Method and device for the production of walls and wall plaster by spraying mortar.

Info

Publication number
CH102924A
CH102924A CH102924DA CH102924A CH 102924 A CH102924 A CH 102924A CH 102924D A CH102924D A CH 102924DA CH 102924 A CH102924 A CH 102924A
Authority
CH
Switzerland
Prior art keywords
mortar
ready
container
hose
production
Prior art date
Application number
Other languages
German (de)
Inventor
A-G Baur Cie
Original Assignee
Baur & Cie A G
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baur & Cie A G filed Critical Baur & Cie A G
Publication of CH102924A publication Critical patent/CH102924A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements
    • E04F21/12Mechanical implements acting by gas pressure, e.g. steam pressure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

  

  Verfahren und Einrichtung zur Herstellung von     Wänden    und     Wandverputz     durch Aufspritzen Fon Mörtel.    Die bisher in der Technik bekannten Ver  fahren und Vorrichtungen zum Errichten von  Mauerwerk bezw. zur Herstellung von Wand  verputz durch Aufspritzen von Mörtel gegen  eine nachher wegzunehmende Schalung oder  gegen eine Wand, gehen von zwei grund  sätzlich verschiedenen Ausgangspunkten aus.

    Bei dem einen Verfahren wird der fertig ge  mischte Mörtel (hauptsächlich Zement, Sand  und Wasser), der sich in einem geschlossenen  Behälter befindet, durch Einführung von  Druckluft in diesen Behälter durch die Aus  trittsöffnung desselben und den anschliessen  den Förderschlauch hindurch zur Arbeitsstelle  unter Überdruck gepresst und nach Austritt  aus dem Schlauch an der Arbeitsstelle in  folge der Expansion der Druckluft zerspritzt.  



  Dieses Arbeitsverfahren und die hierzu  dienenden Einrichtungen erfordern für einen       kontinuierlichen,    ununterbrochenen Betrieb  komplizierte maschinelle Einrichtungen, die  der Erfüllung der Forderung grösster Orts  beweglichkeit an der Baustelle erschwerend  im Wege stehen und damit die Anwendbar  keit des Verfahrens in einer grossen Anzahl    von Betriebsfällen     unmöglich    machen. Es  kommt dabei noch hinzu, dass infolge der  verhältnismässig geringen Geschwindigkeit,  mit welcher der unter Überdruck stehende  Mörtel durch den     Förderschlauch    hindurch  gepresst wird, Verstopfungen dieses     Schläu-          ches    infolge Erhärtung der längs der  Schlauchwandung gleitenden Mörtelteilchen  nicht selten sind.

    



  Die zweite Gruppe von Verfahren ver  zichtet auf die Unterbringung des     Mörtels     oder der Mörtelbestandteile in einem geschlos  senen, unter Überdruck stehenden Behälter,  versucht vielmehr den Mörtel oder die Mörtel  bestandteile aus offenem Behälter zu ent  nehmen     und    .am Austritt dieses Behälters den  Mörtel oder die     Mörtelbestandteile    durch     me-    "       chanische    oder     pneumatische        Hilfsmittel    zur       Arbeitsstelle    zu fördern.  



  Wegen der     Schwierigkeit,    den fertig ge  mischten Mörtel -aus offenem Behälter durch  einen     anschliessenden    Förderschlauch hin=  durch     in        Strahlf        orm    zu leiten, ging man da  bei meist so vor,     däss    die einzelnen Mörtel=  Bestandteile     (Trookenuestandteile    "und Flüs-      sigkeit)

   für sich getrennt durch F örder  s     e        hläue        he        hindurch        zur        Arbeitsstelle        geleitet     und dann unmittelbar erst vor der Arbeits  stelle zur Bildung des fertig gemischten Mör  tels zusammengeführt wurden. Das hat den  Nachteil, dass die Mörtelbildung unmittelbar  vor der Arbeitsstelle keine vollkommene ist  und vor allen Dingen nur schwer geregelt  werden kann.  



  Der     Vorschlag,    fertig gemischten Mörtel  aus offenem, unter normalem Luftdruck  stehenden Behälter zu entnehmen und in  Strahlform durch den anschliessenden     Förder-          schlauch    hindurch zu leiten, hat bisher nur  eine Form der Verwirklichung erlangt, wo  bei als Förder- und Strahlbildungsmittel die  Kombination eines mechanischen und eines  pneumatischen Mittels gewählt wurde, näm  lich einer in bestimmter Weise gestalteten  Förderschnecke, welche den Mörtel aus dem  offenen Mörtelbehälter entnimmt, und einer  vor Eintritt in den Fördersehlauch angeord  neten     Expansionsdüse    für     Druckluft,

      in  deren Expansionsquerschnitt die     Förder-          schnecke    den aus dem offenen Behälter ent  nommen, fertig gemischten Mörtel schiebt,  wo er angesaugt und in Strahlform beschleu  nigt wird.  



  Dieses Verfahren ist sowohl betriebs  technisch, als auch konstruktiv den vorher  beschriebenen Arbeitsverfahren und Ein  richtungen überlegen, doch immerhin noch  wegen des Zusammenwirkens von Schnecke  und     Expansionsdüse    und des erforderlichen  besonderen Antriebes der     Schnecke    relativ  umständlich.  



  Das Verfahren gemäss der vorliegenden  Erfindung besteht nun darin, dass der in  einem offenen, unter gewöhnlichemLuftdruck  befindlichen Behälter untergebrachte, fertig  gemischte Mörtel der Expansionszone einer  Düse für ein pneumatisches Fördermittel,  z. B. Druckluft oder Dampf, lediglich unter  Schwerewirkung bezw. lediglich durch freien  Fall zugeleitet wird und nach Ansaugung  durch das expandierende Fördermittel durch  einen     Förderschlauch    hindurch in Strahl  form beschleunigt wird, um an dem Aus-    trittsenile des Schlauches, z. B. als zylindri  scher Strahl, von grosser     Geschwindigkeit     und folgedessen grossem dynamischen Druck  auszutreten.  



  Durch dieses Verfahren werden alle me  chanisch bewegten Teile, welche sonst für  solche Einrichtungen zum Spritzen fertig  gemischten Mörtels an der Baustelle unmit  telbar vorhanden sein mussten, beseitigt, und  wird trotzdem ein kontinuierlicher, allen Be  triebsfällen gerecht werdender     Spritzbetrieb     ermöglicht. Dabei wird der konstruktive  Aufbau .der eigentlichen Mörtelspritze der  denkbar einfachste, so dass Betriebsunter  brechungen durch Beschädigungen, z. B.  Verstopfungen des Schneckengehäuses, Fest  brennen der Schneckenwelle und so fort, aus  geschlossen sind. Lediglich eine Kompressor  anlage, die bei Grossbauten meist so wie so  vorhanden ist,     und    welche an sicherem Orte  in genügender Entfernung von der Baustelle  angeordnet sein kann, wird zur Erzeugung  des Betriebsmittels, z.

   B. der Druckluft, be  nötigt. Die Versuche haben gezeigt, dass mit  einer     derartigen    Einrichtung nach diesem  Verfahren das Spritzen fertig gemischten  Mörtels durch einen     ausreichend    langen     För-          derschlauch        hindurch    (bis zu 10 Meter) mit  grosser Geschwindigkeit und grossem     dy        na.mi-          schen    Druck ununterbrochen und ohne Ver  stopfungsgefahr möglich ist.  



  Eine Einrichtung zur Ausführung des  neuen Verfahrens ist in der Zeichnung bei  spielsweise im Vertikalschnitt veranschau  licht.  



  Es ist 1 ein oben offener Behälter zur  Aufnahme von fertig gemischtem, also ge  brauchsfertigem Mörtel, :der in demselben  unter Atmosphärendruck steht. Dieser Be  hälter hat einen trichterförmigen Auslauf 9  mit einer engsten Austrittsöffnung 10, in  welche die Expansionsdüse 7 mündet. Diese  Expansionsdüse wird von dem Druckluft  rohr 11 gespeist und ist so gestaltet,     da.ss    eine  vollkommene Expansion der Druckluft ent  sprechend dem verfügbaren     Druckgefälle     herbeigeführt     zarircl,    so dass im Austrittsquer  schnitt 10 die grösste     Cleschwindigkeit    der      expandierten Luft herrscht und damit ein  gegenüber dem offenen Füllbehälter stati  scher Unterdruck,

   durch welchen der unter  der Wirkung der Schwere in die Austritts  öffnung 10 gelangte Mörtel angesaugt, auf  grosse Geschwindigkeit beschleunigt und in  Strahlform durch den Schlauchstutzen 12  und den anschliessenden     Förderschlauch    8  hindurch zur Arbeitsstelle geleitet wird.  



  Diese Einrichtung hat den besonderen  Vorteil, dass keinerlei mechanisch bewegte  Teile vorhanden sind, dass sie infolgedessen  konstruktiv äusserst einfach ist und nur sehr  geringes Gewicht besitzt, was für eine leichte  Ortsbeweglichkeit und     vielfältigeAnwendbar-          keit    im Baubetriebe besonders erwünscht ist.



  Method and device for the production of walls and wall plaster by spraying Fon mortar. The previously known in the art Ver drive and devices for building masonry BEZW. for the production of wall plastering by spraying mortar against a formwork to be removed afterwards or against a wall, go from two fundamentally different starting points.

    In one method, the ready-mixed mortar (mainly cement, sand and water), which is in a closed container, is pressed under overpressure by introducing compressed air into this container through the outlet opening and connecting the conveying hose to the work site and after exiting the hose at the work site as a result of the expansion of the compressed air.



  This working process and the facilities used for this require complex mechanical facilities for continuous, uninterrupted operation, which make it difficult to meet the requirement of the greatest possible mobility at the construction site and thus make the applicability of the process in a large number of operational cases impossible. In addition, due to the relatively low speed at which the mortar under excess pressure is pressed through the delivery hose, blockages of this hose due to hardening of the mortar particles sliding along the hose wall are not uncommon.

    



  The second group of processes dispenses with the placement of the mortar or the mortar components in a closed, pressurized container, but rather tries to remove the mortar or the mortar components from the open container and the mortar or the mortar components at the outlet from this container to promote by mechanical or pneumatic aids to the job.



  Because of the difficulty of conveying the ready-mixed mortar from an open container through a subsequent delivery hose in the form of a jet, the procedure was usually so that the individual mortar = constituents (Trookenu constituents "and liquid)

   separately passed through the conveying pipe to the work site and then brought together immediately in front of the work site to form the ready-mixed mortar. This has the disadvantage that the mortar formation immediately in front of the work site is not perfect and, above all, it is difficult to regulate.



  The proposal to remove ready-mixed mortar from an open container under normal air pressure and to direct it in the form of a jet through the adjoining delivery hose has so far only achieved one form of implementation, where the combination of a mechanical and a jet-forming means as conveying and jet-forming means a pneumatic means was chosen, namely a certain designed screw conveyor, which removes the mortar from the open mortar container, and an expansion nozzle for compressed air arranged in front of the entry into the conveying hose,

      In its expansion cross-section, the screw conveyor pushes the ready-mixed mortar taken from the open container, where it is sucked in and accelerated in the form of a jet.



  This method is both operationally technically and structurally superior to the previously described working methods and devices, but still relatively cumbersome because of the interaction between the screw and the expansion nozzle and the special drive required for the screw.



  The method according to the present invention consists in that the ready-mixed mortar placed in an open container under normal air pressure is applied to the expansion zone of a nozzle for a pneumatic conveying means, e.g. B. compressed air or steam, BEZW only under gravity. is only supplied by free fall and after suction by the expanding conveying means is accelerated through a conveying hose in the form of a jet in order to at the outlet of the hose such. B. emerge as a cylindri cal beam, of great speed and consequently great dynamic pressure.



  This process eliminates all mechanically moving parts that otherwise had to be available directly at the construction site for such equipment for spraying ready-mixed mortar, and it still enables continuous spraying operation that meets all operational requirements. The construction of the actual mortar syringe is the simplest imaginable, so that business interruptions due to damage, e.g. B. clogging of the worm housing, burning the worm shaft and so on, are closed. Only a compressor system, which is usually present in large buildings, and which can be arranged in a safe place at a sufficient distance from the construction site, is used to generate the operating resources, e.g.

   B. the compressed air, be required. The tests have shown that with such a device according to this method the spraying of ready-mixed mortar through a sufficiently long delivery hose (up to 10 meters) at high speed and high dynamic pressure is possible without interruption and without the risk of clogging is.



  A device for carrying out the new method is illustrated in the drawing, for example in vertical section.



  It is 1 an open top container for receiving ready-mixed, so ge ready-to-use mortar: which is in the same under atmospheric pressure. This loading container has a funnel-shaped outlet 9 with a narrowest outlet opening 10 into which the expansion nozzle 7 opens. This expansion nozzle is fed by the compressed air pipe 11 and is designed in such a way that a complete expansion of the compressed air is brought about according to the available pressure gradient, so that in the outlet cross section 10 the greatest speed of the expanded air prevails and thus a compared to the open filling container static negative pressure,

   through which the mortar that has entered the outlet opening 10 under the action of gravity is sucked in, accelerated to high speed and directed in the form of a jet through the hose connector 12 and the adjoining delivery hose 8 to the work site.



  This device has the particular advantage that there are no mechanically moving parts, that as a result, it is extremely simple in construction and has only very low weight, which is particularly desirable for easy mobility and versatile applicability in construction.

 

Claims (1)

PATENTANSPRÜCHE I. Verfahren zur Herstellung von Wänden und Wandverputz durch Aufspritzen von Mörtel, dadurch gekennzeichnet, dass in einem offenen, unter gewöhnlichem Luft druck befindlichen Behälter unterge brachter, fertig gemischter Mörtel ledig lieh unter Schwerewirkung der Expan sionszone einer Düse für ein pneuma tisches Fördermittel zugeleitet wird und nach Ansaugen durch das expandierende Fördermittel durch einen Förderschlauch hindurch in Strahlform beschleunigt wird. PATENT CLAIMS I. A process for the production of walls and wall plastering by spraying mortar, characterized in that ready-mixed mortar placed in an open container under normal air pressure is fed to a nozzle for a pneumatic conveying means under gravity of the expansion zone is and is accelerated after suction by the expanding conveying means through a conveying hose in the form of a jet. II. Einrichtung zur Ausübung des Verfah rens nach Patentanspruch I, gekennzeich net ,durch einen offenen Behälter zur Aufnahme von fertig gemischtem Mör tel, welcher Behälter einen konisch ver laufenden Austrittsteil hat, in welchen eine Expansionsdüse mündet, und der in einen Anschlussstutzen für einen Förder- schlauch übergeht. II. Device for practicing the method according to claim I, marked net, by an open container for receiving ready-mixed mortar tel, which container has a conical ver running outlet part into which an expansion nozzle opens, and which is in a connection piece for a conveyor - hose passes.
CH102924D 1922-09-30 1922-09-30 Method and device for the production of walls and wall plaster by spraying mortar. CH102924A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH102924T 1922-09-30

Publications (1)

Publication Number Publication Date
CH102924A true CH102924A (en) 1924-01-02

Family

ID=4361591

Family Applications (1)

Application Number Title Priority Date Filing Date
CH102924D CH102924A (en) 1922-09-30 1922-09-30 Method and device for the production of walls and wall plaster by spraying mortar.

Country Status (1)

Country Link
CH (1) CH102924A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE943675C (en) * 1939-05-16 1956-05-24 Roemisch Katholische Kirchenge Facility for plastering walls, ceilings, etc. Like. Or for concreting
DE951477C (en) * 1949-10-08 1956-10-31 Edmund Bruche Device for plastering walls, ceilings, etc. by spraying on mortar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE943675C (en) * 1939-05-16 1956-05-24 Roemisch Katholische Kirchenge Facility for plastering walls, ceilings, etc. Like. Or for concreting
DE951477C (en) * 1949-10-08 1956-10-31 Edmund Bruche Device for plastering walls, ceilings, etc. by spraying on mortar

Similar Documents

Publication Publication Date Title
DE4118537C1 (en)
CH674869A5 (en)
DE1232052B (en) Method and device for increasing the flow capacity of mortar or concrete masses
CH102924A (en) Method and device for the production of walls and wall plaster by spraying mortar.
EP0025156A1 (en) Method and apparatus for wet abrasive blasting
DE581532C (en) Device for lining the inner surface of chimneys and other hollow bodies
DE877125C (en) Device for engobing
DE2064617B2 (en) Stoppings to seal-off abandoned mine workings - by pumping mix between support walls with specified binder to filter ash ratio
DE536356C (en) Switch-on piece in flushing offset pipelines
DE701933C (en) Method and device for shoveling sand under water
DE960797C (en) Method and device for conveying concrete or similar pulpy masses by means of compressed air
DE507200C (en) Process and device for the concrete lining of road and other pit areas
DE479521C (en) Sandblowing machine for filling molding boxes in which the air nozzle opens axially into the sand pipe
DE2223060A1 (en) PROCESS AND DEVICE FOR THE PRESERVATION OF NATURAL OR ARTIFICIAL STONES AND THE FORM THEREOF
DE1757787C3 (en) Device for producing pumpable mixtures from fine-grain solids and water
DE2141727A1 (en) PLANT FOR THE PRODUCTION AND PROCESSING OF WET CONCRETE BY A CONCRETE SPRAYING MACHINE
DE869334C (en) Method and device for depositing dust in weather flutes
DE941945C (en) Portable plant protection device
DE1778261A1 (en) Method and system for drawing paint from the air in a paint spray booth
AT106223B (en) Process for conveying and mixing mortar masses by means of pressure medium.
DE4436765C2 (en) Method and device for cleaning liquid containers
DE1962813A1 (en) Plant for the application of deformable hardening compounds
DE2926251C2 (en) Concrete preparation plant
DE3022855A1 (en) Insertion of filler container piers in mine workings - involves valve or other stop device in pipe socket, facilitating complete filling
DE224761C (en)