CH509473A - Procedure for bridge cantilever building with feed - Google Patents

Procedure for bridge cantilever building with feed

Info

Publication number
CH509473A
CH509473A CH1550266A CH1550266A CH509473A CH 509473 A CH509473 A CH 509473A CH 1550266 A CH1550266 A CH 1550266A CH 1550266 A CH1550266 A CH 1550266A CH 509473 A CH509473 A CH 509473A
Authority
CH
Switzerland
Prior art keywords
bridge
feed
sections
produced
extension
Prior art date
Application number
CH1550266A
Other languages
German (de)
Inventor
Koncz Tihamer Ing Dr
Original Assignee
Koncz Tihamer Ing Dr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koncz Tihamer Ing Dr filed Critical Koncz Tihamer Ing Dr
Priority to CH1550266A priority Critical patent/CH509473A/en
Priority to DE1967K0063685 priority patent/DE1658607C3/en
Publication of CH509473A publication Critical patent/CH509473A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • E01D21/065Incremental launching
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

  

  
 



  Verfahren für Brückenfreivorbau mit Vorschub
Die Erfindung bezieht sich auf ein Verfahren für den Freivorbau von Stahl- und Spannbetonbrücken mit Vorschub, bei welchem die Brückenkonstruktion in der Verlängerung der Brückenachse in Abschnitten hergestellt und mit einer Einrichtung in ihre endgültige Lage vorgeschoben wird.



   Es sind bisher Brückenkonstruktionen im Freivorbau durchgeführt worden; bei diesen wurde aber entweder an der endgültigen Stelle betoniert oder es wurden die Abschnitte vorgefertigt und miteinander durch Anschlussbewehrungen verbunden. Diese Verfahren haben den Nachteil, dass die Brücke in der Querrichtung aufgeteilt wurde, weshalb in kurzen Abständen Fugen entstehen; ausserdem sind die Durchbiegungen bei dem Zusammenschluss nicht kontrollierbar, weil das Schwinden und Kriechen nie genau berechnet werden kann.



   Vorschubverfahren sind u.a. auch vom Stahlbau her bekannt. Im Stahlbetonbau sind Brücken aus einzelnen vorfabrizierten Abschnitten an einem Ende der Brücke hergestellt, zusammengespannt und mit Hilfspfeilern über die Pfeiler geschoben worden. Dieses Verfahren hat den Nachteil, dass Fugen entstehen und die Hilfspfeiler das Einschieben hoher Brücken verunmöglichen. Die Erfindung sieht demgegenüber die Herstellung der Brükkenkonstruktion in der Verlängerung der Brückenachse in Abschnitten vor, welche aneinander anbetoniert werden. In der Zeichnung ist ein Ausführungsbeispiel des Verfahrens dargestellt.



   Fig. 1 zeigt einen Brückenquerschnitt, der in der Längsrichtung aufgeteilt ist. Der untere Teil 1 besitzt Trogform, der obere Teil 2 ist eine Fahrbahndecke.



   Fig. 2 zeigt das Bauverfahren: In der Verlängerung der Brückenachse wird jeweils der untere Teil 1 in Abschnitten hergestellt, welche aber doch fugenlos zusammengefügt sind. Jeweils nach der Herstellung eines Abschnitts wird der fertige Teil mittels den Vorschubeinrichtungen 6 vorgeschoben und der nächste Abschnitt 5 hergestellt.



   Den Vorschub erleichtern provisorische Vorspannkabel, ein Vorbauschnabel 3 und ein Abspannturm 4, womit die Durchbiegung des auskragenden Teils verringert wird.



   PATENTANSPRUCH



   Verfahren für den Freivorbau von Stahl- und Spannbetonbrücken mit Vorschub, bei welchem die Brückenkonstruktion in der Verlängerung der Brückenachse in Abschnitten hergestellt und mit einer Einrichtung in ihre endgültige Lage vorgeschoben wird.

 

   UNTERANSPRÜCHE
1. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass der Brückenquerschnitt in der Längsrichtung geteilt wird, der vorgeschobene Teil in    U -Form    gestaltet wird und als ergänzende Elemente vorfabrizierte Betonplatten verwendet werden.



   2. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass der vorgeschobene Teil mit einem Vorbauschnabel verlängert wird.



   3. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass ein Abspannturm eingebaut und dieser mit der Brücke vorgeschoben wird.



   4. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Konstruktion für die Aufnahme der Vorschubsbeanspruchungen   mit provisorischen Spannglie-    dern vorgespannt wird.

**WARNUNG** Ende DESC Feld konnte Anfang CLMS uberlappen**.



   



  
 



  Procedure for bridge cantilever building with feed
The invention relates to a method for the cantilever construction of steel and prestressed concrete bridges with a feed, in which the bridge structure is produced in the extension of the bridge axis in sections and is pushed into its final position with a device.



   So far, bridge constructions have been carried out using cantilever arches; In these, however, either the final point was concreted or the sections were prefabricated and connected to one another by connecting reinforcements. These methods have the disadvantage that the bridge has been divided in the transverse direction, which is why joints are created at short intervals; In addition, the deflections at the merger cannot be controlled because the shrinkage and creep can never be precisely calculated.



   Feed processes include also known from steel construction. In reinforced concrete, bridges are made from individual prefabricated sections at one end of the bridge, clamped together and pushed over the pillars with auxiliary piers. This method has the disadvantage that joints are created and the auxiliary piers make it impossible to insert high bridges. In contrast, the invention provides for the bridge construction to be produced in the extension of the bridge axis in sections which are concreted to one another. An exemplary embodiment of the method is shown in the drawing.



   Fig. 1 shows a bridge cross section which is divided in the longitudinal direction. The lower part 1 has a trough shape, the upper part 2 is a road surface.



   Fig. 2 shows the construction process: In the extension of the bridge axis, the lower part 1 is produced in sections, which are, however, joined together without joints. After each section has been produced, the finished part is advanced by means of the feed devices 6 and the next section 5 is produced.



   The advance is facilitated by provisional pretensioning cables, a stem navel 3 and a guy tower 4, which reduce the deflection of the protruding part.



   PATENT CLAIM



   A method for cantilever construction of steel and prestressed concrete bridges with feed, in which the bridge structure is produced in sections in the extension of the bridge axis and pushed into its final position with a device.

 

   SUBCLAIMS
1. The method according to claim, characterized in that the bridge cross-section is divided in the longitudinal direction, the advanced part is designed in a U-shape and prefabricated concrete slabs are used as supplementary elements.



   2. The method according to claim, characterized in that the advanced part is extended with a front nose.



   3. The method according to claim, characterized in that a guy tower is installed and this is advanced with the bridge.



   4. The method according to claim, characterized in that the structure is pre-tensioned with provisional tendons in order to absorb the feed loads.

** WARNING ** End of DESC field could overlap beginning of CLMS **.



   

 

Claims (1)

**WARNUNG** Anfang CLMS Feld konnte Ende DESC uberlappen **. ** WARNING ** Beginning of CLMS field could overlap end of DESC **. Verfahren für Brückenfreivorbau mit Vorschub Die Erfindung bezieht sich auf ein Verfahren für den Freivorbau von Stahl- und Spannbetonbrücken mit Vorschub, bei welchem die Brückenkonstruktion in der Verlängerung der Brückenachse in Abschnitten hergestellt und mit einer Einrichtung in ihre endgültige Lage vorgeschoben wird. Procedure for bridge cantilever building with feed The invention relates to a method for the cantilever construction of steel and prestressed concrete bridges with a feed, in which the bridge structure is produced in the extension of the bridge axis in sections and is pushed into its final position with a device. Es sind bisher Brückenkonstruktionen im Freivorbau durchgeführt worden; bei diesen wurde aber entweder an der endgültigen Stelle betoniert oder es wurden die Abschnitte vorgefertigt und miteinander durch Anschlussbewehrungen verbunden. Diese Verfahren haben den Nachteil, dass die Brücke in der Querrichtung aufgeteilt wurde, weshalb in kurzen Abständen Fugen entstehen; ausserdem sind die Durchbiegungen bei dem Zusammenschluss nicht kontrollierbar, weil das Schwinden und Kriechen nie genau berechnet werden kann. So far, bridge constructions have been carried out using cantilever arches; In these, however, either the final point was concreted or the sections were prefabricated and connected to one another by connecting reinforcements. These methods have the disadvantage that the bridge has been divided in the transverse direction, which is why joints are created at short intervals; In addition, the deflections at the merger cannot be controlled because the shrinkage and creep can never be precisely calculated. Vorschubverfahren sind u.a. auch vom Stahlbau her bekannt. Im Stahlbetonbau sind Brücken aus einzelnen vorfabrizierten Abschnitten an einem Ende der Brücke hergestellt, zusammengespannt und mit Hilfspfeilern über die Pfeiler geschoben worden. Dieses Verfahren hat den Nachteil, dass Fugen entstehen und die Hilfspfeiler das Einschieben hoher Brücken verunmöglichen. Die Erfindung sieht demgegenüber die Herstellung der Brükkenkonstruktion in der Verlängerung der Brückenachse in Abschnitten vor, welche aneinander anbetoniert werden. In der Zeichnung ist ein Ausführungsbeispiel des Verfahrens dargestellt. Feed processes include also known from steel construction. In reinforced concrete, bridges are made from individual prefabricated sections at one end of the bridge, clamped together and pushed over the pillars with auxiliary piers. This method has the disadvantage that joints are created and the auxiliary piers make it impossible to insert high bridges. In contrast, the invention provides for the bridge construction to be produced in the extension of the bridge axis in sections which are concreted to one another. An exemplary embodiment of the method is shown in the drawing. Fig. 1 zeigt einen Brückenquerschnitt, der in der Längsrichtung aufgeteilt ist. Der untere Teil 1 besitzt Trogform, der obere Teil 2 ist eine Fahrbahndecke. Fig. 1 shows a bridge cross section which is divided in the longitudinal direction. The lower part 1 has a trough shape, the upper part 2 is a road surface. Fig. 2 zeigt das Bauverfahren: In der Verlängerung der Brückenachse wird jeweils der untere Teil 1 in Abschnitten hergestellt, welche aber doch fugenlos zusammengefügt sind. Jeweils nach der Herstellung eines Abschnitts wird der fertige Teil mittels den Vorschubeinrichtungen 6 vorgeschoben und der nächste Abschnitt 5 hergestellt. Fig. 2 shows the construction process: In the extension of the bridge axis, the lower part 1 is produced in sections, which are, however, joined together without joints. After each section has been produced, the finished part is advanced by means of the feed devices 6 and the next section 5 is produced. Den Vorschub erleichtern provisorische Vorspannkabel, ein Vorbauschnabel 3 und ein Abspannturm 4, womit die Durchbiegung des auskragenden Teils verringert wird. The advance is facilitated by provisional pretensioning cables, a stem navel 3 and a guy tower 4, which reduce the deflection of the protruding part. PATENTANSPRUCH PATENT CLAIM Verfahren für den Freivorbau von Stahl- und Spannbetonbrücken mit Vorschub, bei welchem die Brückenkonstruktion in der Verlängerung der Brückenachse in Abschnitten hergestellt und mit einer Einrichtung in ihre endgültige Lage vorgeschoben wird. A method for cantilevered steel and prestressed concrete bridges with feed, in which the bridge structure is produced in sections as an extension of the bridge axis and is pushed into its final position with a device. UNTERANSPRÜCHE 1. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass der Brückenquerschnitt in der Längsrichtung geteilt wird, der vorgeschobene Teil in U -Form gestaltet wird und als ergänzende Elemente vorfabrizierte Betonplatten verwendet werden. SUBCLAIMS 1. The method according to claim, characterized in that the bridge cross-section is divided in the longitudinal direction, the advanced part is designed in a U-shape and prefabricated concrete slabs are used as supplementary elements. 2. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass der vorgeschobene Teil mit einem Vorbauschnabel verlängert wird. 2. The method according to claim, characterized in that the advanced part is extended with a front nose. 3. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass ein Abspannturm eingebaut und dieser mit der Brücke vorgeschoben wird. 3. The method according to claim, characterized in that a guy tower is installed and this is advanced with the bridge. 4. Verfahren nach Patentanspruch, dadurch gekennzeichnet, dass die Konstruktion für die Aufnahme der Vorschubsbeanspruchungen mit provisorischen Spannglie- dern vorgespannt wird. 4. The method according to claim, characterized in that the structure is pre-tensioned with provisional tendons in order to absorb the feed loads.
CH1550266A 1966-10-25 1966-10-25 Procedure for bridge cantilever building with feed CH509473A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH1550266A CH509473A (en) 1966-10-25 1966-10-25 Procedure for bridge cantilever building with feed
DE1967K0063685 DE1658607C3 (en) 1966-10-25 1967-10-23 Method and device for manufacturing a multi-span bridge superstructure made of reinforced or prestressed concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1550266A CH509473A (en) 1966-10-25 1966-10-25 Procedure for bridge cantilever building with feed

Publications (1)

Publication Number Publication Date
CH509473A true CH509473A (en) 1971-06-30

Family

ID=4409598

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1550266A CH509473A (en) 1966-10-25 1966-10-25 Procedure for bridge cantilever building with feed

Country Status (2)

Country Link
CH (1) CH509473A (en)
DE (1) DE1658607C3 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2638361A1 (en) * 1976-08-26 1978-03-02 Eberspaecher Gmbh Displacer for bridge superstructure - with rear drive mechanism on bridge abutment
DD130796B1 (en) * 1977-03-08 1979-11-28 Bernd Matthes DEVICE FOR SLIDING BRIDGE CONSTRUCTIONS
DE2902381C2 (en) 1979-01-23 1980-10-30 Wayss & Freytag Ag, 6000 Frankfurt Process for building a bridge made of reinforced or prestressed concrete and auxiliary beams for carrying out the process
DE2939996B2 (en) * 1979-01-23 1981-05-07 Wayss & Freytag Ag, 6000 Frankfurt Method of building a bridge from reinforced or prestressed concrete
ES2368318B8 (en) * 2011-06-30 2012-06-19 Universidad De Cantabria SYSTEM AND METHOD OF LAUNCHING OF STRUCTURES.

Also Published As

Publication number Publication date
DE1658607B2 (en) 1975-05-07
DE1658607A1 (en) 1970-10-22
DE1658607C3 (en) 1979-02-22

Similar Documents

Publication Publication Date Title
CH509473A (en) Procedure for bridge cantilever building with feed
AT129118B (en) Multi-storey buildings.
DE718280C (en) Process for the production of a reinforced concrete ceiling or a reinforced concrete beam with prestressed reinforcement and shaped bodies for the process
DE973407C (en) Process for the production of wide-span bridge structures made of reinforced concrete
CH437399A (en) Process for producing structures made of steel, for example prestressed concrete, which extend mainly in a longitudinal direction
DE484435C (en) Space framework for roofs
DE521060C (en) Process for the production of reinforced concrete rib ceilings without formwork
DE920096C (en) Suspension device for ceilings to be suspended
DE2607574C2 (en) Process for the production of arched structures
AT258541B (en) Reinforced concrete slab, in particular prefabricated slab (permanent formwork) for ceilings
DE968816C (en) Method for producing a prestressed concrete beam, in particular a prestressed concrete slab beam bridge, which runs through several fields
DE975280C (en) Steel truss bridge with reinforced concrete deck
DE975592C (en) Process for the production of a truss bridge made of reinforced concrete and movable scaffolding for carrying out the process
AT164313B (en) Reinforced wooden beam
DE2156017A1 (en) PRE-TENSIONED STEEL COMPOSITE BEAM
AT354032B (en) CEILING STONE, AS WELL AS CEILING WITH SUCH CEILING STONES
DE801467C (en) Hollow stone ceiling
DE812597C (en) Ceiling made of T-shaped reinforced concrete parts
DE1006448B (en) Prestressed concrete beam bridge, prestressed concrete ceiling or the like and process for their production
AT163036B (en) Construction method for monolithic hollow stone ceilings
DE930477C (en) Saw roof made of precast reinforced concrete
DE731214C (en) Self-supporting reinforced hollow concrete slab
DE975034C (en) Concrete roof construction with trusses
DE919595C (en) Process for the production of composite structures, especially for building bridges
AT223364B (en) Building contractors, in particular formwork supports

Legal Events

Date Code Title Description
PL Patent ceased