CN100396803C - Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall - Google Patents

Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall Download PDF

Info

Publication number
CN100396803C
CN100396803C CNB2006100484908A CN200610048490A CN100396803C CN 100396803 C CN100396803 C CN 100396803C CN B2006100484908 A CNB2006100484908 A CN B2006100484908A CN 200610048490 A CN200610048490 A CN 200610048490A CN 100396803 C CN100396803 C CN 100396803C
Authority
CN
China
Prior art keywords
brick
arch
wall
broken line
refractory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100484908A
Other languages
Chinese (zh)
Other versions
CN1944693A (en
Inventor
李建纯
王玉平
李建三
李建晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANYE REFRACTORY CO Ltd GONGYI CITY
Original Assignee
JIANYE REFRACTORY CO Ltd GONGYI CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANYE REFRACTORY CO Ltd GONGYI CITY filed Critical JIANYE REFRACTORY CO Ltd GONGYI CITY
Priority to CNB2006100484908A priority Critical patent/CN100396803C/en
Publication of CN1944693A publication Critical patent/CN1944693A/en
Application granted granted Critical
Publication of CN100396803C publication Critical patent/CN100396803C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention discloses one kind of masonry cross beam with air guide wall and vertical pellet furnace with the air guide wall. The arched masonry cross beam is laid with refractory bricks of different shapes and with ventilating hole. The cross beam has refractory bricks of special shape in its ends to form square column ends for easy installation. The vertical pellet furnace has masonry cross beam, wall with ventilating hole and closed top. The present invention has reasonable structure, high strength, low cost and wide use range, and is especially suitable for use in large span vertical pellet furnace.

Description

Air-guiding wall arch or broken line arch are built brick crossbeam and the blast deflecting wall for vertical pellet furnace built by laying bricks or stones
One. technical field:
The present invention relates to a kind of air-guiding wall and crossbeam of palletizing shaft furnace, particularly relate to a kind of air-guiding wall arch or broken line arch and build brick crossbeam and the blast deflecting wall for vertical pellet furnace built by laying bricks or stones.
Two. background technology:
The powdered iron ore pelletizingization is one of efficient, long-lived, energy-conservation gordian technique of blast furnace ironmaking, must dry after the powdered iron ore pelletizingization, and sintering, shaft furnace are the advanced technologies in the sintering technology.That shaft furnace process has is simple in structure, less investment, thermo-efficiency height, convenient, the operating rate advantages of higher of operating maintenance.The oven dry bed places shaft furnace furnace roof place, the green-ball that has certain particle size during work is carried other shaft furnace top with conveyor, be distributed into continuously, uniformly in the oven dry bed by material distributing machine, the green-ball that enters in the shaft furnace descends with a certain speed, hot gas in the combustion chamber sprays in the stove from burner, carries out heat exchange from bottom to top.Most of cooling air (hot blast) after the heat exchange is by air-guiding wall, converges under the fire grate of oven dry bed with the waste gas (after the heat exchange) of combustion chamber---dry green-ball, draw from fire door then, and through dustproof, feed smoke stack emission.At first process drying and dehydrating preheating oxidation in shaft furnace top oven dry bed of green-ball enters the roasting band then, at high temperature takes place fixed; Through the soaking zone, finish whole consolidation processes; Fixed good pelletizing and bottom blast the cooling air that in the stove rise in the back and carry out heat exchange and obtain cooling; Cold finished pellet of being honored as a queen is discharged from furnace bottom; Finish the whole roasting process of pelletizing.
The oven dry bed mainly is made up of oven dry bed supporting beam and dry the comb.Majority is an individual layer, and only a few is a herring-bone intersection multilayer.Oven dry bed supporting beam all adopts water cooling, is called baking bed water beam, and baking bed water beam is commonly called as Xiao Shuiliang, is that the dry double-edged fine-toothed comb of rest is used, and beam requires to bear 500-600 ℃, and individual cases reach the high temperature of 900 ~ C, simultaneously water-fast vapour and the corrosion of other sour gas; Bear the uniform load of about 1t/m, so the performance of beam, life-span are related to sintering cost, energy consumption and labour productivity.Early stage baking bed water beam is the rectangular configuration with the angle steel welding, and weld seam cracking easily leaks.After change thick-walled seamless steel pipes into, avoided the cracking leak.Baking bed water beam is worked under hot conditions, and adopt water cooling to have following defective: (1) water loss is big, and this problem is along with the anxiety of water resources is more and more outstanding; (2) along with the deposition of incrustation scale, the cooling performance variation causes the wall temperature rising and makes the water beam deflection; 3) when having a power failure suddenly, make the water beam cut off the water supply and burn out; (4) current consumption is big, because the residing position of oven dry bed absolute altitude is very high, increased the water coolant pump lift greatly, the power of water pump, power consumption all increase greatly under the identical condition of the water yield, about in addition 1/3rd heat energy is taken away by water, reduce thermo-efficiency, caused the consumption of thermal waste and water resources.
At this situation, (publication number is CN1600879A to Chinese patent, application number is 200410086129.5) a kind of " high furnace baking bed for sintering ball body of powder of iron ore water free beam " disclosed, the cross section of this beam is combined by the semicircle arch and the bottom rectangle on top, and its centre portions is the reinforcing bar pottery beam body that is combined with the superalloy skeleton (2) of internal layout by the matrix (1) that enhancing toughening ceramic material constitutes; Even coating alumina silicate fibrous insulant (3) plays a role in insulation around the beam body; Thermal insulation material coats stainless refractory steel protective guard (4) outward; surface lacquer Y2O3ZrO2 thermal barrier coating (5); this beam has good heat-resistant, mechanical property and chemical property; replace the weldless steel tube water-cooled beam that present pellet sintering shaft furnace baking bed uses, the cancellation shaft furnace is produced huge pressure water supply cooling system, realizes the waterless operation of Shaft furnace drying bed; reach the minimizing initial cost; the conserve water resource improves energy utilization rate, improves the purpose that product produces matter and quality.But this beam is the straight line cylindricality, and during large span, the intermediary weak strength improves the intensity of whole beam if desired, needs to increase the rugosity of beam, increases cost.
Three. summary of the invention:
Purpose of the present invention: the defective that overcomes prior art, provide a kind of air-guiding wall arch or broken line arch reasonable in design, simple in structure, that intensity is high to build the brick crossbeam of building by laying bricks or stones, and provide a kind of this air-guiding wall arch or broken line arch used to build the brick blast deflecting wall for vertical pellet furnace of building crossbeam by laying bricks or stones, it has cancelled the pressure water supply cooling system of Shaft furnace drying bed bulky complex, has reduced the sintering cost.
Technical scheme of the present invention: a kind of air-guiding wall arch or broken line arch are built the brick crossbeam of building by laying bricks or stones, contain arch or broken line arched beam body, described arch or broken line arched beam body are made of prefabricated arch brick of refractory materials or brick the building of broken line arch, according to design requirements, center camber line with arch or broken line arched beam body is a benchmark, outwards with the prefabricated arch brick of refractory materials or the broken line arch brick of inwardly building certain number of plies respectively by laying bricks or stones, to form the integral thickness of arch or broken line arched beam body, side with layer adjacent prefabricated arch brick of refractory materials or broken line arch brick is complementary and closely contact, the outside surface arc length of prefabricated arch brick of described refractory materials or broken line arch brick vertical cross-section or chord length are greater than its internal surface arc length or chord length, the prolongation Plane intersects of two sides that makes prefabricated arch brick of described refractory materials or broken line arch brick is in straight line, be provided with ventilation hole in prefabricated arch brick of each refractory materials or the broken line arch brick, prefabricated arch brick of the refractory materials of different layers or the dislocation of broken line arch brick are arranged, and its ventilation hole is complementary and up/down perforation, different positions according to arch or broken line arched beam body upper surface, build the different top quarl of vertical cross-section respectively by laying bricks or stones, the adjacent side of described top quarl closely contacts, its upper surface has been built rectangular parallelepiped refractory brick by laying bricks or stones, the upper surface shape of prefabricated arch brick of its underside shape and refractory materials or broken line arch brick is complementary, the upper surface of all the superiors' rectangular parallelepiped refractory brick is similar to and is in same plane, different positions according to arch or surface, broken line arched beam body both ends, build the different end quarl of vertical cross-section respectively by laying bricks or stones, the surface shape of prefabricated arch brick of the medial surface of described end quarl and contacted refractory materials or broken line arch brick is complementary, its outer side is the plane, to form a cylindrical end, be convenient to install and fix, be respectively arranged with in top quarl and the rectangular parallelepiped refractory brick with prefabricated arch brick of refractory materials or broken line arch brick in ventilation hole be complementary and the ventilation hole of up/down perforation.
Described ventilation hole be shaped as square, or be rectangle, or be Polygons, or be circular.The sagitta of described beam body is 1/6~1/3 of an arch length.
The vertical cross-section of prefabricated arch brick of described refractory materials or broken line arch brick is arc fan annular or isosceles trapezoid; The vertical cross-section of described top quarl and end quarl is a right-angle triangle, or is right-angled trapezium, or is rectangle, or is the combination of above-mentioned shape.
A kind ofly contain described air-guiding wall arch or the broken line arch is built the brick blast deflecting wall for vertical pellet furnace of building crossbeam by laying bricks or stones, also contain body of wall and bind, and be provided with ventilation hole in the body of wall, body of wall upper end or bind and be provided with exhaust outlet, described air-guiding wall arch or broken line arch are built the brick rectangular parallelepiped refractory brick of building the crossbeam upper end by laying bricks or stones and are provided with body of wall, the body of wall upper surface is provided with and binds, described body of wall contains brick layer that is made of rectangular parallelepiped body of wall refractory brick and the brick layer that is made of T type body of wall refractory brick, wherein, rectangular parallelepiped body of wall fire brick layer and T type body of wall fire brick layer are alternately arranged, and the rectangular parallelepiped body of wall refractory brick of adjacent layers and the dislocation of T type body of wall refractory brick are arranged, to gain in strength, described rectangular parallelepiped body of wall refractory brick is provided with ventilation hole, the inner of the adjacent T type body of wall refractory brick of layer surrounds ventilation hole, the ventilation hole of rectangular parallelepiped body of wall refractory brick together, the ventilation hole that T type body of wall refractory brick the inner surrounds all with prefabricated arch of refractory materials or broken line arch brick, the top quarl, the ventilation hole that is provided with respectively in the rectangular parallelepiped refractory brick is complementary and up/down perforation.
The location is convenient in the upper and lower surperficial both sides of described rectangular parallelepiped body of wall refractory brick and T type body of wall refractory brick and be respectively arranged with projection and the groove that is complementary along the length direction of beam body.
The two sides of described rectangular parallelepiped body of wall refractory brick are respectively arranged with projection and the groove that is complementary, and are convenient to the location.
Described binding is built into by refractory brick, more than one deck.
Beneficial effect of the present invention:
1. air-guiding wall arch of the present invention or broken line arch are built by laying bricks or stones and are brickly built that crossbeam is reasonable in design, intensity is high, its beam body is an arch, is formed by prefabricated arch brick of refractory materials or brick the building of broken line arch, adopts domes to increase its loading strength greatly, and the saving material of construction, cost is lower.
2. air-guiding wall arch of the present invention or broken line arch are built the brick crossbeam of building by laying bricks or stones and are cooled off without water flowing, have cancelled the huge pressure waterworks of water-cooled steel tubular beam, reduce capital cost; simultaneously, because without water-cooled, heat energy utilization rate height; can effectively reduce production costs decontamination, protection environment.Accident such as avoided under the high temperature because of lack of water, the cut off the water supply fracture of water beam, the air-guiding wall that cause collapse simultaneously.
3. air-guiding wall arch of the present invention or broken line arch build that brick to build crossbeam good in economic efficiency by laying bricks or stones, the work-ing life of ordinary steel structural beams is about 1 year, and beam body of the present invention work-ing life is more than a year and a half, reduce the frequency of changing, save cost, and every cover beam body of the present invention is than 1,500,000 yuan of the annual saving of ordinary steel structural beams, remarkable benefit.
4. air-guiding wall of the present invention is durable, and the rectangular parallelepiped body of wall fire brick layer of its body of wall and T type body of wall fire brick layer are alternately arranged, and the rectangular parallelepiped body of wall refractory brick of adjacent layers and T type body of wall refractory brick dislocation arrangement, the intensity height.In addition, be respectively arranged with projection and the groove that is complementary on described rectangular parallelepiped body of wall refractory brick and the T type body of wall refractory brick, be convenient to the location.
5. use range of the present invention is wide, particularly is applicable to the palletizing shaft furnace of large span, is easy to promote, and has good social and economic benefit.
Four. description of drawings:
Fig. 1 builds one of brick structural representation of building crossbeam by laying bricks or stones for air-guiding wall arch or broken line arch;
Fig. 2 builds the brick vertical view of building crossbeam by laying bricks or stones for air-guiding wall arch shown in Figure 1 or broken line arch;
Fig. 3 builds two of the brick structural representation of building crossbeam by laying bricks or stones for air-guiding wall arch or broken line arch;
Fig. 4 is the structural representation of blast deflecting wall for vertical pellet furnace;
Fig. 5 is the vertical view of blast deflecting wall for vertical pellet furnace shown in Figure 4;
Fig. 6 is the left view of blast deflecting wall for vertical pellet furnace shown in Figure 4.
Five. embodiment:
Embodiment one: referring to Fig. 1 and Fig. 2, among the figure, the air-guiding wall arch is built the brick beam body of crossbeam of building by laying bricks or stones by the prefabricated arch brick 3 of refractory materials, two-layer building by laying bricks or stones formed in 6 minutes, and the prefabricated arch brick 3 of refractory materials, 6 dislocation are arranged, gain in strength, the two ends of the prefabricated arch brick 3 of refractory materials have been built by laying bricks or stones and have been joined shape refractory brick 8, prefabricated arch brick 3 upper surfaces of refractory materials are built top quarl 2 by laying bricks or stones, 5,7, top quarl 2,5,7 upper surfaces are provided with rectangular parallelepiped refractory brick 1, quarl 2,5, prefabricated arch brick 3 upper surfaces of 7 lower surfaces and refractory materials are complementary, its upper surface and rectangular parallelepiped refractory brick 1 are complementary, adjacent quarl 2,5, a left side of 7, the right side is complementary, make the upper end of beam body form a horizontal plane, quarl 2,5,7 vertical cross-section is respectively: approximate right angle is trapezoidal, approximate rectangle, the approximate right angle trilateral, the prefabricated arch brick 3 of the refractory materials of beam body, 6, top quarl 2,5,7 and rectangular parallelepiped refractory brick 1 same position on be respectively arranged with the ventilation hole 4 that is complementary, ventilation hole 4 is vertical with the string of a musical instrument of beam body; The two ends of beam body are respectively arranged with end quarl 9,10, the surface shape of end quarl 9,10 medial surfaces and the prefabricated arch brick 3,6 of contacted refractory materials is complementary, its outer side is the plane, it is trapezoidal that vertical cross-section is shaped as approximate right angle, to form a square column type end, be convenient to be fixed on the body of heater of palletizing shaft furnace.
In addition, the beam body can be formed by brick the building of the prefabricated arch of one deck refractory materials; Also can be formed by brick the building of the prefabricated arch of the above refractory materials of one deck, for example three layers, four layers or five layers, during multilayer, the refractory materials preformed bricks of adjacent layers is dislocatedly distributed, and increases the intensity of beam.
The sagitta of beam body is 1/6~1/3 of an arch length, determines as the case may be.Side with the adjacent prefabricated arch brick 3,6 of refractory materials of layer is complementary and closely contact, prefabricated arch brick 3,6 vertical cross-sections of refractory materials are arc fan annular, its outer arc arc length in it of growing up, the prolongation Plane intersects of two sides that makes the prefabricated arch brick 3,6 of refractory materials is in straight line.
Embodiment two: referring to Fig. 3, numbering is identical with embodiment one among the figure, the same meaning of representative, something in common does not repeat, difference is: be respectively arranged with the ventilation hole 4 that is complementary on the prefabricated arch brick 3,6 of the refractory materials of beam body, top quarl 2,5,7 and rectangular parallelepiped refractory brick 1 same position, and the ventilation hole in the prefabricated arch brick 3,6 of refractory materials is vertical with the string of a musical instrument of the prefabricated arch brick 3,6 of refractory materials; Ventilation hole 4 in top quarl 2,5,7 and the rectangular parallelepiped refractory brick 1 is a vertical direction up and down.
Embodiment three: present embodiment and embodiment one or embodiment two are basic identical, something in common does not repeat, difference is: the air-guiding wall arch is built the brick beam body of building crossbeam by laying bricks or stones and is divided two-layer building by laying bricks or stones to form by the prefabricated broken line arch of refractory materials brick, side with the adjacent prefabricated broken line arch of the refractory materials brick of layer is complementary and closely contact, the outside surface chord length of the prefabricated broken line arch of refractory materials brick vertical cross-section is greater than its internal surface chord length, the prolongation Plane intersects of two sides that makes the prefabricated broken line arch of refractory materials brick is in straight line, and the vertical cross-section of the prefabricated broken line arch of refractory materials brick is approximately isosceles trapezoid.
Embodiment four: referring to Fig. 4, Fig. 5 and Fig. 6, numbering is identical with embodiment one among the figure, the same meaning of representative, something in common does not repeat, blast deflecting wall for vertical pellet furnace contains the air-guiding wall arch builds the brick crossbeam of building by laying bricks or stones, body of wall and binding, the air-guiding wall arch is built the brick rectangular parallelepiped refractory brick 1 of building the crossbeam upper end by laying bricks or stones and is provided with body of wall, the body of wall upper surface is provided with and binds 17, body of wall is a multiple layer refractory brick layer, wherein the odd number layer is made of rectangular parallelepiped body of wall refractory brick 11, the even numbers layer is by "] at intermediary T type body of wall refractory brick 15 and two ends " shape body of wall refractory brick formation, wherein, the rectangular parallelepiped body of wall refractory brick 11 of adjacent layers and 15 dislocation of T type body of wall refractory brick are arranged, to gain in strength, rectangular parallelepiped body of wall refractory brick 11 is provided with ventilation hole 13, adjacent T type body of wall refractory brick the inner with layer surrounds ventilation hole 13, the ventilation hole 13 that the ventilation hole 13 of rectangular parallelepiped body of wall refractory brick 11 and T type body of wall refractory brick 15 the inners surround is complementary, and and the prefabricated arch brick 3 of refractory materials, 6, top quarl 2,5,7, the ventilation hole 4 that is provided with respectively on the rectangular parallelepiped refractory brick 1 is complementary, and is convenient to ventilate.Body of wall upper end or bind and be provided with exhaust outlet (not drawing among the figure).
The upper and lower surperficial both sides of rectangular parallelepiped body of wall refractory brick 11 and T type body of wall refractory brick 15 and be respectively arranged with projection and the groove 12 that is complementary along the length direction of beam body are convenient to locate up and down.And the two sides of rectangular parallelepiped body of wall refractory brick 11 are respectively arranged with projection and the groove 14 that is complementary, location about being convenient to.
In addition, binding 17 is built into by refractory brick, is one deck, or is more than one deck, determines as required, among the figure is four layers.
Embodiment five: present embodiment and embodiment four are basic identical, and something in common does not repeat, and difference is: the air-guiding wall lower end adopts embodiment one or embodiment two described air-guiding wall arches or broken line arch to build the brick crossbeam of building by laying bricks or stones.
Change the concrete structure of refractory materials preformed bricks, top quarl, rectangular parallelepiped refractory brick, rectangular parallelepiped body of wall refractory brick, T type body of wall refractory brick, and change refractory materials preformed bricks in the beam body the number of plies, change body of wall, the number of plies that binds can form a plurality of embodiment, all belong to common variation range of the present invention, do not describe in detail one by one at this.

Claims (8)

1. air-guiding wall arch or broken line arch are built the brick crossbeam of building by laying bricks or stones, contain arch or broken line arched beam body, it is characterized in that: described arch or broken line arched beam body are made of prefabricated arch brick of refractory materials or brick the building of broken line arch, center camber line with arch or broken line arched beam body is a benchmark, outwards with the prefabricated arch brick of refractory materials or the broken line arch brick of inwardly building certain number of plies respectively by laying bricks or stones, to form the integral thickness of arch or broken line arched beam body, side with layer adjacent prefabricated arch brick of refractory materials or broken line arch brick is complementary and closely contact, the outside surface arc length of prefabricated arch brick of described refractory materials or broken line arch brick vertical cross-section or chord length are greater than its internal surface arc length or chord length, the prolongation Plane intersects of two sides that makes prefabricated arch brick of described refractory materials or broken line arch brick is in straight line, be provided with ventilation hole in prefabricated arch brick of each refractory materials or the broken line arch brick, prefabricated arch brick of the refractory materials of different layers or the dislocation of broken line arch brick are arranged, and its ventilation hole is complementary and up/down perforation, different positions according to arch or broken line arched beam body upper surface, build the different top quarl of vertical cross-section respectively by laying bricks or stones, the adjacent side of described top quarl closely contacts, its upper surface has been built rectangular parallelepiped refractory brick by laying bricks or stones, the upper surface shape of prefabricated arch brick of its underside shape and refractory materials or broken line arch brick is complementary, the upper surface of all the superiors' rectangular parallelepiped refractory brick is similar to and is in same plane, different positions according to arch or surface, broken line arched beam body both ends, build the different end quarl of vertical cross-section respectively by laying bricks or stones, the surface shape of prefabricated arch brick of the medial surface of described end quarl and contacted refractory materials or broken line arch brick is complementary, its outer side is the plane, to form a cylindrical end, be convenient to install and fix, be respectively arranged with in top quarl and the rectangular parallelepiped refractory brick with prefabricated arch brick of refractory materials or broken line arch brick in ventilation hole be complementary and the ventilation hole of up/down perforation.
2. air-guiding wall arch according to claim 1 or broken line arch are built the brick crossbeam of building by laying bricks or stones, it is characterized in that: described ventilation hole be shaped as square, or be rectangle, or be Polygons, or be circular.
3. air-guiding wall arch according to claim 1 or broken line arch are built the brick crossbeam of building by laying bricks or stones, it is characterized in that: the sagitta of described beam body is 1/6~1/3 of an arch length.
4. air-guiding wall arch according to claim 1 or broken line arch are built the brick crossbeam of building by laying bricks or stones, it is characterized in that: the vertical cross-section of prefabricated arch brick of described refractory materials or broken line arch brick is arc fan annular or isosceles trapezoid; The vertical cross-section of described top quarl and end quarl is a right-angle triangle, or is right-angled trapezium, or is rectangle, or is the combination of above-mentioned shape.
5. one kind contains the described air-guiding wall arch of claim 1 or the broken line arch is built the brick blast deflecting wall for vertical pellet furnace of building crossbeam by laying bricks or stones, also contain body of wall and bind, and be provided with ventilation hole in the body of wall, body of wall upper end or bind and be provided with exhaust outlet, it is characterized in that: described air-guiding wall arch or broken line arch are built the brick rectangular parallelepiped refractory brick of building the crossbeam upper end by laying bricks or stones and are provided with body of wall, the body of wall upper surface is provided with and binds, described body of wall contains brick layer that is made of rectangular parallelepiped body of wall refractory brick and the brick layer that is made of T type body of wall refractory brick, wherein, rectangular parallelepiped body of wall fire brick layer and T type body of wall fire brick layer are alternately arranged, and the rectangular parallelepiped body of wall refractory brick of adjacent layers and the dislocation of T type body of wall refractory brick are arranged, to gain in strength, described rectangular parallelepiped body of wall refractory brick is provided with ventilation hole, the inner of the adjacent T type body of wall refractory brick of layer surrounds ventilation hole, the ventilation hole of rectangular parallelepiped body of wall refractory brick together, the ventilation hole that T type body of wall refractory brick the inner surrounds all with prefabricated arch of refractory materials or broken line arch brick, the top quarl, the ventilation hole that is provided with respectively in the rectangular parallelepiped refractory brick is complementary and up/down perforation.
6. blast deflecting wall for vertical pellet furnace according to claim 5 is characterized in that: the upper and lower surperficial both sides of described rectangular parallelepiped body of wall refractory brick and T type body of wall refractory brick and be respectively arranged with projection and the groove that is complementary along the length direction of beam body, be convenient to the location.
7. blast deflecting wall for vertical pellet furnace according to claim 5 is characterized in that: the two sides of described rectangular parallelepiped body of wall refractory brick are respectively arranged with projection and the groove that is complementary, and are convenient to the location.
8. blast deflecting wall for vertical pellet furnace according to claim 5 is characterized in that: described binding is built into by refractory brick, more than one deck.
CNB2006100484908A 2006-07-31 2006-07-31 Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall Expired - Fee Related CN100396803C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100484908A CN100396803C (en) 2006-07-31 2006-07-31 Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100484908A CN100396803C (en) 2006-07-31 2006-07-31 Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall

Publications (2)

Publication Number Publication Date
CN1944693A CN1944693A (en) 2007-04-11
CN100396803C true CN100396803C (en) 2008-06-25

Family

ID=38044342

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100484908A Expired - Fee Related CN100396803C (en) 2006-07-31 2006-07-31 Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall

Country Status (1)

Country Link
CN (1) CN100396803C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101738082B (en) * 2010-01-19 2011-05-11 唐山市盈心耐火材料有限公司 Smelting palletizing shaft furnace air-guiding wall and building method thereof
CN113883884A (en) * 2021-10-14 2022-01-04 南京钢铁股份有限公司 Wall brick structure of air guide wall of shaft furnace and preparation process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2457171Y (en) * 2000-12-29 2001-10-31 莱芜钢铁股份有限公司烧结厂 Air guide wall water beam of pelletizing vertical furnace with protective layer
CN2489284Y (en) * 2001-06-19 2002-05-01 长沙冶金设计研究院 Air guide wall for vetical furnace
CN1600879A (en) * 2004-10-27 2005-03-30 周传禄 Water free beam of high furnace baking bed for sintering ball body of powder of iron ore
CN2876659Y (en) * 2006-07-31 2007-03-07 巩义市建业耐材有限公司 Arch or fold line arch brick summer beam for air ducting wall and air guide wall of pellet shaft furnace

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2457171Y (en) * 2000-12-29 2001-10-31 莱芜钢铁股份有限公司烧结厂 Air guide wall water beam of pelletizing vertical furnace with protective layer
CN2489284Y (en) * 2001-06-19 2002-05-01 长沙冶金设计研究院 Air guide wall for vetical furnace
CN1600879A (en) * 2004-10-27 2005-03-30 周传禄 Water free beam of high furnace baking bed for sintering ball body of powder of iron ore
CN2876659Y (en) * 2006-07-31 2007-03-07 巩义市建业耐材有限公司 Arch or fold line arch brick summer beam for air ducting wall and air guide wall of pellet shaft furnace

Also Published As

Publication number Publication date
CN1944693A (en) 2007-04-11

Similar Documents

Publication Publication Date Title
CN101792837B (en) High-temperature low-oxygen top-combustion-type air heating furnace
JP3223816U (en) New top-fired hot air furnace
CN2876659Y (en) Arch or fold line arch brick summer beam for air ducting wall and air guide wall of pellet shaft furnace
US5052918A (en) Method and a regenerator for heating gases
CN100396803C (en) Air guide wall arch or mansard arch masonry and brick masonry large beam and pelletizing vertical furnace air guide wall
CN112128975B (en) Hot blast stove for combustion and heat transfer in air gas up-spraying entrainment high-temperature flue gas heat accumulator
CN202382575U (en) High-temperature furnace top lining reinforcing beam structure with central flue
CN206330432U (en) It is a kind of to eliminate the process structure that Mialz lime kiln runs wind
CN103553373A (en) Annular sleeve kiln
CN203530147U (en) Annular sleeve kiln
CN2802400Y (en) Vertical internal combustion pelletizing shaft furnace
CN201634702U (en) High-temperature and low-oxygen top-combustion type hot-blast stove
CN201245671Y (en) Novel catenary dome ceramic combusting device hot-air furnace
CN101748230A (en) High-temperature low-oxygen external combustion stove
CN213179369U (en) Double-cylinder rotary kiln for burning back tail gas
CN101398259B (en) Bottom flue gas passage structure of electrode calcination furnace with cap
CN202116623U (en) Heat storage type soaking pit combusting gas with low heat value
CN101792838B (en) High-temperature low-oxygen internal-combustion-type air heating furnace
CN201129732Y (en) Calcine furnace bottom flue gas duct structure with cap electrode
CN104098097A (en) High-efficient vertical-pipe activation furnace
CN217154982U (en) Heat preservation stove cap for reburning kiln
CN216472943U (en) Shaft kiln cooling device with good high-temperature performance
CN218937020U (en) Double-hearth kiln supporting arch refractory material reinforcing, repairing and improving mechanism
CN218989346U (en) Cover type stepping trolley and top refractory arrangement structure thereof
CN101949642A (en) Wide roller kiln for baking pattern penetrated bricks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080625

Termination date: 20150731

EXPY Termination of patent right or utility model