CH329659A - Method of repairing railway tracks and installation for its implementation - Google Patents

Method of repairing railway tracks and installation for its implementation

Info

Publication number
CH329659A
CH329659A CH329659DA CH329659A CH 329659 A CH329659 A CH 329659A CH 329659D A CH329659D A CH 329659DA CH 329659 A CH329659 A CH 329659A
Authority
CH
Switzerland
Prior art keywords
rails
ballast
installation
sleepers
gantry
Prior art date
Application number
Other languages
French (fr)
Inventor
Scheuchzer Alfred
Original Assignee
Scheuchzer Alfred
Scheuchzer Andre
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheuchzer Alfred, Scheuchzer Andre filed Critical Scheuchzer Alfred
Publication of CH329659A publication Critical patent/CH329659A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

  

  Procédé de     réfection    de voies ferrées  et     installation    pour la mise en     aeuvre    -de celui-ci    Au cours des travaux de réfection de voies  ferrées, les différents procédés connus de     dé-          garnissage    (avec ou sans criblage) consistent  à pousser latéralement, c'est-à-dire dans le sens  transversal de la voie, le matériau à traiter,  au-delà de l'extrémité des traverses afin qu'il  puisse être recueilli et évacué.  



  Dans ces procédés, par ce fait même, cha  que parcelle de matériau doit parcourir un  chemin relativement long. Elle rencontre, de  plus, la résistance de toute la masse de maté  riau se trouvant jusqu'au bout de son chemin.  Cette résistance est très appréciable surtout  lorsque le terrain est bien damé ; elle devient  encore beaucoup plus grande lorsque l'extré  mité au-delà des traverses est resserrée, par  exemple, entre des murs.  



  De plus, les différents moyens connus mis  en     oeuvre    pour prendre ce ballast au-delà de  l'extrémité des traverses exigent tous un espace  d'au moins plusieurs dizaines de centimètres  qui - s'il est le plus souvent disponible en  pleine voie - ne l'est pas partout, par exem  ple, dans les endroits resserrés, dans un grand  nombre de tranchées, où se trouvent des mu  rettes très près de l'extrémité des traverses, sur  les ponts, dans les gares et dans les tunnels.  



  Dans ces cas-là, les machines connues ne  peuvent pas être utilisées.    La présente invention a pour objet un  procédé de réfection de voies ferrées, dans  lequel on excave le ballast usagé, et dépose le  ballast propre, ces opérations se faisant de  façon continue le long d'une voie ferrée.  



  Le procédé selon l'invention est caractérisé  par le fait que l'opération d'excavation se fait  en     draguant    le ballast dans un plan vertical  parallèle aux rails.  



  La présente invention a aussi pour objet  une installation de réfection de voies ferrées  comprenant, à l'instar d'autres installations  connues, au moins un excavateur à ruban  continu. Cette installation est caractérisée par  le fait que l'excavateur est disposé de manière  à travailler dans un plan vertical parallèle aux  rails.  



  Le dessin annexé représente, schématique  ment et à titre d'exemple, une forme d'exécu  tion d'une installation pour la mise en     oeuvre     du procédé faisant l'objet de l'invention.  



  La     fig.    1 est une vue en élévation de l'ins  tallation complète.    La     fig.    2 est une vue en plan.    La     fig.    3 est une vue en coupe selon     111-11l     de la     fig.    2.  



  La     fig.    4 est une vue en coupe selon<I>IV-IV</I>  de la même     fig.    2.      La     fig.    5 est une vue d'un détail de l'instal  lation.  



  La fi-. 6 montre la phase préliminaire à la  réfection d'un tronçon de voie ferrée selon le  procédé faisant l'objet de     l'invention.     



  Les     fig.    7 et 8 sont des schémas     illustrant     une variante de ce procédé.  



  Comme on le voit aux     fig.    1 et 2 notam  ment,     l'installation    représentée comprend un  véhicule 1 en forme de     portique,    disposé lon  gitudinalement par rapport aux rails. Ce véhi  cule est muni de trains de roues 2     fixés    res  pectivement à chaque extrémité de ce portique.  Dans le cas particulier, ces trains de roues  sont groupés de     manière    à constituer deux  bogies.  



  Quatre excavateurs 3, 4, 5, 6 sont disposés  à proximité de l'extrémité     avant    du véhicule  en forme de portique 1. Ces excavateurs 3 à 6  sont articulés indépendamment les uns des  autres à leur partie supérieure 7, de manière  à pouvoir suivre le terrain en évitant les obsta  cles tels que, par exemple, les rochers R (voir       fig.    3) pouvant faire saillie sous la voie. Ces  excavateurs 3 à 6 sont entraînés en mouvement  par un moteur 8. Un ruban transporteur trans  versal 9 rassemble tous les matériaux amenés  par les excavateurs 3 à 6 sur un transporteur  général 10 destiné à amener le ballast excavé  dans un véhicule 11 portant un crible 12.

   Ce  véhicule 11 porte lui-même un transporteur 13  pour la répartition du ballast sur le crible 12  et un transporteur 14 pour l'élimination des  criblures. En effet, celles-ci sont évacuées dans  un ou des wagons 15 par     l'intermédiaire    de  transporteurs     auxiliaires    16 et 17.  



  Le ballast propre est pris en charge à l'ex  trémité     inférieure    du crible 12 par un trans  porteur 18 l'amenant en haut du véhicule 1  et le déversant sur un transporteur 19 déchar  geant le ballast propre dans un réceptacle 20  que contient la partie arrière du véhicule en  forme de portique 1. Des     canaux    21 qui sor  tent du réceptacle 20 permettent la distribution  du ballast propre le long de la voie. En outre,  la partie arrière du véhicule 1 en forme de por  tique est munie d'un support ou plate-forme 22    destiné à la réception de nouvelles traverses 23  amenées par un wagon 25 muni d'une grue 26.  



  Dans l'exemple représenté, ce support ou  plate-forme 22 est constitué par un plan incliné  muni de rouleaux 24 pour faciliter le déplace  ment des traverses 23 vers le centre du por  tique.  



  Le véhicule 1 est en outre muni de deux  rails 27 du type appelé      tourtelier      disposés  longitudinalement sous le portique. Ces rails  27 servent de chemin de roulement à deux  palans 28 prévus pour le transport des tra  verses 23 du support 22 à l'endroit de leur  pose sous le portique, . c'est-à-dire entre les  excavateurs 3 à 6 et le support 22.  



  Le fonctionnement de l'installation de ré  fection de voies ferrées, décrite en regard des       fig.    1 à 5 du dessin annexé, se fait selon le  procédé d'utilisation suivant : lorsqu'on doit  procéder à la réfection d'un certain tronçon de  voie ferrée, on commence tout d'abord par  enlever toutes les traverses 23 de ce tronçon,  par exemple à l'aide d'un wagon 29 muni d'une  grue 30 tels que représenté à la     fig.    6. Ces  traverses 23, une fois enlevées, sont remplacées  en partie par des barres d'espacement 31 amo  vibles et munies de moyens de fixation rapides  aux rails 32. De tels moyens peuvent être, par  exemple, constitués par des poignées 33 dont  la rotation provoque le déplacement de griffes  34 pour enserrer le pied des rails 32.

   Une  fois qu'un certain tronçon de voie a été débar  rassé de ses traverses 23 et muni de barres  d'espacement 31, l'installation de réfection pro  prement dite comprenant les véhicules 1, 11  et 15 est amenée à une extrémité de ce tron  çon de voie. Un ouvrier se trouvant près du  bogie 2 avant du véhicule 1 enlève les tra  verses d'espacement 31 au fur et à mesure  qu'elles apparaissent entre ce bogie et les exca  vateurs 3 à 6. Ceux-ci peuvent donc travailler  librement entre les rails 32, le ballast excavé  étant transporté vers le wagon-crible 11, 12  pour son nettoyage. Les criblures sont évacuées  sur le ou les wagons 15 et le ballast propre  est amené par les transporteurs 18 et 19 dans  le réceptacle 20.

   Au fur et à mesure que la  voie a été excavée, de nouvelles traverses 23      sont transportées du wagon 25 sous le portique  du véhicule 1, grâce à la rampe 22 et aux  palans 28. Chaque traverse 23 est amenée  longitudinalement entre les rails 32, puis des  cendue entre     ceux-ci    et tournée de     90o    pour  être disposée transversalement sous les rails 32  (voir     fig.    1 et 4).  



  Au fur et à mesure que de nouvelles tra  verses 23 sont fixées sous les rails 32, du bal  last propre est dirigé par les conduites 21 vers  l'espace excavé et ainsi sous les traverses nou  vellement placées. Comme on le comprend  sans autre par ce qui précède, une installation  de réfection telle que décrite ci-dessus peut  travailler de façon continue à grand rendement  et de ce fait     n'immobiliser    la voie que pendant  une période très courte.

   En outre, un des  avantages les plus marquants de cette instal  lation réside dans le fait que celle-ci est d'un       encombrement    très restreint en largeur, ce qui  permet son utilisation pour la réfection de  tronçons de voies situés, par exemple, dans un  tunnel, sur un pont, ou éventuellement le long  des quais d'une gare, ou encore pour la réfec  tion de voies bordées par des murettes, par  exemple. ,  L'installation décrite ci-dessus pourrait être  utilisée selon une forme d'exécution du procédé  qui sera décrite ci-dessous en regard des     fig.    7  et 8. Selon cette forme d'exécution du procédé,  on enlève préalablement, à l'aide de rails auxi  liaires 35, disposés parallèlement le long de la  voie à traiter, et de portiques 36, une travée  entière 37 de la voie.

   Pour cela, cette travée  est déboulonnée des tronçons de voie adjacents  et soulevée grâce aux palans 38 portés par plu  sieurs portiques 36. La travée 37 soulevée est  déplacée pour être, soit déposée sur le tron  çon de voie adjacent, soit placée sur des     lorys     39 pour être évacuée et remplacée par une  nouvelle. Ensuite, les rails auxiliaires 35 sont  rapprochés l'un de l'autre et maintenus à  l'écartement normal par des barres d'espace  ment amovibles 31. Ainsi, l'ancienne voie fer  rée a été remplacée entièrement par une nou  velle voie auxiliaire sur laquelle l'installation  de réfection décrite en regard des     fig.    1 à 4  pourra être amenée pour effectuer son travail    de la manière indiquée ci-dessus.

   Toutefois,  de     nouvelles        traverses    ne seront pas nécessaire  ment placées sous les rails     auxiliaires    35, mais  les barres d'espacement 31 enlevées devant  les excavateurs 3 à 6 seront replacées derrière  ceux-ci au fur et à mesure de l'avance du véhi  cule 1. Une fois que la longueur totale de la  travée aura été traitée, les rails auxiliaires 35  seront placés à l'écartement des portiques 36  pour la mise en place, soit de la travée 37 en  levée provisoirement, soit d'une nouvelle tra  vée.  



  . De nombreuses variantes de l'installation  décrite ci-dessus pourraient être prévues. Par  exemple, au lieu de prévoir quatre excavateurs  indépendants, on pourrait en prévoir trois seu  lement, l'excavateur central ayant la largeur  de l'espace compris entre les rails 32. On pour  rait aussi     n'utiliser    qu'un excavateur central  creusant entre les rails 32. Le ballast se trou  vant à l'extérieur des rails 32 serait dans ce  cas poussé vers l'intérieur des rails par des  appareils accessoires, par exemple du genre  fraise. En outre, certains transporteurs, tels  que le transporteur 9, pourraient être rempla  cés par des canaux en tôle     lisse    munis de  vibreurs garantissant l'écoulement des maté  riaux sur leur fond incliné.

      Les avantages du procédé décrit ci-dessus  et de l'installation permettant sa mise en     oeuvre     sont les suivants  1     o    Ce procédé peut être utilisé pour traiter  les tronçons de voie resserrés, où les autres  moyens ne peuvent être mis en     aauvre.     



  20 En draguant longitudinalement et de bas  en haut, le matériau est extrait vers la  ligne de moindre résistance.  



  En outre, en agissant simultanément sur  toute la largeur ou sur une grande partie  de la largeur du terrain à traiter, on assure  une avance très supérieure à celle obtenue  par les autres procédés. Cette grande supé  riorité de rendement compense très large  ment le petit inconvénient résultant parfois  de l'obligation d'enlever les traverses, d'au  tant plus que l'extraction du ballast et son      épuration s'opèrent le plus souvent à l'oc  casion de réfection de matériel, donc de       changement    de traverses.  



       3-)    Il est à remarquer que la mise en place  des excavateurs est très     simple    et très  rapide ; il suffit de laisser descendre la  partie postérieure de ceux-ci sur la voie.



  Method of repairing railway tracks and installation for its implementation During the repair work of railway tracks, the various known methods of stripping (with or without screening) consist of pushing laterally, this is that is to say in the transverse direction of the track, the material to be treated, beyond the end of the sleepers so that it can be collected and evacuated.



  In these processes, by this very fact, each parcel of material must travel a relatively long path. It also meets the resistance of all the mass of material found to the end of its path. This resistance is very appreciable especially when the ground is well groomed; it becomes still much larger when the end beyond the sleepers is tightened, for example, between walls.



  In addition, the various known means implemented to take this ballast beyond the end of the sleepers all require a space of at least several tens of centimeters which - if it is most often available in the middle of the track - does not. is not everywhere, for example, in confined areas, in a large number of trenches, where there are muzzles very close to the end of sleepers, on bridges, in stations and in tunnels.



  In these cases, the known machines cannot be used. The present invention relates to a method for repairing railway tracks, in which the used ballast is excavated, and the clean ballast is deposited, these operations being carried out continuously along a railway track.



  The method according to the invention is characterized by the fact that the excavation operation is carried out by dredging the ballast in a vertical plane parallel to the rails.



  The present invention also relates to an installation for repairing railway tracks comprising, like other known installations, at least one continuous belt excavator. This installation is characterized by the fact that the excavator is arranged so as to work in a vertical plane parallel to the rails.



  The appended drawing represents, schematically and by way of example, one embodiment of an installation for carrying out the method forming the subject of the invention.



  Fig. 1 is an elevational view of the complete installation. Fig. 2 is a plan view. Fig. 3 is a sectional view along 111-111 of FIG. 2.



  Fig. 4 is a sectional view along <I> IV-IV </I> of the same FIG. 2. FIG. 5 is a view of a detail of the installation.



  The fi-. 6 shows the phase preliminary to the repair of a section of railway line according to the method forming the subject of the invention.



  Figs. 7 and 8 are diagrams illustrating a variant of this method.



  As seen in Figs. 1 and 2 in particular, the installation shown comprises a vehicle 1 in the form of a gantry, arranged longitudinally relative to the rails. This vehicle is provided with sets of wheels 2 attached respectively to each end of this gantry. In the particular case, these wheel sets are grouped so as to constitute two bogies.



  Four excavators 3, 4, 5, 6 are arranged near the front end of the gantry-shaped vehicle 1. These excavators 3 to 6 are articulated independently of each other at their upper part 7, so as to be able to follow the terrain by avoiding obstacles such as, for example, rocks R (see fig. 3) which may protrude under the track. These excavators 3 to 6 are driven in motion by a motor 8. A transverse conveyor belt 9 gathers all the materials brought by the excavators 3 to 6 on a general conveyor 10 intended to bring the excavated ballast into a vehicle 11 carrying a screen 12 .

   This vehicle 11 itself carries a conveyor 13 for distributing the ballast on the screen 12 and a conveyor 14 for eliminating screenings. Indeed, these are evacuated in one or more wagons 15 by means of auxiliary conveyors 16 and 17.



  The clean ballast is taken in charge at the lower end of the screen 12 by a conveyor 18 bringing it to the top of the vehicle 1 and discharging it onto a conveyor 19 discharging the clean ballast into a receptacle 20 in the rear part. of the vehicle in the form of a gantry 1. Channels 21 which exit from the receptacle 20 allow the distribution of the clean ballast along the track. In addition, the rear part of the vehicle 1 in the form of a porch is provided with a support or platform 22 intended to receive new sleepers 23 brought by a wagon 25 equipped with a crane 26.



  In the example shown, this support or platform 22 is formed by an inclined plane provided with rollers 24 to facilitate movement of the sleepers 23 towards the center of the gate.



  The vehicle 1 is also provided with two rails 27 of the type called a tourtelier arranged longitudinally under the gantry. These rails 27 serve as a track for two hoists 28 provided for the transport of the sleepers 23 of the support 22 to the place of their installation under the gantry,. i.e. between excavators 3 to 6 and support 22.



  The operation of the installation for the rehabilitation of railway tracks, described with reference to FIGS. 1 to 5 of the appended drawing, is carried out according to the following method of use: when a certain section of railway has to be repaired, the first step is to remove all the sleepers 23 of this section, for example using a wagon 29 fitted with a crane 30 as shown in FIG. 6. These crosspieces 23, once removed, are replaced in part by removable spacers 31 and provided with quick fixing means to the rails 32. Such means can be, for example, constituted by handles 33 of which the rotation causes the movement of claws 34 to grip the foot of the rails 32.

   Once a certain section of track has been unloaded from its sleepers 23 and provided with spacers 31, the repair installation proper comprising vehicles 1, 11 and 15 is brought to one end of this section. track lesson. A worker standing near bogie 2 before vehicle 1 removes the spacers 31 as they appear between this bogie and the excavators 3 to 6. These can therefore work freely between the rails. 32, the excavated ballast being transported to the screen car 11, 12 for cleaning. The screenings are evacuated on the wagon (s) 15 and the clean ballast is brought by the conveyors 18 and 19 into the receptacle 20.

   As the track has been excavated, new sleepers 23 are transported from the wagon 25 under the gantry of the vehicle 1, thanks to the ramp 22 and the hoists 28. Each sleeper 23 is brought longitudinally between the rails 32, then ash between them and turned 90o to be placed transversely under the rails 32 (see fig. 1 and 4).



  As new sleepers 23 are fixed under the rails 32, clean ballast is directed through the conduits 21 into the excavated space and thus under the newly placed sleepers. As can be understood without further from the foregoing, a repair installation as described above can work continuously at high efficiency and therefore only immobilize the track for a very short period.

   In addition, one of the most striking advantages of this installation resides in the fact that it is very small in width, which allows its use for the repair of sections of tracks located, for example, in a tunnel, on a bridge, or possibly along the platforms of a station, or for the repair of tracks bordered by low walls, for example. The installation described above could be used according to an embodiment of the method which will be described below with reference to FIGS. 7 and 8. According to this embodiment of the method, is removed beforehand, using auxiliary rails 35, arranged parallel along the track to be treated, and gantries 36, an entire span 37 of the track.

   To do this, this span is unbolted from the adjacent track sections and raised using hoists 38 carried by several gantry cranes 36. The raised span 37 is moved to be either placed on the adjacent track section or placed on lorys 39 to be evacuated and replaced by a new one. Then, the auxiliary rails 35 are brought closer to each other and kept at normal spacing by removable space bars 31. Thus, the old railway track has been entirely replaced by a new auxiliary track. on which the repair installation described with reference to fig. 1 to 4 may be required to perform their work in the manner indicated above.

   However, new sleepers will not necessarily be placed under the auxiliary rails 35, but the spacer bars 31 removed in front of the excavators 3 to 6 will be replaced behind them as the vehicle moves forward 1 Once the total length of the span has been processed, the auxiliary rails 35 will be placed at the spacing of the gantries 36 for the installation, either of the span 37 temporarily lifted, or of a new span.



  . Many variations of the installation described above could be provided. For example, instead of providing four independent excavators, one could provide three only, the central excavator having the width of the space between the rails 32. One could also use only one central excavator digging between. the rails 32. The ballast hole vanting the outside of the rails 32 would in this case be pushed towards the inside of the rails by accessory devices, for example of the cutter type. In addition, some conveyors, such as conveyor 9, could be replaced by smooth sheet channels fitted with vibrators ensuring the flow of materials on their inclined bottom.

      The advantages of the process described above and of the installation allowing its implementation are as follows: 1 o This process can be used to treat narrow sections of track, where the other means cannot be made poor.



  By dredging longitudinally and from bottom to top, material is extracted towards the line of least resistance.



  In addition, by acting simultaneously over the entire width or over a large part of the width of the land to be treated, a much greater advance is ensured than that obtained by the other methods. This great superiority of output compensates very largely for the small inconvenience sometimes resulting from the obligation to remove the sleepers, especially since the extraction of the ballast and its purification usually take place on occasion. repair of equipment, therefore change of sleepers.



       3-) It should be noted that the installation of the excavators is very simple and very fast; it suffices to let the rear part of these descend on the track.

 

Claims (1)

REVENDICATIONS I. Procédé de réfection de voies ferrées, dans lequel on excave le ballast usagé et dépose le ballast propre, ces opérations se faisant de façon continue le long d'une voie, caractérisé en ce que l'opération d'excavation se fait en draguant le ballast dans un plan vertical paral lèle aux rails. II. Installation de réfection de voies fer rées, comprenant au moins un excavateur à ruban continu, caractérisée en ce que l'exca vateur est disposé de manière à travailler dans un plan vertical parallèle aux rails. SOUS-REVENDICATIONS 1. CLAIMS I. Method for repairing railway tracks, in which the used ballast is excavated and the clean ballast is deposited, these operations being carried out continuously along a track, characterized in that the excavation operation is carried out by dredging the ballast in a vertical plane parallel to the rails. II. Installation for the repair of railway tracks, comprising at least one continuous belt excavator, characterized in that the exchanger is arranged so as to work in a vertical plane parallel to the rails. SUB-CLAIMS 1. Procédé selon la revendication I, carac térisé en ce qu'on enlève toutes les traverses d'un tronçon de la voie à traiter et les rem place en partie par des barres d'espacement, celles-ci étant enlevées au fur et à mesure de l'avance de l'excavateur, de nouvelles traverses étant placées sous les rails dans l'espace excavé, l'amenée du ballast propre se faisant au fur et à mesure de la pose des nouvelles traverses. 2. Procédé selon la revendication I et la sous-revendication 1, caractérisé en ce que les nouvelles traverses sont amenées longitudina lement entre les rails, descendues entre ceux-ci et tournées de 90,1 pour être disposées trans versalement sous les rails. 3. Method according to Claim I, characterized in that all the sleepers of a section of the track to be treated are removed and replaced in part by spacing bars, the latter being removed as and when the advance of the excavator, new sleepers being placed under the rails in the excavated space, the supply of clean ballast taking place as the new sleepers are laid. 2. Method according to claim I and sub-claim 1, characterized in that the new sleepers are brought longitudinally between the rails, lowered between them and turned by 90.1 to be disposed transversely under the rails. 3. Procédé selon la revendication I, carac térisé en ce qu'on enlève, à l'aide de rails auxi liaires et de portiques, au moins une travée entière, qu'on dispose à la place les rails auxi liaires maintenus à l'écartement normal par des barres d'espacement amovibles, celles-ci étant enlevées et replacées au fur et à mesure de l'avance de l'excavateur, l'amenée du ballast propre se faisant au fur et à mesure de la pose des barres d'espacement derrière l'excavateur, les rails auxiliaires étant placés à l'écartement des portiques, une fois toute la longueur de la travée traitée, pour la mise en place de la travée définitive. 4. Method according to Claim 1, characterized in that at least one entire span is removed with the aid of auxiliary rails and gantries, and the auxiliary rails maintained at normal spacing are placed instead. by removable spacer bars, these being removed and replaced as the excavator advances, the supply of clean ballast taking place as the spacer bars are installed behind the excavator, the auxiliary rails being placed at the spacing of the gantries, once the entire length of the span has been processed, for the installation of the final span. 4. Installation selon la revendication 11, caractérisée en ce qu'elle comprend plusieurs excavateurs disposés parallèlement les uns aux autres pour prendre le ballast entre les rails aussi bien qu'à l'extérieur de ceux-ci, ces exca vateurs étant articulés à leur partie supérieure indépendamment les uns des autres pour pou voir suivre le terrain en évitant les obstacles (rochers). 5. Installation selon la revendication II et la sous-revendication 4, caractérisée en ce qu'elle comprend un véhicule en forme de por tique disposé longitudinalement par rapport aux rails, au moins un train de roues étant fixé respectivement à chaque extrémité de ce por tique, les excavateurs étant montés à proximité de l'extrémité avant du portique. 6. Installation according to Claim 11, characterized in that it comprises several excavators arranged parallel to each other to take the ballast between the rails as well as outside them, these excavators being articulated at their upper part. independently of each other to be able to follow the terrain avoiding obstacles (rocks). 5. Installation according to claim II and sub-claim 4, characterized in that it comprises a portal-shaped vehicle disposed longitudinally with respect to the rails, at least one set of wheels being fixed respectively at each end of this por tick, the excavators being mounted near the front end of the gantry. 6. Installation selon la revendication II et les sous-revendications 4 et 5, caractérisée en ce que l'extrémité arrière du véhicule en forme de portique est munie d'un support de réception des nouvelles traverses à poser, au moins un palan déplaçable sur un rail fixé au portique étant prévu pour le transport "des traverses du support à l'endroit de leur pose entre les exca vateurs et le support. 7. Installation selon la revendication II et les sous-revendications 4 à 6, caractérisée en ce que ce support est constitué par un plan incliné muni de rouleaux pour faciliter le dépla cement des traverses vers le centre du portique. 8. Installation according to claim II and sub-claims 4 and 5, characterized in that the rear end of the vehicle in the form of a gantry is provided with a support for receiving the new sleepers to be installed, at least one hoist movable on a rail fixed to the gantry being provided for the transport "of the cross members of the support at the place of their installation between the excavators and the support. 7. Installation according to claim II and sub-claims 4 to 6, characterized in that this support consists of an inclined plane fitted with rollers to facilitate the movement of the sleepers towards the center of the gantry. Installation selon la revendication II et les sous-revendications 4 à 7, caractérisée en ce que la partie arrière du véhicule en forme de portique contient un réceptacle pour le bal last propre, les moyens d'amenée du ballast étant constitués par des canaux dirigeant le ballast du réceptacle sur la voie. 9. Installation selon la revendication II et les sous-revendications 4 à 8, comprenant un crible, des moyens transporteurs du ballast ex cavé vers le crible, des moyens d'évacuation des criblures et des moyens de transport du ballast propre vers son lieu d'utilisation, carac térisée en ce que ces derniers moyens compren nent au moins un ruban transporteur disposé dans la partie supérieure du véhicule en forme de portique pour amener le ballast propre dans le réceptacle. 10. Installation according to claim II and sub-claims 4 to 7, characterized in that the rear part of the vehicle in the form of a gantry contains a receptacle for the clean ballast, the means for supplying the ballast being constituted by channels directing the ballast. ballast from the receptacle on the track. 9. Installation according to claim II and sub-claims 4 to 8, comprising a screen, means for conveying the ex cavé ballast towards the sieve, means for evacuating the screenings and means for transporting the clean ballast to its place of. 'Use, charac terized in that the latter means comprise at least one conveyor tape arranged in the upper part of the vehicle in the form of a gantry to bring the clean ballast into the receptacle. 10. Installation selon la revendication II, caractérisée en ce qu'elle comprend des barres d'espacement amovibles destinées à remplacer les traverses enlevées préalablement du tronçon de voie à traiter, ces barres étant munies de moyens de fixation rapide aux rails. Installation according to Claim II, characterized in that it comprises removable spacer bars intended to replace the sleepers previously removed from the section of track to be treated, these bars being provided with means for rapid attachment to the rails.
CH329659D 1956-03-03 1956-03-03 Method of repairing railway tracks and installation for its implementation CH329659A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH329659T 1956-03-03

Publications (1)

Publication Number Publication Date
CH329659A true CH329659A (en) 1958-05-15

Family

ID=4501419

Family Applications (1)

Application Number Title Priority Date Filing Date
CH329659D CH329659A (en) 1956-03-03 1956-03-03 Method of repairing railway tracks and installation for its implementation

Country Status (1)

Country Link
CH (1) CH329659A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2529135A1 (en) * 1974-07-11 1976-01-29 Scheuchzer Fils Auguste PROCEDURE FOR COMPLETE RENEWAL OF A RAILWAY TRACK AND CONSTRUCTION TRAIN FOR CARRYING OUT THIS PROCEDURE
FR2424361A1 (en) * 1978-04-25 1979-11-23 Mercadier Paul Railway track and ballast renewal process - with mid section of three lifted by portal frames and lowered onto wagons passing below for replacement by temporary section
US4892151A (en) * 1983-12-22 1990-01-09 Franz Plasser Bahnbaumaschinen-Industrie Gmbh Ballast cleaning machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2529135A1 (en) * 1974-07-11 1976-01-29 Scheuchzer Fils Auguste PROCEDURE FOR COMPLETE RENEWAL OF A RAILWAY TRACK AND CONSTRUCTION TRAIN FOR CARRYING OUT THIS PROCEDURE
FR2424361A1 (en) * 1978-04-25 1979-11-23 Mercadier Paul Railway track and ballast renewal process - with mid section of three lifted by portal frames and lowered onto wagons passing below for replacement by temporary section
US4892151A (en) * 1983-12-22 1990-01-09 Franz Plasser Bahnbaumaschinen-Industrie Gmbh Ballast cleaning machine

Similar Documents

Publication Publication Date Title
EP0004985B1 (en) Train for the renewal of a railway track
FR2518602A1 (en) ROLLING PLANT AND PROCESS FOR THE PROGRESSIVE CONTINUOUS CLEAN-UP OF THE INFRASTRUCTURE OF A RAILWAY
FR2533520A1 (en) DEVICEABLE LOADING WAGON, ESPECIALLY FOR LOADING DEBLAIS FROM A BALLAST BED PURIFICATION MACHINE
FR2473575A1 (en) MOBILE INSTALLATION FOR SANITATION OF INFRASTRUCTURE OF RAILWAYS AND METHOD FOR PERFORMING SANITATION USING SUCH FACILITY
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
FR2558859A1 (en) METHOD AND MACHINE FOR CLEANING A RAILWAY BALLAST BED
CH329659A (en) Method of repairing railway tracks and installation for its implementation
JP2011513607A (en) How to refurbish the ballast of the track
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
FR2594155A1 (en) MOBILE INSTALLATION FOR THE CONTINUOUS RENEWAL OF RAILS AND TRAVERSES OF A RAILWAY.
FR2504162A1 (en) ROLLING INSTALLATION FOR CARRYING OUT A PROTECTIVE LAYER EXTENDING BETWEEN THE TRACK BEARING AND THE BALLAST PIERRAILLE BED OF A RAILWAY
EP0146681A1 (en) Railway ballast cleaning method and machine for performing it
EP0028668A1 (en) Train for stabilising a railway track
EP0775780B1 (en) Method for renewing railway tracks
BE555081A (en)
FR2618465A1 (en) Machine for compaction of railway track
WO2015025092A1 (en) Method for replacing rails and associated railway vehicles
FR2546925A1 (en) Multi-chassis rail track laying and dismantling machine
FR2736367A1 (en) Installation for continuous repair of rail track - comprises several pivoted machine chassis, supported on wheels, having systems for placing new sleepers, lifting old sleepers from track and ballast cleaning and ejection
FR2561275A1 (en) Method for renewing the railway track gear and device for the implementation thereof.
EP3892775A1 (en) Carriage for transferring sleepers and associated railway vehicle
FR2564117A1 (en) METHOD AND APPARATUS FOR RENEWING RAILWAY APPARATUS
EP0085790B1 (en) Railway track reconditioning train
FR2588023A1 (en) Method and machine for clearing the ballast from a railway track
CH426919A (en) Method for moving sets of tracks and apparatus for carrying out this method