CH155370A - System for heating and hot water generation. - Google Patents

System for heating and hot water generation.

Info

Publication number
CH155370A
CH155370A CH155370DA CH155370A CH 155370 A CH155370 A CH 155370A CH 155370D A CH155370D A CH 155370DA CH 155370 A CH155370 A CH 155370A
Authority
CH
Switzerland
Prior art keywords
heating
boiler
reheater
preheater
boilers
Prior art date
Application number
Other languages
German (de)
Inventor
Ebersold Paul
Original Assignee
Ebersold Paul
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ebersold Paul filed Critical Ebersold Paul
Publication of CH155370A publication Critical patent/CH155370A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/08Hot-water central heating systems in combination with systems for domestic hot-water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

  

  Anlage zum Heizen und zur     Warmwassererzeugung.       Gegenstand vorliegender Erfindung ist  eine Anlage zum Heizen     und    zur Warm  wassererzeugung, die eine Zentralheizung  und mehrere Boiler aufweist und bei welcher  die Zentralheizung mindestens zeitweise zur       Warmwasserbereitung    herangezogen     wird,     dadurch gekennzeichnet, dass die     Zentral-          beizung    an einen als     Vorwärmer    dienenden  Boiler angeschlossen ist, derart, dass das  Heizmedium nicht mit dem Wasser des  Boilers in Berührung kommt, und dass dieser  Boiler mit mindestens einem weiteren, als  Nachwärmer dienenden, mit einer andern  Wärmequelle versehenen Boiler in Verbin  dung steht.

    



  Beiliegende Zeichnung stellt mehrere       Ausführungsbeispiele    des Erfindungsgegen  standes dar, und zwar zeigt jede Figur ein  Ausführungsbeispiel.  



  In der Anlage nach     Fig.    1 sind zwei ge  schlossene, zylindrische, senkrecht gestellte  Boiler 1 und 2 vorhanden, wovon in den  ersten, als     Vorwärmer    benützten     Boiler    ein  von einer Zentralheizung der Anlage gespie-         sener    zylindrischer Hohlkörper 3 eingebaut  ist, während in den zweiten als Nachwärmer  dienenden Boiler ein elektrischer Heizkörper  eingebaut ist. Das     Heizmedium    der Zen  tralheizung kommt, wie ersichtlich, mit dem  Wasser des Boilers 1, an welchem die Zen  tralheizung angeschlossen ist, nicht in Berüh  rung. Beide Boiler sind mit     Wärmeschutz-          masse    5 umgeben.

   Der     Iialtwassereintritt    ist  bei 6 im     Vorwärmer    und der     Warmwasser-          austritt    bei 7 im Nachwärmer angeordnet.  Ein Rohr 8 verbindet das obere Ende des       Vorwärmers    mit dem untern Ende des     Nach-          wärmers.     



  Dadurch dass das Heizmedium der Zen  tralheizung mit dem Wasser des Boilers 1  nicht in Berührung kommt. wird erreicht,  dass die billigere Heizwirkung der Zentral  heizung ungehindert zur Geltung gelangen  kann und der teureren     Heizart    durch den  elektrischen Strom nur so weit zu wirken  verbleibt, als zur Ergänzung für das Errei  chen der gewünschten Temperatur des Warm  wassers nötig ist.

        Der Unterschied der Anlage nach     Fig.    2  gegenüber     derjenigen    nach     Fig.    1 besteht  darin, dass der als     Vorwärmer    dienende Boiler  1 einen von der Zentralheizung erwärmten,  den     Wasseraum    des Boilers umgebenden  Hohlraum 9 besitzt, während der als Nach  wärmer dienende Boiler 2 eine von einem  Gasbrenner 10 erhitzte Rohrschlange 11 auf  weist. Der Hohlraum 9 und die Rohrschlan  gen 11 dienen zur Erwärmung der beiden  Boiler.  



  Die in     Fig.    3 dargestellte Anlage weist  zwei liegende Boiler 1 und 2 auf, welche     mit-          telst    Rohrschlangen erhitzt werden. Der als       Vorwärmer    dienende Boiler 1 wird durch die  von der Zentralheizung     gespiesene    Rohr  schlange 12 und der als Nachwärmer die  nende Boiler 2 durch die von einem beliebi  gen Heizmittel, zum Beispiel Hohle, Gas,  Dampf oder Elektrizität, erwärmte Schlange  13 geheizt.  



  In der Anlage nach     Fig.    4 sind zwei senk  recht gestellte Boiler verwendet, der als Vor  wärmer dienende Boiler 1, der mittelst einer  von der Zentralheizung     gespiesenen    Rohr  schlange 14 geheizt wird und der als Nach  wärmer dienende Boiler 2, der mittelst einem  den Wasserraum desselben umgebenden  Hohlraum 15, welcher von einem     Heizelement     16 seine Wärme empfängt, geheizt wird.  Dieses     Heizelement    kann elektrisch oder mit  Gas oder mit Dampf geheizt sein.  



  In     Fig.    5 endlich ist der senkrecht ge  stellte zylindrische, als     Vorwärmer    dienende  Boiler 1 mit Rippen 17 versehen, während  der als Nachwärmer dienende Boiler 2 durch  einen darin eingebauten zylindrischen Hohl  körper 18 erwärmt wird. Der Boiler 1 kann       ninden    oder ovalen Querschnitt aufweisen.  



  Bei den Ausführungsformen nach     Fig.    6  und 7 sind der senkrecht angeordnete Vor  wärmer 1 und der Nachwärmer 2 durch     mit-          telst        Abschlussorganen    19     absperrbare        Bei-          pa.ssleitungen    20 verbunden. Diese     Beipass-          leitungeri    verbinden einerseits den Auslauf  des     Vorwärmers    direkt mit dem des     Nach-          wärmers    und den Einlauf des     Vorwärmers     direkt mit dem Einlauf des Nachwärmers.

      Auch das die beiden Rohrverzweigungen 20  verbindende Rohr besitzt ein     Abschlussorgan     21. Die Heizung des     Vorwärmers    geschieht  bei beiden Ausführungsformen durch einen  von der Zentralheizung geheizten Mantel 22.  Bei der Ausführungsform nach     Fig.    7 wird  das     Heizmedium    im Mantel 22     .durch    ein  gebaute Metallstreifen     23    zu einer schrau  benförmigen Bewegung gezwungen. Bei bei  den     Ausführungsformen    geschieht die Hei  zung des Nachwärmers 2 durch ein     Heizele-          ment    24.  



  Die in den     Fig.    6 und 7 dargestellten An  lagen können durch Betätigen von Ventilen  vom Winterbetrieb zum     Sommerbetrieb    über  geführt werden, bei welchen die Zentral  heizung gewöhnlich, ausser Tätigkeit ist.  



  Für den Winterbetrieb sind die Ventile  19 geschlossen und ist nur das     Ventil    21 ge  öffnet, so dass der normale Betrieb mit in  Reihe geschalteten Boilern stattfindet.  



  Für den Sommerbetrieb aber wird Ven  til 21 geschlossen, also das Rohr 8 abgesperrt,  die Ventile 19 dagegen stehen offen. Die bei  den Boiler sind also parallel geschaltet. Da  durch wird der     Vorwärmer    1 als Wärme  speicher benutzt, indem seine Wassermasse  diejenige des Nachwärmers 2 ergänzt. Es  findet nämlich zwischen den beiden Boilern  eine Wasserzirkulation statt, welche bestrebt  ist, die Temperatur des kälteren     Vorwärmers     auf diejenige des Nachwärmers 2 zu bringen,  so dass die in den     Vorwärmer    1 aufgespei  cherte Wärme in Zeiten eines Stossbetriebes  der Anlage zustatten kommt.  



  In     Fig.    7 ist ein Warmwasserkessel 25  der Zentralheizung angedeutet, wobei mit 26  das Steigrohr und mit 27 das Fallrohr des  Wassers bezeichnet ist.  



  In der Anlage nach     Fig.    8 sind ausser  dem von einer Zentralheizung 14 geheizten,  als     Vorwä.rmer    dienenden Boiler 1 zwei als  Nachwärmer dienende Boiler 2' und 22 vor  gesehen, welche durch Rohrleitungen und  Abschlüsse parallel oder hintereinander ge  schaltet werden können oder aber es kann der  Elektroboiler 21 oder der Gasboiler 22 jeder  für sich ausgeschaltet werden.      Diese Anordnung bezweckt folgende Be  triebsmöglichkeiten:  1. Im Winter können alle Boiler in Be  trieb gehalten werden, indem durch Abschluss  der Ventile     19i,   <B>19'</B> die drei Boiler 1, 2' und  23 in Reihe geschaltet werden. Die Ventile  21' und 212 bleiben dann offen.  



  2. Im Sommerbetrieb fällt die Zentral  heizung 14 aus und wird das Ventil 21' ge  schlossen, und die Ventile 191 geöffnet, so  dass der     Vorwärmer    wiederum als Wärme  speicher     dient.     



  3.     Die    Boiler 2' und     22    können aber jeder  für sich ausgeschaltet werden und es kann  am     Tagei    zur Zeit des teureren elektrischen  Betriebes durch Schliessen der obern Ventile  <B>191,</B> 192 und der Ventile     .211,    212 und Öffnen  der untern Ventile     19i,   <B>19'</B> nur der Gasboiler  betrieben werden, während der billigen Nach  stromzeit aber nur der Elektroboiler 2' be  trieben werden durch Schliessen der Ventile  211, 212, unteres Ventil 192,

   oberes Ventil<B>19'</B>  und Öffnen des untern Ventils 191 und des  obern Ventils     19Z.       In der Anlage nach     Fig.    9 sind ausser dem  indirekt von einem     Zentralheizungskessel    aus  mittelst eines Wassermantels 22 heizbaren       Vorwärmer    1 zwei mittelst Gas heizbare  Nachwärmer 21 und 22 vorgesehen.

   Der  zweite Nachwärmer ist in der Nähe .der Zapf  stellengruppe<B>30'</B> angeordnet und durch  eine Leitung 30 mit der vom     Vorwärmer    1  und dem ersten Nachwärmer 2'     gespiesenen     Hauptsteigleitung 20 für das Nutzwasser an  geschlossen, welch letztere die Zapfstellen  gruppe 30' bedient.     Vorwärmer    1 und Nach  wärmer 2' sind wiederum durch ein von  einem Absperrventil 21'     unterbrochenen    Rohr  8' verbunden und ist das Steigrohr 20 mit  dem obern Teil dieses Rohres durch eine     mit-          telst    eines Ventils 192 absperrbare     Beipasslei-          tung    20' verbunden.

   Ebenso verbindet eine  mittelst eines Ventils 19' absperrbare Bei  passleitung 20' den untern Teil des Rohres 8  mit dem     Kaltwasserspeiserohr    20  des Vor  wärmers; welch letzteres durch ein Ventil 19   absperrbar ist.    Zwischen das Speiserohr 261 und das       Rücklaufrohr        271    des     Vorwärmernnantels    ist  ein zusätzlicher und elektrisch geheizter  Boiler     2,

  5'    vorgesehen und ausser \dem für  diesen Boiler bestimmten elektrischen Heiz  körper 4' ist noch ein elektrischer     Heizkörper     42 für den     Vorwärmer    1 vorgesehen und ein  Absperrventil 26  für das Speiserohr des Vor  wärmers zwischen dem Steigrohr 26 und dem  Verbindungsrohr mit Boiler<B>25'.</B> In letzteres  ist ein weiteres Absperrventil     25     eingebaut.  



  Mit dieser Anordnung sind namentlich  folgende Möglichkeiten gegeben:  Im Winter kann das Maximum der       Warmwasserbereitung    erhalten werden durch  den Betrieb aller Heizstellen, wobei die Ven  tile     2'5 ,    26  , 19 , 21' geöffnet und die Ven  tile 191 und<B>19'</B> geschlossen werden müssen.  



  Im Sommer wird am Tag mit Vorteil nur  mit Gas geheizt, während der Zentralheiz  kessel ausser Betrieb steht, wobei die Ventile       21i,    25  und '2I6  geschlossen, und die Ventile  19 ,     19i,    192 geöffnet sind.  



  Des Nachts wird nur mit dem billigen  elektrischen Nachtstrom geheizt, wobei die  Ventile     26 ,    19'., 21' geschlossen. aber die  Ventile 19 , 25  und<B>19'</B> geöffnet sind.  



  Ist die Gasheizung in Betrieb so wird die       Zapfenstellengruppe    30' speziell durch den  Nachwärmer 2' und die Gruppe 302 durch  den Nachwärmer 22 bedient, was beim Aus  fall der einen oder andern Gruppe als Er  sparnis gelten kann.  



  Es könnten auch der Gruppenzahl der  Zapfstellen entsprechend mehr als zwei lach  wärmer vorgesehen sein. Bei allen den be  schriebenen Anordnungen kommt das Reiz  medium der Zentralheizung, welches Luft,       \Vasser    oder Dampf sein kann, mit dem  Wasser der beiden, als Vor- und     Nachwärmer     arbeitenden Boiler nicht in Berührung.



  System for heating and hot water generation. The subject of the present invention is a system for heating and hot water generation, which has a central heating system and several boilers and in which the central heating system is used at least temporarily for hot water preparation, characterized in that the central heating system is connected to a boiler serving as a preheater that the heating medium does not come into contact with the water in the boiler, and that this boiler is connected to at least one additional boiler which is used as a reheater and is provided with another heat source.

    



  The accompanying drawing shows several embodiments of the subject matter of the invention, each figure shows an embodiment.



  In the system according to FIG. 1 there are two closed, cylindrical, vertically positioned boilers 1 and 2, of which a cylindrical hollow body 3 fed by a central heating system is installed in the first boiler used as a preheater, while in the second An electric heater is built in to serve as a reheater boiler. As can be seen, the heating medium of the central heating does not come into contact with the water in the boiler 1 to which the central heating is connected. Both boilers are surrounded by heat protection compound 5.

   The cold water inlet is arranged at 6 in the preheater and the hot water outlet at 7 in the reheater. A pipe 8 connects the upper end of the preheater to the lower end of the reheater.



  Because the heating medium of the central heating does not come into contact with the water in the boiler 1. What is achieved is that the cheaper heating effect of the central heating can be used unhindered and the more expensive type of heating due to the electric current only remains effective as far as is necessary to supplement the desired temperature of the hot water.

        The difference between the system according to FIG. 2 and that according to FIG. 1 is that the boiler 1 serving as a preheater has a cavity 9 that is heated by the central heating and surrounding the water space of the boiler, while the boiler 2 serving as an after-warmer has one of a Gas burner 10 heated coil 11 has. The cavity 9 and the Rohrschlan gene 11 are used to heat the two boilers.



  The system shown in FIG. 3 has two horizontal boilers 1 and 2, which are heated by means of pipe coils. The boiler 1 serving as a preheater is heated by the pipe snake 12 fed by the central heating system and the boiler 2 as a reheater is heated by the snake 13 heated by any heating means, for example cave, gas, steam or electricity.



  In the system according to Fig. 4, two vertically placed boilers are used, the boiler 1 serving as a warmer before, which is heated by means of a pipe fed by the central heating coil 14 and the boiler 2 serving as an after warmer, the same by means of a water room surrounding cavity 15, which receives its heat from a heating element 16, is heated. This heating element can be heated electrically or with gas or steam.



  In Fig. 5, finally, the vertically ge provided cylindrical boiler 1 serving as a preheater is provided with ribs 17, while the boiler 2 serving as a reheater is heated by a cylindrical hollow body 18 built therein. The boiler 1 can have a small or oval cross-section.



  In the embodiments according to FIGS. 6 and 7, the vertically arranged pre-heater 1 and the post-heater 2 are connected by auxiliary lines 20 which can be shut off by means of closing elements 19. These bypass lines connect the preheater outlet directly to that of the reheater and the preheater inlet directly to the reheater inlet.

      The pipe connecting the two pipe branches 20 also has a terminating element 21. In both embodiments, the preheater is heated by a jacket 22 heated by the central heating. In the embodiment according to FIG. 7, the heating medium in jacket 22 is closed by a built-in metal strip 23 forced a helical movement. In the embodiments, the reheater 2 is heated by a heating element 24.



  The systems shown in Figs. 6 and 7 can be performed by operating valves from winter operation to summer operation, in which the central heating is usually out of action.



  For winter operation, the valves 19 are closed and only the valve 21 is opened, so that normal operation takes place with boilers connected in series.



  For summer operation, however, Ven valve 21 is closed, so the pipe 8 is shut off, the valves 19, however, are open. The boilers are connected in parallel. Since the preheater 1 is used as a heat store by adding its water mass that of the reheater 2. There is namely a water circulation between the two boilers, which strives to bring the temperature of the colder preheater to that of the reheater 2 so that the heat stored in the preheater 1 is beneficial in times of burst operation of the system.



  In Fig. 7, a hot water boiler 25 of the central heating is indicated, with 26 the riser and 27 the downpipe of the water is designated.



  In the system according to FIG. 8, apart from the boiler 1, which is heated by a central heating system and serving as a preheater, two boilers 2 'and 22 serving as reheaters are seen, which can be switched in parallel or one behind the other by pipelines and closures or else it the electric boiler 21 or the gas boiler 22 can be switched off individually. This arrangement aims at the following operating options: 1. In winter, all boilers can be kept in operation by connecting the three boilers 1, 2 'and 23 in series by closing off the valves 19i, 19'. The valves 21 'and 212 then remain open.



  2. In summer operation, the central heating 14 fails and the valve 21 'is closed and the valves 191 opened so that the preheater in turn serves as a heat store.



  3. The boilers 2 'and 22 can, however, be switched off individually and during the day during the more expensive electrical operation, by closing and opening the upper valves 191, 192 and valves 211, 212 of the lower valves 19i, <B> 19 '</B> only the gas boiler can be operated, but only the electric boiler 2' can be operated during the cheap after-current time by closing the valves 211, 212, lower valve 192,

   upper valve <B> 19 '</B> and opening of the lower valve 191 and the upper valve 19Z. In the system according to FIG. 9, in addition to the preheater 1 which can be indirectly heated by a central heating boiler by means of a water jacket 22, two reheaters 21 and 22 which can be heated by gas are provided.

   The second reheater is located near the tap group <B> 30 '</B> and is connected by a line 30 to the main riser 20 for the utility water fed by the preheater 1 and the first reheater 2', the latter being the taps group 30 'served. Preheater 1 and downstream heater 2 'are in turn connected by a pipe 8' interrupted by a shut-off valve 21 'and the riser pipe 20 is connected to the upper part of this pipe by a bypass line 20' that can be shut off by means of a valve 192.

   Likewise, a means of a valve 19 'closable at pass line 20' connects the lower part of the pipe 8 with the cold water feed pipe 20 of the preheater; which latter can be shut off by a valve 19. Between the feed pipe 261 and the return pipe 271 of the preheater jacket is an additional and electrically heated boiler 2,

  5 'and in addition to the electric heater 4' intended for this boiler, there is also an electric heater 42 for the preheater 1 and a shut-off valve 26 for the feed pipe of the preheater between the riser 26 and the connecting pipe with boiler 25 '. </B> A further shut-off valve 25 is installed in the latter.



  With this arrangement, the following possibilities are given: In winter, the maximum hot water generation can be obtained by operating all heating points, with the valves 2'5, 26, 19, 21 'open and the valves 191 and 19' </B> must be closed.



  In summer, during the day it is advantageous to only heat with gas, while the central heating boiler is out of operation, with valves 21i, 25 and '2I6 closed and valves 19, 19i, 192 open.



  At night it is only heated with the cheap electric night power, with the valves 26, 19 '., 21' closed. but the valves 19, 25 and <B> 19 '</B> are open.



  If the gas heater is in operation, the tap point group 30 'is specifically served by the reheater 2' and the group 302 by the reheater 22, which can be considered as savings if one or the other group fails.



  It could also be provided corresponding to the number of groups of taps more than two laugh warmer. In all of the arrangements described, the stimulus medium of the central heating, which can be air, water or steam, does not come into contact with the water of the two boilers that work as pre- and post-heaters.

 

Claims (1)

PATENTANSPRUCH: Anlage zum Heizen und zur @Varm- wassererzeugung, die eine Zentralheizung und mehrere Boiler aufweist und bei welcher die Zentralheizung mindestens zeitweise zur Warmwassererzeugung herangezogen wird, dadurch gekennzeichnet, dass die Zentralhei zung an einen als- Vorwärmer dienenden Boiler angeschlossen ist, derart, dass das Heizmedium nicht mit dem Wasser des Boilers in Berührung kommt, und dass dieser Boiler mit mindestens einem weiteren, als Nachwärmer dienenden, mit einer andern Wärmequelle versehenen Boiler in Verbin dung steht. UNTERANSPRÜCHE: 1. PATENT CLAIM: System for heating and for hot water generation, which has a central heating system and several boilers and in which the central heating system is used at least temporarily to generate hot water, characterized in that the central heating system is connected to a boiler serving as a preheater, such as that the heating medium does not come into contact with the water in the boiler, and that this boiler is connected to at least one additional boiler, which is used as a reheater and is provided with another heat source. SUBCLAIMS: 1. Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass für die Erwärmung des Vorwärmers ein darin eingebauter, zylin drischer Hohlkörper vorgesehen ist und für die Erwärmung des Nachwärmers ein in demselben eingebauter elektrischer Heizkörper. \?. Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass für die Erwärmung des Vorwärmers ein den Wasserraum dessel ben umgebender Hohlraum vorgesehen ist und für die Erwärmung des Nachwärmers eine durch direkte Heizung erwärmte Rohrschlange. 3. System according to patent claim, characterized in that a cylindrical hollow body built into it is provided for heating the preheater and an electric heater built into the same is provided for heating the reheater. \ ?. System according to claim, characterized in that a cavity surrounding the water space is provided for heating the preheater and a pipe coil heated by direct heating is provided for heating the reheater. 3. Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass-für die Erwärmung so wohl des Vorwärmers, als auch des Nach- wärmers Rohrschlangen vorgesehen sind. 4. Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass für die Erwärmung des Vorwärmers eine Rohrschlange und für die Erwärmung des Nachwärmers ein den Wasserraum desselben umgebender Hohl körper vorgesehen ist. 5. Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass der Vorwärmer mit Rippen versehen ist, und dass für die Er wärmung des Nachwärmers ein in diesen eingebauter, zylindrischer Hohlkörper vor gesehen ist. 6. System according to patent claim, characterized in that coils are provided for heating both the preheater and the post-heater. 4. Plant according to claim, characterized in that a pipe coil for heating the preheater and a hollow body surrounding the water space is provided for heating the reheater. 5. Plant according to claim, characterized in that the preheater is provided with ribs, and that a built-in cylindrical hollow body in this is seen in front of the heating of the reheater. 6th Anlage nach Patentanspruch, dadurch ge kennzeichnet, dass sowohl die Einläufe, als auch die Ausläufe der beiden Boiler je unter sich verbunden sind, dass die beiden Verbindungsleitungen unter sich ebenfalls verbunden sind, und da,ss Abschlussorgane in den als Beipässe benützten Verbin dungsleitungen angeordnet sind, so dass die beiden Boiler sowohl in Reihe, als auch parallel geschaltet werden können. 7. System according to patent claim, characterized in that both the inlets and the outlets of the two boilers are each connected to each other, that the two connecting lines are also connected to each other, and that closing organs are arranged in the connecting lines used as bypasses so that the two boilers can be connected in series as well as in parallel. 7th Anlage nach Patentanspruch, mit zwei Nachwärmern, dadurch.gekennzeichnet,dass sowohl die Einläufe, als auch die Aus läufe der beiden Nachwärmer je unter sich verbunden sind, dass die beiden Verbin dungsleitungen unter sich ebenfalls ver bunden sind, dass der eine Nachwärmer ein Elektroboiler und der andere ein Gas boiler ist, und dass alle Boiler in Reihe ge schaltet werden können und auch je nach der Betriebszeit ein Boiler ausgeschaltet werden kann. B. Anlage nach Patentanspruch, mit mehr als einem Nachwärmer, dadurch Bekenn zeichnet, dass jeder Nachwärmer je einer bestimmten Gruppe von Zapfstellen zu geteilt ist, und dass der Vorwärmer ausser durch die Zentralheizung sowohl direkt, als indirekt durch elektrische Heizkörper heizbar gemacht ist. System according to claim, with two reheaters, characterized in that both the inlets and the outlets of the two reheaters are connected to each other, that the two connecting lines are also connected, that one reheater is an electric boiler and the other is a gas boiler and that all boilers can be connected in series and one boiler can also be switched off depending on the operating time. B. System according to claim, with more than one reheater, characterized in that each reheater is divided into a certain group of taps, and that the preheater is made heatable both directly and indirectly by electric radiators except through the central heating.
CH155370D 1931-05-05 1931-05-05 System for heating and hot water generation. CH155370A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH155370T 1931-05-05

Publications (1)

Publication Number Publication Date
CH155370A true CH155370A (en) 1932-06-30

Family

ID=4409884

Family Applications (1)

Application Number Title Priority Date Filing Date
CH155370D CH155370A (en) 1931-05-05 1931-05-05 System for heating and hot water generation.

Country Status (1)

Country Link
CH (1) CH155370A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1404915B1 (en) * 1957-03-08 1971-01-21 Alfred Eckerfeld Electrically heated instantaneous water heater with two flow systems connected in series
DE2047128A1 (en) * 1969-11-06 1971-05-13 Saunier Duval S A , Paris Temperature stabilizer for Sam tann installations
NL1000210C2 (en) * 1995-04-24 1996-10-25 Apparatenfabriek Warmtebouw B Combi boiler with improved performance.

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1404915B1 (en) * 1957-03-08 1971-01-21 Alfred Eckerfeld Electrically heated instantaneous water heater with two flow systems connected in series
DE2047128A1 (en) * 1969-11-06 1971-05-13 Saunier Duval S A , Paris Temperature stabilizer for Sam tann installations
NL1000210C2 (en) * 1995-04-24 1996-10-25 Apparatenfabriek Warmtebouw B Combi boiler with improved performance.
EP0740113A1 (en) * 1995-04-24 1996-10-30 Apparatenfabriek Warmtebouw B.V. Combined heating boiler with improved performance

Similar Documents

Publication Publication Date Title
EP0288695B1 (en) Condensing boiler and method for its operation
DE2919524A1 (en) PLANT FOR THE GENERATION OF THERMAL ENERGY USING THE SUNWATER
EP0098450B1 (en) Fuel-fired heat source
CH155370A (en) System for heating and hot water generation.
DE102006023627A1 (en) Solar plant has primary circuit, provided with solar collector as heat exchanger device for changing solar energy into heat energy for heating fluids, where secondary heat exchanger separates primary circuit from secondary circuit
DE3308447C2 (en) Device for generating hot water
DE1951487A1 (en) Central heating system with electric water heater
DE2301832A1 (en) CONTROL DEVICE FOR A CENTRAL HEATING SYSTEM
DE633144C (en) Steam generator with indirect heating
DE962080C (en) Steam boiler system with several waste heat boilers
EP0611923B1 (en) Method for the control of legionnella in hot water installations with an accumulator
AT207970B (en) Electrically heated hot water tank
DE10114990B4 (en) Heating and hot water system for buildings
DE2827166C2 (en) Hot water system
DE694683C (en) Hot water heating system with an electrically heated water storage tank
DE2932125A1 (en) Heating system with two fluid media - has two separate passages with one connected to heat pump in each radiator unit
DE595395C (en) Combined hot water heating and hot water supply system
AT259815B (en) Gas-heated circulation water heater
DE437534C (en) Boiler system with device for regulating the hot steam temperature
DE1018439B (en) Process for temperature control of steam-heated heat exchangers of all kinds
DE29614057U1 (en) Heat exchanger for attachment to a commercially available tumble dryer to run the drying process with solar heat
EP0621450A2 (en) Method and apparatus for heating domestic hot water
DE9304889U1 (en) Multipurpose storage
DE1454427C (en) Collective heating system
DE102018002690A1 (en) Method and device for heating drinking water