CN100344568C - Cement clinker sintering technology and its equipment - Google Patents

Cement clinker sintering technology and its equipment Download PDF

Info

Publication number
CN100344568C
CN100344568C CNB2006100391617A CN200610039161A CN100344568C CN 100344568 C CN100344568 C CN 100344568C CN B2006100391617 A CNB2006100391617 A CN B2006100391617A CN 200610039161 A CN200610039161 A CN 200610039161A CN 100344568 C CN100344568 C CN 100344568C
Authority
CN
China
Prior art keywords
combustion chamber
preheating
chamber
cooling
zones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006100391617A
Other languages
Chinese (zh)
Other versions
CN1830867A (en
Inventor
缪建通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100391617A priority Critical patent/CN100344568C/en
Publication of CN1830867A publication Critical patent/CN1830867A/en
Application granted granted Critical
Publication of CN100344568C publication Critical patent/CN100344568C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/10Production of cement, e.g. improving or optimising the production methods; Cement grinding
    • Y02P40/121Energy efficiency measures, e.g. improving or optimising the production methods

Abstract

The present invention relates to a cement clinker sintering technology and devices thereof. The technology has a metering chamber, a water adding and stirring chamber, a combustion chamber and a cooling chamber; the devices are characterized in that the outlets of feeding devices are connected to a preheating and drying chamber; the preheating and drying chamber is connected to a draught fan through an air guiding pipe; the preheating and drying chamber is connected to the cooling chamber through a hot air mixing burner; the cooling chamber is connected to a combustion chamber through material sealing pipes; the combustion chamber is connected to the hot air mixing burner through hot air pipes. The present invention has the advantages that the cement clinker firing system fires traditional cement clinkers into preheating zones, firing zones and cooling zones of the system, and the preheating zones, the firing zones and the cooling zones are relatively separated and are organically uniform; the preheating and drying chamber, the combustion chamber, the cooling chamber and the hot air mixing burner all adopt a vertical type structure, which can greatly improve system heat transferring efficiency; simultaneously, the combustion chamber is set into a sub system which is used for firing the clinkers and reducing firing influence exerted on the clinkers from the preheating zones and the cooling zones, and therefore, the aims of fast burning and quenching of the clinkers, stable and continuous operation, automatic control, and large scale can be realized.

Description

Cement clinker sintering technology
Technical field
What the present invention relates to is that a kind of to transform traditional cement clinker firing system be brand-new cement clinker sintering technology.Belong to the technology of producing cement field.
Background technology
At present, China's Cement industry has adopted the kinds of processes technology, is divided into rotary kiln and shaft kiln two big classes generally.Rotary kiln comprises nsp kiln (being new type dry kiln), preheater kiln, dry method hollow kiln, lepol kiln, wet-process rotary kiln etc.; Be divided into native shaft kiln, ordinary shaft kiln and mechanical vertical kiln etc. in the shaft kiln.
In rotary kiln, the most advanced with nsp kiln (new type dry kiln), become the main body kiln type in the rotary kiln; In shaft kiln, be best with mechanized cement shaft kiln.In actual production, native shaft kiln is superseded substantially at present, and ordinary shaft kiln is also rare, mechanical vertical kiln account in the shaft kiln more than 90%.New dry process technology can realize maximizing, the level of automation height, and energy consumption is low, is better than mechanical vertical kiln technology greatly.All the time, because the new dry process technology investment is big, the construction period is long, the cement cost height of producing, so tempo is unhappy.Thirty years of age firer plants owing to less investment, instant effect, and product can be up to state standards, and can satisfy the demand of fundamental construction, is developed in decades.
At present, the kiln shape of the most of machine shaft kiln of China is that single horn is to be the vertical barrel type kiln below the hydraucone, and this form defective is very big.The one, influence grog and move down and draw off, especially when bell mouth angle was inappropriate, the grog after the contraction can not waltz through cooling zone and draw off, and influenced shaft kiln output; The 2nd, improper ventilation after kiln wind enters in the kiln from the bottom, is subjected to the resistance of material, and " apoplexy deficiency, limit wind surplus " can be caused greater than in the middle of the kiln in the space between kiln wall and the material in addition, the influence calcining; The 3rd, kiln inwall high more than 3 meters is arranged at kiln bottom, and to be casting liner plate become with steel is brick, and top then is built into refractory brick entirely.Operation back refractory wear is very fast, and liner plate, the wearing and tearing of steel brick are less, shaft kiln is formed at steel brick, liner plate place protrude annular steel ring together, cause the discharging difficulty, even the card kiln.
Shaft kiln calcination the most essential is the stable fire in a stove before fuel is added, make stable position and the thickness that just need control heat zone well of thermal regulation in the kiln, have only the fire in a stove before fuel is added steady, inclined to one side fire just can not appear, reduce leak living, the loss on ignition and the free calcium oxide of grog are reduced, improve clinker quality and shaft kiln output.
According to present shaft kiln kiln shape and ventilation form, do not reach the fire in a stove before fuel is added steadily, pull and stretch, the high temperature chamotte chilling of getting back not is very difficult, the workman that need have higher state of the art operates, and is careless slightly, fire in a stove before fuel is added pull and stretch and fiery partially phenomenon will occur, make shaft kiln burn till instability.
On air supply mode, most of shaft kiln is to ventilate from the bottom, promptly enters cooling zone through dumper, from bottom to top discharges from chimney through thermal zone, preheating zone.This form will inevitably cause the steam flow distributary phenomenon owing to be subjected to the influence of material resistance in the kiln.Middle part wind is few, and limit portion wind is big, because the uneven distribution of air-flow on the kiln cross section brought the difficulty that is difficult to overcome to vertical kiln operation, directly influences the cooling and the clinker quality of grog.
Influencing the equally distributed basic factor of air-flow is resistance, because solid accumulation and the influence that is subjected to the kiln wall in the kiln, the voidage of kiln periphery is always greater than the kiln middle part, like this, the gas flow of kiln periphery, flow velocity are also just greater than the kiln middle part, this has technical barrier to be overcome " apoplexy deficiency, the limit wind surplus " that come out in the vertical kiln operation for many years just to have occurred.
Summary of the invention
The objective of the invention is to defective at the existence of shaft kiln prior art, a kind of cement clinker sintering technology and equipment of brand new are proposed, it is low that it has effectively overcome existing in prior technology system heat transfer efficiency, preheating zone, cooling zone are big to the influence that grog burns till, and the fast burning chilling, steady and continuous operation that can't realize grog be defective such as control and maximization automatically.
Technical solution of the present invention: cement clinker sintering technology, it is characterized in that branch one, complete black meal enter the raw material silo of weighing, measure by the current stabilization measuring apparatus, enter the raw material whipping appts again and add water and stir, enter the pan-pelletizer balling-up; By the pellet e Foerderanlage, send into the oven dry of preheating drying shed; Two, Hong Gan pellet enters the combustion chamber and blasts under the situation of sufficient oxygen at the combustion chamber gas blower, burns; Three, pellet burning finishes, and grog enters cooling room by dipleg, blasts at cooling air blower under the help of cold wind to cool off, and is transferred out to the grog e Foerderanlage down by tremie pipe again.
Cement clinker calcination equipment, its structure are that the outlet of feeding unit connects the preheating drying shed, and the preheating drying shed joins by induced exhaust and induced draft fan; The preheating drying shed joins by hot gas mixing burner and cooling room; Cooling room joins by dipleg and combustion chamber; The combustion chamber joins by heating duct and hot gas mixing burner.
Advantage of the present invention: this cement clinker sintering technology and equipment thereof, with the preheating zone in traditional cement clinker sintering technology and the equipment thereof, clinkering zone, cooling zone relative separation organic unity again, preheating drying shed, combustion chamber, cooling room, hot gas mixing burner all adopt vertical structure, can greatly improve system's heat transfer efficiency, simultaneously the combustion chamber is set at a sub-system, being used for grog burns till, the influence that minimizing preheating zone, cooling zone burn till grog, thus realize that really the fast burning chilling of grog, steady and continuous operation realize control automatically and maximization.
Description of drawings
Accompanying drawing 1 is the embodiments of the invention structural representations
Among the figure 1 is raw material silo, the 2nd, current stabilization measuring apparatus, the 3rd, material water whipping appts, the 4th, pan-pelletizer, the 5th, pellet e Foerderanlage, the 6th, preheating drying shed, the 7th, combustion chamber, the 8th, cooling room, the 9th, heating duct, the 10th, hot gas mixing burner, the 11st, dipleg, the 12nd, combustion chamber gas blower, the 13rd, cooling room gas blower, the 14th, tremie pipe, the 15th, grog transfer roller, the 16th, induced exhaust, the 17th, tornado dust collector, the 18th, fly-ash separator, the 19th, induced draft fan, the 20th, chimney.
Embodiment
Contrast accompanying drawing 1, its structure is that the outlet of feeding unit connects preheating drying shed 6, preheating drying shed 6 joins by induced exhaust 16 and induced draft fan 19; Preheating drying shed 6 joins by hot gas mixing burner 10 and cooling room 8; Cooling room 8 joins by dipleg 11 and combustion chamber 7; Combustion chamber 7 joins by heating duct 9 and hot gas mixing burner 10.
Described preheating drying shed 6 joins by induced exhaust 16 and tornado dust collector 17; Tornado dust collector 17 join with fly-ash separator 18, and fly-ash separator 18 joins with induced draft fan 19, and induced draft fan 19 connects chimney 20.
Described cooling room 8 joins by tremie pipe 14 and grog transfer roller 15.
Described preheating drying shed 6, combustion chamber 7, cooling room 8 are respectively independent device.
Described feeding unit is formed by raw material silo 1, current stabilization measuring apparatus 2, material water whipping appts 3, pan-pelletizer 4, pellet e Foerderanlage 5 serial connections.
A kind of brand-new cement clinker production system is made up of pre-watering granulation machine, preheating drying shed, combustion chamber, cooling room, hot gas mixing burner, dust-removal system and automatic control system.The black meal ball of making is preheated oven dry in the preheating drying shed, in the combustion chamber, finish cement clinker and burn till reaction, the grog that sinters carries out fast fully cooling through cooling room again, hot gas source and combustiblematerials that combustion chamber and cooling room reclaim carry out secondary combustion in the hot gas mixing burner, hot gas flow is for preheating drying shed preheating oven dry pellet, and waste gas is handled through dust-removal system.
Production technique of the present invention:
Complete black meal enters the raw material silo of weighing, and is measured by the current stabilization measuring apparatus, enters the raw material whipping appts again and adds water and stir, and enters the pan-pelletizer balling-up; By the pellet e Foerderanlage, send into the oven dry of preheating drying shed; The pellet of oven dry enters the combustion chamber and blasts under the situation of sufficient oxygen at the combustion chamber gas blower, burn and (make stable position and the thickness that just need control heat zone well of thermal regulation in the kiln, inclined to one side fire just can not occur, reduce to leak and give birth to, the loss on ignition and the free calcium oxide of grog are reduced, improve clinker quality and shaft kiln output).Pellet burning finishes, and grog enters cooling room by dipleg, blasts at cooling air blower under the help of cold wind to cool off (free calcium oxide of grog is reduced, improve clinker quality and shaft kiln output).By tremie pipe, transfer out to the grog e Foerderanlage down again.
Cooling air blower blasts cold wind and enters cooling room, cold wind heats up by the cooling grog, hot blast adds the hot waste gas of being emerged by the combustion chamber, (cooling air blower blasts oxygen to enter the hot gas hybrid combustor together, contain unburned carbon monoxide and other combustible gas in the hot waste gas that comes out in the combustion chamber, in the combustion chamber internal combustion, the burning room temp rises, effectively utilize preheating, cut down the consumption of energy); High-temperature gas is dried the indoor raw material ball of prebake in the combustion chamber, reduces the pellet water content, and grog burns till coal consumption in the saving combustion chamber, saves the production coal consumption.
Remaining gas and molecule in the preheating drying shed, by induced exhaust, in tornado dust collector, it is bigger to select particulate, enters raw material silo.All the other molecules under collecting under the wind-force of induced draft fan, enter raw material silo by fly-ash separator (reducing pm emission concentration, economical environment-protective).All the other waste gas are then by smoke stack emission.
The heat of a whole set of technology has a good recycle, greatly reduces grog and burns till and use coal, cuts down the consumption of energy.In the gas of discharging, do not have harmful molecule, help environmental protection greatly.

Claims (3)

1, cement clinker sintering technology is characterized in that this processing step is divided into, one, complete black meal enters the raw material silo of weighing, measure by the current stabilization measuring apparatus, enter the raw material whipping appts again and add water and stir, enter the pan-pelletizer balling-up, by the pellet e Foerderanlage, send into the oven dry of preheating drying shed; Two, Hong Gan pellet enters the combustion chamber and blasts under the situation of sufficient oxygen at the combustion chamber gas blower, burns; Three, pellet burning finishes, and grog enters cooling room by dipleg, blasts at cooling air blower under the help of cold wind to cool off, and is transferred out to the grog e Foerderanlage down by tremie pipe again.
2, cement clinker sintering technology according to claim 1, it is characterized in that cooling air blower blasts cold wind and enters cooling room, cold wind heats up by the cooling grog, hot blast adds the hot waste gas of being emerged by the combustion chamber, enter the hot gas hybrid combustor together, high-temperature gas is dried the indoor raw material ball of prebake in the combustion chamber, reduces the pellet water content.
3, cement clinker sintering technology according to claim 1, it is characterized in that remaining gas and molecule in the preheating drying shed, pass through induced exhaust, in tornado dust collector, it is bigger to select particulate, enters raw material silo, all the other molecules pass through fly-ash separator, under collecting under the wind-force of induced draft fan, enter raw material silo, all the other waste gas are then by smoke stack emission.
CNB2006100391617A 2006-03-29 2006-03-29 Cement clinker sintering technology and its equipment Expired - Fee Related CN100344568C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100391617A CN100344568C (en) 2006-03-29 2006-03-29 Cement clinker sintering technology and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100391617A CN100344568C (en) 2006-03-29 2006-03-29 Cement clinker sintering technology and its equipment

Publications (2)

Publication Number Publication Date
CN1830867A CN1830867A (en) 2006-09-13
CN100344568C true CN100344568C (en) 2007-10-24

Family

ID=36993392

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100391617A Expired - Fee Related CN100344568C (en) 2006-03-29 2006-03-29 Cement clinker sintering technology and its equipment

Country Status (1)

Country Link
CN (1) CN100344568C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009041089C5 (en) * 2009-09-10 2013-06-27 Khd Humboldt Wedag Gmbh Process and plant for the production of cement with reduced CO2 emission
CN110183122B (en) * 2019-05-21 2020-07-31 山东大学 System and method for preparing cementing material based on industrial waste heat cooperative disposal of solid waste
WO2021204797A1 (en) * 2020-04-08 2021-10-14 Thyssenkrupp Industrial Solutions Ag Method for the production of cement clinker

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1015392B (en) * 1988-06-26 1992-02-05 王长庚 Multifunctional three-insurance door lock with double pins and associated control
CN1021509C (en) * 1990-08-09 1993-07-07 松下电器产业株式会社 Rotary magnetic head cylinder and its manufacturing method
WO1996007622A1 (en) * 1994-09-08 1996-03-14 Kawasaki Jukogyo Kabushiki Kaisha Method and apparatus for making cement clinker by firing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1015392B (en) * 1988-06-26 1992-02-05 王长庚 Multifunctional three-insurance door lock with double pins and associated control
CN1021509C (en) * 1990-08-09 1993-07-07 松下电器产业株式会社 Rotary magnetic head cylinder and its manufacturing method
WO1996007622A1 (en) * 1994-09-08 1996-03-14 Kawasaki Jukogyo Kabushiki Kaisha Method and apparatus for making cement clinker by firing

Also Published As

Publication number Publication date
CN1830867A (en) 2006-09-13

Similar Documents

Publication Publication Date Title
CN101269919B (en) Vertical kiln apparatus for materials calcination
CN101624647B (en) Pellet roasting production technology recycling residual heat and system thereof
CN101987783B (en) Method for producing active pulverized lime by utilizing coal gas to calcine limestone through suspended state pre-heating decomposing furnace
CN109574523B (en) Lime kiln for directly burning high-temperature coal gas of gasification furnace in hot feeding manner
CN109437608B (en) Double-path air built-in heat exchanger lime shaft kiln and calcining method thereof
CN102001837A (en) Method and device for calcining materials by using low calorific value fuel
CN100344568C (en) Cement clinker sintering technology and its equipment
CN203190791U (en) Energy-saving roller kiln
CN105271841A (en) Rotary kiln device and method for constant temperature indirect calcination of limestone
CN102079982B (en) Production method of formed coke
CN209685619U (en) A kind of limekiln that the hot sending of gasification furnace coal gas of high temperature is directly burnt
CN214406065U (en) Comprehensive treatment system for carbon roasting flue gas
CN105753348B (en) A kind of production technology of Indonesia's bituminous rock tailing particles nsp kiln
CN204058259U (en) A kind of take coal dust as the roasting assembly of fuel
CN101195521B (en) Method for producing margin coal gas by using steel in rotary cement kiln predecomposition furnace
CN203999383U (en) Low-temperature decomposition and high temperature sintering all-in-one oven
CN2893594Y (en) Cement clinker firing equipment
CN204625480U (en) A kind of rotary kiln device of constant temperature indirect calcination Wingdale
CN209602391U (en) A kind of preheater kiln technology prepares the device of pure calcium aluminate cement
CN202861312U (en) Automatically controlled forging heating furnace
CN201344733Y (en) Waste heat recovery/power generation engineering system device for belt/ring cooling machine of sintering machine
CN201217652Y (en) Coal gas burnt lime vertical kiln
CN201355185Y (en) Energy-saving kiln
CN110736354A (en) Automatic furnace burden settlement heater
CN218846846U (en) Efficient direct-fired device of special alternative fuel for cement kiln

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071024

Termination date: 20120329