up and down by twice the support of totally ten six roots of sensation steel support large form;
A kind of job practices of Formworkfor elevator well of high rising building comprises a mold process and a form removal process, and lifting tube mould makes a mould in place earlier, proofreaies and correct back colligation body of wall reinforcing bar, and external mold is in place then, proofreaies and correct external mold again, fluid concrete after having proofreaied and correct; After treating that concrete strength reaches 1.2Mpa, shrink cylinder mould steel support is adopted tower crane to hang and is risen the tube mould to the template storage area, clears up template then, proofreaies and correct and be provided with the back and use; It is characterized in that:
Prop up and touch detailed process: at first integral hoisting tube mould after a tube mould puts in place, turns spanner to assigned address clockwise, and last controll block moves down, and the pulley in the last controll block track relatively outwards moves, thereby holds out against large form; Simultaneously, following controll block moves up, and the pulley in the following controll block track relatively outwards moves, and drives the tight large form of steel support simultaneously; Template is in place, weigh down with the transit line then the tube mould is measured correction for four jiaos, after template satisfies the vertical angle requirement, large form and Angle formwork are connected firmly with pin rod;
Form removal detailed process: can carry out form removal after the concrete setting, at first hang on the suspension hook of tower crane with suspension ring, the pin rod that large form is connected with Angle formwork is totally released then, turn spanner clockwise, last controll block moves up, controll block moves down down, the steel support is shunk inward, and template and concrete surface break away from; Owing to is connected by pin rod between Angle formwork and the large form, when large form is shunk inwards by steel support pulling, angle mould by and large form between also contraction inwards of pin rod pulling; Make the whole concrete surface that breaks away from of a mould; Drink spiked 5cm earlier with tower crane, made in the steel support and receive, tower crane slowly rises to template region with the tube mould, clears up, proofreaies and correct, and the brushing release agent uses in order to lower floor.
Compared with prior art, the invention has the beneficial effects as follows:
1, the molded work of tube is simple
The tube mould is made up of four angle moulds and four large forms, does not need hinge.For tongue and groove is connected, prevent spillage between Angle formwork and the large form.According to the difference of elevator shaft design size, can adjust large form length at any time, satisfy different designing requirements.
2, simple to operate
By eight steel supports in plane of assembly pulley control, two groups of pulleys connect into integral body up and down, control 16 steel supports simultaneously.Only need turn the top spanner, can make 16 steel supports flexible simultaneously, not only saving of labor but also laborsaving was easy to operation.Compare recruitment with eight hinge tube moulds and reduce half, reduce 3/4 than three butt bolt moulds.
Description of drawings
Fig. 1 is the tube mould schematic diagram under the holding state;
Fig. 2 is the tube mould schematic diagram of receiving under the mould state;
Fig. 3 is the screw configuration schematic diagram;
Among the figure, 1. Angle formwork 2. large forms 3. back cords 4. bodies of wall 5. spanners 6. screw rods 7. steel support 11. times controll blocks of controll block on 8. fixed legs, 9. pulleys 10..
The specific embodiment
Embodiment sees Fig. 1-3.Formworkfor elevator well of high rising building in the specific embodiment, comprise four Angle formworks 1, four large forms 2, large form 2 by twice up and down totally ten six roots of sensation steel support 7 support large forms, the upper steel support is intersected in the flexible last controll block 10 of pair of control upper steel support, and steel support in bottom is intersected in the flexible following controll block 11 of a control bottom steel support; Have track on last controll block 10, the following controll block 11, have the hole of passing for the steel support between track and the sidewall; Steel support 7 in the same up and down vertical guide is rigidly connected by fixed leg 8; Be provided with pulley between steel support 7 and the track, the track of last controll block 10 is that top is outward-dipping; Following controll block 11 is for outward-dipping downwards; Have screwed hole in the middle of last controll block 10 and the following controll block 11, last controll block 10 screwed holes are right-handed thread, and following controll block 11 screwed holes are left hand thread, and screw rod 6 connects by screwed hole goes up controll block 10 and following controll block 11, screw rod 6 tops are right-handed thread, and the bottom is a left hand thread; Screw rod 6 tops and a spanner 5 are rigidly connected.For ease of dismounting, Angle formwork and large form are connected with the tongue and groove form.
The job practices of this Formworkfor elevator well of high rising building comprises a mold process and a form removal process, and lifting tube mould makes a mould in place earlier, proofreaies and correct back colligation body of wall reinforcing bar, and external mold is in place then, proofreaies and correct external mold again, fluid concrete after having proofreaied and correct; After treating that concrete strength reaches 1.2Mpa, shrink cylinder mould steel support is adopted tower crane to hang and is risen the tube mould to the template storage area, clears up template then, proofreaies and correct and be provided with the back and use;
Prop up and touch detailed process: at first integral hoisting tube mould after a tube mould puts in place, turns spanner to assigned address clockwise, and last controll block moves down, and the pulley in the last controll block track relatively outwards moves, thereby holds out against large form; Simultaneously, following controll block moves up, and the pulley in the following controll block track relatively outwards moves, and drives the tight large form of steel support simultaneously; Template is in place, weigh down with the transit line then the tube mould is measured correction for four jiaos, after template satisfies the vertical angle requirement, large form and Angle formwork are connected firmly with pin rod;
Form removal detailed process: can carry out form removal after the concrete setting, at first hang on the suspension hook of tower crane with suspension ring, the pin rod that large form is connected with Angle formwork is totally released then, turn spanner clockwise, last controll block moves up, controll block moves down down, the steel support is shunk inward, and template and concrete surface break away from; Owing to is connected by pin rod between Angle formwork and the large form, when large form is shunk inwards by steel support pulling, angle mould by and large form between also contraction inwards of pin rod pulling; Make the whole concrete surface that breaks away from of a mould; Drink spiked 5cm earlier with tower crane, made platform support interior the receipts, tower crane slowly rises to template region with the tube mould, clears up, proofreaies and correct, and the brushing release agent uses in order to lower floor.
This mould supports, convenient disassembly, is suitable for the highrise building practicality, has certain application value.

Claims (4)

1, a kind of Formworkfor elevator well of high rising building, comprise Angle formwork, large form, it is characterized in that large form by twice steel support support up and down, the upper steel support is intersected in the flexible last controll block of pair of control upper steel support, and steel support in bottom is intersected in one and controls the flexible following controll block of bottom steel support; Have track on the controll block, have the hole of passing for the steel support between track and the controll block sidewall; Steel support in the same up and down vertical guide is rigidly connected by fixed leg; Be provided with pulley between steel support and the track, the track of last controll block ecto-entad from top to bottom tilts; The track of following controll block tilts from top to bottom from inside to outside; Have screwed hole in the middle of last controll block and the following controll block, last controll block screwed hole is a right-handed thread, and following controll block screwed hole is a left hand thread, and screw rod connects by screwed hole goes up controll block and following controll block, and screw rod top is right-handed thread, and the bottom is a left hand thread; A screw rod top and a spanner are rigidly connected; Angle formwork and large form are connected with the tongue and groove form; This mould is combined by four Angle formworks, four large forms, up and down by twice totally ten six roots of sensation steel supports support large form.
2, the job practices of Formworkfor elevator well of high rising building according to claim 1 comprises a mold process and a form removal process of template, and a lifting tube mould makes a mould in place earlier, proofread and correct back colligation body of wall reinforcing bar, external mold is in place then, proofreaies and correct external mold again, fluid concrete after having proofreaied and correct; After treating that concrete strength reaches 1.2Mpa, shrink cylinder mould steel support is adopted tower crane to hang and is risen the tube mould to the template storage area, clears up template then, proofreaies and correct and be provided with the back and use; It is characterized in that:
Prop up and touch detailed process: at first integral hoisting tube mould after a tube mould puts in place, turns spanner to assigned address clockwise, and last controll block moves down, and the pulley in the last controll block track relatively outwards moves, thereby holds out against large form; Simultaneously, following controll block moves up, and the pulley in the following controll block track relatively outwards moves, and drives the tight large form of steel support simultaneously; Template is in place, weigh down with the transit line then the tube mould is measured correction for four jiaos, after template satisfies the vertical angle requirement, large form and Angle formwork are connected firmly with pin rod;
Form removal detailed process: can carry out form removal after the concrete setting, at first hang on the suspension hook of tower crane with suspension ring, the pin rod that large form is connected with Angle formwork is totally released then, turn spanner clockwise, last controll block moves up, controll block moves down down, the steel support is shunk inward, and template and concrete surface break away from; Owing to is connected by pin rod between Angle formwork and the large form, when large form is shunk inwards by steel support pulling, angle mould by and large form between also contraction inwards of pin rod pulling; Make the whole concrete surface that breaks away from of a mould; Drink spiked 5cm earlier with tower crane, made in the steel support and receive, tower crane slowly rises to template region with the tube mould, clears up, proofreaies and correct, and the brushing release agent uses in order to lower floor.
3, the job practices of Formworkfor elevator well of high rising building according to claim 2 is characterized in that Angle formwork and large form are connected with the tongue and groove form.
4, the job practices of Formworkfor elevator well of high rising building according to claim 2 is characterized in that this kind tube mould is combined by four Angle formworks, four large forms, supports large form by the support of twice ten six roots of sensation steel up and down.
CNB2007101303938A 2007-07-19 2007-07-19 Formworkfor elevator well of high rising building and construction method thereof Expired - Fee Related CN100429375C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007101303938A CN100429375C (en) 2007-07-19 2007-07-19 Formworkfor elevator well of high rising building and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007101303938A CN100429375C (en) 2007-07-19 2007-07-19 Formworkfor elevator well of high rising building and construction method thereof

Publications (2)

Publication Number Publication Date
CN101113642A CN101113642A (en) 2008-01-30
CN100429375C true CN100429375C (en) 2008-10-29

Family

ID=39022154

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007101303938A Expired - Fee Related CN100429375C (en) 2007-07-19 2007-07-19 Formworkfor elevator well of high rising building and construction method thereof

Country Status (1)

Country Link
CN (1) CN100429375C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433990B (en) * 2011-12-15 2013-12-11 中国一冶集团有限公司 Reusable mould for basic foundation bolt holes of large-scale equipment
CN102536249A (en) * 2012-02-23 2012-07-04 中煤第五建设有限公司 Fast construction method of headframe lifting system
CN105298120B (en) * 2015-09-22 2017-09-05 中铁十八局集团隧道工程有限公司 A kind of template fast-supporting device
CN105979139A (en) * 2016-05-31 2016-09-28 深圳埃蒙克斯科技有限公司 Mobile terminal and shooting method thereof
CN107060331B (en) * 2017-06-22 2022-06-07 中国三峡建设管理有限公司 Expansion device
CN107503365B (en) * 2017-09-11 2019-07-30 上海宝冶集团有限公司 Super High elevator high and big die plate installation engineering method
CN110512867A (en) * 2019-08-15 2019-11-29 湖北广盛建设集团有限责任公司 Support shuttering for elevator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5417519A (en) * 1992-08-06 1995-05-23 Smuts; Michiel Formwork apparatus
JPH08105240A (en) * 1994-10-03 1996-04-23 Taisei Corp Mold frame of tower concrete structure and its construction method
DE29705434U1 (en) * 1997-03-26 1997-05-15 Babiuch, Jens, 98701 Neustadt Adjustable formwork, especially for the interior wall areas of a chimney cover plate
CN1258798A (en) * 2000-01-24 2000-07-05 刘国恩 Telescopic rigid angle elevator well formwork with one central mechanism
CN2489024Y (en) * 2001-06-28 2002-05-01 冯树营 Elevator shaft mould in type of drawing in and drawing out integrally

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5417519A (en) * 1992-08-06 1995-05-23 Smuts; Michiel Formwork apparatus
JPH08105240A (en) * 1994-10-03 1996-04-23 Taisei Corp Mold frame of tower concrete structure and its construction method
DE29705434U1 (en) * 1997-03-26 1997-05-15 Babiuch, Jens, 98701 Neustadt Adjustable formwork, especially for the interior wall areas of a chimney cover plate
CN1258798A (en) * 2000-01-24 2000-07-05 刘国恩 Telescopic rigid angle elevator well formwork with one central mechanism
CN2489024Y (en) * 2001-06-28 2002-05-01 冯树营 Elevator shaft mould in type of drawing in and drawing out integrally

Also Published As

Publication number Publication date
CN101113642A (en) 2008-01-30

Similar Documents

Publication Publication Date Title
CN100429375C (en) Formworkfor elevator well of high rising building and construction method thereof
CN106801510A (en) Plastic formwork early removing system
CN202830776U (en) Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device
CN206707270U (en) Early dismantling head and early-dismantling formwork system
CN102587918B (en) High-strength reducing template for construction of coal mine freezing vertical shaft
CN101408020A (en) Integral lifting rack of movable mould frame and method for hanging movable mould frame thereof
CN105781100A (en) Template component for sidewall of subway station
CN205804939U (en) template assembly for subway station side wall
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN103104090B (en) Silo concrete whole slip template
CN104131700A (en) Method and formwork for pouring door and window cast-in-place beam
CN203113793U (en) Large formwork installation system of oblique structure
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN203475790U (en) Hydraulic lifting-type building scaffold
CN205669313U (en) A kind of Universal adjustable hangs template system
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN204252083U (en) Arch dam bracket hangs plate device by the feet entirely
CN206707266U (en) Plastic formwork early removing system
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN205894292U (en) Prefabricated assembly structure tip beam column node fixed knot constructs
CN104372948A (en) Elevator shaft formwork lifting frame
CN205279745U (en) Adjustable vault
CN204299182U (en) The overall advance and retreat mold mechanism of a kind of wall form
CN210340091U (en) Column main reinforcement hoisting tool of concrete cast-in-place steel rib column
CN202324658U (en) Device for installing large-span roof truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: TIANJIN UNIVERSITY; APPLICANT

Free format text: FORMER OWNER: HEBEI CONSTRUCTION GROUP CO.

Effective date: 20080425

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080425

Address after: Zip code 92, Weijin Road, Nankai District, Tianjin: 300072

Applicant after: Tianjin University

Co-applicant after: HEBEI CONSTRUCTION GROUP Co.,Ltd.

Address before: Address 329, 54 West Road, Xinshi District, Hebei, Baoding: 071002

Applicant before: HEBEI CONSTRUCTION GROUP Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Co-patentee after: HEBEI CONSTRUCTION GROUP Corp.,Ltd.

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Co-patentee before: HEBEI CONSTRUCTION GROUP Co.,Ltd.

Patentee before: Tianjin University

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081029