CN100374673C - Sloping wedge clamp of building moulding board and mounting, unloading tool thereof - Google Patents

Sloping wedge clamp of building moulding board and mounting, unloading tool thereof Download PDF

Info

Publication number
CN100374673C
CN100374673C CNB031136699A CN03113669A CN100374673C CN 100374673 C CN100374673 C CN 100374673C CN B031136699 A CNB031136699 A CN B031136699A CN 03113669 A CN03113669 A CN 03113669A CN 100374673 C CN100374673 C CN 100374673C
Authority
CN
China
Prior art keywords
wedge
polished rod
tiltedly
present
clamping device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB031136699A
Other languages
Chinese (zh)
Other versions
CN1521381A (en
Inventor
潘颖聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB031136699A priority Critical patent/CN100374673C/en
Publication of CN1521381A publication Critical patent/CN1521381A/en
Application granted granted Critical
Publication of CN100374673C publication Critical patent/CN100374673C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to an inclined wedge clamping device used for a building mould plate and a handling tool thereof. The inclined wedge clamping device comprises a polished rod and is characterized in that an inclined sleeve is a prolate formed steel pipe, the shaft direction of a hole has an inclined degree which is the same as that of an inclined wedge, the polished rod penetrates into the hole of the inclined sleeve, and the inclined wedge is wedged into an interval of the polished rod and the hole of the inclined sleeve. The present invention separates the clamping device from the handling tool, and the position of the mould plate can be regulated by a pair of installing tool pliers of a crank link mechanism, and the clamping device can be disassembled by the inclined wedge. The present invention has the advantages of simple and reliable technology, easy assembly and disassembly and low cost; furthermore, the present invention has great popularization value.

Description

The wedge anchor clamps and the demounting tool thereof of construction formwork
Technical field
A kind of construction formwork anchor clamps and handling instrument of loading and unloading fast of relating to.
Background technology
The ramming concrete all uses powerful electromagnetic shaker tamped concrete on the building site now, because shaking force is big, requirement to the more stable and stronger of template is also high, it is the easiest and effectual that yes clamps with lead screw, as the left figure of Fig. 1 of accompanying drawing, it is an exemplary of ramming concrete wall, screw rod passes two templates, two templates are kept wanting the thickness of ramming concrete wall and pressing, when the concrete ramming, screw rod keeps the position of template and bears the shaking force of concrete expansion force and electromagnetic shaker, it is when decking that screw rod also has a function, turn nut and produce a P to power, template is adjusted to the right place, this function does not all have at a lot of newly-designed anchor clamps, because in the reality construction, template all is very big one, be impossible produce the big like this adjustment pressure of P template is shifted onto position and pressing by installer's hand push power, at patent No. ZL99228347.7 " template support fixture ", patent No. ZL94216354.0 " formwork tie anchor clamps " and patent No. ZLO 1229940.5 " draw rod device of using on the construction formwork " are exactly an example, all do not produce the measure of P to the power of adjustment.All use the common fault that all has of screw rod clamping template is exactly that the screw rod waste is big, because the unavoidable cement bonded sand that is stained with of screw rod during the ramming concrete, and the corrosion of on-the-spot open work wind and rain, when dismantling, stick in the cement hardening already on the screw rod silk tooth, make the nut rust dead, be difficult to dismounting, only cut off and get over, more will cut off within the walls because of ramming as the concrete wall screw of the left figure of Fig. 1, historical facts or anecdotes border use cost is not low yet.If screw rod silk tooth wrapped up protect a tooth, be to lose more than gain from economic angle, so also unmanned the employing.Each building site situation difference in addition, screw requires the length difference to cause reusable chance seldom.
The most approaching patent of the present invention is that the patent No. is 94213579.2 " formwork tie anchor clamps ", pull bar and wedge mounting or dismounting and reusable in this patented technology, have been used, performance has been advanced major step than screw rod beyond doubt, but wherein disadvantage is not produce to resemble the P shown in the left figure of Fig. 1 to adjustment power, structure is also complicated in addition, the cost height, because each building site is not to use 1,000 hundreds of covers, but several thousand few covers, many more than ten ten thousand covers of wanting, be a very big equipment input, the significant drawbacks of this patented technology is handling instrument to be connected in increased equipment cost on the anchor clamps in fact, so the user is difficult to accept.
Summary of the invention
Task of the present invention is that one of development is simpler, practical, can adjust template position, and mounting or dismounting are convenient, do not get loose, and are reusable, anchor clamps that cost is low and handling instrument.
(1) anchor clamps
The right figure of content of the present invention such as Fig. 1, with the steel wedge of tooth is arranged, tiltedly cover and the pull bar of naked body replace screw rod and the nut structure of left figure.
The present invention reaches by following measure: the polished rod that comprises steel, wedge, it is characterized in that tiltedly cover is the steel pipe of a flat type, endoporus axially be gradient, and it is consistent with the wedge gradient, polished rod penetrates in the oblique trepanning, in the interior interporal lacuna of wedge wedging polished rod and oblique cover, when by the E of the right figure of Fig. 1 when forcing in wedge, and tiltedly cover is stoped by pad can not to advance, then tiltedly overlap inclined-plane compressing wedge, the tooth of wedge is nipped in the polished rod, the assurance wedge can not slided and move back, and the gradient of design wedge and oblique cover all in 10 ° of angle of frictions, is moved back so that assurance is sliding.The present invention then selects for use about 7 °, angle is crossed the easy pine of conference and is moved back, too small then being difficult to dismantles, F direction expansion force that produces when the ramming concrete and vibration force promote tiltedly cover by pad, tiltedly cover pushes wedge, because wedge has been killed polished rod, F direction thrust is more then nipped pull bar more deeply, can not move back by pine.Tiltedly overlapping the column type projection that outside wedge two sides of tail all has raised side, is as taking wedge apart and tiltedly overlapping and use.
(2) clamp installation tool
Above mention the building site mounting template, owing to reasons such as template deformations, the installer can not put the template leveling in place by manpower aloft, just can install so must the instrument pushing assist.
The technology of the present invention can lean on following measure to reach: with reference to figure 3, comprise handle, and caliper, crank, axle, spring, little axle, last connecting rod, lower link, the crank-link mechanism that the thrust groove is formed advances.When two handles are pressed the commentaries on classics of K direction pressure, promote to go up connecting rod through crank, lower link and thrust groove push to the T direction, thereby promote tiltedly cover, to T direction compressing template, be contained in the ramp blocks of the surface cylinder body shape on the thrust groove, can rotate around little axle, the afterbody that rotation adjustment ramp blocks can make sloped roof arrive wedge advances to the T direction simultaneously with oblique cover, when the instrument pincers produce T thrust simultaneously, template also produces deboost-T to the instrument pincers, instrument pincers are retreated, but press when changeing to the K direction when handle, spring spurs retaining sour jujube and rotates to the S direction, tooth is bitten polished rod, instrument pincers can not be retreated, when two handles are opened to 130 ° of-150 ° of angles by the opposite direction of K, then be contained in the adjustment screw top commentaries on classics retaining sour jujube top on the crank, make the opposite spin of retaining sour jujube, the polished rod that breaks away from interlock can advance or withdraw from the instrument pincers on polished rod is axial.
(3) demounting tool (with reference to figure 2)
The technology of the present invention reaches by following measure, it is characterized in that demounting tool is one and is with two balance wedges of handle to cause the forked type instrument as prong, harden through heat treatment, as Fig. 2, the forked type wedge inserts gap between oblique cover and the wedge afterbody raised side cylinder projection, knock demounting tool with hammer by the H direction, thereby produce great R, will tiltedly overlap and the wedge separation to decomposing force.
(4) useful effect
In the relevant patent that retrieves, structure of the present invention reaches the firmest the simplest degree, has only a tiltedly cover, polished rod and wedge, it is not influenced by cement setting corrosion etc., and polished rod is adjusted two folder distances within length very convenient, do not resemble screw and will be subjected to the restriction of reach, install and remove also easily, and fast, embodiment designs each propelling can reach 2cm, more faster than the turn of the screw mother, these performances are superior than screw rod, can repeat repeatedly to use, because design elements is simple and firm, damage should be seldom, eliminate thread and cause whole the out of use limitation of screw rod because of mounting or dismounting damage, can unlimitedly use in theory, each amortization cost that uses is very low, mounting or dismounting tools is also very simple, and practical, each building site use amount is many, if its effect of carrying out in an all-round way is very huge.
Description of drawings
The left figure of Fig. 1 is a prior art screw rod clamp mode panel assembly structure chart, and right figure is the structure chart of wedge anchor clamps clamping template of the present invention.
Fig. 2 be the present invention with wedge by tool construction of removing in oblique cover and the pull bar and schematic diagram.
Fig. 3 is that wedge anchor clamps of the present invention and erecting tools wrench structure and use principle figure~day figure are elevations, and figure below is a top view.
The specific embodiment
Be described in further detail for example with regard to specific implementation method of the present invention by accompanying drawing 1,2,3 below.
Press Fig. 1, right figure is the using method of common buildings template clamping, put on polished rod 5 earlier, oblique cover 3 and wedge 4 are all loaded onto in two, strike in the tangible tiltedly cover 3 with the wedge 4 of hammer earlier by one of E steering handle, the other end is by the clamp installation tool that is inserted in shown in Figure 3, when two handles 13 to K to firmly the time, retaining sour jujube 8 nips in the polished rod 5 and withstands vice body 12 the back is sliding, to tiltedly overlap 3 pushes ahead, because of having sandwiched a sleeve clamp, polished rod 5 other ends withstand the another side template, so can not retreat, tiltedly cover 3 can only advance to the T direction, rotate the ramp blocks 6 of oblique circular cylinder shape, make the inclined-plane contact the afterbody of wedge 4, its effect is the ramp blocks 6 that also promotes to be contained on the thrust groove 14 when thrust groove 14 promotes tiltedly to overlap 3, wedge 3 to T to synchronous propelling, the purpose that ramp blocks 6 is set is because tiltedly overlap 3, wedge 4, the size of polished rod 5 has error, make wedge 4 enter have in the oblique cover 3 have deeply shallow, ramp blocks 6 is to be used for adjusting this error to guarantee wedge 4 and tiltedly cover 3 propelling synchronously, if only withstand wedge 4, tiltedly overlap motionlessly, thrust groove 14 just advances and is obstructed.When pine instrument when pincers, the bounce of template will be oppressed pad 2, tiltedly overlap 3, tiltedly cover 3 compressing wedges 4 make it bite polished rod 5, can not retreat, when two handles 13 of instrument pincers are opened 130 ° of-150 ° of angles, adjust the top that retaining sour jujube 8 is changeed on screw 17 tops, make the interlock of sour jujube 8 disengagings and polished rod 5, the entire tool pincers can push forward and make thrust groove 14 press close to oblique cover 3, repeat handle 13 and press the K direction firmly, oblique cover 3 is pushed to back again and is and then pinned by wedge 4, repeatedly work repeatedly, shift template onto precalculated position till, ramp blocks 6 is rotated make the width position of ramp blocks 6 push down wedge 4 again, thrust groove 14 then is not pressed onto oblique cover 3, repeat the above method that advances, become thrust groove 14 and withstand ramp blocks 6, withstand wedge 4 again and be pressed in the oblique cover 3, make wedge 4 sting real polished rod 5 more, perhaps clamp installation tool is withdrawed from polished rod 5, enter in the oblique cover with the heavy wedge 4 that knocks of hammer, locking to reinforce.
Dismounting uses demounting tool 18 as Fig. 2, in the foregoing invention content 3) o'clock say very clear no longer repetition.
As the above example of Fig. 3, the tooth of wedge 4 and retaining sour jujube with 90 ° of about at interval 2.5mm of wedge angle about, crossing conference as angle stings not tight, the too small tooth that then collapses easily, the many contact surfaces of the interval too small number of teeth greatly then difficulty are stung into polished rod 5, the number of teeth is too small, and then to damage polished rod 5 serious, once testing wedge does not scribe tooth and reduces gradient again to increase frictional force yet, the full friction lock of using, if polished rod 5, wedge 4, when tiltedly cover 3 contact surfaces were dry hair sides, its frictional force increase also was limited, and its normal pressure generally is ten times of frictional force, can its frictional force increase then depend on the intensity of oblique cover 3 withstand frictional force increases needed normal pressure, so also be limited.But when being stained with sliding agent such as water, oil, paint, wet cement slurry when contact surface, because friction factor has diminished, so the performance that locks is unsettled, add that gradient is too little, dismounting is had any problem, so do not adopt.Once replaced cylinder ramp blocks 6 with spring or plane wedge in the trial-production, all feasible, but effect is undesirable, and spring force kicks the beam and then pushes away motionless wedge 4, and excessive then advance distance can dwindle, and plane wedge method structure is than complex loose, and adjusting range is also wide inadequately.

Claims (2)

1. the wedge anchor clamps of a construction formwork, comprise polished rod (5), wedge (4) is characterized in that oblique cover (3) is the steel pipe of a flat type, and endoporus axially is being gradient, and it is consistent with wedge (4) gradient, polished rod (5) passes in oblique cover (3) hole, and wedge (4) wedge has the cylinder projection of protrusion in wedge (4) two sides of tail of tiltedly overlapping (3) outside in the gap of polished rod (5) and oblique cover (3) endoporus, tooth is arranged at the bottom of wedge (4), in the polished rod (5) of can nipping.
2. demounting tool of implementing the wedge anchor clamps of construction formwork as claimed in claim 1, it is characterized in that this instrument makes prong by two balance wedges, cause the instrument of forked type, these two wedges are inserted in space between oblique cover (3) and wedge (4) the afterbody cylinder projection, and pound with a hammer the demounting tool top and will tiltedly overlap (3) and wedge (4) and separate.
CNB031136699A 2003-01-27 2003-01-27 Sloping wedge clamp of building moulding board and mounting, unloading tool thereof Expired - Fee Related CN100374673C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031136699A CN100374673C (en) 2003-01-27 2003-01-27 Sloping wedge clamp of building moulding board and mounting, unloading tool thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031136699A CN100374673C (en) 2003-01-27 2003-01-27 Sloping wedge clamp of building moulding board and mounting, unloading tool thereof

Publications (2)

Publication Number Publication Date
CN1521381A CN1521381A (en) 2004-08-18
CN100374673C true CN100374673C (en) 2008-03-12

Family

ID=34283764

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031136699A Expired - Fee Related CN100374673C (en) 2003-01-27 2003-01-27 Sloping wedge clamp of building moulding board and mounting, unloading tool thereof

Country Status (1)

Country Link
CN (1) CN100374673C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN110318539B (en) * 2019-07-16 2021-07-30 山东***建筑劳务有限公司 A high-efficient recovery plant for building mould

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027847A (en) * 1976-03-26 1977-06-07 Johnson Clavin R Expandable tie anchor
CN1042751A (en) * 1988-11-12 1990-06-06 约瑟夫·梅厄 Be used to connect the anchor clamps of template
CN2204833Y (en) * 1994-07-04 1995-08-09 方景辉 Formwork fastener
US5594977A (en) * 1993-12-30 1997-01-21 Mccallion; James P. Smooth rod-gripping apparatus
CN2383908Y (en) * 1999-05-14 2000-06-21 江都市利建科技开发有限公司 Formwork support clamp
CN2494861Y (en) * 2000-12-28 2002-06-12 何玉良 Split form

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027847A (en) * 1976-03-26 1977-06-07 Johnson Clavin R Expandable tie anchor
CN1042751A (en) * 1988-11-12 1990-06-06 约瑟夫·梅厄 Be used to connect the anchor clamps of template
US5594977A (en) * 1993-12-30 1997-01-21 Mccallion; James P. Smooth rod-gripping apparatus
CN2204833Y (en) * 1994-07-04 1995-08-09 方景辉 Formwork fastener
CN2383908Y (en) * 1999-05-14 2000-06-21 江都市利建科技开发有限公司 Formwork support clamp
CN2494861Y (en) * 2000-12-28 2002-06-12 何玉良 Split form

Also Published As

Publication number Publication date
CN1521381A (en) 2004-08-18

Similar Documents

Publication Publication Date Title
US7819388B2 (en) Tendon gripping device
US5594977A (en) Smooth rod-gripping apparatus
US4231541A (en) Concrete form panel tying apparatus
KR102048578B1 (en) Stripping Deck Plate
CN100374673C (en) Sloping wedge clamp of building moulding board and mounting, unloading tool thereof
CN204728694U (en) A kind of concrete component template fixation kit
CN2670500Y (en) Wedge clamp for building formwork and tools for attaching and detaching
US3007221A (en) Nail free wall form assembly device
JP5336550B2 (en) Building screw tightening device
CA3101653C (en) Device and method for forming voids in concrete
CA3002721C (en) Extractor for extracting conical spacers in concrete walls or pillars and associated method
US1000213A (en) Clamping device for building constructions.
CN211666274U (en) Split screw rod dismounting device
US3377763A (en) Shear clamp
CN103182732A (en) Concrete formwork locking and fastening device
US1958076A (en) Concrete form construction
US2946360A (en) Concrete form clamp
US1932540A (en) Spacer and tie rod remover
CN204139606U (en) Building form fastener
EP4339384A1 (en) Device and method for connecting construction elements
CN220226241U (en) Template clamp
CN203125675U (en) Concrete formwork locking and fastening device
KR100864235B1 (en) A clamping apparatus for a concrete formr
CN219622347U (en) Reinforcing apparatus of I-steel encorbelments and pre-buried U-shaped ring
JPS6139802Y2 (en)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Pan Yingcong

Document name: Notification of registration procedures and notice of patent for invention

C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee