CH412960A - Process for applying shotcrete as lining for tunnels or the like - Google Patents

Process for applying shotcrete as lining for tunnels or the like

Info

Publication number
CH412960A
CH412960A CH460464A CH460464A CH412960A CH 412960 A CH412960 A CH 412960A CH 460464 A CH460464 A CH 460464A CH 460464 A CH460464 A CH 460464A CH 412960 A CH412960 A CH 412960A
Authority
CH
Switzerland
Prior art keywords
shotcrete
reinforcement
cavity
lining
tunnels
Prior art date
Application number
CH460464A
Other languages
German (de)
Inventor
Brunner Anton
Original Assignee
Brunner Anton
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Brunner Anton filed Critical Brunner Anton
Publication of CH412960A publication Critical patent/CH412960A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

  

  Verfahren zum Aufbringen von Spritzbeton als     Auskleidung    von Tunneln oder dergleichen    Die Erfindung betrifft ein Verfahren zum Auf  bringen von Spritzbeton als Auskleidung von Tun  neln oder dergleichen, bei denen auf den Ausbruch  eine Schicht aus erhärtendem Spritzbeton aufgespritzt  wurde, und eine Vorrichtung zur Ausführung dieses  Verfahrens.  



  Zum Vortreiben und Sichern des Ausbruchs von  Tunneln und Stollen oder dergleichen in lockeren,       rolligen    und     quellfähigen    Oberflächenschichten wird  in neuer Zeit mit Vorteil ein Verfahren angewendet,  bei dem auf die Wandungen des Ausbruchs als  bald nach dem Ausbruch eine schnell erhärtende       Spritzbetonschicht    aufgebracht und in diese Beweh  rungen     miteingespritzt    werden, wodurch sich die  Verwendung der üblichen, später zu entfernenden  Sicherungseinbauten erübrigt.  



  Bei diesem Verfahren tritt jedoch die Schwie  rigkeit auf, dass von dem frei mit Düsen ,aufgespritz  ten, schnell erhärtenden Spritzbeton ein Teil, haupt  sächlich das grobe Material, zurückprallt, wodurch  etwa     30-40    % der gesamten Masse des aufgespritz  ten Spritzbetons verloren geht. Damit geht aber auch  Hand in Hand ein Verlust an Arbeitszeit, ausserdem  sind die Arbeiter dem Abfall des Rückpralls und  durch die Staubentwicklung der Gefahr der Silikose  ausgesetzt.  



  Die Erfindung vermeidet diesen Nachteil da  durch, dass innerhalb des durch die erste     Spritzbe-          tonschicht    gesicherten Hohlraumes eine bogenför  mige, den Lichtraum freilassende, in der Ausklei  dung verbleibende Bewehrung aufgestellt und an  dieser gegen das Innere des Hohlraumes gerichtete       Schalungstafeln    befestigt, sodann der dahinter lie  gende Hohlraum mit schnell erhärtendem Spritz  beton ausgespritzt und nach dessen Erhärten die       Schalungstafeln    wieder entfernt werden.

   Es     wird    da  durch ein Rückprall und Verlust dieses rückgeprall-         ten    Spritzbetons     vollkommen    verhindert, die     Gefahr     der Silikose ausgeschaltet und weiters der Vorteil  erzielt, dass eine glatte     Innenwand    entsteht, die u. a.  jede Isolierung sofort aufnehmen kann.  



       Vorteilhafterweise    wird die bogenförmige Be  wehrung frei, d. h. ohne Verbindung mit der ersten       Spritzbetonschicht    aufgestellt.  



  Zum abnehmbaren Befestigen der Schalungen  werden     vorteilhafterweise    an der Bewehrung Befe  stigungsmittel, wie z. B. Bolzen, Haken, Bügel oder  Schrauben vorgesehen, die in Abständen voneinander  angeordnet sind, die sich jeweils nur auf einem Bruch  teil des     Umfanges    des Tunnels oder dergleichen er  strecken. Dadurch werden in verhältnismässig kurzen  Abständen Befestigungspunkte     geschaffen,    so dass  man zwischen diesen verhältnismässig schmale     Scha-          lungstafeln        anbringen        kann.    Es erübrigt sich infolge  dessen die Aufstellung eigener     Schalungsgerüste,    wie  sie sonst bei Schalungen üblich sind.

    



       In    der Zeichnung sind beispielsweise Ausfüh  rungsformen     des    erfindungsgemässen Verfahrens und  der dazu verwendeten Mittel schematisch dargestellt,  und zwar zeigen die     Fig.    1 und 2 einen Querschnitt  durch eine erste Ausführungsform bzw. einen Aus  schnitt     hievon    in grösserem Massstab, die     Fig.    3 und 4  dasselbe für eine zweite     Ausführungsform,    die     Fig.    5  und 6 zeigen, quer zur Tunnel- bzw.     Stollenachse     gesehen,     Einzelheiten    der Ausführungsformen nach  den     Fig.    2 bzw.

   4, die     Fig.    7 und 8 zeigen im Quer  schnitt     Einzelheiten    einer     dritten        Ausführungsform,     die     Fig.9    und 10 einer vierten Ausführungsform,  die     Fig.    11 und 12 einer fünften Ausführungsform  und die     Fig.    13 und 14 einer sechsten Ausführungs  form.  



  In     Fig.    1 ist mit 1 der Ausbruch in druckhaftem       Gebirge    oder dergleichen dargestellt, auf den sofort  nach dem Ausbruch eine Schicht 2 aus schnell er-           härtendem    Spritzbeton aufgebracht wird, wobei ein       Baustahlgewebe    3 oder dergleichen     beim        Einspritzen     eingebettet wird. Sodann wird auf die Tunnelsohle 21  frei eine aus     I-Trägern    bestehende Bewehrung 4  aufgestellt, die in der endgültigen Auskleidung ver  bleibt.

   An dieser sind in Abständen a voneinander,  die jeweils nur einen Bruchteil des Umfanges des  Tunnels oder Stollens betragen, Bolzen 5 ange  schweisst, die in     ihrem    äusseren Teil 6 schwächer  gehalten und mit Gewinde 7 versehen sind. Dadurch  werden Schultern 8 zur Auflage der jeweils aus  einem Brett bestehenden Schaltungstafeln 9 gebildet,  die in Längsrichtung eingeschoben werden können  und auf den Schultern 8     aufruhen.    Im Bereich der       Bolzen    5 sind die Schulungstafeln 9 mit Schlitzen 10  versehen, um eine kleine Verschiebung zu ermögli  chen.

   Diese Schulungstafeln 9 werden dann unter  Zwischenlage von     Unterlagsplatten    11 und     Beilags-          scheiben    15 mittels Schraubenmuttern 14 an den  Bolzen 5 befestigt.  



  Hierauf wird der Hohlraum 12 zwischen den  Schulungstafeln 9 und der zuerst aufgebrachten  Schicht 2 mit die endgültige Auskleidung bildendem,  schnell     erhärtendem    Spritzbeton 13 schichtenweise       tangential    zur     Hohlraumkrümmung        hinterspritzt.     Schon nach kurzer Zeit können dann die Schulungs  tafeln 9 abgenommen und an anderer Stelle wieder  weiter verwendet werden.  



  Nach Fertigstellung eines Ringes auf diese     ge-          schilderte    Art wird die bogenförmige Bewehrung 4  für den nächsten Ring aufgestellt und gegebenen  falls mit dem ersten Ring verbunden und der folgende  Ring     in    gleicher Weise hergestellt.  



  Die     Ausführungsform    nach den     Fig.3    und 4  unterscheidet sich von jener nach den     Fig.    1 und 2  bloss dadurch, dass bei ihr zur Bewehrung nicht       I-Träger,    sondern Rohre 24     verwendet    werden. Fer  ner sind die für die Befestigung der Schaltungs  bretter dienenden Bolzen 5 nicht abgesetzt, so dass  die Schulungstafeln unmittelbar auf den Rohren 24  aufruhen. Bei dieser     Ausführungsform    besteht jede  Schulungstafel aus drei miteinander verleimten oder  auf andere Weise verbundenen Brettern 9', wodurch  eine bessere Anpassung dieser gekrümmten Schu  lungstafeln an die Krümmung der Bewegung er  zielt wird.

   Es könnten aber auch aus einem Stück  bestehende gekrümmte Schulungstafeln verwendet  werden, ferner auch nicht gekrümmte Schulungsta  feln. Bei der Ausführungsform gemäss den     Fig.    3 und  4 ist weiters angenommen, dass ein     Sohlebeton    22  aufgebracht wird, in den die Enden der bogenförmi  gen     Bewehrungen    24 einbetoniert werden.  



       Fig.5    zeigt, quer zur Tunnel- oder     Stollenachse     gesehen, eine Ausführungsform der Bewehrung mit       I-Trägern    und in ihrem Durchmesser nicht abge  setzte Bolzen 5.     Fig.6    zeigt, ebenfalls quer zur  Stollen- oder Tunnelachse gesehen, die Ausgestal  tung der Bewehrung mit den Bolzen gemäss     Fig.4.     



  Bei der Ausführungsform gemäss den     Fig.    7 und  8 wird wieder eine aus     I-Trägern    bestehende Be-         wehrung    verwendet, jedoch dienen bei ihr zur Be  festigung der Schalung wieder an die Bewehrung 4  angeschweisste Flacheisen 16, die hinter ihren äusseren  Enden mit viereckigen Löchern 17 versehen sind.  Die     Unterlagsplatte    11 ist mit einem rechteckigen  Loch versehen, so dass sie auf das Flacheisen 16 auf  geschoben werden kann, sie wird mit der Schalung 9  dann durch einen Keil 18 gesichert, der durch das  Loch 17 geschlagen wird.  



  Bei der Ausführungsform gemäss den     Fig.    9 und  10, die auch einen     I-Träger    4     Ws    Bewehrung  verwendet, sind an dem einen Flansch U-förmige  Bügel 19 befestigt, die Befestigung der Schulungs  platten 9 erfolgt wieder mittels durch Keile 18 ge  sicherter     Unterlagsplatten    11.  



  Die     Fig.    11 und 12 zeigen, dass man auch ein  Hohlprofil 34 anstelle der     1-Träger    oder Rohre  verwenden kann. Zur Befestigung der Schulungsta  feln 9 sind an diesem U-förmige Bügel 20 aus Flach  eisen angeschweisst. Die     Unterlagsplatten    11 werden  in diesem Fall durch den Hohlraum des Hohlpro  fils 34 gesteckt und wieder mittels Keilen 18 fest  gehalten.  



  Bei der Ausführungsform gemäss den     Fig.13     und 14 werden als     Bewehrungselemente        U-Eisen    44  verwendet, wobei die offene Seite des U gegen die  Tunnel- oder     Stollenwand    zeigt. Zur Befestigung  der     Schulungstafeln    9 sind an diese     U-Eisen    44  Butzen 23 angeschweisst; diese     Butzen    23 sind zu  sammen mit der Basis des U mit Gewindebohrungen  versehen, in die Schraubenbolzen 25 eingeschraubt  werden können. Diese dienen zur Befestigung der  Schulungstafeln 9 unter Zwischenlage der     Unterlags-          platten    11.  



  Die einzelnen Teile könnten zur Bildung weiterer       Ausführungsformen    gegeneinander ausgetauscht wer  den, die einzelnen Befestigungsmittel könnten auch  in anderer Weise als durch Anschweissen an den  Bewehrungen befestigt werden.  



  Auch könnten für die Bewehrung andere Pro  file, wie z. B. Torstahl, verwendet werden, auch kön  nen die     einzelnen    Befestigungsmittel, wie z. B. ab  gesetzte und nicht abgesetzte Bolzen, mit oder ohne  Haken, mit oder ohne Gewinde,     Laschen    usw, bei  den verschiedensten     Bewehrungsprofilen    verwendet  werden. Die Schlitze in den     Schulungstafeln    könn  ten auch nur die Form von     Ausnehmungen    haben,  die so gross sind, dass gerade die Hälfte eines Bolzens  durch sie hindurchgeht, oder sie könnten auch ganz  entfallen.  



  Der Vorteil der erfindungsgemässen Schalung und  Bewehrung liegt darin, dass für die zügige Fort  setzung des Vortriebes auf kilometerlangen     Strek-          ken    nur eine ganz geringe Zahl von     Schulungsta-          feln,    etwa 15 bis 20     m2,    erforderlich ist.



  Method for applying shotcrete as lining of tunnels or the like. The invention relates to a method for applying shotcrete as lining of tunnels or the like, in which a layer of hardening shotcrete was sprayed onto the excavation, and a device for carrying out this method.



  To drive and secure the excavation of tunnels and tunnels or the like in loose, rolling and swellable surface layers, a method has recently been used with advantage in which a rapidly hardening shotcrete layer is applied to the walls of the excavation soon after the excavation and in this Beweh stanchions are also injected, which eliminates the need to use the customary internal fuse elements to be removed later.



  With this method, however, the difficulty arises that part of the sprayed concrete, which is sprayed on freely with nozzles, is quickly hardening, mainly the coarse material, so that around 30-40% of the total mass of the sprayed concrete is lost. However, this also goes hand in hand with a loss of working time, and the workers are also exposed to the drop in rebound and the risk of silicosis due to the dust.



  The invention avoids this disadvantage because within the cavity secured by the first layer of sprayed concrete, an arched reinforcement that leaves the clearance free and remaining in the lining is erected and formwork panels are attached to this facing the interior of the cavity, then behind it The surrounding cavity is sprayed with rapidly hardening sprayed concrete and the shuttering panels are removed again after it has hardened.

   A rebound and loss of this rebounded shotcrete is completely prevented, the risk of silicosis is eliminated and, furthermore, the advantage is achieved that a smooth inner wall is created which, among other things, can a. can absorb any insulation immediately.



       Advantageously, the arcuate reinforcement is free, d. H. erected without connection to the first layer of shotcrete.



  For the detachable fastening of the formwork fastenings are advantageously fastened to the reinforcement BEFORE such. B. bolts, hooks, brackets or screws are provided, which are spaced apart, each stretching only on a fraction of the circumference of the tunnel or the like. As a result, fastening points are created at relatively short intervals, so that relatively narrow formwork panels can be attached between them. As a result, there is no need to set up your own formwork scaffolding, as is usually the case with formwork.

    



       In the drawing, for example, embodiments of the method according to the invention and the means used for this purpose are shown schematically, namely FIGS. 1 and 2 show a cross section through a first embodiment or a section thereof on a larger scale, FIGS. 3 and 4 the same for a second embodiment shown in FIGS. 5 and 6, seen transversely to the tunnel or tunnel axis, details of the embodiments according to FIGS.

   4, FIGS. 7 and 8 show in cross-section details of a third embodiment, FIGS. 9 and 10 of a fourth embodiment, FIGS. 11 and 12 of a fifth embodiment and FIGS. 13 and 14 of a sixth embodiment.



  In FIG. 1, 1 shows the eruption in a rocky mountain or the like, onto which a layer 2 of fast-setting shotcrete is applied immediately after the eruption, with a structural steel fabric 3 or the like being embedded during injection. Then a reinforcement 4 consisting of I-beams is freely placed on the tunnel floor 21, which remains ver in the final lining.

   At this, bolts 5 are welded at intervals a from each other, each of which is only a fraction of the circumference of the tunnel or adit, which are held weaker in their outer part 6 and provided with thread 7. As a result, shoulders 8 are formed to support the circuit boards 9, each consisting of a board, which can be pushed in in the longitudinal direction and rest on the shoulders 8. In the area of the bolts 5, the training boards 9 are provided with slots 10 to enable a small shift.

   These training boards 9 are then fastened to the bolts 5 by means of screw nuts 14 with support plates 11 and washers 15 in between.



  Then the cavity 12 between the training boards 9 and the first applied layer 2 is back-injected in layers tangential to the curvature of the cavity with the fast-setting shotcrete 13 forming the final lining. After a short time, the training boards 9 can then be removed and used again elsewhere.



  After a ring has been completed in this manner, the arched reinforcement 4 is erected for the next ring and, if necessary, connected to the first ring and the following ring is produced in the same way.



  The embodiment according to FIGS. 3 and 4 differs from that according to FIGS. 1 and 2 only in that it does not use I-beams for reinforcement, but rather tubes 24. Fer ner, the bolts 5 used to fasten the circuit boards are not removed, so that the training boards rest directly on the tubes 24. In this embodiment, each training board consists of three boards glued together or otherwise connected boards 9 ', whereby a better adaptation of these curved training boards to the curvature of the movement he aims.

   But it could also consist of one piece curved training boards can be used, and also non-curved training boards. In the embodiment according to FIGS. 3 and 4 it is also assumed that a concrete base 22 is applied, in which the ends of the bogenförmi gene reinforcements 24 are concreted.



       5 shows, seen transversely to the tunnel or tunnel axis, an embodiment of the reinforcement with I-beams and bolts 5 which have not been set in their diameter. FIG. 6 shows, also seen transversely to the tunnel or tunnel axis, the Ausgestal device of the reinforcement with the bolts according to Fig. 4.



  In the embodiment according to FIGS. 7 and 8, reinforcement consisting of I-beams is again used, but flat irons 16 welded to reinforcement 4 are used to fasten the formwork, which behind their outer ends have square holes 17 are provided. The base plate 11 is provided with a rectangular hole so that it can be pushed onto the flat iron 16; it is then secured to the formwork 9 by a wedge 18 which is driven through the hole 17.



  In the embodiment according to FIGS. 9 and 10, which also uses an I-beam 4 Ws reinforcement, U-shaped brackets 19 are attached to one flange; the training plates 9 are again fastened by means of base plates 11 secured by wedges 18 .



  11 and 12 show that a hollow profile 34 can also be used instead of the 1-beam or tubes. To attach the Schulungsta feln 9 are welded to this U-shaped bracket 20 made of flat iron. In this case, the base plates 11 are inserted through the cavity of the Hohlpro fils 34 and again held firmly by means of wedges 18.



  In the embodiment according to FIGS. 13 and 14, U-irons 44 are used as reinforcement elements, with the open side of the U facing the tunnel or gallery wall. To attach the training boards 9 slugs 23 are welded to this U-iron 44; these slugs 23 are provided together with the base of the U with threaded holes into which screw bolts 25 can be screwed. These serve to fasten the training boards 9 with the support plates 11 in between.



  The individual parts could be interchanged with each other to form further embodiments, the individual fasteners could also be attached to the reinforcement in other ways than by welding.



  Other profiles, such as B. gate steel, can also be used, the individual fasteners, such. B. from set and not set bolts, with or without hooks, with or without thread, tabs, etc., can be used in a wide variety of reinforcement profiles. The slots in the training boards could also just have the shape of recesses that are so large that just half a bolt goes through them, or they could be omitted entirely.



  The advantage of the formwork and reinforcement according to the invention lies in the fact that only a very small number of training boards, about 15 to 20 m2, is required for the rapid continuation of the advance on kilometers of routes.

 

Claims (1)

PATENTANSPRÜCHE I. Verfahren zum Aufbringen von Spritzbeton als Auskleidung von Tunneln oder dergleichen, bei denen auf den Ausbruch eine Schicht aus erhärten- dem Spritzbeton aufgespritzt wurde, dadurch gekenn zeichnet, dass innerhalb des durch die erste Spritz betonschicht (2) gesicherten Hohlraumes eine bogen förmige, den Lichtraum freilassende, in der Ausklei dung verbleibende Bewehrung (4) aufgestellt und an dieser gegen das Innere des Hohlraumes gerich tete Schalungstafeln (9) befestigt, sodann der dahinter liegende Hohlraum (12) mit schnell erhärtendem Spritzbeton ausgespritzt und nach dessen Erhärten die Schalungstafeln (9) wieder entfernt werden. PATENT CLAIMS I. A method for applying shotcrete as lining of tunnels or the like, in which a layer of hardening shotcrete was sprayed onto the outbreak, characterized in that within the cavity secured by the first shotcrete layer (2) an arc-shaped cavity , the clearance leaving free, in the lining remaining reinforcement (4) set up and attached to this against the interior of the cavity gerich ended formwork panels (9), then the cavity (12) behind it is sprayed with fast-hardening shotcrete and the formwork panels after it has hardened (9) can be removed again. 1I. Vorrichtung zur Durchführung des Verfah rens nach Patentanspruch I, dadurch gekennzeich net, dass an der Bewehrung Befestigungsmittel zur abnehmbaren Befestigung der Schulungstafeln (9) vorgesehen sind. UNTERANSPRüCHE 1. Verfahren nach Patentanspruch 1, dadurch gekennzeichnet, dass die bogenförmige Bewehrung (4) frei, d. h. ohne Verbindung mit der ersten Spritz betonschicht (2) aufgestellt wird. 2. 1I. Device for carrying out the method according to patent claim I, characterized in that fastening means for removable fastening of the training boards (9) are provided on the reinforcement. SUBClaims 1. The method according to claim 1, characterized in that the arcuate reinforcement (4) is free, d. H. is erected without connection to the first sprayed concrete layer (2). 2. Vorrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die Befestigungsmittel (5, 7) in Abständen (a) voneinander angeordnet sind, die sich jeweils nur auf einen Bruchteil des Umfanges des Tunnels, Stollens oder dergleichen erstrecken. 3. Vorrichtung nach Patentanspruch 1I, dadurch gekennzeichnet, dass die Höhe der Tafeln dem Ab stand (a) zweier benachbarter Befestigungsmittel (5, 7) voneinander entspricht. Device according to patent claim II, characterized in that the fastening means (5, 7) are arranged at distances (a) from one another, each of which only extends over a fraction of the circumference of the tunnel, adit or the like. 3. Device according to claim 1I, characterized in that the height of the panels stood from the (a) of two adjacent fastening means (5, 7) corresponds to each other.
CH460464A 1963-04-17 1964-04-10 Process for applying shotcrete as lining for tunnels or the like CH412960A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT310563A AT273211B (en) 1963-04-17 1963-04-17 Reinforcement for lining tunnels or the like.

Publications (1)

Publication Number Publication Date
CH412960A true CH412960A (en) 1966-05-15

Family

ID=3545371

Family Applications (1)

Application Number Title Priority Date Filing Date
CH460464A CH412960A (en) 1963-04-17 1964-04-10 Process for applying shotcrete as lining for tunnels or the like

Country Status (2)

Country Link
AT (1) AT273211B (en)
CH (1) CH412960A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2320419A1 (en) * 1975-08-06 1977-03-04 Thiele Ruth FORMWORK SYSTEM FOR THE FILLING OF A MINE GALLERY SHORTED BY FOLDED SUPPORT PROFILES
WO2005075792A1 (en) * 2004-02-04 2005-08-18 Andrew Michael Finean Apparatus for supporting injected wet concrete during the formation of a concrete tunnel

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2915588A1 (en) * 1979-04-18 1980-10-30 Bochumer Eisen Heintzmann Mine or tunnel gallery lattice girder support lining - has peripherally aligned sheathing plates supported on girder linked holders

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2320419A1 (en) * 1975-08-06 1977-03-04 Thiele Ruth FORMWORK SYSTEM FOR THE FILLING OF A MINE GALLERY SHORTED BY FOLDED SUPPORT PROFILES
WO2005075792A1 (en) * 2004-02-04 2005-08-18 Andrew Michael Finean Apparatus for supporting injected wet concrete during the formation of a concrete tunnel

Also Published As

Publication number Publication date
AT273211B (en) 1969-08-11

Similar Documents

Publication Publication Date Title
DE1608527B1 (en) Underground expansion
CH412960A (en) Process for applying shotcrete as lining for tunnels or the like
DE2041059A1 (en) Process for the production of components from reinforced concrete and reinforcement for carrying out the process
EP1338724B1 (en) Method for erecting a structure having an annular concrete wall
CH701411A1 (en) Formwork and method for constructing a formwork.
DE2319190A1 (en) DEVICE FOR PRODUCING RECESSES IN CAST CONCRETE
DE2636168C2 (en) Buildings made from load-bearing prefabricated components
DE102009021143A1 (en) Foundation basket, foundation and method for forming a foundation
DE2714620C3 (en) Reinforcement for a composite structure made of steel-reinforced concrete, especially shotcrete
DE1659007A1 (en) Device for connecting reinforced concrete components to wall-like reinforced concrete components produced in wall formwork
DE19537373A1 (en) Reinforcing system for chimney in building
EP0808238B1 (en) Process for the production of heat insulation panels for large panel construction
DE2829941A1 (en) Connectors for steel-reinforced concrete building parts - comprises ribbed-steel components mounted on U=profile hard PVC carrier and linked by couplings
DE820068C (en) Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose
DE1804657A1 (en) Process for the production of concrete or reinforced concrete walls and concrete or reinforced concrete wall produced using this process
DE1784137A1 (en) Production of walls made of concrete or reinforced concrete underground
AT200778B (en) Slab formwork and process for its manufacture
DE2552736A1 (en) Attachment for concrete construction component - has internal threaded shaft and transverse holed unit on anchor
DE2548298C2 (en) Method and cavity formwork wall for building a cavity wall
DE1608527C (en) Underground expansion
AT164109B (en) Reinforced concrete ceiling
DE102016103982A1 (en) An element
AT163852B (en) Process for the production of infill masonry and framework element for carrying out the process
DE202020103812U1 (en) Set of elements for producing a strip foundation with at least one foundation corner
DE2112977C3 (en) Method and device for the production of large prefabricated concrete components that adjoin one another in a fitting manner