Switzerland
Prior art keywords
track
ballast
machine according
screen
excavators
Prior art date
Application number
Other languages
French (fr)
Inventor
Henri Lemaire Maurice
Original Assignee
Henri Lemaire Maurice
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henri Lemaire Maurice filed Critical Henri Lemaire Maurice
Publication of CH159346A publication Critical patent/CH159346A/en

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

  

  Procédé et machine pour     Pépuration    continue du ballast des voies ferrées.    Avec les méthodes actuelles, le travail  d'épuration du ballast nécessite un temps et  une     main-d'aeuvre    considérables. Il faut enle  ver le ballast à. épurer à la pioche et à la  pelle, le passer au crible, le reprendre et     re-          ballaster    la voie, toutes opérations longues et  onéreuses. On utilise également divers dispo  sitifs mécaniques montés sur matériel rou  lant, mais ces derniers sont d'un débit relati  vement lent ou bien ne peuvent .être utilisés  que sur voie double, ce qui a pour inconvé  nient d'immobiliser le trafic sur deux voies et       surtout    d'être inutilisable en cas de voie  unique.  



  La présente invention a pour objet un pro  cédé d'épuration continue du ballast pouvant  donner un débit considérable et remarquable.  Ce procédé consiste à. utiliser un wagon cri  ble muni de deux boggies, de façon à pouvoir  circuler sur la voie même à nettoyer, et sus  ceptible, par suite, d'être employé sur voie  unique, ledit wagon comprenant une poutre  rigide portant à.

   la     partie    médiane un disposi-         tif    mécanique d'excavateur et de criblage, et  -des dispositifs élévateurs -de la voie dis  posés de part et d'autre de     l'appareil    excava  teur, afin qu'au cours de l'avancement du  wagon, la voie soit soulevée progressivement  et .automatiquement en forme d'arc sous une  partie de la longueur de la poutre pour per  mettre le     passage    des     excavateurs    sous la voie,  et leur mouvement continu autour de la pou  tre pendant la progression de l'ensemble, le  ballast à épurer, enlevé par les excavateurs  étant amené au dispositif de criblage monté  sur la poutre, et déversé sur la voie d'une ma  nière continue, après épuration.

      La machine pour l'exécution du procédé  ci-dessus se caractérise en ce qu'elle présente  des     dispositifs    élévateurs de la- voie compor  tant un     châssis    mobile verticalement sur  poutre, des traverses mobiles transversale  ment,     indépendamment    l'une de l'autre, et  des organes     destinés    à maintenir soulevée la  voie.

        Au dessin schématique annexé, donné à       titre    d'exemple:  La fi-. 1 est une vue en élévation de l'ap  pareil épurateur en     action;     La     fig.    2 est une vue en plan de la     fig.    1;  La     fig.    3 est une vue en bout de la     fig.    1;  La     fig.    4 est une coupe transversale à  plus grande échelle suivant la ligne     4-4    de  la     fig.    1;  La     fig.    5 est une coupe à plus grande  échelle     suivant    la ligne 5-5 de la     fig.    1;

    La     fig.    6 est une coupe transversale sui  vant la ligne 6-6 de la     fig.    1, représentant  l'un des     dispositifs    de soulèvement de la voie  par action directe sur les rails;  La     fig.    7 est une coupe partielle à plus  grande échelle, correspondant à la     fig.    6 et  montrant le détail d'un galet de soulèvement;  La.     fig.    8 est une vue en élévation repré  sentant l'un des appareils excavateurs à plus  grande échelle;  La     fig.    9 représente schématiquement en  élévation une variante du     dispositif    de soulè  vement de la voie;

    La     fig.        10    est une     coupe        suivant    la ligne  10-10 de la     fig.    9;  Les     fig.    11 à 23 sont     relatives    à une autre  forme d'exécution;  La     fig.    11 est une vue en élévation du  type en     position    de route;  La     fig.    1:2 montre le     même    en position de  travail;  La     fig.    13 est une vue à plus grande  échelle     corespondant    à la précédente;

    Les     fig.    14 et 15 sont des vues des trains  de chenilles en coupe transversale, respective  ment selon les plans     e-f    de la fie. 11, et       x-y    de la     fig.    13;  La     fig:    16 est une vue schématique d'un  appareil de préhension et d'élévation de la  voie,     correspondant    à une coupe selon le plan       g-h    de la     fig.    13:;  La     fig.    17 est une vue de détail à plus  grande échelle, correspondant à la figure pré  cédente;  La     fig.    18 donne une vue de face d'un ap  pareil élévateur;

      Les     fig.    19 et 20 sont des vues des appa  reils     excavateurs,    en coupe transversale, res  pectivement selon les plans     m-n    de la       fig.    11 et     a-b    de la     fig.    1.3;       La        fig.    2!1 est une vue schématique de  lace d'un des châssis coulissants extensibles,  portant les excavateurs.

   Elle correspond à une  coupe selon le plan     c-d    de la     fig.    13;  Les     fig.        22    et 2:3 représentent le dispositif  égalisateur, niveleur et compresseur de bal  last, la première en coupe selon le plan     o-p     de la     fig.    13, la, seconde en plan.  



  Dans la machine représentée aux     fig.    1 à  8, le dispositif épurateur comporte une poutre  rigide 1, montée, par exemple,     sur    deux  boggies 2 munis d'essieux et de roues permet  tant la circulation sur la voie. Sur la poutre  1 sont fixés     quatre    dispositifs élévateurs de  voie 3. Aux     fig.    6 et 7, on a représenté à plus  grande échelle les dispositifs 3.

   Ces derniers  comportent, par exemple, un châssis 4 monté  à glissière sur la poutre 1; ce châssis se dé  place     verticalement    au moyen d'une cré  maillère 5 formant cric, en     prise    avec un pi  gnon 6; la     crémaillère    5 est solidaire du châs  sis 4 et le pignon 6 est monté d'une manière  appropriée sur la poutre 1. Une manivelle 7,  assure la. rotation du     pignon    6.  



  A la base du     châssis,        deux    traverses 8 sont  montées de manière à pouvoir se déplacer in  dépendamment l'une de l'autre, respective  ment sur la droite et sur la gauche du châs  sis 4 au moyen, par exemple, de crémaillères  5a et de     pignons        6a.    En bout de chaque tra  verse 8 est fixé un galet 9     (fig.    7); ces galets  sont, par exemple,     articulés    sur un axe verti  cal 10 et munis de roulements à billes ou à  rouleaux 11. Les galets 9 sont, en outre, mu  nis sur leur circonférence d'une gorge 12  ayant un profil     correspondant    au champignon  du rail à soulever.  



  Afin de permettre la circulation du galet  9 à     l'intérieur    du rail, l'éclisse intérieure est  enlevée, et l'éclisse extérieure 13 est mainte  nue provisoirement au moyen de boulons à.  tête plate 14.  



  A la. partie médiane de la poutre 1, quatre       excavateurs    15 sont installés. Aux     fig.    4 et 8      on a représenté à plus grande échelle l'un des  excavateurs.  



  Les excavateurs 15 sont constitués en  principe par un cadre 16 reposant sur la pou  tre 1. Ce cadre est     susceptible    de se dépla  cer latéralement au moyen d'un dispositif mé  canique; le     dispositif    représenté comporte une  crémaillère 5b fixée à la poutre, en prise avec  un pignon 6b commandé, par exemple, par un  dispositif à. vis sans fin et manivelle 17. Une  armature 18 est montée sur le cadre 16  de façon à pouvoir se déplacer verti  calement et être réglée en hauteur au  moyen d'une crémaillère     5c    en prise  avec un pignon à manivelle 6c fixé sur  le     cadre.    Sur l'armature 18, .des rouleaux en  traîneurs 19 sont montés convenablement  pour entraîner une chaîne sans fin 20 munie  de godets 21.

   Une poulie .22, ou autre organe,  est prévue pour actionner la. chaîne à godets  20. Cette poulie est, par exemple, clavetée en  bout. d'arbre de l'un des rouleaux 19.  



  Une bande transporteuse 23 montée sur la  poutre 1 est entraînée par un moteur, et re  çoit le ballast déchargé par les godets 21. La  bande 23 est placée sous les excavateurs 15  à leur partie supérieure, et se prolonge de fa  çon à décharger le ballast à cribler dans un  crible rotatif 2,4 monté sur la poutre 1. Le  crible 24 est     entrainé    par une poulie     2..5.     



  En dessous du crible, une trémie 26 re  çoit les matériaux éliminés au criblage,  comme, par exemple, des. résidus, terres, etc.,       cette    trémie comporte à sa base une ouverture  27 pour l'évacuation desdits matériaux. L'ou  verture 27 débouche en face d'un second       transporteur    23a transversal ù . la voie, et en  traîné à grande vitesse. Le transporteur 23a  se prolonge extérieurement jusqu'en 28  (fi g. 5).  



  A l'extrémité du crible 24, un récipient  29, fixé à la poutre 1, et placé transversale  ment, reçoit le ballast. Ce récipient, comme  représenté aux     fig.    1 et 5, comporte un réser  voir supérieur 30, dans lequel débouchent  deux goulottes 31. Celles-ci sont en pente et       placéesensiblement    à, l'aplomb de chaque  rail.    Le     fonctionnement    du dispositif est le  suivant:  Le     wagon-crible    est remorqué sur la voie  à     reballaster    à l'endroit voulu.  



  Au moyen -de la crémaillère 5 et du pi  gnon 6, on amène les dispositifs élévateurs 3  à la hauteur du rail.     Les    galets 9 sont mis  en contact avec les champignons des rails par  action sur les: crémaillères 5a et pignons 6a.  On règle ensuite la hauteur des     dispositifs    3,  de telle façon que ceux du centre soient plus  élevés que ceux des     extrémités;    la voie est  ainsi soulevée en arc sur une certaine lon  gueur.  



  En     manoeuvrant    les crémaillères     5c-6e,     on abaisse les supports d'excavateurs 18 et  on opère le montage en position de     travail    des  chaînes à godets qui étaient préalablement re  levées de part et d'autre du châssis 18 en po  sition de route.  



  Les excavateurs lis, les transporteurs     23     et     2;3a,    ainsi que le crible 24, sont alors mis  en mouvement, le wagon est remorqué dans  le sens de la flèche et on abaisse progressive  ment les excavateurs, de façon que le premier  entraîne la couche superficielle, et le dernier  arase la plate-forme de la voie.  



  Au fur et à mesure de l'avancement du  wagon, grâce aux galets 9 en prise avec les  rails, les dispositifs 3 soulèvent la voie, le bal  last à. nettoyer     enlevé    par les excavateurs se  décharge sur le transporteur 23 qui, à son  tour, le conduit dans le crible 24. Les résidus,  terres, etc., s'échappant du crible     dans    la tré  mie 26,     tombent    sur le transporteur 23a.  



  En raison de sa position transversale et de  sa grande     vitesse    d'entraînement, le transpor  teur     2:3a        projette    hors de la voie les     maté-          riaux    éliminés au criblage.  



  Le ballast criblé sort du crible 24 et  tombe dans le réservoir 30 d'où il s'écoule par  les     goulottes    3:1.  



  En raison de la disposition des     goulottes     31 le ballast tombe sur les rails et se trouve  ainsi divisé et réparti uniformément entre les  rails. Il suffit alors, après le passage du wa  gon, d'égaliser le ballast, de le bourrer, et de  replacer les éclisses     intérieures    qui avaient      été préalablement enlevées pour permettre le  passage des galets :des: dispositifs élévateurs.  Dans: les courbes, la, voie est     maintenue    à sa  place sous le wagon, grâce au déplacement la  téral effectué de façon convenable des dispo  sitifs élévateurs 3.  



  L'emploi de ce     dispositif    est extrêmement  simple et très     efficace;    de plus, il permet de       réaliser    une     économie    importante de     main-          d'oeuvre    et un gain de temps     considérable    pour  l'exécution d'épuration du ballast. La vitesse  d'avancement -du dispositif peut aisément  atteindre 150     mètres    par heure.  



  Aux     fig.    9 et 10, on a représenté une va  riante de l'appareil élévateur, dans laquelle  le     dispositif    -est     constitué    par deux éléments       â2    et     3,3    fixés à la poutre 1; ces éléments  comportent une armature 34 réglable en hau  teur et latéralement. A la base de     cette    ar  mature sont fixés deux     châssis        longitudinaux     35 et 36 recourbés à leurs extrémités en 37  et 38.  



  Des rouleaux 39 sont montés fous sur ces  châssis, l'intervalle entre deux rouleaux étant  moindre que la largeur d'une traverse.  



  Dans ce cas, la voie est préalablement       soulevée    à l'aide de cries, les châssis sont  amenés sous les traverses, et le dispositif est  réglé et bloqué en hauteur et en inclinaison.  



  Au fur et à mesure de l'avancement du  wagon-crible, la voie sera soulevée par l'élé  ment avant 33, les traverses reposant succes  sivement sur les rouleaux. La voie repose en  suite sur l'élément arrière, avant de se re  placer d'elle-même sur le ballast criblé. Les  excavateurs et le crible fonctionnent comme  décrit ci-dessus. Dans les courbes, la voie con  serve sa. courbure sous le wagon grâce à     la     présence de galets 40 s'appuyant sur les rails.  



  <B>Il</B> est a noter, en autre, que     l'ensemble    du  dispositif peut être dans le gabarit normal du  matériel roulant et peut donc se déplacer  sans inconvénient sur tout le réseau des voies  ferrées.  



  Dans la variante représentée aux     fig.    11  à 23, l'appareil épurateur comprend une     pou-          tré-    rigide 1 en treillis métallique, par exem  ple. En position de route, cette poutre repose    et roule sur la voie V par deux boggies 2  et 12a.  



  Sur cette poutre sont montés des     groupes     de     vérins    41, qui peuvent être électriques, hy  drauliques ou pneumatiques, et qui per  mettent de soulever la poutre pour passer de  la position de route à la position de travail.  



  Pour cette conversion, le     wagon-poutre     est pourvu de deux trains de chenilles       42-42a.    Chacun d'eux est monté sur la pou  tre à la façon d'un boggie dont la cheville ou  vrière 43 serait orientable.  



  Le boggie avant 42 est seul     moteur.    La  traction est réalisée de chaque côté par un  moteur 44 dont le mouvement est transmis  par chaînes 45 aux roues de la chenille.  



  Les chenilles sont rendues solidaires ;les  boggies au moyen de fusées coulissantes 46  pénétrant dans un manchon 47. Cette dis  position est adoptée pour dégager en position  de route le gabarit de la voie, ainsi qu'il est  montré sur la     fig.    14. Les moteurs 44 sont à  vitesse réglable, de façon à pouvoir faire  tourner une     chenille    plus rapidement que  l'autre dans les courbes de la voie.  



  Les appareils élévateurs de la voie, repré  sentés sur les     fig.    16 à 18, seront en général  au nombre de deux paires 48-48a convena  blement espacées sur la poutre. Chacun de  ces appareils constitue une sorte de     main-          courante    emprisonnant le champignon du rail       R.    Ces     mains-courantes    sont construites  comme une pince à charnière formée de deux  éléments assemblés 49 et 50. Les rails sont  saisis par des galets 51-52 disposés de part  et d'autre sur les pinces.

   Celles-ci peuvent pi  voter autour d'axes 53 en     laissant    un certain  jeu latéral, ce qui permet aux     mains-          courantes    de se prêter aux divers écartements  de rails et aux différentes inclinaisons de       ceux-ci.    Les     mains-courantes    sont levées et  maintenues par des vérins (hydrauliques ou  pneumatiques) 54-55 disposés sur une tra  verse 56.  



  Les appareils excavateurs qui tournent  autour de la. voie le long des circuits 57 et  58 sont guidés par des rouleaux     tournant    sur  des axes     59---60-61.        Ils    glissent sur un      bâti coulissant 6,2 et sont entraînés par des  roues dentées 63. Ces excavateurs sont sup  portés par des mécanismes 64-65 qui les en  cadrent. Chacun de ces mécanismes comprend  un châssis 66 pouvant coulisser dans des rai  nures pratiquées sur les montants 67 et 68  de la poutre 1     (fig.    21). Des traverses 69-70  entretoisent le châssis 6,6.  



  Le moteur d'entraînement 71 est porté     par     la     traverse    69.  



       La    montée et la descente du châssis cou  lissant sont assurées par un double treuil       7,2-73'    actionné par deux moteurs 74. Bien  entendu, les moteurs 74 tournent en synchro  nisme lors de l'élévation ou de l'abaissement  du châssis 66.  



  Pour que les excavateurs soient extensi  bles transversalement à la voie, les axes       59---60-61    des rouleaux d'excavateurs tour  nent dans des armatures 75-76, lesquelles  peuvent coulisser, par exemple au moyen de  galets à l'intérieur de la. traverse 70. Les ar  matures 75-76 sont rapprochées (position de  route     fig.    19, ou éloignées, position de tra  vail,     fig.    20), par l'action d'un dispositif à  pignon et crémaillère 77 (ou de vérins pneu  matiques, hydrauliques, etc.).  



  Le ballast déchargé par des godets exca  vateurs 78 est reçu par une bande transpor  teuse 79 qui l'amène dans. un     crible    rotatif  80, monté sur la poutre et entraîné par un  moteur 81; le principe même de cette dispo  sition est d'ailleurs déjà. indiqué dans la  forme d'exécution représentée aux     fig.    1 à 10.  



  Le dispositif égalisateur, niveleur et com  presseur de ballast, comporte deux branches  en fonte 82 dont la forme en V est assez ana  logue à celle d'un chasse-neige. Cette pièce  est supportée en ses extrémités par de farts  ressorts à boudins,<B>83</B> réglables en     hauteur    au  moyen de vis 84 tournant dans des. supports  85. La partie inférieure de cet égalisateur est  chanfreinée, afin de répartir, d'égaliser et de  comprimer facilement le ballast. Ce système  doit pouvoir être replié en position de route  pour dégager le gabarit de la voie. A cet ef  fet, les supports 85 sont rapprochés de l'axe    de la voie, grâce au coulissement des bras 816  qui les portent à l'intérieur d'un manchon 87.

    Pour     permettre    cette déformation, les branches       82--,82    du V peuvent tourner chacune autour  d'un axe antérieur 88 et de plus, des coulisses  89 sont prévues aux     extrémtés    arrière     des-          dites    branches.  



  Le dispositif égalisateur peut tourner au  tour d'axes 90 parallèles à la     direction    de la  poutre, de façon à s'incliner légèrement lors  que l'on désire donner au ballast un     surhaus-          sement    convenable d'un certain côté.  



  Sur le wagon-crible est installée     une    ca  bine 91 occupée par le mécanicien. La direc  tion des chenilles avant s'effectue de cette ca  bine. Les chenilles arrière sont dirigées par  un     manoeuvre    au moyen d'un volant 92. Le  même     manoeuvre    peut également agir sur les  volants     9:31        assurant    la descente de l'égalisa  teur.  



  L'énergie nécessaire pour actionner les di  vers     mécanismes    sera     fournie,    par exemple,  par un moteur Diesel accouplé avec une gé  nératrice donnant le courant     électrique.    Le  même moteur     pourra    actionner, en outre, les  pompes à air ou à. eau nécessaires pour les vé  rins.  



  Le fonctionnement de cet appareil épura  teur est le suivant:  Le wagon-crible, en position de route, est  amené     sur    la. voie à     reballaster,    au point de  départ du     travail.     



  Pour passer de la position de route à la       position    de travail, le wagon est soulevé     paz     les vérins 41-41. Les boggies 2 et 9a sont  démontés et     attachés        respectivement    à l'avant  et à     l'arrière    du véhicule par des câbles 94  de     part    et d'autre du -dos d'âne qui sera formé  par le soulèvement de la voie.  



  Les trains chenilles sont tirés vers l'exté  rieur en position de travail, afin d'encadrer  la tète des traverses     (fig.    1.5). Ils sont en  suite descendus jusqu'à la voie en agissant  sur les vérins 41.  



  Pour la.     mise    en action des     excavateurs,    la  voie est     déséclissée    à un joint de rails, et elle  est soulevée à l'avant par les.     mains-courantes     d'avant 48.     On    fait alors progresser la poutre      sur les chenilles, de sorte que l'extrémité sou  levée de la voie pénètre à l'intérieur des cein  tures formées par les excavateurs préalable  ment écartés par     extension    des     armatures     7:5-76, et légèrement descendus par le châs  sis 86.

   Lorsque les     excavateurs    sont complè  tement engagés sous la voie, on parachève  leur mise en position de travail en commen  çant l'épuration, les excavateurs étant mis en  marche au moyen des moteurs 71.  



  L'égalisateur niveleur de ballast est intro  duit sous la voie après avoir été     ouvert    en  position de travail. Sa descente est effectuée  progressivement.  



  Enfin, on peut éclisser la voie à nouveau  à l'arrière de la machine, et mettre en     action     également les dispositifs élévateurs d'ar  rière 48a.  



  Comme dans. la forme d'exécution décrite  et représentée aux fi g. 1 à 10, afin de per  mettre la circulation des galets de préhension  52 à     l'intérieur    des rails, les éclisses inté  rieures sont enlevées et les éclisses extérieu  res sont maintenues provisoirement, par exem  ple, par des boulons à tête plate.  



  Les opérations inverses des précédentes  sont exécutées lors de la cessation du travail.  Bien     entendu,        l'invention    n'est pas limi  tée aux exemples représentés. On peut, par  exemple, pour le dispositif élévateur repré  senté aux     fig.    1 à 10, utiliser des galets in  clinés ou, au lieu d'un châssis à rouleaux, un  simple patin dont le dessus serait     bombé,    les  traverses glissant alors sur le patin, ou bien  encore utiliser un dispositif à galets et électro  aimants.

   On peut encore employer tout autre  appareil excavateur, de transporteur ou de       crible.    Les organes de déplacement latéral et:  vertical à crémaillère et pignon peuvent éga  lement être remplacés par des dispositifs à vis  et écrous:, vérins hydraulique ou pneumati  que, ou d'autres appareils.  



  De même, la machine décrite comme va  riante peut être     utilisée    spécialement pour le  relevage de voie, c'est-à-dire pour l'opération  qui     consiste    à déverser du ballast neuf et en  suite à     soulever    la voie et à introduire ce bal  last sous les traverses.

   Dans ce but, et sans    sortir du cadre de     l'invention,    la poutre  pourra ne pas comporter d'excavateurs, ou       bien,si    elle en comporte, ils resteront     inactifs.     Une telle application peut être envisagée aussi  bien dans l'appareil de progression sur la  voie elle-même que dans celui de progression  sur     chenilles,    avec un wagon à grand empat  tement du type représenté aux     fig.    1 à 10.  



  Au surplus, au lieu de rouler soit sur  boggies, soit sur chenilles, le wagon-crible  pourrait progresser sur un chemin de roule  ment auxiliaire,     encadrant    la voie et posé pro  visoirement pour l'exécution du travail d'épu  ration.



  Method and machine for the continuous purification of railway ballast. With current methods, the ballast purification work requires considerable time and manpower. The ballast must be removed from. purify it with a pickaxe and a shovel, sift it, take it back and re-ballast the track, all long and expensive operations. Various mechanical devices mounted on rolling stock are also used, but these are relatively slow in speed or can only be used on double track, which has the disadvantage of immobilizing traffic on two tracks. and above all to be unusable in the event of a single track.



  The present invention relates to a process for continuous purification of the ballast capable of giving a considerable and remarkable flow rate. This process consists of. use a screening wagon fitted with two bogies, so as to be able to circulate on the same track to be cleaned, and therefore capable of being used on a single track, said wagon comprising a rigid beam bearing to.

   the middle part, a mechanical excavator and screening device, and -track lifting devices placed on either side of the excavator device, so that during the advancement of the wagon , the track is raised progressively and automatically in the form of an arc under part of the length of the beam to allow the passage of the excavators under the track, and their continuous movement around the beam during the progression of the assembly , the ballast to be cleaned, removed by the excavators being brought to the screening device mounted on the beam, and discharged onto the track in a continuous manner, after purification.

      The machine for carrying out the above process is characterized in that it has track lifting devices comprising a frame movable vertically on a beam, crossmembers movable transversely, independently of one another, and organs intended to keep the track raised.

        In the attached schematic drawing, given by way of example: The fi-. 1 is an elevational view of the purifier apparatus in action; Fig. 2 is a plan view of FIG. 1; Fig. 3 is an end view of FIG. 1; Fig. 4 is a cross-section on an enlarged scale taken on line 4-4 of FIG. 1; Fig. 5 is a section on a larger scale taken along line 5-5 of FIG. 1;

    Fig. 6 is a cross section taken along line 6-6 of FIG. 1, showing one of the track lifting devices by direct action on the rails; Fig. 7 is a partial section on a larger scale, corresponding to FIG. 6 and showing the detail of a lifting roller; Fig. 8 is an elevational view showing one of the excavating devices on a larger scale; Fig. 9 shows schematically in elevation a variant of the device for lifting the track;

    Fig. 10 is a section taken along line 10-10 of FIG. 9; Figs. 11 to 23 relate to another embodiment; Fig. 11 is an elevational view of the type in the road position; Fig. 1: 2 shows the same in working position; Fig. 13 is a view on a larger scale corresponding to the previous one;

    Figs. 14 and 15 are views of the crawler tracks in cross section, respectively according to the planes e-f of the fie. 11, and x-y of fig. 13; FIG: 16 is a schematic view of a device for gripping and raising the track, corresponding to a section along the plane g-h of FIG. 13 :; Fig. 17 is a detail view on a larger scale, corresponding to the previous figure; Fig. 18 gives a front view of such a lifting device;

      Figs. 19 and 20 are views of the excavating apparatus, in cross section, respectively according to the planes m-n of FIG. 11 and a-b of fig. 1.3; Fig. 2! 1 is a schematic view of one of the extendible sliding frames, carrying the excavators.

   It corresponds to a section along the plane c-d of FIG. 13; Figs. 22 and 2: 3 show the bal last equalizer, leveler and compressor, the first in section on the o-p plane of fig. 13, la, second in plan.



  In the machine shown in fig. 1 to 8, the scrubber device comprises a rigid beam 1, mounted, for example, on two bogies 2 provided with axles and wheels, allowing both movement on the track. On the beam 1 are fixed four track lifting devices 3. In fig. 6 and 7, the devices 3 have been shown on a larger scale.

   The latter comprise, for example, a frame 4 slidably mounted on the beam 1; this frame moves vertically by means of a crank 5 forming a jack, engaged with a pin 6; the rack 5 is integral with the frame sis 4 and the pinion 6 is mounted in an appropriate manner on the beam 1. A crank 7 ensures the. pinion rotation 6.



  At the base of the frame, two cross members 8 are mounted so as to be able to move independently of one another, respectively on the right and on the left of the frame sis 4 by means, for example, of racks 5a and of pinions 6a. At the end of each rail 8 is fixed a roller 9 (fig. 7); these rollers are, for example, articulated on a vertical axis 10 and provided with ball or roller bearings 11. The rollers 9 are, moreover, fitted on their circumference with a groove 12 having a profile corresponding to the mushroom of the rail to lift.



  In order to allow the movement of the roller 9 inside the rail, the inner fishplate is removed, and the outer fishplate 13 is temporarily kept bare by means of bolts. flat head 14.



  To the. middle part of the beam 1, four excavators 15 are installed. In fig. 4 and 8 show on a larger scale one of the excavators.



  The excavators 15 are constituted in principle by a frame 16 resting on the beam 1. This frame is capable of moving laterally by means of a mechanical device; the device shown comprises a rack 5b fixed to the beam, in engagement with a pinion 6b controlled, for example, by a device. endless screw and crank 17. An armature 18 is mounted on the frame 16 so as to be able to move vertically and to be adjusted in height by means of a rack 5c engaged with a crank pinion 6c fixed to the frame. On the frame 18, drag rollers 19 are suitably mounted to drive an endless chain 20 provided with buckets 21.

   A pulley .22, or other member, is provided to actuate the. bucket chain 20. This pulley is, for example, keyed at the end. shaft of one of the rollers 19.



  A conveyor belt 23 mounted on the beam 1 is driven by a motor, and receives the ballast unloaded by the buckets 21. The belt 23 is placed under the excavators 15 at their upper part, and extends so as to unload the ballast. to be screened in a rotary screen 2,4 mounted on the beam 1. The screen 24 is driven by a pulley 2..5.



  Below the screen, a hopper 26 receives the materials removed by screening, such as, for example,. residues, soil, etc., this hopper has at its base an opening 27 for the evacuation of said materials. The opening 27 opens in front of a second transverse conveyor 23a ù. the track, and dragged at high speed. The conveyor 23a extends externally to 28 (fi g. 5).



  At the end of the screen 24, a container 29, fixed to the beam 1, and placed transversely, receives the ballast. This container, as shown in FIGS. 1 and 5, comprises a see upper reservoir 30, into which two chutes 31 open. These are sloping and placed substantially in line with each rail. The operation of the device is as follows: The screen wagon is towed on the track to be reballasted to the desired location.



  By means -de the rack 5 and the pin gnon 6, the lifting devices 3 are brought up to the height of the rail. The rollers 9 are brought into contact with the mushrooms of the rails by action on the: racks 5a and pinions 6a. The height of the devices 3 is then adjusted, so that those in the center are higher than those at the ends; the track is thus raised in an arch for a certain length.



  By maneuvering the racks 5c-6e, the excavator supports 18 are lowered and the assembly in the working position of the bucket chains which were previously raised on either side of the chassis 18 in road position is carried out.



  The excavators read, the carriers 23 and 2; 3a, as well as the screen 24, are then set in motion, the wagon is towed in the direction of the arrow and the excavators are gradually lowered, so that the first drives the layer. shallow, and the last level the platform of the way.



  As the wagon advances, thanks to the rollers 9 engaged with the rails, the devices 3 raise the track, the ball last. The cleaning removed by the excavators discharges onto the conveyor 23 which in turn leads it into the screen 24. The residue, soil, etc., escaping from the screen into the hopper 26, falls onto the conveyor 23a.



  Due to its transverse position and its high driving speed, the 2: 3a conveyor throws the material removed during the screening out of the way.



  The screened ballast exits the screen 24 and falls into the tank 30 from where it flows through the 3: 1 chutes.



  Due to the arrangement of the chutes 31, the ballast falls on the rails and is thus divided and distributed evenly between the rails. It is then sufficient, after the passage of the wa gon, to equalize the ballast, to stuff it, and to replace the internal ribs which had been previously removed to allow the passage of the rollers: of: lifting devices. In: curves, the track is kept in its place under the wagon, thanks to the proper displacement of the lifting devices 3.



  The use of this device is extremely simple and very effective; moreover, it makes it possible to achieve a significant saving in labor and a considerable saving of time for the execution of the ballast purification. The forward speed of the device can easily reach 150 meters per hour.



  In fig. 9 and 10, there is shown a variant of the lifting device, in which the device -est constituted by two elements â2 and 3.3 fixed to the beam 1; these elements comprise a frame 34 adjustable in height and laterally. At the base of this mature ar are fixed two longitudinal frames 35 and 36 curved at their ends at 37 and 38.



  Rollers 39 are mounted idle on these frames, the interval between two rollers being less than the width of a cross member.



  In this case, the track is previously lifted using cries, the frames are brought under the sleepers, and the device is adjusted and locked in height and inclination.



  As the screen wagon advances, the track will be lifted by the front element 33, the sleepers resting successively on the rollers. The track then rests on the rear element, before placing itself back on the screened ballast. The excavators and the screen operate as described above. In the curves, the way preserves its. curvature under the wagon thanks to the presence of rollers 40 resting on the rails.



  <B> It </B> should be noted, in addition, that the whole of the device can be in the normal gauge of the rolling stock and can therefore move without inconvenience on the whole network of railways.



  In the variant shown in FIGS. 11 to 23, the purifying apparatus comprises a rigid frame 1 made of metal mesh, for example. In the road position, this beam rests and rolls on track V by two bogies 2 and 12a.



  On this beam are mounted groups of jacks 41, which can be electric, hydraulic or pneumatic, and which allow the beam to be lifted to go from the road position to the working position.



  For this conversion, the beam wagon is fitted with two undercarriages 42-42a. Each of them is mounted on the beam in the manner of a bogie whose peg or vrière 43 would be orientable.



  The front bogie 42 is the only motor. Traction is carried out on each side by a motor 44, the movement of which is transmitted by chains 45 to the wheels of the caterpillar.



  The tracks are made integral, the bogies by means of sliding rockets 46 penetrating into a sleeve 47. This position is adopted to release the track gauge in the road position, as shown in FIG. 14. The motors 44 are speed adjustable, so as to be able to turn one track faster than the other in the bends of the track.



  The track elevators, shown in fig. 16 to 18, will generally be two pairs 48-48a suitably spaced on the beam. Each of these devices constitutes a sort of handrail enclosing the head of the rail R. These handrails are constructed as a hinged clamp formed of two assembled elements 49 and 50. The rails are gripped by rollers 51-52 arranged on both sides on the clamps.

   These can pi vote around axes 53 leaving a certain lateral play, which allows the handrails to lend themselves to the various rail spacings and to the various inclinations thereof. The handrails are lifted and maintained by jacks (hydraulic or pneumatic) 54-55 arranged on a crossbar 56.



  The excavating devices that revolve around the. track along circuits 57 and 58 are guided by rollers rotating on axes 59 --- 60-61. They slide on a sliding frame 6,2 and are driven by toothed wheels 63. These excavators are supported by mechanisms 64-65 which frame them. Each of these mechanisms comprises a frame 66 which can slide in grooves made on the uprights 67 and 68 of the beam 1 (FIG. 21). Cross members 69-70 brace the frame 6,6.



  The drive motor 71 is carried by the cross member 69.



       The ascent and descent of the sliding frame are ensured by a double winch 7.2-73 'actuated by two motors 74. Of course, the motors 74 rotate in synchronism during the raising or lowering of the frame 66 .



  In order for the excavators to be extensible transversely to the track, the axes 59 --- 60-61 of the excavator rollers turn in frames 75-76, which can slide, for example by means of rollers inside the track. the. traverse 70. The mature arches 75-76 are brought closer together (road position fig. 19, or distant, working position, fig. 20), by the action of a rack and pinion device 77 (or pneumatic cylinders matic, hydraulic, etc.).



  The ballast discharged by excavator buckets 78 is received by a conveyor belt 79 which brings it into. a rotary screen 80, mounted on the beam and driven by a motor 81; the very principle of this provision is already there. indicated in the embodiment shown in FIGS. 1 to 10.



  The ballast equalizer, leveler and com pressor device comprises two cast iron branches 82 the V-shape of which is quite similar to that of a snow plow. This part is supported at its ends by coil spring waxes, <B> 83 </B> adjustable in height by means of screws 84 rotating in. supports 85. The lower part of this equalizer is chamfered in order to easily distribute, equalize and compress the ballast. This system must be able to be folded into the road position to release the gauge from the track. To this end, the supports 85 are brought closer to the axis of the track, thanks to the sliding of the arms 816 which carry them inside a sleeve 87.

    To allow this deformation, the branches 82 -, 82 of the V can each rotate around an anterior axis 88 and, moreover, slides 89 are provided at the rear ends of said branches.



  The leveling device can rotate around axes 90 parallel to the direction of the beam, so as to tilt slightly when it is desired to give the ballast a suitable boost on a certain side.



  On the screen wagon is installed a cab 91 occupied by the mechanic. The steering of the front tracks is carried out from this chain. The rear tracks are controlled by a maneuver by means of a steering wheel 92. The same maneuver can also act on the steering wheels 9:31 ensuring the descent of the equalizer.



  The energy necessary to actuate the various mechanisms will be supplied, for example, by a diesel engine coupled with a generator giving the electric current. The same motor can also operate the air or air pumps. water needed for the vines.



  The operation of this purifier apparatus is as follows: The screen wagon, in the road position, is brought to the. lane to reballast, at the starting point of the work.



  To go from the road position to the working position, the wagon is lifted by jacks 41-41. The bogies 2 and 9a are removed and attached respectively to the front and to the rear of the vehicle by cables 94 on either side of the donkey back which will be formed by the lifting of the track.



  The crawler tracks are pulled outwards into the working position, in order to frame the head of the cross members (fig. 1.5). They then went down to the track by acting on jacks 41.



  For the. When the excavators are put into action, the track is split at a joint in the rails, and it is lifted at the front by them. Front handrails 48. The beam is then moved forward on the tracks, so that the raised end of the track penetrates inside the belts formed by the excavators previously spaced apart by extension of the reinforcements 7: 5-76, and slightly lowered by the frame sis 86.

   When the excavators are completely engaged under the track, their positioning in working position is completed by starting the purification, the excavators being started by means of the motors 71.



  The ballast leveling equalizer is inserted under the track after being opened in the working position. Its descent is carried out gradually.



  Finally, the track can be spliced again at the rear of the machine, and the rear lifting devices 48a can also be activated.



  As in. the embodiment described and shown in fi g. 1 to 10, in order to allow the movement of the gripping rollers 52 inside the rails, the internal ribs are removed and the external ribs are temporarily held, for example, by bolts with a flat head.



  The reverse operations of the previous ones are carried out when the job is stopped. Of course, the invention is not limited to the examples shown. It is possible, for example, for the lifting device shown in FIGS. 1 to 10, use sloped rollers or, instead of a roller frame, a simple shoe with a curved top, the cross members then sliding on the shoe, or even use a device with rollers and electromagnets.

   It is also possible to use any other excavator, conveyor or screen device. The lateral and: vertical rack-and-pinion displacement members can also be replaced by screw and nut devices :, hydraulic or pneumatic jacks, or other devices.



  Likewise, the machine described as va riant can be used especially for the lifting of the track, that is to say for the operation which consists in dumping new ballast and then in lifting the track and introducing this last ballast. under the sleepers.

   For this purpose, and without departing from the scope of the invention, the beam may not include excavators, or else, if it does, they will remain inactive. Such an application can be envisaged both in the progression device on the track itself and in that of progression on tracks, with a large wheelbase wagon of the type shown in FIGS. 1 to 10.



  In addition, instead of rolling either on bogies or on caterpillars, the screen wagon could progress on an auxiliary rolling path, framing the track and placed provisionally for the execution of the cleaning work.

 

Claims (1)

REVENDICATIONS I Procédé d'épuration continue du ballast des voies ferrées, consistant à utiliser un wagon-crible muni de deux boggies, de fa- con à pouvoir circuler sur la voie même à nettoyer, et, par suite, susceptible d'être employé sur voie unique, ledit wagon comprenant une poutre rigide portant à la partie médiane un dispositif mécanique d'excavateurs et de criblage, et des dispo sitifs élévateurs de la voie disposés de part et d'autre de l'appareil excavateur, afin qu'au cours de l'avancement du wagon, CLAIMS I Process for the continuous purification of railroad ballast, consisting in using a screen wagon fitted with two bogies, so as to be able to circulate on the same track to be cleaned, and, consequently, capable of being used on single track, said wagon comprising a rigid beam carrying at the middle part a mechanical device of excavators and screening, and lifting devices of the track arranged on either side of the excavating device, so that during the progress of the wagon, la voie soit soulevée progressivement et au tomatiquement en forme d'arc sous une partie de la longueur de la poutre pour permettre le passage des excavateurs sous la voie et leur mouvement continu autour de la poutre pendant la progression de l'ensemble, le ballast à épurer enlevé par les excavateurs étant amené au dispositif de criblage monté sur la poutre et déversé sur la voie d'une manière continue après épuration. the track is raised gradually and automatically in the form of an arc under part of the length of the beam to allow the passage of the excavators under the track and their continuous movement around the beam during the progression of the assembly, the ballast to purge removed by excavators being fed to the beam mounted screening device and discharged onto the track in a continuous manner after purging. II Machine pour l'exécution du procédé, selon la revendication I, caractérisée en ce qu'elle présente des dispositifs. élévateurs de la voie comportant un châssis. mobile verticalement sur la poutre, des traverses mobiles transversalement indépendam ment l'une de l'autre, et des organes des tinés. à maintenir soulevée la voie. II Machine for carrying out the method, according to claim I, characterized in that it has devices. track elevators comprising a frame. movable vertically on the beam, crossmembers movable transversely independently of one another, and members of the tines. to keep the track raised. SOUS-REVENDICATIONS: 1 Machine suivant la revendication II, ca ractérisée en ce que les organes pour maintenir soulevée la. vie sont constitués par des galets montés en bout .des traver ses, lesdits galets étant destinés à accro cher et retenir la voie par les rails pen dant l'action de soulèvement. 2 Machine suivant la revendication II, ca ractérisée en ce que les appareils excava teurs sont disposés sur un châssis: des or ganes de déplacement vertical et transver sal étant prévus sur le châssis, afin de ré gler la. hauteur et la position des divers éléments indépendamment l'un de l'autre, par exemple dans les voies en courbe. SUB-CLAIMS: 1 Machine according to claim II, ca ractérisée in that the members to keep raised. life are formed by rollers mounted at the end .des traverses, said rollers being intended to hang dear and retain the track by the rails during the lifting action. 2 Machine according to claim II, ca ractérisée in that the excavator devices are arranged on a frame: vertical movement or ganes transver sal being provided on the frame, in order to adjust it. height and position of the various elements independently of each other, for example in curved tracks. 3 Machine suivant la revendication Il, ca ractérisée en ce qu'un transporteur est installé sous la partie supérieure des exca vateurs et conduit le ballast déchargé dans un crible placé sur la poutre rigide. 4 Machine suivant la revendication II et la sous-revendication 2, caractérisée en ce qu'une trémie est placée sous le crible pour recevoir les matériaux éliminés, et comporte une ouverture de déchargement déversant lesdits matériaux sur un trans porteur. 5 Machine suivant la revendication II, ca ractérisée en ce qu'un transporteur rece vant les matériaux éliminés est disposé transversalement par rapport à la poutre, et est animé d'une grande vitesse, afin de rejeter lesdits matériaux hors de la voie. 3 Machine according to claim II, ca ractérisée in that a conveyor is installed under the upper part of the excavators and leads the unloaded ballast in a screen placed on the rigid beam. 4 Machine according to claim II and sub-claim 2, characterized in that a hopper is placed under the screen to receive the removed materials, and comprises an unloading opening discharging said materials on a carrier. 5 Machine according to claim II, characterized in that a conveyor receiving the removed material is disposed transversely to the beam, and is driven at high speed, in order to reject said materials out of the way. 6 Machine suivant la, revendication II et la sous-revendication 2, caractérisée en ce qu'à la sortie du crible est disposé un ré servoir qui comporte deux goulottes de déversement placées en pente et sensible ment à l'aplomb de chaque rail, de telle sorte que le ballast tombant sur les rails est divisé et réparti également entre les rails. 7 Machine suivant la. revendication II, ca ractérisée en ce que lors du passage de la position de route à. la position de tra vail, le train de roulement ordinaire pour rails est enlevé, le wagon-crible progres sant ensuite sur le ballast même pendant le travail d'épuration par l'intermédiaire de trains de chenilles encadrant les tra verses. 6 Machine according to claim II and sub-claim 2, characterized in that at the outlet of the screen is disposed a tank which comprises two discharge chutes placed on a slope and substantially directly in line with each rail, such that the ballast falling on the rails is divided and evenly distributed among the rails. 7 Machine according to. claim II, characterized in that when changing from the road position to. In the working position, the ordinary undercarriage for rails is removed, the screen car then progressing over the ballast even during the purification work by means of crawlers framing the sleepers. 8 Machine suivant la revendication II, ca ractérisée en ce que les excavateurs sont montés sur des châssis extensibles coulis sants, qui peuvent être repliés pour dé gager le gabarit de la voie en position de route. 8 Machine according to claim II, ca ractérisée in that the excavators are mounted on sliding extensible frames, which can be folded to release the gauge from the track in the road position. 9 Machine suivant la revendication II, ca ractérisée en ce que le wagon-crible est complété par un .dispositif égalisateur, ni veleur et compresseur de ballast, agissant pour répartir uniformément, niveler et comprimer le ballast épuré, avant la dces- cente de la voie, de telle façon que celle- ci subisse un garnissage immédiat sous traverses avec le ballast épuré. 10 Machine suivant la revendication II, ca ractérisée en ce que chacun des appareils pour la préhension et le soulèvement de la voie est constitué par une pince à char nière pourvue de galets, et susceptible de pivoter autour d'un axe perpendiculaire aux rails. 9 Machine according to claim II, characterized in that the screen wagon is completed by an equalizer device, neither veleur and compressor of ballast, acting to uniformly distribute, level and compress the purified ballast, before the decline of the track, in such a way that it undergoes immediate lining under sleepers with the purified ballast. 10 Machine according to claim II, characterized in that each of the devices for gripping and lifting the track is constituted by a hinge clamp provided with rollers, and capable of pivoting about an axis perpendicular to the rails.
CH159346D 1930-07-28 1931-06-01 Process and machine for the continuous purification of railway ballast. CH159346A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR159346X 1930-07-28
FR20131X 1931-01-02

Publications (1)

Publication Number Publication Date
CH159346A true CH159346A (en) 1933-01-15

Family

ID=26182468

Family Applications (1)

Application Number Title Priority Date Filing Date
CH159346D CH159346A (en) 1930-07-28 1931-06-01 Process and machine for the continuous purification of railway ballast.

Country Status (1)

Country Link
CH (1) CH159346A (en)

Similar Documents

Publication Publication Date Title
CH620005A5 (en)
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
FR2596453A1 (en) METHODS AND APPARATUS FOR TRANSPORTING AND LOADING MATERIALS, IN PARTICULAR IN MINES
EP0355240B1 (en) Train for renewing a railway track
FR2473575A1 (en) MOBILE INSTALLATION FOR SANITATION OF INFRASTRUCTURE OF RAILWAYS AND METHOD FOR PERFORMING SANITATION USING SUCH FACILITY
FR2532968A1 (en) TOOL ARRANGEMENT FOR BOTTOM UNDER BOTTOM, LEVELING AND LATERAL DRESSING OF A RAILWAY
FR2476708A1 (en) MOBILE ASSEMBLY FOR CLEANING THE RAILWAY BALLAST LAYER AND CLEANING METHOD USING SUCH AN ASSEMBLY
FR2968017A1 (en) PROCESS FOR CONSTRUCTING RAILWAY.
FR2666102A1 (en) MACHINE FOR REPLACING THE RAILS OF A RAILWAY TRACK.
EP0971071B1 (en) Method and device for laying railway track elements using a tracked vehicle
EP0021987B1 (en) Machine for driving underground galleries
FR2553124A1 (en) ROLLING MACHINE FOR STOCKING, LEVELING, AND RAIL TRACKING
FR2562572A1 (en) ROLL-UP SYSTEM AND METHOD FOR RECEIVING AND / OR INSTALLING RAILWAY WORKS
FR2585006A1 (en) MOVABLE CARRIER-ELEVATOR, IN PARTICULAR FOR OPEN MINES
HU184423B (en) Track constructing machine with rubblework unloading and plaining device
EP0505240B1 (en) Device for placing and replacing rail components and procedure for using this device
CA1182135A (en) Method and installation for the packaging of cast iron bell and spigot pipes
FR2556752A1 (en) FERTILIZED RAILWAY MOPPING MACHINE CONTINUOUSLY CONTINUOUSLY
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
CH159346A (en) Process and machine for the continuous purification of railway ballast.
WO2015025092A1 (en) Method for replacing rails and associated railway vehicles
BE380237A (en)
US2186059A (en) Fine-grading machine
CH651338A5 (en) RAILWAY SITE MACHINE FOR REPLACING A SECTION OR MOUNTED TRACK APPARATUS.
FR2546925A1 (en) Multi-chassis rail track laying and dismantling machine