CH634370A5 - Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method - Google Patents

Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method Download PDF

Info

Publication number
CH634370A5
CH634370A5 CH1133878A CH1133878A CH634370A5 CH 634370 A5 CH634370 A5 CH 634370A5 CH 1133878 A CH1133878 A CH 1133878A CH 1133878 A CH1133878 A CH 1133878A CH 634370 A5 CH634370 A5 CH 634370A5
Authority
CH
Switzerland
Prior art keywords
drill
pile
borehole
mortar
sheet
Prior art date
Application number
CH1133878A
Other languages
German (de)
Inventor
Franz Leutert
Original Assignee
Fietz & Leuthold Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fietz & Leuthold Ag filed Critical Fietz & Leuthold Ag
Priority to CH1133878A priority Critical patent/CH634370A5/en
Publication of CH634370A5 publication Critical patent/CH634370A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The method of placing a pile, a steel girder or a sheet pile in the foundation soil consists in a borehole (9) first of all being excavated with a drill (6) and by the borehole wall being supported by the drill in the process. Then the drill is withdrawn and at the same time mortar (10) is fed as supporting fluid through the hollow drill rod into the borehole (9). Finally, the pile, the steel girder or the sheet pile is inserted and held in an orientated manner until the mortar has set. <IMAGE>

Description

       

  
 

**WARNUNG** Anfang DESC Feld konnte Ende CLMS uberlappen **.

 



   PATENTANSPRÜCHE
1. Verfahren zum Einbringen eines Pfahls, einer Spundwandbohle oder eines Stahlträgers in den Baugrund, dadurch gekennzeichnet, dass zuerst mittels eines Bohrers mit Hohlgestänge ein Bohrloch erstellt wird, dass dann während des Rückzugs des Bohrers durch sein Hohlgestänge in das Bohrloch eine kolloidale Stützflüssigkeit eingebracht wird und dass nach dem Entfernen des Bohrers der Pfahl, der Stahiträger oder die Spundwandbohle eingesetzt wird.



   2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Pfahl, der Stahlträger oder die Spundwandbohle bis zum Abbinden der Stützflüssigkeit gerichtet gehalten wird.



   3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass als Stützflüssigkeit ein Mörtel verwendet wird.



   4. Verfahren nach einem der Ansprüche 1-3, dadurch gekennzeichnet, dass die Stahlträger oder Spundbohlen vor dem Einsetzen mit einem Trennmittel, z.B. Bitumen oder 01 behandelt werden, um eine Verbindung zwischen denselben und dem erhärteten, sie umgebenden Mörtel zu verhindern.



   5. Verfahren nach einem der Ansprüche 1-4, dadurch gekennzeichnet, dass während des Bohrens ein Rollenmeissel zum Durchbohren harter Schichten auf die Bohrerspitze aufgesetzt wird.



   6. Anwendung des Verfahrens nach Anspruch 1, zur Erstellung von Rühlwänden, wobei während des Baugruben Aushubvorgangs die erhärtete Stützflüssigkeit im Bereiche der Ausfachung abgetragen wird.



   7. Bohrer zur Durchführung des Verfahrens nach Anspruch   1, dadurch    gekennzeichnet, dass das hohle Bohrergestänge mit einer Zuleitung für eine Stützflüssigkeit verbunden ist.



   8. Bohrer nach Anspruch 7, dadurch gekennzeichnet, dass seine Länge mindestens der Bohrlochtiefe entspricht.



   9. Bohrer nach Anspruch 7 oder 8, dadurch gekennzeichnet, dass an seiner Spitze unter Druck ausstossbare Abschlussorgane vorgesehen sind.



   10. Bohrer nach einem der Ansprüche 7-9, dadurch gekennzeichnet, dass seine Spitze so ausgebildet ist, dass ein Bohrmeissel, z.B. Rollenmeissel, befestigt werden kann.



   Die vorliegende Erfindung betrifft ein Verfahren zum Einbringen eines Pfahls, einer Spundwandbohle oder eines Stahlträgers in den Baugrund.



   Bisher wurden Pfähle, Träger und Spundbohlen meist eingerammt, was jedoch mit verschiedenen bekannten Nachteilen, insbesondere Lärm und Erschütterung verbunden ist.



  Es ist auch bekannt, Löcher vorzubohren und zu verrohren und im Schutze der Rohre den Träger einzusetzen, wobei der Fuss normalerweise ausbetoniert wird. Dieses Verfahren ist aufwendig.



   Es ist das Ziel vorliegender Erfindung ein Verfahren   anzu-    geben, dass für bestimmte Böden besonders einfach und geeignet ist. Es ist dadurch gekennzeichnet, dass zuerst mittels eines Bohrers mit Hohlgestänge ein Bohrloch erstellt wird, dass dann während des Rückzugs des Bohrers durch sein Hohlgestänge in das Bohrloch eine kolloidale Stützflüssigkeit eingebracht wird und dass nach dem Entfernen des Bohrers der Pfahl, der Stahlträger oder die Spundwandbohle eingesetzt wird. Ein Verrohren der Bohrung ist nicht mehr erforderlich. Die Stützflüssigkeit hat eine Doppelfunktion, nämlich das Erdreich zu stützen, bis das Element, nämlich der Pfahl, der Stahlträger oder die Spundwandbohle eingesetzt ist und dann nach dem Aushärten das Element im Grund zu sichern.



   Gegenstand der Erfindung ist auch eine Anwendung des Verfahrens und ein Bohrer zur Durchführung des Verfahrens.



   Ein Ausführungsbeispiel des erfindungsgemässen Verfahrens und der Vorrichtung zu seiner Durchführung wird nun anhand der Zeichnung näher erläutert.



   Die Fig. 1 bis 3 zeigen je ein Stadium des Bauverfahrens.



   Die Fig. 1 und 2 zeigen die eigentliche Bohrvorrichtung.



   An einem Raupenhebezeug   list    eine mittels eines Zylinders 2 aufrichtbare und einstellbare Führung 3 angebracht, an welcher ein Ausleger 4 vertikal verschiebbar und in bestimmten Lagen feststellbar angebracht ist. Mit dem Ausleger ist ein Antriebsaggregat 5 verbunden, durch welches ein Schneckenbohrer 6 durchragt. Gemäss Fig.   list    der Bohrer mittels eines Seilzugs 7 aufgehängt und kann vertikal verschoben werden. Im Antriebsaggregat 5 sind den Bohrer 6 umgreifende, radial gegen denselben anpressbare und lösbare Backen vorgesehen, die in klemmendem Zustand den Bohrer anzutreiben und axial mitzunehmen imstande sind.



  Durch axiale Verschiebung des Auslegers 4 kann der axiale Vorschub des Bohrers 6 bewerkstelligt werden.



   Fig. 1 zeigt den Bohrvorgang, wobei der Bohrer 6 kontinuierlich gedreht und axial vorgeschoben wird. Sein Schraubengang fördert dabei gelöstes Material laufend nach oben, wobei die Steigung der Bohrergänge so bemessen ist, dass das Erdreich darauf liegen bleibt. Die Aussenseite der Bohrergänge und das darauf liegehde Erdreich stützen die Wand des entstehenden Bohrloches 9. Von Zeit zu Zeit wird der Bohrer im Aggregat 5 gelockert, dieses wird dann angehoben, fasst den Bohrer weiter oben und treibt ihn für den weiteren Bohrvorgang an. Die Länge des Bohrers, der aus mehreren   ver    bundenen Teilstücken bestehen kann genügt für die zu erreichende Bohrtiefe.



   Das Bohrergestänge ist hohl und dient dem Einbringen von Stützflüssigkeit, insbesondere Mörtel mit geringer Zementbeimischung, dessen   Hauptkomponenten    aus Opalinuston und Zement bestehen, in das Bohrloch. Ist die Tiefe des Bohrloches erreicht, so wird der Bohrer gemäss Fig. 2 hochgezogen. Dabei ist nun das obere Ende des Bohrers über eine Leitung 8b mit einer Pumpstation 8a für Mörtel oder dergleichen erhärtende Stützflüssigkeit verbunden, und der Mörtel 10 wird durch das Hohlgestänge des Bohrers 6 laufend in das entstandene Bohrloch als Stützflüssigkeit eingebracht. Um diesen Vorgang sicherzustellen, ist das untere Ende des Bohrers mit einem Düsenkopf versehen, in welchen beim Bohren (Fig.   1) Verschlusszapfen    in Düsenöffnungen eingesetzt sind.

  Zu Beginn des Rückzugs des Bohrers werden diese Zapfen durch kurzzeitiges Einleiten von Druckwasser in das Bohrgestänge ausgestossen und damit die Düsenöffnungen freigelegt für den hierauf nachgepumpten Mörtel.



  Der Bohrer wird ganz aus dem Bohrloch 9 entfernt und seitlich weggefahren. Dann wird mittels eines anderen Hebezeugs 11 gemäss Fig. 3 ein Träger 12 in das mit Mörtel 10 gefüllte Bohrloch eingesetzt und dann in der gewollten Lage gestützt bis der Mörtel abgebunden hat.

 

   Das oben für einen Träger, z.B. einen I-Träger beschriebene Verfahren kann entsprechend auch zum Einbringen eines vorfabrizierten Betonpfahls, insbesondere Schleuderbetonpfahls verwendet werden. Es wird dabei mit einem Bohrer gebohrt, dessen Aussendurchmesser etwas geringer ist als der Pfahldurchmesser. Es wird z.B. mit Bohrern der Durchmesser 20, 30 und 40 für Pfähle mit Aussendurchmesser 24, 34 bzw.



  45 gebohrt.



   Es ist auch möglich, Spundwände entsprechend zu erstellen. In diesem Falle werden in einzelnen Bohrungen einzelne Spundbohlen gesetzt. Praktisch geht man z.B. so vor, dass man zuerst eine Reihe von Löchern in der beschriebenen Weise bohrt, und mit Mörtel füllt und dann die Spundbohlen einbringt. Es werden z.B. Reihen von seitlich der Versetzung der Bohlen entsprechend etwas versetzten Löchern auf eine  

 

   Länge von 4 m erstellt und dann die Spundbohlen in üblicher
Weise eingestellt und gekuppelt. Nach dem Aushärten des
Mörtels wird das Verfahren weitergeführt.



   Sollen Stahlträger oder Spundbohlen nachträglich zurückgewonnen werden, kann man sie vor dem Einsetzen mit einem Trennmaterial wie Bitumen, Öl oder dergleichen behandeln, damit kein fester Verbund mit dem Mörtel entsteht.



   Das Verfahren nach Fig. 1-3 zum Setzen von   Stahlträgern    kann mit Vorteil angewendet werden bei der Erstellung von Rühlwänden. Es werden mehrere Träger gemäss Fig. 1-3 eingebracht. Hierauf wird in bekannter Weise entlang der Reihe von Trägern mit dem Aushub einer Baugrube begonnen.



  Damit nun zwischen benachbarte Träger die Wandelemente der Rühlwand eingesetzt werden können, ist der Mörtel im Bereiche des Aushubs zu entfernen. 



  
 

** WARNING ** beginning of DESC field could overlap end of CLMS **.

 



   PATENT CLAIMS
1. A method for inserting a pile, a sheet pile or a steel beam into the ground, characterized in that a borehole is first created using a drill with a hollow rod, and then a colloidal support fluid is introduced into the borehole through the hollow rod during the withdrawal of the drill and that after the drill has been removed, the pile, steel beam or sheet pile is used.



   2. The method according to claim 1, characterized in that the pile, the steel beam or the sheet pile is kept directed until the supporting fluid sets.



   3. The method according to claim 1 or 2, characterized in that a mortar is used as the supporting liquid.



   4. The method according to any one of claims 1-3, characterized in that the steel beams or sheet piles with a release agent, e.g. Bitumen or 01 can be treated to prevent a bond between the same and the hardened mortar surrounding it.



   5. The method according to any one of claims 1-4, characterized in that a roller chisel for drilling through hard layers is placed on the drill tip during drilling.



   6. Application of the method according to claim 1, for the creation of cooling walls, the hardened supporting liquid being removed in the region of the infill during the excavation process.



   7. Drill for carrying out the method according to claim 1, characterized in that the hollow drill rod is connected to a supply line for a supporting liquid.



   8. Drill according to claim 7, characterized in that its length corresponds at least to the borehole depth.



   9. Drill according to claim 7 or 8, characterized in that at its tip under pressure ejectable closure members are provided.



   10. Drill according to one of claims 7-9, characterized in that its tip is designed such that a drill bit, e.g. Roller chisel, can be attached.



   The present invention relates to a method for introducing a pile, a sheet pile or a steel beam into the foundation.



   So far, piles, beams and sheet piles have mostly been driven in, but this is associated with various known disadvantages, in particular noise and vibration.



  It is also known to predrill and pipe holes and to use the support in the protection of the pipes, the base being normally concreted. This process is complex.



   The aim of the present invention is to provide a method which is particularly simple and suitable for certain soils. It is characterized in that a borehole is first created using a drill with a hollow rod, that a colloidal supporting liquid is then introduced into the borehole through its hollow rod during the withdrawal of the drill and that after the drill has been removed, the pile, the steel girder or the sheet pile wall is used. It is no longer necessary to pipe the hole. The supporting fluid has a double function, namely to support the soil until the element, namely the pile, the steel girder or the sheet pile is inserted and then to secure the element in the ground after hardening.



   The invention also relates to an application of the method and a drill for carrying out the method.



   An embodiment of the inventive method and the device for its implementation will now be explained in more detail with reference to the drawing.



   1 to 3 each show a stage of the construction process.



   1 and 2 show the actual drilling device.



   A caterpillar hoist has a guide 3 which can be erected and adjusted by means of a cylinder 2 and on which a boom 4 is vertically displaceable and fixable in certain positions. A drive unit 5 is connected to the boom, through which a screw drill 6 projects. According to FIG. 1, the drill is suspended by means of a cable 7 and can be moved vertically. In the drive unit 5, the drill 6 is provided with gripping, radially compressible and releasable jaws which, in the clamped state, are able to drive the drill and are able to take it axially.



  The axial feed of the drill 6 can be achieved by axially displacing the boom 4.



   Fig. 1 shows the drilling process, the drill 6 is rotated continuously and advanced axially. His screw thread continuously transports dissolved material upwards, whereby the pitch of the drill threads is dimensioned so that the soil remains on it. The outside of the drill tunnels and the soil lying on them support the wall of the resulting borehole 9. From time to time the drill in the unit 5 is loosened, this is then raised, grips the drill further up and drives it for the further drilling process. The length of the drill, which can consist of several connected sections, is sufficient for the drilling depth to be achieved.



   The drill string is hollow and is used to introduce supporting fluid, in particular mortar with a low cement admixture, the main components of which are opal clay and cement, into the borehole. If the depth of the borehole has been reached, the drill is pulled up as shown in FIG. 2. The upper end of the drill is now connected via a line 8b to a pumping station 8a for mortar or the like hardening supporting liquid, and the mortar 10 is continuously introduced into the resulting borehole as a supporting liquid through the hollow rod of the drill 6. To ensure this process, the lower end of the drill is provided with a nozzle head, in which locking pins are inserted into the nozzle openings during drilling (FIG. 1).

  At the start of the retraction of the drill, these pins are ejected by briefly introducing pressurized water into the drill pipe, thus exposing the nozzle openings for the mortar pumped thereon.



  The drill is completely removed from the borehole 9 and moved away to the side. A carrier 12 is then inserted into the borehole filled with mortar 10 by means of another lifting device 11 according to FIG. 3 and then supported in the desired position until the mortar has set.

 

   The above for a carrier e.g. A method described in an I-beam can also be used accordingly for the introduction of a prefabricated concrete pile, in particular a spun concrete pile. It is drilled with a drill whose outside diameter is slightly less than the pile diameter. For example with drills of diameters 20, 30 and 40 for piles with outer diameters 24, 34 and



  45 drilled.



   It is also possible to create sheet piling accordingly. In this case, single sheet piles are placed in individual holes. In practice you go e.g. so that you first drill a row of holes in the manner described and fill with mortar and then insert the sheet piles. E.g. Rows of holes laterally displaced on one side corresponding to the displacement of the planks

 

   Length of 4 m created and then the sheet piles in the usual
Wise set and coupled. After curing the
Mörtels will continue the process.



   If steel girders or sheet piles are to be recovered afterwards, they can be treated with a separating material such as bitumen, oil or the like before use, so that there is no firm bond with the mortar.



   The method according to Fig. 1-3 for setting steel girders can be used with advantage in the creation of cooling walls. Several carriers according to FIGS. 1-3 are introduced. Then excavation of an excavation pit is started in a known manner along the row of supports.



  So that the wall elements of the cooling wall can now be inserted between adjacent beams, the mortar must be removed in the area of the excavation.


    

Claims (10)

PATENTANSPRÜCHE 1. Verfahren zum Einbringen eines Pfahls, einer Spundwandbohle oder eines Stahlträgers in den Baugrund, dadurch gekennzeichnet, dass zuerst mittels eines Bohrers mit Hohlgestänge ein Bohrloch erstellt wird, dass dann während des Rückzugs des Bohrers durch sein Hohlgestänge in das Bohrloch eine kolloidale Stützflüssigkeit eingebracht wird und dass nach dem Entfernen des Bohrers der Pfahl, der Stahiträger oder die Spundwandbohle eingesetzt wird.  PATENT CLAIMS 1. A method for inserting a pile, a sheet pile or a steel beam into the ground, characterized in that a borehole is first created using a drill with a hollow rod, and then a colloidal support fluid is introduced into the borehole through the hollow rod during the withdrawal of the drill and that after the drill has been removed, the pile, steel beam or sheet pile is used. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Pfahl, der Stahlträger oder die Spundwandbohle bis zum Abbinden der Stützflüssigkeit gerichtet gehalten wird.  2. The method according to claim 1, characterized in that the pile, the steel beam or the sheet pile is kept directed until the supporting liquid sets. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass als Stützflüssigkeit ein Mörtel verwendet wird.  3. The method according to claim 1 or 2, characterized in that a mortar is used as the supporting liquid. 4. Verfahren nach einem der Ansprüche 1-3, dadurch gekennzeichnet, dass die Stahlträger oder Spundbohlen vor dem Einsetzen mit einem Trennmittel, z.B. Bitumen oder 01 behandelt werden, um eine Verbindung zwischen denselben und dem erhärteten, sie umgebenden Mörtel zu verhindern.  4. The method according to any one of claims 1-3, characterized in that the steel beams or sheet piles with a release agent, e.g. Bitumen or 01 can be treated to prevent a bond between the same and the hardened mortar surrounding it. 5. Verfahren nach einem der Ansprüche 1-4, dadurch gekennzeichnet, dass während des Bohrens ein Rollenmeissel zum Durchbohren harter Schichten auf die Bohrerspitze aufgesetzt wird.  5. The method according to any one of claims 1-4, characterized in that a roller chisel for drilling through hard layers is placed on the drill tip during drilling. 6. Anwendung des Verfahrens nach Anspruch 1, zur Erstellung von Rühlwänden, wobei während des Baugruben Aushubvorgangs die erhärtete Stützflüssigkeit im Bereiche der Ausfachung abgetragen wird.  6. Application of the method according to claim 1, for the creation of cooling walls, the hardened supporting liquid being removed in the area of the infill during the excavation process. 7. Bohrer zur Durchführung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, dass das hohle Bohrergestänge mit einer Zuleitung für eine Stützflüssigkeit verbunden ist.  7. Drill for carrying out the method according to claim 1, characterized in that the hollow drill rod is connected to a supply line for a supporting liquid. 8. Bohrer nach Anspruch 7, dadurch gekennzeichnet, dass seine Länge mindestens der Bohrlochtiefe entspricht.  8. Drill according to claim 7, characterized in that its length corresponds at least to the borehole depth. 9. Bohrer nach Anspruch 7 oder 8, dadurch gekennzeichnet, dass an seiner Spitze unter Druck ausstossbare Abschlussorgane vorgesehen sind.  9. Drill according to claim 7 or 8, characterized in that at its tip under pressure ejectable closure members are provided. 10. Bohrer nach einem der Ansprüche 7-9, dadurch gekennzeichnet, dass seine Spitze so ausgebildet ist, dass ein Bohrmeissel, z.B. Rollenmeissel, befestigt werden kann.  10. Drill according to one of claims 7-9, characterized in that its tip is designed such that a drill bit, e.g. Roller chisel, can be attached. Die vorliegende Erfindung betrifft ein Verfahren zum Einbringen eines Pfahls, einer Spundwandbohle oder eines Stahlträgers in den Baugrund.  The present invention relates to a method for introducing a pile, a sheet pile or a steel beam into the foundation. Bisher wurden Pfähle, Träger und Spundbohlen meist eingerammt, was jedoch mit verschiedenen bekannten Nachteilen, insbesondere Lärm und Erschütterung verbunden ist.  So far, piles, beams and sheet piles have mostly been driven in, but this is associated with various known disadvantages, in particular noise and vibration. Es ist auch bekannt, Löcher vorzubohren und zu verrohren und im Schutze der Rohre den Träger einzusetzen, wobei der Fuss normalerweise ausbetoniert wird. Dieses Verfahren ist aufwendig. It is also known to predrill and pipe holes and to use the support in the protection of the pipes, the base being normally concreted. This process is complex. Es ist das Ziel vorliegender Erfindung ein Verfahren anzu- geben, dass für bestimmte Böden besonders einfach und geeignet ist. Es ist dadurch gekennzeichnet, dass zuerst mittels eines Bohrers mit Hohlgestänge ein Bohrloch erstellt wird, dass dann während des Rückzugs des Bohrers durch sein Hohlgestänge in das Bohrloch eine kolloidale Stützflüssigkeit eingebracht wird und dass nach dem Entfernen des Bohrers der Pfahl, der Stahlträger oder die Spundwandbohle eingesetzt wird. Ein Verrohren der Bohrung ist nicht mehr erforderlich. Die Stützflüssigkeit hat eine Doppelfunktion, nämlich das Erdreich zu stützen, bis das Element, nämlich der Pfahl, der Stahlträger oder die Spundwandbohle eingesetzt ist und dann nach dem Aushärten das Element im Grund zu sichern.  The aim of the present invention is to provide a method which is particularly simple and suitable for certain soils. It is characterized in that a borehole is first created using a drill with a hollow rod, that a colloidal supporting liquid is then introduced into the borehole through its hollow rod during the withdrawal of the drill and that after the drill has been removed, the pile, the steel girder or the sheet pile wall is used. It is no longer necessary to pipe the hole. The supporting fluid has a double function, namely to support the soil until the element, namely the pile, the steel girder or the sheet pile is inserted and then to secure the element in the ground after hardening. Gegenstand der Erfindung ist auch eine Anwendung des Verfahrens und ein Bohrer zur Durchführung des Verfahrens.  The invention also relates to an application of the method and a drill for carrying out the method. Ein Ausführungsbeispiel des erfindungsgemässen Verfahrens und der Vorrichtung zu seiner Durchführung wird nun anhand der Zeichnung näher erläutert.  An embodiment of the inventive method and the device for its implementation will now be explained in more detail with reference to the drawing. Die Fig. 1 bis 3 zeigen je ein Stadium des Bauverfahrens.  1 to 3 each show a stage of the construction process. Die Fig. 1 und 2 zeigen die eigentliche Bohrvorrichtung.  1 and 2 show the actual drilling device. An einem Raupenhebezeug list eine mittels eines Zylinders 2 aufrichtbare und einstellbare Führung 3 angebracht, an welcher ein Ausleger 4 vertikal verschiebbar und in bestimmten Lagen feststellbar angebracht ist. Mit dem Ausleger ist ein Antriebsaggregat 5 verbunden, durch welches ein Schneckenbohrer 6 durchragt. Gemäss Fig. list der Bohrer mittels eines Seilzugs 7 aufgehängt und kann vertikal verschoben werden. Im Antriebsaggregat 5 sind den Bohrer 6 umgreifende, radial gegen denselben anpressbare und lösbare Backen vorgesehen, die in klemmendem Zustand den Bohrer anzutreiben und axial mitzunehmen imstande sind.  A caterpillar hoist has a guide 3 which can be erected and adjusted by means of a cylinder 2 and on which a boom 4 is vertically displaceable and can be fixed in certain positions. A drive unit 5 is connected to the boom, through which a screw drill 6 projects. According to FIG. 1, the drill is suspended by means of a cable 7 and can be moved vertically. In the drive unit 5, the drill 6 is provided with gripping, radially compressible and releasable jaws which, in the clamped state, are able to drive the drill and are able to take it axially. Durch axiale Verschiebung des Auslegers 4 kann der axiale Vorschub des Bohrers 6 bewerkstelligt werden. The axial feed of the drill 6 can be achieved by axially displacing the boom 4. Fig. 1 zeigt den Bohrvorgang, wobei der Bohrer 6 kontinuierlich gedreht und axial vorgeschoben wird. Sein Schraubengang fördert dabei gelöstes Material laufend nach oben, wobei die Steigung der Bohrergänge so bemessen ist, dass das Erdreich darauf liegen bleibt. Die Aussenseite der Bohrergänge und das darauf liegehde Erdreich stützen die Wand des entstehenden Bohrloches 9. Von Zeit zu Zeit wird der Bohrer im Aggregat 5 gelockert, dieses wird dann angehoben, fasst den Bohrer weiter oben und treibt ihn für den weiteren Bohrvorgang an. Die Länge des Bohrers, der aus mehreren ver bundenen Teilstücken bestehen kann genügt für die zu erreichende Bohrtiefe.  Fig. 1 shows the drilling process, the drill 6 is rotated continuously and advanced axially. His screw thread continuously transports dissolved material upwards, whereby the pitch of the drill threads is dimensioned so that the soil remains on it. The outside of the drill tunnels and the soil lying on them support the wall of the resulting borehole 9. From time to time the drill in the unit 5 is loosened, this is then raised, grips the drill further up and drives it for the further drilling process. The length of the drill, which can consist of several connected sections, is sufficient for the drilling depth to be achieved. Das Bohrergestänge ist hohl und dient dem Einbringen von Stützflüssigkeit, insbesondere Mörtel mit geringer Zementbeimischung, dessen Hauptkomponenten aus Opalinuston und Zement bestehen, in das Bohrloch. Ist die Tiefe des Bohrloches erreicht, so wird der Bohrer gemäss Fig. 2 hochgezogen. Dabei ist nun das obere Ende des Bohrers über eine Leitung 8b mit einer Pumpstation 8a für Mörtel oder dergleichen erhärtende Stützflüssigkeit verbunden, und der Mörtel 10 wird durch das Hohlgestänge des Bohrers 6 laufend in das entstandene Bohrloch als Stützflüssigkeit eingebracht. Um diesen Vorgang sicherzustellen, ist das untere Ende des Bohrers mit einem Düsenkopf versehen, in welchen beim Bohren (Fig. 1) Verschlusszapfen in Düsenöffnungen eingesetzt sind.  The drill string is hollow and is used to introduce supporting fluid, especially mortar with a low cement admixture, the main components of which are opal clay and cement, into the borehole. If the depth of the borehole has been reached, the drill is pulled up as shown in FIG. 2. The upper end of the drill is now connected via a line 8b to a pumping station 8a for mortar or the like hardening supporting liquid, and the mortar 10 is continuously introduced into the resulting borehole as a supporting liquid through the hollow rod of the drill 6. To ensure this process, the lower end of the drill is provided with a nozzle head, in which locking pins are inserted into the nozzle openings during drilling (FIG. 1). Zu Beginn des Rückzugs des Bohrers werden diese Zapfen durch kurzzeitiges Einleiten von Druckwasser in das Bohrgestänge ausgestossen und damit die Düsenöffnungen freigelegt für den hierauf nachgepumpten Mörtel. At the beginning of the withdrawal of the drill, these pins are ejected by briefly introducing pressurized water into the drill pipe, thus uncovering the nozzle openings for the mortar pumped thereon. Der Bohrer wird ganz aus dem Bohrloch 9 entfernt und seitlich weggefahren. Dann wird mittels eines anderen Hebezeugs 11 gemäss Fig. 3 ein Träger 12 in das mit Mörtel 10 gefüllte Bohrloch eingesetzt und dann in der gewollten Lage gestützt bis der Mörtel abgebunden hat. The drill is completely removed from the borehole 9 and moved away to the side. A carrier 12 is then inserted into the borehole filled with mortar 10 by means of another lifting device 11 according to FIG. 3 and then supported in the desired position until the mortar has set.   Das oben für einen Träger, z.B. einen I-Träger beschriebene Verfahren kann entsprechend auch zum Einbringen eines vorfabrizierten Betonpfahls, insbesondere Schleuderbetonpfahls verwendet werden. Es wird dabei mit einem Bohrer gebohrt, dessen Aussendurchmesser etwas geringer ist als der Pfahldurchmesser. Es wird z.B. mit Bohrern der Durchmesser 20, 30 und 40 für Pfähle mit Aussendurchmesser 24, 34 bzw.  The above for a carrier e.g. A method described in an I-beam can also be used accordingly for the introduction of a prefabricated concrete pile, in particular a spun concrete pile. It is drilled with a drill whose outside diameter is slightly less than the pile diameter. For example with drills of diameters 20, 30 and 40 for piles with outer diameters 24, 34 and 45 gebohrt. 45 drilled. Es ist auch möglich, Spundwände entsprechend zu erstellen. In diesem Falle werden in einzelnen Bohrungen einzelne Spundbohlen gesetzt. Praktisch geht man z.B. so vor, dass man zuerst eine Reihe von Löchern in der beschriebenen Weise bohrt, und mit Mörtel füllt und dann die Spundbohlen einbringt. Es werden z.B. Reihen von seitlich der Versetzung der Bohlen entsprechend etwas versetzten Löchern auf eine **WARNUNG** Ende CLMS Feld konnte Anfang DESC uberlappen**.  It is also possible to create sheet piling accordingly. In this case, single sheet piles are placed in individual holes. In practice you go e.g. so that you first drill a row of holes in the manner described and fill with mortar and then insert the sheet piles. E.g. Rows of holes laterally displaced on one side corresponding to the displacement of the planks ** WARNING ** End of CLMS field could overlap beginning of DESC **.
CH1133878A 1978-11-03 1978-11-03 Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method CH634370A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH1133878A CH634370A5 (en) 1978-11-03 1978-11-03 Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1133878A CH634370A5 (en) 1978-11-03 1978-11-03 Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method

Publications (1)

Publication Number Publication Date
CH634370A5 true CH634370A5 (en) 1983-01-31

Family

ID=4372533

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1133878A CH634370A5 (en) 1978-11-03 1978-11-03 Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method

Country Status (1)

Country Link
CH (1) CH634370A5 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576938A1 (en) * 1985-02-01 1986-08-08 Bloch Christian Method, which may be made industrial, for building foundations and substructures for constructions with a ground floor and one storey
WO2008086693A1 (en) * 2007-01-08 2008-07-24 Tianjin Leihua Hi-Tech. Co., Ltd. Piling machine with high-pressure jet spiral bit and its piling method
CN108755729A (en) * 2018-08-20 2018-11-06 中铁二十局集团第工程有限公司 A kind of CFG pile foundations pile cover and pile body integrative construction device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576938A1 (en) * 1985-02-01 1986-08-08 Bloch Christian Method, which may be made industrial, for building foundations and substructures for constructions with a ground floor and one storey
WO2008086693A1 (en) * 2007-01-08 2008-07-24 Tianjin Leihua Hi-Tech. Co., Ltd. Piling machine with high-pressure jet spiral bit and its piling method
CN108755729A (en) * 2018-08-20 2018-11-06 中铁二十局集团第工程有限公司 A kind of CFG pile foundations pile cover and pile body integrative construction device and method
CN108755729B (en) * 2018-08-20 2023-07-04 中铁二十局集团第一工程有限公司 CFG pile foundation pile cap and pile body integrated construction device and method

Similar Documents

Publication Publication Date Title
EP2527539B1 (en) Submarine drilling assembly and method for inserting a foundation element into the soil of a body of water
DE10155105C1 (en) Earth drill with pipe line installer has frame supporting hollow drill shaft with flushing pipes
DE1634237A1 (en) Method for producing a tie rod in the ground
DE3718480C2 (en) Drilling device for a high pressure injection drilling method and drilling method using the drilling device
DE69926410T2 (en) Soil reinforcement method
DE69216358T2 (en) Tunnel expansion process and suitable device
CH634370A5 (en) Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method
DE3818998C3 (en) Procedure for laying supply lines
DE3612762A1 (en) Telescopic drilling implement
EP0509385A1 (en) Method for creating concrete bodies and cement bodies in the ground
DE2126867A1 (en) Directional drilling method
DE19506337C1 (en) Anchoring device for drilling carriage of mobile earth drilling equipment
DE3151856A1 (en) DEVICE FOR CENTRICALLY PUTING IN A PROTECTIVE POST INTO A PITCH HOLE
CH639447A5 (en) METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD.
CH693934A5 (en) Method for earth and rock anchor bore drilling uses drill crown to which drill pipe is attached to define annular space for evacuation of hardened material
DE3122032C2 (en) Process for the subsequent anchoring of sheet pile walls, as well as a mounting device for a drilling device and anchor pile for carrying out the process
DE3926787A1 (en) Pile driving and anchoring in ground - uses driven into ground, pile inserting into tube, tube removal, and anchoring substance injecting
DE4006320C1 (en) Straight line tunnel borer - has guide tube to which casing is connected with load-out conveyor
DE102016107899A1 (en) Method for producing a pipe sheet pile wall and support tube
DE19512076A1 (en) Earth drill
DE19744322C1 (en) Method of placing anchor piles in friable soils
EP2843138A1 (en) Method and device for producing ground piles
EP0381665B1 (en) Process and apparatus for forming a strand of single elements under water
DE3644793A1 (en) Method for producing a foundation by integrating a prefabricated part, in particular a support, in a situ-cast foot
DE3913313A1 (en) Vertical column attached to hydraulic excavator - adjustable mounting for hydraulic vibration rammer and drilling machine and immediate change-over between the two

Legal Events

Date Code Title Description
PL Patent ceased