CH703613A1 - A method for extracting energy from geothermal sources and investment purpose. - Google Patents

A method for extracting energy from geothermal sources and investment purpose. Download PDF

Info

Publication number
CH703613A1
CH703613A1 CH01314/10A CH13142010A CH703613A1 CH 703613 A1 CH703613 A1 CH 703613A1 CH 01314/10 A CH01314/10 A CH 01314/10A CH 13142010 A CH13142010 A CH 13142010A CH 703613 A1 CH703613 A1 CH 703613A1
Authority
CH
Switzerland
Prior art keywords
bore
energy
rock layer
hot
water
Prior art date
Application number
CH01314/10A
Other languages
German (de)
Inventor
Vyacheslav Trushkin
Original Assignee
Vyacheslav Trushkin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vyacheslav Trushkin filed Critical Vyacheslav Trushkin
Priority to CH01314/10A priority Critical patent/CH703613A1/en
Priority to PCT/RU2011/000621 priority patent/WO2012023881A1/en
Publication of CH703613A1 publication Critical patent/CH703613A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24TGEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
    • F24T10/00Geothermal collectors
    • F24T10/20Geothermal collectors using underground water as working fluid; using working fluid injected directly into the ground, e.g. using injection wells and recovery wells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Sustainable Energy (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Sustainable Development (AREA)
  • Hydrology & Water Resources (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Die Erfindung betrifft ein Verfahren zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen Gesteinsschichten gespeicherter (petrothermischer) Energie sowie eine Anlage hierzu. Erreicht werden soll eine sichere und strukturell einfache Nutzung petrothermischer Energie, insbesondere zur Gewinnung von Elektroenergie sowie zur Wärmeversorgung. Hierzu wird vorgeschlagen, dass eine Hauptbohrung in mindestens eine heisse, trockene Gesteinsschicht (18) eingebracht wird und mittels mindestens einer, von dieser Bohrung abzweigenden seitlichen Bohrung ein petrothermisches Zirkulationssystem ermöglicht wird.The invention relates to a method for the production of energy from geothermal sources, in particular for the development of stored in hot rock layers (petrothermal) energy and a system for this purpose. To be achieved is a safe and structurally simple use of petrothermal energy, in particular for the production of electrical energy and heat supply. For this purpose, it is proposed that a main bore is introduced into at least one hot, dry rock layer (18) and a petrothermal circulation system is made possible by means of at least one lateral bore branching off from this bore.

Description

[0001] Die Erfindung betrifft ein Verfahren zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen Gesteinsschichten gespeicherter (petrothermischer) Energie sowie eine Anlage hierzu. The invention relates to a process for the production of energy from geothermal sources, in particular for the development of stored in hot rock layers (petrothermal) energy and a system for this purpose.

[0002] Erdwärme ist eine wesentliche alternative Energiequelle, die bereits genutzt wird. Neben der Einbringung von Erdsonden in oberflächennahe Schichten sind auch Tiefenbohrungen bis in heisse Gesteinsschichten (HDR - Hot dry rock) bekannt um die in heissen Gesteinsschichten aus Basalt oder Granit gespeicherte Energie zu erschliessen und diese Energie zur Warmwasser- oder Dampfgewinnung oder zur Erzeugung von Elektroenergie zu nutzen. Geothermal energy is a significant alternative energy source that is already in use. In addition to the introduction of geothermal probes in near-surface layers, deep wells into hot rock layers (HDR - hot dry rock) are known to tap into the stored hot rock layers of basalt or granite energy and this energy for hot water or steam extraction or for the production of electric energy use.

[0003] Nach der DE-B-10 2005 044 352 sind Bohrungen in Tiefen von 4000-6000 Metern erforderlich um Schichten mit einer Temperatur von mehr als 100 °C für einen HDR-Wärmetauscher zu erschliessen. According to DE-B-10 2005 044 352 holes at depths of 4000-6000 meters are required to tap layers with a temperature of more than 100 ° C for an HDR heat exchanger.

[0004] Hierzu wird zunächst eine erste Tiefenbohrung bis in eine solche heisse Gesteinsschicht vorgetrieben und ein Liner in diese eingebracht. Der Liner wird gemeinsam mit der Gesteinsschicht perforiert und nachfolgend Wasser eingepresst um Risse in der Gesteinsschicht zu bilden. In diese Risse wird nachfolgend ein explosives Material gepumpt und gezündet, so dass sich im Ergebnis der Detonation die Risse vergrössern. Danach wird zumindest eine zweite Tiefenbohrung in den rissigen Bereich gebohrt. Somit kann im Anschluss. For this purpose, a first deep hole is first driven into such a hot rock layer and a liner introduced into it. The liner is perforated together with the rock layer and subsequently water is pressed in to form cracks in the rock layer. An explosive material is subsequently pumped into these cracks and ignited so that the cracks increase as a result of the detonation. Thereafter, at least a second deep hole is drilled in the cracked area. Thus, in the connection.

[0005] Durch die erste Tiefenbohrung wird Wasser in die heisse Gesteinsschicht gepumpt, nimmt Wärme aus dieser auf (Wärmetauscher), strömt zur zweiten Tiefenbohrung und wird über diese zur Erdoberfläche gefördert. In einem weiteren Wärmetauscher wird dem Wasser die Energie wieder entzogen und zur Energiegewinnung genutzt. Through the first deep hole, water is pumped into the hot rock layer, absorbs heat from it (heat exchanger), flows to the second deep hole and is conveyed via this to the earth's surface. In another heat exchanger, the energy is withdrawn from the water and used to generate energy.

[0006] Bei einem geothermischen Sondensystem gemäss DE-A-10 2007 040 709 wird die Erdwärme durch Einbringung eines erwärm- oder verdampfbaren Wärmeübertragungsmediums in Tiefen von ca. 4500 Metern genutzt. Hierzu ist eine erste Tiefbohrung vorgesehen, die das Wärmeübertragungsmedium einleitet und die eine Vorkammer in Form eines Hohlraums aufweist. Die Vorkammer ist mit weiteren Tiefbohrungen verbunden, die das erwärmte Medium zu Verbrauchern führen. Das bei den Verbrauchern abgekühlte Medium wird anschliessend wieder über die erste Tiefbohrung in die Vorkammer eingeleitet, um einen geschlossenen Kreislauf zu erreichen. In a geothermal probe system according to DE-A-10 2007 040 709 geothermal heat is used by introducing a heatable or evaporable heat transfer medium at depths of about 4500 meters. For this purpose, a first deep hole is provided, which initiates the heat transfer medium and having an antechamber in the form of a cavity. The pre-chamber is connected to further deep wells, which lead the heated medium to consumers. The cooled at the consumer medium is then re-introduced via the first deep hole in the antechamber to achieve a closed circuit.

[0007] Bei einem Verfahren zur Erschliessung geothermischer Energie nach DE-C-19 919 555 kann der Bohrverlauf temperaturgesteuert in Abhängigkeit von der Temperatur im Boden erfolgen, was verlaufsgesteuerte Bohrungen in Tiefen bis zu 1500 m mit einem fernsteuerbaren Bohrkopf ermöglicht. Die Bohrung kann in einer dreidimensional beliebigen Richtungsorientierung einer geothermisch nutzbaren Zone folgen. Bei einer geothermischen Anlage gemäss der DE-A-10 2007 003 066 soll mittels einer Tiefbohrung ein thermodynamischer Kreisprozess geschaffen werden, bei dem zwei Stoffströme eines Wärmeträgermediums in der Bohrung geführt sind. In einem inneren Rohr wird das Medium in eine angelegte Kaverne in der warmen Schicht geleitet, nimmt Wärme auf und wird durch ein Mantelrohr der Bohrung zu einem Energiewandler geführt. Im Mantelrohr ist eine hydraulische Kreuzung zum Innenrohr vorgesehen. Die Kaverne ist mit einem wärmeleitfähigen Material ausgekleidet. In a method for the development of geothermal energy according to DE-C-19 919 555, the course of the bore can be controlled by temperature as a function of the temperature in the ground, which allows course-controlled drilling at depths up to 1500 m with a remote-controlled drill head. The hole can follow in a three-dimensional arbitrary directional orientation of a geothermally usable zone. In a geothermal plant according to DE-A-10 2007 003 066 a thermodynamic cycle is to be created by means of a deep well, in which two streams of a heat transfer medium are guided in the bore. In an inner tube, the medium is passed into an applied cavern in the warm layer, absorbs heat and is passed through a jacket tube of the bore to an energy converter. In the jacket pipe a hydraulic crossing to the inner pipe is provided. The cavern is lined with a thermally conductive material.

[0008] Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen Gesteinsschichten vorhandener resp. gespeicherter petrothermischer Energie. Die Aufgabe ist mit den Merkmalen des Patentanspruchs 1 gelöst. The invention has for its object to provide a method for recovering energy from geothermal sources, in particular for the development of existing in hot rock layers resp. stored petrothermal energy. The object is solved with the features of claim 1.

[0009] Mittels eines Bohrlochs, das in einer heissen Gesteinsschicht in mindestens eine, bevorzugt mehrere seitliche Bohrungen bzw. Röhren übergeht, wird ein wässriges Medium eingebracht und es wird ein petrothermisches Zirkulationssystem erzeugt. By means of a borehole, which passes in a hot rock layer in at least one, preferably a plurality of lateral bores or tubes, an aqueous medium is introduced and it is generated a petrothermal circulation system.

[0010] Bevorzugte und vorteilhafte Ausgestaltungen des Verfahrens sind in den abhängigen Ansprüchen offenbart. Preferred and advantageous embodiments of the method are disclosed in the dependent claims.

[0011] So sind die seitlich von der Hauptbohrung abzweigenden Bohrungen bzw. Röhren auf, die der Aufnahme von Heissdampf aus dem heissen Gestein dienen, bevorzugt in einer Tiefe von 7-9 km angeordnet. Eine Tiefe, in der eine Temperatur von ca. 250 °C anzutreffen ist. Das Wasser wird durch die Hauptbohrung eingebracht, zirkuliert durch die Gesteinsschicht, nimmt die vorhandene Energie auf und wird durch natürliche Permeabilität in die seitlichen Röhren geleitet. Thus, the laterally branched off from the main bore bores or tubes, which serve to receive hot steam from the hot rock, preferably arranged at a depth of 7-9 km. A depth in which a temperature of about 250 ° C can be found. The water is introduced through the main well, circulates through the rock layer, absorbs the available energy, and is channeled through natural permeability into the side tubes.

[0012] Es ist somit möglich, mit vergleichsweise geringem Aufwand Energie mit hohem Wirkungsgrad zu gewinnen. Das Verfahren kann nicht nur in geothermisch aktiven Gebieten sondern faktisch in jedem Gebiet mittels nur einer Tiefenbohrung betrieben werden, in dem eine petrothermisches Zirkulation möglich ist. It is thus possible to gain energy with high efficiency with relatively little effort. The method can be operated not only in geothermal active areas but in fact in each area by means of only one deep hole in which a petrothermal circulation is possible.

[0013] Eine weitere Aufgabe besteht in der Bereitstellung einer Anlage zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen Gesteinsschichten gespeicherter petrothermischer Energie. Diese Aufgabe ist mit den Merkmalen des Patentanspruchs 8 gelöst. In einem Bohrloch, der Hauptbohrung, sind sowohl eine absteigende Leitung für das wässrige Medium als auch aufsteigende Heissdampfleitungen untergebracht, die mit jeweiligen Versorgungs- resp. Einspeisestationen verbunden sind. Another object is to provide a plant for the production of energy from geothermal sources, in particular for the development of stored in hot rock layers petrothermal energy. This object is achieved with the features of claim 8. In a borehole, the main bore, both a descending line for the aqueous medium and ascending steam lines are housed, which with respective supply resp. Feed-in stations are connected.

[0014] Bevorzugte Ausführungsformen sind in den zugehörigen abhängigen Ansprüchen offenbart. Seitlich von der Hauptbohrung abzweigenden Bohrungen, dienen der Einbringung von Wasser in das heisse Gestein. Bevorzugt ist beabstandet von der Hauptbohrung ein Wetterloch angeordnet. Die Hauptbohrung ist im Bereich der glühend heissen Gesteinsschicht perforiert, so dass das Wasser besser verteilt austreten kann. Die Hauptbohrung ist im oberen Bereich, d. h. oberhalb der ersten Abzweigung und in den kühleren Erd- und Gesteinsschichten mit einem Betonmantel oder dergleichen versehen. Preferred embodiments are disclosed in the associated dependent claims. Boreholes branching off to the side of the main bore serve to introduce water into the hot rock. Preferably, a weather hole is spaced from the main bore. The main hole is perforated in the area of the red hot rock layer, so that the water can emerge better distributed. The main hole is in the upper area, d. H. provided above the first branch and in the cooler soil and rock layers with a concrete jacket or the like.

[0015] Das Bohrungsfutter im unteren Bereich des trockenen Gesteins ist ohne geologische Komplikationen in blosser Durchführung der Bohrung ausführbar, eine separate Auskleidung wäre auch wirtschaftlich nicht vertretbar. The hole lining in the lower part of the dry rock is feasible without geological complications in the mere implementation of the bore, a separate lining would not be economically viable.

[0016] Geothemische Ressourcen umfassen solche hydrogeologiscer und petrografischer Natur. Hydrogeologische Quellen für Wärmeenergie sind durch Wärmeträger wie oberflächennahes heisses Wasser oder Dampf gekennzeichnet. Hierbei genügt es Bohrungen in einer Tiefe von maximal 3-4,5 km einzubringen. Geothermal resources include such hydrogeologic and petrographic nature. Hydrogeological sources of heat energy are characterized by heat carriers such as near-surface hot water or steam. It is sufficient to drill holes at a depth of no more than 3-4.5 km.

[0017] Petrografische Ressourcen speichern die Energie glühend heisser, trockener Gesteinsschichten der Erdkruste. Um jedoch industriell elektrische Energie aus petrografischen Ressourcen zu gewinnen, sind tiefe Bohrungen von 7-9 km erforderlich. Für eine ausreichende Erschliessung und Energieerzeugung ist eine Hauptbohrung mit einer entsprechenden Anzahl von dieser seitlich abzweigenden Bohrungen einzubringen. Das bohren von Bohrlöchern bewirkt in bekannter Weise ein zerkleinern von Gestein mittels geeigneter Werkzeuge. Gebohrt werden kann vertikal, horizontal und kontrolliert winklig bzw. schräg. Gestartet wird eine Bohrung an der Erdoberfläche mit einem sogenannten Mundloch, der Endpunkt am Grund ist das Grundloch. Petrographic resources store the energy of glowing hot, dry rock layers of the earth's crust. However, to gain industrial electrical energy from petrographic resources, deep holes of 7-9 km are required. For a sufficient development and energy generation, a main bore with a corresponding number of these laterally branching holes should be introduced. The drilling of boreholes causes in a known manner a crushing of rock by means of suitable tools. Can be drilled vertically, horizontally and controlled angle or oblique. A hole is started on the earth's surface with a so-called mouth hole, the end point at the bottom is the blind hole.

[0018] Zur Bildung eines petrothermischen Zirkulationssystems in einer glühend heissen trockenen Gesteinsschicht ist eine Temperatur am bzw. im Bereich des Grundlochs von ca. 250 °C erforderlich, was die genannte Bohrtiefe von 7-9 km zur Folge hat (basierend auf einer durchschnittlichen Temperaturerhöhung je 100 m). Es existieren jedoch einzelne abgrenzbare Gebiete, z.B. dass Cooper Bassin in Südaustralien, wo die genannte Gesteinstemperatur bereits in einer Tiefe von 3,5-4,5 km erreicht wird. To form a petrothermal circulation system in a glowing hot dry rock layer, a temperature at or in the region of the base hole of about 250 ° C is required, resulting in said drilling depth of 7-9 km result (based on an average temperature increase 100 m each). However, there are individual definable areas, e.g. that Cooper basin in South Australia, where the mentioned rock temperature is already reached at a depth of 3.5-4.5 km.

[0019] Sobald die Hauptbohrung eine Region erreicht hat, in der Temperaturen von ca. 250 °C im Gestein gegeben sind, können aus der gebildeten Hauptbohrung heraus die seitlich abzweigenden Bohrungen im Bereich der Gesteinsschicht vorgetrieben werden. Länge und Anzahl der seitlichen Bohrungen sind kalkulierbar entsprechend der erforderlichen Kontaktfläche von Wasser mit dem glühend heissen Gestein («unterirdischer Dampfkessel»). In der Hauptbohrung ist ein Förderrohr für Wasser geführt und das Wasser wird unter hohem Druck in das Gestein, resp. vorgegebene und/oder beim Bohren erzeugte Kavitäten gepresst und konvertiert infolge der hohen Temperatur zu Frischdampf, der durch natürliche Permeabilität in die seitlichen Röhren gelangt. Diese leiten den Frischdampf in eine Ringleitung in der Hauptbohrung bis zum Mundloch und von da in Einrichtungen zur Nutzung des Dampfs für Wärmezwecke und/oder zur Erzeugung von Elelektroenergie. Diese Einrichtungen können permanent und sicher betrieben werden, sobald ein ausreichendes petrothermisches Zirkulationssystem gebildet ist. Das Bohrungssystem ist strukturell einfach herstellbar und nutzbar. Once the main bore has reached a region in which temperatures of about 250 ° C are given in the rock, the laterally branching holes can be driven out of the main hole formed in the rock layer. The length and number of side bores can be calculated according to the required contact surface of water with the hot, hot rock ("underground steam boiler"). In the main bore a delivery pipe for water is guided and the water is under high pressure in the rock, resp. pressed and / or produced during drilling cavities and converts due to the high temperature to live steam, which passes through natural permeability in the lateral tubes. These direct the live steam in a loop in the main bore to the mouth hole and from there in facilities for the use of steam for heating purposes and / or for the production of eloelectric energy. These devices can be operated permanently and safely as soon as a sufficient petrothermal circulation system is formed. The bore system is structurally easy to produce and usable.

[0020] Während Quellen mit heissem Wasser oder Dampf ungleichmässig («planlos») verteilt angeordnet sind, stehen petrografische/petrothermische Quellen in hoher Zahl und langfristig zur Verfügung. Soweit abschätzbar, könnte diese ohne Erschöpfungsgefahr über viele tausende von Jahren genutzt werden. While sources of hot water or steam are distributed unevenly ("haphazardly"), petrographic / petrothermal sources are available in high numbers and long term. As far as can be estimated, this could be used without danger of exhaustion for many thousands of years.

[0021] Die Erfindung wird nachfolgend in einem Ausführungsbeispiel anhand einer Zeichnung näher beschrieben. In der Zeichnung zeigen die <tb>Fig. 1:<sep>eine Hauptbohrung mit seitlich abzweigenden Bohrungen <tb>Fig. 2:<sep>die Bohrungsanordnung in zwei Varianten (a, und b,) <tb>Fig. 3:<sep>eine Anlage zur Erschliessung petrothermischer Energie.The invention will be described below in an embodiment with reference to a drawing. In the drawing show the <Tb> FIG. 1: <sep> a main bore with laterally branching holes <Tb> FIG. 2: <sep> the bore arrangement in two variants (a, and b,) <Tb> FIG. 3: <sep> a plant for the development of petrothermal energy.

[0022] Eine von einem Anschlag 15 bzw. Mundloch bis zu einem Grundloch 17 in einer glühend heissen Gesteinsschicht 18 vorgetriebene Hauptbohrung 10 weist im Bereich der Gesteinsschicht 18 mehrere seitlich abzweigende Bohrungen 7 auf (Fig. 1). Im oberflächennahen Bereich ist die Hauptbohrung 10 mit einem Stützprofil 1 in Form eines Betonmantels 2 ausgekleidet. Im unteren Bereich, in Richtung auf das Grundloch 17 ist die Hauptbohrung 10 (wie auch die seitlichen Bohrungen 7) unausgekleidet (Segment 6). Im Ringraum 3 der Hauptbohrung 10 ist ein Förderrohr 4 bis zum Grundloch 17 angeordnet, das nur einen Teil des Ringraums 3 ausfüllt und das im Bereich der Gesteinsschicht 18 perforiert ist (Segment 8). One of a stop 15 or mouth hole to a blind hole 17 in a glowing hot rock layer 18 propelled main bore 10 has in the region of the rock layer 18 a plurality of laterally branching holes 7 (Fig. 1). In the near-surface region, the main bore 10 is lined with a support profile 1 in the form of a concrete jacket 2. In the lower region, in the direction of the blind hole 17, the main bore 10 (as well as the lateral bores 7) is unlined (segment 6). In the annular space 3 of the main bore 10, a delivery pipe 4 is arranged to the bottom hole 17, which fills only a part of the annular space 3 and which is perforated in the region of the rock layer 18 (segment 8).

[0023] Das Förderohr 4 ist über Leitungen mit einer Pumpstation 14 verbunden, von der aus Wasser unter hohem Druck und gleichmässig verteilt via Förderrohr 4 und ein perforiertes Segment 8 desselben in die heisse Gesteinsschicht 18 gepresst wird, infolge natürlicher Permeabilität 9 durch Poren, Risse und Spalten im Gestein dringt, wobei ein Druck von wenigstens ca. 700 atm zu überwinden ist. Infolge der herrschenden Temperatur von ca. 250 °C konvertiert das Wasser zu Frischdampf 5, der weiter in die seitlichen Bohrungen 7 eintritt (Sammelwirkung, Fig. 3a). Durch diese steigt er im Ringraum 3 der Hauptbohrung 10 zum Anschlag 15 an die Erdoberfläche und gelangt durch angeschlossene Leitungen in ein Kraftwerk 13, wo er Turbinen zur Erzeugung von Elektroenergie antreibt und anschliessend in eine Wärmeaufbereitungsanlage 12. Zu Wasser kondensierter Dampf wird danach wieder zur Pumpstation 14 geführt, so dass ein geschlossener Kreislauf gebildet wird. The delivery pipe 4 is connected via lines to a pumping station 14, from which water is pressed under high pressure and evenly distributed via delivery pipe 4 and a perforated segment 8 thereof in the hot rock layer 18, due to natural permeability 9 through pores, cracks and cracks in the rock, overcoming a pressure of at least about 700 atm. Due to the prevailing temperature of about 250 ° C, the water to live steam 5, which further enters the side holes 7 (collecting effect, Fig. 3a). By this he rises in the annular space 3 of the main bore 10 to the stop 15 to the earth's surface and passes through connected lines in a power plant 13, where he drives turbines for generating electrical energy and then into a heat treatment plant 12. Condensed water to steam is then back to the pumping station 14 out, so that a closed circuit is formed.

[0024] Weiterhin vorgesehen ist ein übliches Wetterloch 16. Furthermore, a usual weather hole 16 is provided.

[0025] In einer zweiten Variante ohne Sammelwirkung (Fig. 3b) wird eine Lagerstätte mit hydraulischem Überdruck 9 ́ genutzt, in der der Frischdampf 5 nach oben in etwa horizontal angeordnete seitliche Bohrungen 7 eintritt. In a second variant without collecting action (FIG. 3 b), a reservoir with hydraulic overpressure 9 is used, in which the live steam 5 enters upwardly approximately horizontally arranged lateral bores 7.

[0026] Die Erfindung ist nicht auf diese Ausführungsbeispiele begrenzt. The invention is not limited to these embodiments.

Bezugszeichenreference numeral

[0027] <tb>1<sep>Stützprofil <tb>2<sep>Betonmantel <tb>3<sep>Ringraum <tb>4<sep>Förderrohr <tb>5<sep>Frischdampf <tb>6<sep>unverkleidetes Segment <tb>7<sep>seitliche Bohrung <tb>8<sep>perforiertes Segment <tb>9<sep>natürliche Permeabilität <tb>10<sep>Hauptbohrung <tb>11<sep>Wärmeversorgungsleitung <tb>12<sep>Wärmeaufbereitungsanlage <tb>13<sep>Kraftwerk <tb>14<sep>Pumpstation <tb>15<sep>Anschlag (Mundloch) <tb>16<sep>Wetterloch <tb>17<sep>Grundloch <tb>18<sep>Gesteinsschicht[0027] <Tb> 1 <sep> Support Profile <Tb> 2 <sep> concrete casing <Tb> 3 <sep> annulus <Tb> 4 <sep> conveyor tube <Tb> 5 <sep> steam <tb> 6 <sep> unclad segment <tb> 7 <sep> side hole <tb> 8 <sep> perforated segment <tb> 9 <sep> natural permeability <Tb> 10 <sep> main bore <Tb> 11 <sep> Heat supply line <Tb> 12 <sep> heat treatment plant <Tb> 13 <sep> power plant <Tb> 14 <sep> pumping station <tb> 15 <sep> stop (mouth hole) <Tb> 16 <sep> Weather hole <Tb> 17 <sep> blind hole <Tb> 18 <sep> stratum

Claims (13)

1. Verfahren zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen, trockenen Gesteinsschichten gespeicherter (petrothermischer) Energie, bei dem eine Tiefenbohrung eingebracht wird, durch die Wasser als Wärmeträger in tiefer gelegene Schichten gepresst wird, dadurch gekennzeichnet, dass eine Bohrung in mindestens eine heisse, trockene Gesteinsschicht (18) eingebracht wird und mittels mindestens einer, von dieser Bohrung abzweigenden seitlichen Bohrung (7) ein petrothermisches Zirkulationssystem ermöglicht wird.A process for the production of energy from geothermal sources, in particular for the development of stored in hot, dry rock layers (petrothermal) energy, in which a deep well is introduced, is pressed through the water as a heat carrier in deeper layers, characterized in that Bore in at least one hot, dry rock layer (18) is introduced and by means of at least one, branching off from this bore lateral bore (7) a petrothermal circulation system is made possible. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das petrothermische Zirkulationssystem mittels in die heisse, trockene Gesteinsschicht (18) eingepresstes Wasser, dass in der Gesteinsschicht (18) zu Frischdampf (5) konvertiert, erzeugt wird.2. The method according to claim 1, characterized in that the petrothermal circulation system by means of in the hot, dry rock layer (18) pressed water that in the rock layer (18) converts to live steam (5) is generated. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Bohrung eine Tiefe von 7-9 km erreicht.3. The method according to claim 1 or 2, characterized in that the bore reaches a depth of 7-9 km. 4. Verfahren nach mindestens einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das Wasser durch ein perforiertes Segment (8) eines, in der Bohrung angeordneten Förderrohrs (4) in die heisse, trockene Gesteinsschicht (18) eingepresst wird.4. The method according to at least one of claims 1 to 3, characterized in that the water through a perforated segment (8) of a, arranged in the bore conveyor pipe (4) in the hot, dry rock layer (18) is pressed. 5. Verfahren nach mindestens einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass der gebildete Frischdampf (5) in die mindestens eine seitliche Bohrung (7) eintritt.5. The method according to at least one of claims 1 to 4, characterized in that the formed live steam (5) enters the at least one lateral bore (7). 6. Verfahren nach mindestens einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der gebildete Frischdampf (5) zur Gewinnung von Elektroenergie und/oder Wärmezwecke verwendet wird.6. The method according to at least one of claims 1 to 5, characterized in that the formed live steam (5) is used for the production of electrical energy and / or heat purposes. 7. Verfahren nach Anspruch 6, dadurch gekennzeichnet, dass der verwendete Frischdampf (5) nach Kondensation als Wasser erneut der Gesteinsschicht (18) zugeführt wird und somit ein geschlossener Wasserkreislauf gebildet wird.7. The method according to claim 6, characterized in that the fresh steam used (5) after condensation as water again the rock layer (18) is supplied and thus a closed water cycle is formed. 8. Anlage zur Gewinnung von Energie aus geothermischen Quellen, insbesondere zur Erschliessung von in heissen, trockenen Gesteinsschichten gespeicherter petrothermischer Energie, enthaltend Einrichtungen zum Transport, zur Nutzung und/oder Umwandlung dieser Energie, wobei eine Tiefenbohrung bis in die Gesteinsschicht (18) eingebracht ist, durch die Wasser als wärmeträger in die Gesteinsschicht (18) gepresst wird, dadurch gekennzeichnet, dass die Bohrung eine Hauptbohrung (10) bildet, von der im Bereich der Gesteinsschicht (18) mindestens eine seitliche Bohrung (7) abzweigt und dass die Hauptbohrung (10) einen Ringraum (3) umschliesst, der teilweise durch ein Förderrohr (4) ausgefüllt ist.8. System for the production of energy from geothermal sources, in particular for the development of stored in hot, dry rock layers petrothermic energy containing means for transport, for the use and / or conversion of this energy, wherein a deep hole is introduced into the rock layer (18) in which water is pressed into the rock layer (18) as heat carrier, characterized in that the bore forms a main bore (10) from which at least one lateral bore (7) branches off in the region of the rock layer (18) and the main bore (10) 10) encloses an annular space (3), which is partially filled by a delivery pipe (4). 9. Anlage nach Anspruch 8, dadurch gekennzeichnet, dass seitliche Bohrungen (7) horizontal und/oder schräg verlaufend von der Hauptbohrung (10) abzweigen.9. Plant according to claim 8, characterized in that lateral bores (7) branch off horizontally and / or obliquely from the main bore (10). 10. Anlage nach Anspruch 8 oder 9, dadurch gekennzeichnet, dass das Förderrohr (4) auf Höhe der Gesteinsschicht (18) ein perforiertes Segment (8) aufweist.10. Plant according to claim 8 or 9, characterized in that the conveying pipe (4) at the level of the rock layer (18) has a perforated segment (8). 11. Anlage nach mindestens einem der Ansprüche 8 bis 10, dadurch gekennzeichnet, dass die Hauptbohrung (10) zumindest im oberflächennahen Bereich mit einem Stützprofil (1) in Form eines Betonmantels (2) versehen ist.11. Installation according to at least one of claims 8 to 10, characterized in that the main bore (10) is provided at least in the near-surface region with a support profile (1) in the form of a concrete jacket (2). 12. Anlage nach mindestens einem der Ansprüche 8 bis 11, dadurch gekennzeichnet, dass das Förderrohr (4) mit einer Pumpstation (14) verbunden ist.12. Plant according to at least one of claims 8 to 11, characterized in that the conveying pipe (4) with a pumping station (14) is connected. 13. Anlage nach Anspruch 12, dadurch gekennzeichnet, dass der Ringraum (3), ausgenommen das Förderrohr (4), mit einem Kraftwerk (13) und/oder einer Wärmeaufbereitungsanlage (12) verbunden ist, die über eine Leitung mit der Pumpstation (14) verbunden sind.13. Plant according to claim 12, characterized in that the annular space (3), except the conveying pipe (4), with a power plant (13) and / or a heat treatment plant (12) is connected via a line to the pumping station (14 ) are connected.
CH01314/10A 2010-08-17 2010-08-17 A method for extracting energy from geothermal sources and investment purpose. CH703613A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH01314/10A CH703613A1 (en) 2010-08-17 2010-08-17 A method for extracting energy from geothermal sources and investment purpose.
PCT/RU2011/000621 WO2012023881A1 (en) 2010-08-17 2011-08-16 Method and device for producing energy from petrothermal sources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH01314/10A CH703613A1 (en) 2010-08-17 2010-08-17 A method for extracting energy from geothermal sources and investment purpose.

Publications (1)

Publication Number Publication Date
CH703613A1 true CH703613A1 (en) 2012-02-29

Family

ID=45605346

Family Applications (1)

Application Number Title Priority Date Filing Date
CH01314/10A CH703613A1 (en) 2010-08-17 2010-08-17 A method for extracting energy from geothermal sources and investment purpose.

Country Status (2)

Country Link
CH (1) CH703613A1 (en)
WO (1) WO2012023881A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022076594A1 (en) * 2020-10-07 2022-04-14 Board Of Regents, The University Of Texas System Geothermal well designs and control thereof for extraction of subsurface geothermal power

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939621B (en) * 2017-12-01 2024-04-02 西安交通大学 S-CO based on geothermal energy of heating dry rock of fin sleeve 2 Power generation system and method
WO2019223164A1 (en) * 2018-05-21 2019-11-28 西南石油大学 Hot-dry rock robot explosion-hydraulic composite fracturing well drilling and completion system and method
CN110388760A (en) * 2019-08-14 2019-10-29 青海省水文地质工程地质环境地质调查院 A kind of heat flow field superposition hot dry rock Energy harvesting methods
CN113374659B (en) * 2021-06-18 2023-05-09 中国石油化工股份有限公司 Dry-hot rock power generation system based on carbon dioxide closed circulation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1816260A (en) * 1930-04-05 1931-07-28 Lee Robert Edward Method of repressuring and flowing of wells
US3786858A (en) * 1972-03-27 1974-01-22 Atomic Energy Commission Method of extracting heat from dry geothermal reservoirs
US3938592A (en) * 1970-03-23 1976-02-17 Ivan Timofeevich Aladiev Rock-exploitation method based on thermodynamic cycles utilizing in-situ energy source
US4220202A (en) * 1970-03-23 1980-09-02 Aladiev Ivan T Apparatus for realization of rock exploitation method based on thermodynamic cycles utilizing in situ energy source
WO1985003994A1 (en) * 1984-03-02 1985-09-12 Geo-Thermal Müszaki Fejlesztési És Hasznositási Ki Method and deep well for extracting geothermal energy
RU2110019C1 (en) * 1996-03-11 1998-04-27 институт проблем геотермии Дагестанского научного центра РАН Steam-turbine plant for geothermal power station

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1633237A1 (en) * 1989-03-27 1991-03-07 Ленинградский горный институт им.Г.В.Плеханова Geothermic device
AU2001293606B2 (en) * 2000-10-20 2006-12-21 Hita Ag Method and system for exchanging earth energy between earthly bodies and an energy exchanger, especially to produce an electric current
UA38664U (en) * 2008-07-01 2009-01-12 Украинский Государственный Геологоразведочный Институт Geo-thermal installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1816260A (en) * 1930-04-05 1931-07-28 Lee Robert Edward Method of repressuring and flowing of wells
US3938592A (en) * 1970-03-23 1976-02-17 Ivan Timofeevich Aladiev Rock-exploitation method based on thermodynamic cycles utilizing in-situ energy source
US4220202A (en) * 1970-03-23 1980-09-02 Aladiev Ivan T Apparatus for realization of rock exploitation method based on thermodynamic cycles utilizing in situ energy source
US3786858A (en) * 1972-03-27 1974-01-22 Atomic Energy Commission Method of extracting heat from dry geothermal reservoirs
WO1985003994A1 (en) * 1984-03-02 1985-09-12 Geo-Thermal Müszaki Fejlesztési És Hasznositási Ki Method and deep well for extracting geothermal energy
RU2110019C1 (en) * 1996-03-11 1998-04-27 институт проблем геотермии Дагестанского научного центра РАН Steam-turbine plant for geothermal power station

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022076594A1 (en) * 2020-10-07 2022-04-14 Board Of Regents, The University Of Texas System Geothermal well designs and control thereof for extraction of subsurface geothermal power

Also Published As

Publication number Publication date
WO2012023881A1 (en) 2012-02-23

Similar Documents

Publication Publication Date Title
JP6735839B2 (en) Geothermal heat recovery from high temperature and low permeability formations for power generation using a closed loop system
CN105649588B (en) Utilize the method for SAGD production of heavy oil reservoir
US4912941A (en) Method and apparatus for extracting and utilizing geothermal energy
US6988549B1 (en) SAGD-plus
EP1327111B1 (en) Method and system for exchanging earth energy between earthly bodies and an energy exchanger, especially to produce an electric current
CN103225497B (en) Exploitation method of vaporizing formation water and displacing heavy oil by microwaves in situ
CH703613A1 (en) A method for extracting energy from geothermal sources and investment purpose.
US20160169211A1 (en) Boiling-water geothermal heat exchanger and boiling-water geothermal power generation equipment
JP5839531B1 (en) Geothermal exchanger and geothermal power generator
CN106468163B (en) Vertical well for steam flooding oil production and heavy oil production method
GB2549832A (en) Geothermal power system
EP2682689A1 (en) Generation of electrical energy from geothermal energy
DE102014005003A1 (en) System for the provision of regenerative heat and methods for supplying residential and / or commercial real estate with regenerative heat
DE102005036472B3 (en) Closed geothermal heat exchanger producing process for heat extraction involves making two deep borings impermeable to liquid and connecting them to each other
DE4115431A1 (en) DEVICE FOR UTILIZING GEOTHERMAL ENERGY
DE102008057943A1 (en) System for utilization of renewable geothermal energy, has storage area lying in underground, which is guided to another storage area after cooling by heat extraction in heat exchange process
DE102019129308A1 (en) Earth probe system
CN207741060U (en) One group of steam production plant for going deep into xeothermic rock stratum
DE4229185A1 (en) Gathering energy from heat stored in ground - circulating heat transfer medium through closed circuit beneath ground to extract stored heat for driving turbine etc.
US5253926A (en) Process for making general use of the earth&#39;s heat and obtaining minerals in the zone of weakness (at depths of 13-30 km)
CH586378A5 (en) Geothermal energy collector with sunk tubes - has vertical shaft with horizontal branches for steam generation
RU2375559C1 (en) Oil production method
DE112020007431T5 (en) METHOD OF DESIGNING WELLHOLES IN A GEOLOGICAL FORMATION
AT351708B (en) DEVICE FOR STORAGE OF HEAT RECOVERED FROM THE SOLAR ENERGY OR INDUSTRIAL WASTE HEAT IN GROUND ZONES NEAR THE SURFACE
Gayko et al. Development of methods for utilization of thermal energy in the underground gasification of coal mining

Legal Events

Date Code Title Description
AZW Rejection (application)