CA3065842A1 - Mine exploitation, separation and filling and x exploitation mode - Google Patents

Mine exploitation, separation and filling and x exploitation mode

Info

Publication number
CA3065842A1
CA3065842A1 CA3065842A CA3065842A CA3065842A1 CA 3065842 A1 CA3065842 A1 CA 3065842A1 CA 3065842 A CA3065842 A CA 3065842A CA 3065842 A CA3065842 A CA 3065842A CA 3065842 A1 CA3065842 A1 CA 3065842A1
Authority
CA
Canada
Prior art keywords
exploitation
filling
separation
coal
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
CA3065842A
Other languages
French (fr)
Inventor
Jixiong ZHANG
Qiang Zhang
Wenyue QI
Meng Li
Jianfeng Sun
Guohao MENG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhongkuang Backfilling & Mining Technology Co Ltd
China University of Mining and Technology CUMT
Original Assignee
Xuzhou Zhongkuang Backfilling & Mining Technology Co Ltd
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Zhongkuang Backfilling & Mining Technology Co Ltd, China University of Mining and Technology CUMT filed Critical Xuzhou Zhongkuang Backfilling & Mining Technology Co Ltd
Publication of CA3065842A1 publication Critical patent/CA3065842A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention discloses a mine exploitation, separation and filling and X
exploitation mode, including four "exploitation, separation and filling and X"

exploitation modes, namely an "exploitation, separation and filling and retaining"
exploitation mode, an "exploitation, separation and filling and treatment"
exploitation mode, an "exploitation, separation and filling and extraction" exploitation mode, and an "exploitation, separation and filling and control" exploitation mode. The selection of the "exploitation, separation and filling and X" exploitation mode is determined by actual engineering needs. Firstly, "exploitation, separation and filling"
systems are determined according to factors such as mine geological and hydrological conditions, mine system layout, mine "exploitation, separation and filling" capability requirements and coal resource exploitation sites, then, an X production system is determined according to actual engineering needs of the mine and technical problems, and an "exploitation, separation and filling and X" exploitation mode is formed. A
goaf filling rate is designed to meet the actual engineering needs of the mine, solve the technical problems in mine resource exploitation, and realize the objective of green, harmionious and safe exploitation of coal resources. Compared with an original "exploitation, separation and filling" exploitation mode, the "exploitation, separation and filling and X" exploitation mode is more systematic and comprehensive and is beneficial to engineering promotion and application.

Description

MINE EXPLOITATION, SEPARATION AND FILLING AND X
EXPLOITATION MODE
FIELD OF THE INVENTION
[0001] The present invention relates to a coal seam exploitation method, particularly relates to a mine exploitation, separation and filling and X exploitation mode, and belongs to the technical field of coal mine exploitation.
DESCRIPTION OF RELATED ART
[0002] In a traditional roof caving type coal mining mode, a roof is caved after exploitation, thereby causing the environmental problems of surface subsidence, gangue discharge and the like. Therefore, a comprehensive mechanized solid filling coal mining technology has gradually developed. However, the comprehensive mechanized solid filling coal mining technology still needs to lift underground raw coal doped with gangue to the ground, and after being washed and separated, the coal is conveyed to a working face by a batch feeder for performing filling operation, so that mine auxiliary lifting and ground coal washing plants have larger pressure and higher cost. An exploitation, separation and filling integrated production mode developed on this basis integrates underground coal mining, separation and filling, thereby realizing high synergy in the aspects of mine development layout, production system layout, exploitation, separation and filling equipment capability matching and the like.
[0003] With the continuous application of an "exploitation, separation and filling"
system in mine exploitation, the functions of the "exploitation, separation and filling"
system have been continuously improved and developed from an original gangue treatment function to a water-preserved exploitation function, a gob-side entry retaining function and an "under-three" coal exploitation function. More and more engineering cases prove that the "exploitation, separation and filling" system can be suitable for mines under different geological conditions to solve different engineering technology problems in coal resource exploitation. However, at present, mine exploitation modes based on the "exploitation, separation and filling" system to meet certain engineering needs of mines are mostly applied to a certain working face of a certain mine, and no systematic and comprehensive exploitation modes have been formed. Furthermore, most of the "exploitation, separation and filling" systems are reformed systems which difficultly form good matching and connection with the original production system of the mine and are not conducive to engineering application and promotion.
Therefore, the study on an exploitation mode which takes a mine "exploitation, separation and filling" system as a basis, adds related systems according to actual engineering needs of the mine and realizes high integration of all systems has great significance for on-site engineering promotion and application of the "exploitation, separation and filling"
system.
SUMMARY OF THE INVENTION
[0004] In order to overcome various defects existing in the prior art, the present invention provides a mine exploitation, separation and filling and X
exploitation mode.
An exploitation method suitable for each mine condition is systematically selected. A
goaf filling rate is controlled to meet an actual engineering need of a mine, solve technical problems in mine resource exploitation, and realize the objective of green, harmonious and safe exploitation of coal resources.
[0005] In order to solve the above problems, the present invention provides a mine exploitation, separation and filling and X exploitation mode. "Exploitation"
is a gangue small-scale exploitation system, "separation" is a coal gangue separation system, "filling" is a filling system, and "X" is an exploitation, separation and filling integrated synergistic production system. The mine exploitation, separation and filling and X
exploitation mode includes the following steps:
100061 step I: selecting the gangue small-scale exploitation system according to mine geological and hydrological conditions, a mine system layout manner and a coal resource exploitation site, selecting the a coal gangue separation system according to a coal gangue separation effect, underground space occupation and separation system performance factor, selecting an on-site filling system according to filling material performance, a material conveying manner and a filling system performance factor, and forming an "exploitation, separation and filling" system suitable for an actual production need of a mine;

[0007] step 2: determining an X production system according to an actual engineering need of the mine, and forming an "exploitation, separation and filling and X"
exploitation mode;
[0008] step 3: designing a goaf filling rate to meet the actual engineering need of the mine; and [0009] step 4: obtaining an actually measured filling rate by dynamic monitoring equipment in an exploitation process, performing comparison with an engineering control object, and ensuring that a measured value of the filling rate meets the need of engineering control by adjusting a technology and a management method, thereby realizing an engineering objective.
[0010] Further, the gangue small-scale exploitation system includes a tunneling face gangue small-scale exploitation system, a protection layer gangue small-scale exploitation system, a coal seam group gangue small-scale exploitation system and a wild coal seam gangue small-scale exploitation system;
[0011] the coal gangue underground separation system includes a selectively crushed coal gangue separation system, a dense-medium shallow-slot coal gangue separation system, a movable sieve jigging coal gangue separation system and a whole-grain water-based coal gangue separation system;
[0012] the on-site filling system includes a gangue filling system, a paste filling system, a cementing material filling system and a high-water material filling system;
and [0013] the X production system includes a coal pillar-less entry retaining system, a filling and caving synergistic production system, a gas three-dimensional extraction system and a filling effect control feedback system.
[0014] Further, a specific method for determining the X production system in the step 2 includes the following steps:
[0015] a. when mine engineering aims to increase a mining rate of coal resources, taking a coal pillar-less gob-side entry retaining system as the X, and forming an "exploitation, separation and filling and retaining" exploitation mode;
[0016] b. when the mine engineering aims to purely treat gangue, taking the filling and caving synergistic production system as the X, and forming an "exploitation, separation and filling and treatment" exploitation mode;
[0017] c. when the mine engineering aims to simultaneously exploit coal and gas, taking the gas three-dimensional extraction system as the X, and forming an "exploitation, separation and filling and extraction" exploitation mode; and [0018] d. when the mine engineering aims to realize water-preserved harmonious exploitation of coal under a water-bearing bed, safe exploitation of a coal seam group under a hard roof and non-destructive exploitation of an "under-three" deep coal resource, taking the filling effect control feedback system as the X, and forming an "exploitation, separation and filling and control" exploitation mode.
[0019] Further, a specific method for designing the goaf filling rate in the step 3 includes the following steps:
[0020] a. when the exploitation mode is "exploitation, separation and filling and retaining", controlling the stability of a roadside filling body by controlling the goaf filling .rate to replace a coal pillar support roof to displace coal resources, thereby increasing the mining rate of the coal resources and realizing exploitation of many coal resources;
[0021] b. when the exploitation mode is "exploitation, separation and filling and treatment", controlling gangue treatment capacity by controlling the goaf filling rate, thereby realizing wasteless exploitation of the coal resources;
[0022] c. when the exploitation mode is "exploitation, separation and filling and extraction", changing coal seam permeability by controlling the goaf filling rate to achieve an objective of harmonious simultaneous exploitation of coal and gas, thereby realizing simultaneous exploitation of coal associated resources; and [0023] d. when the exploitation mode is "exploitation, separation and filling and control", controlling height of a water flowing fractured zone of a water-preserved exploitation mine, a critical breaking distance of a hard roof of a hard roof coal seam, and critical equivalent mining height of the "under-three" coal mine by controlling the goaf filling rate, thereby realizing water-preserved harmonious exploitation of coal under the water-bearing bed, safe exploitation of the coal seam group under the hard roof, and non-destructive exploitation of an "under-three" deep coal resource.
[0024] In the present invention, "exploitation, separation and filling"
systems are determined according to factors such as mine geological and hydrological conditions, mine system layout, mine "exploitation, separation and filling" capability requirements and the coal resource exploitation site, then, an X production system is determined according to an actual engineering need of the mine and technical problems, and an "exploitation, separation and filling and X" exploitation mode is formed. The overall system involves 256 exploitation methods. The goaf filling rate is controlled according to different methods to meet the actual engineering need of the mine, solve the technical problems in mine resource exploitation, and realize the objective of green, harmonious and safe exploitation of coal resources. Compared with an original "exploitation, separation and filling" exploitation mode, the "exploitation, separation and filling and X" exploitation mode disclosed by the present invention is more systematic and comprehensive and is beneficial to engineering promotion and application.
BRIEF DESCRIPTION OF THE DRAWINGS
10025] FIG. 1 is a design flow chart of a method of the present invention.
DETAILED DESCRIPTION OF THE INVENTION
[0026] The present invention will be described in detail below with reference to the drawing and specific embodiments.
Embodiment 1 [0027] Since the construction of a mine in Shandong, a strip type coal mining method was always adopted, leaving a large number of protective coal pillars and forming a stagnant coal volume, and resulting in a low resource recovery rate;
furthermore, existing coal seams were doped with gangue severely; and a large amount of aeolian sand was deposited on the surface of the mine, and tests showed that cementing and conveying properties were excellent. In order to increase a mining rate of coal resources of the mine, reduce gangue content and treat gangue on the site, and consider a matching relationship between production systems, by following a principle of "low excavated volume of separated gangue and less space occupation of a separation system", a set of suitable exploitation, separation and filling system was selected according to an actual condition of the mine to realize a production objective of the mine.
[0028] As shown in FIG. 1, a mine exploitation, separation and filling and X
exploitation mode includes the following steps:
[0029] step 1: an "exploitation, separation and filling" system, including a wild coal seam gangue small-scale exploitation system, a dense-medium shallow-slot coal gangue separation system and a cementing and filling system, suitable for an actual production need of the mine was selected according to the above factors;
[0030] step 2: since mine engineering aims to increase a mining rate of coal resources, a coal pillar-less gob-side entry retaining system was taken as the X, and an "exploitation, separation and filling and retaining" exploitation mode was formed;
[0031] step 3: the stability of a roadside filling body was controlled by controlling a goaf filling rate to replace a coal pillar support roof to displace the coal resources, thereby increasing the mining rate of the coal resources and realizing exploitation of many coal resources; and [0032] step 4: an actually measured filling rate was obtained by dynamic monitoring equipment in an exploitation process, comparison was performed with an engineering control object for the stability of the roadside filling body, and a technology and a management method were adjusted to ensure that a measured value of the filling rate meets the need of engineering control, thereby realizing an engineering objective.
Embodiment 2 [0033] The exploitation depth of a mine in Henan exceeded 1100m, and auxiliary lifting became a major problem. The fifteenth coal seam was mainly exploited, and the coal seam had original gas content of 15.256m3/t, original gas pressure of 1.78MPa and a gas permeability coefficient of only 0.0776m2/MPa2d, which was a high-gas, low-permeability and low-drainage coal seam. The occurrence of the fourteenth coal seam coating the fifteenth coal seam was unstable, the thickness of the coal seam was only 0.5m, and technical conditions for conventional protection layer exploitation were not provided. In order to safely exploit a protection layer for performing gas pressure relief and increasing permeability, achieve an objective of simultaneously exploiting the
6 fifteenth coal seam and gas, and simultaneously underground treating exploited gangue during protection layer exploitation, a set of suitable exploitation, separation and filling system needs to be selected according to the actual condition of the mine to realize an production objective of the mine.
100341 As shown in FIG. 1, a mine exploitation, separation and filling and X
exploitation mode includes the following steps:
[0035] step 1: an "exploitation, separation and filling" system, including a protection layer gangue small-scale exploitation system, a movable sieve jigging coal gangue separation system and a gangue filling system, suitable for an actual production need of a mine was selected according to above factors;
[0036] step 2: since mine engineering aims to simultaneously exploit coal and gas, a gas three-dimensional extraction system was taken as the X, and an "exploitation, separation and filling and extraction" exploitation mode was formed;
[0037] step 3: coal seam permeability was changed by controlling a goaf filling rate to achieve an objective of harmonious simultaneous exploitation of coal and gas, thereby realizing simultaneous exploitation of coal associated resources; and [0038] step 4: an actually measured filling rate was obtained by dynamic monitoring equipment in an exploitation process, comparison was performed with an engineering control object, and a technology and a management method were adjusted to ensure that a measured value of the filling rate meets the need of engineering control, thereby realizing an engineering objective.
Embodiment 3 [0039] The occurrence of a coal seam of a primary mineable coal bed in a mine in Inner Mongolia was complicated, the thickness of the coal seam has large change, a working face was overlarge and has more minor faults, and the coal seam of the working face was doped with gangue severely, resulting in increase in mine lifting cost.
Furthermore, a large amount of gangue was deposited on the surface of the mine, occupied a large area of land and polluted the surrounding environment of the mine. In order to solve the problem that the coal seam of the mine was doped with gangue and to convey the gangue on the ground to a underground space for filling, a set of suitable exploitation,
7 separation and filling system needs to be selected according to actual conditions of the mine to realize a production objective of the mine.
[0040] As shown in FIG. 1, a mine exploitation, separation and filling and X
exploitation mode includes the following steps:
[0041] step 1: an "exploitation, separation and filling" system, including a wild coal seam gangue small-scale exploitation system, a selective crushing separation system and a gangue filling system, suitable for an actual production need of a mine was selected according to above factors;
[0042] step 2: since mine engineering aims to treat gangue, a filling and caving synergistic production system was taken as the X, and an "exploitation, separation and filling and treatment" exploitation mode was formed;
[0043] step 3: coal seam permeability was changed by controlling a goaf filling rate to achieve an objective of harmonious simultaneous exploitation of coal and gas, thereby realizing simultaneous exploitation of coal associated resources; and [0044] step 4: an actually measured filling rate was obtained by dynamic monitoring equipment in an exploitation process, comparison was performed with an engineering control object, and a technology and a management method were adjusted to ensure that a measured value of the filling rate meets the need of engineering control, thereby realizing an engineering objective.
[0045] According to different actual engineering needs, the system may form four exploitation modes, namely an "exploitation, separation and filling and retaining"
exploitation mode, an "exploitation, separation and filling and treatment"
exploitation mode, an "exploitation, separation and filling and extraction" exploitation mode and an "exploitation, separation and filling and control" exploitation mode, almost covering all exploitation methods, so that there are ways to follow when engineering methods are formulated, and control on engineering quality and promotion of the engineering methods are more facilitated. The above three embodiments are specifically selected according to different conditions of mines for the method of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the
8 present invention shall be included within the protection scope of the present invention.
9

Claims (4)

What is claimed is:
1. A mine exploitation, separation and filling and X exploitation mode, wherein "exploitation" is a gangue small-scale exploitation system, "separation" is a coal gangue separation system, "filling" is a filling system, and "X" is an exploitation, separation and filling integrated synergistic production system; and the mine exploitation, separation and filling and X exploitation mode comprises the following steps:
step 1: selecting the gangue small-scale exploitation system according to mine geological and hydrological conditions, a mine system layout manner and a coal resource exploitation site, selecting the coal gangue separation system according to a coal gangue separation effect, underground space occupation and a separation system performance factor, selecting an on-site filling system according to filling material performance, a material conveying manner and a filling system performance factor, and forming an "exploitation, separation and filling" system suitable for an actual production need of a mine;
step 2: determining an X production system according to an actual engineering need of the mine, and forming an "exploitation, separation and filling and X"
exploitation mode;
step 3: designing a goaf filling rate to meet the actual engineering need of the mine; and step 4: obtaining an actually measured filling rate by dynamic monitoring equipment in an exploitation process, performing comparison with an engineering control object, and ensuring that a measured value of the filling rate meets the need of engineering control by adjusting a technology and a management method, thereby realizing an engineering objective.
2. The mine "exploitation, separation and filling and X" exploitation method based on coal gangue separation and on-site filling according to claim 1, wherein the gangue small-scale exploitation system comprises a tunneling face gangue small-scale exploitation system, a protection layer gangue small-scale exploitation system, a coal seam group gangue small-scale exploitation system and a wild coal seam gangue small-scale exploitation system;
the coal gangue underground separation system comprises a selectively crushed coal gangue separation system, a dense-medium shallow-slot coal gangue separation system, a movable sieve jigging coal gangue separation system and a whole-grain water-based coal gangue separation system;
the on-site filling system comprises a gangue filling system, a paste filling system, a cementing material filling system and a high-water material filling system;
and the X production system comprises a coal pillar-less entry retaining system, a filling and caving synergistic production system, a gas three-dimensional extraction system and a filling effect control feedback system.
3. The mine "exploitation, separation and filling and X" exploitation method based on coal gangue separation and on-site filling according to claim 1 or 2, wherein a specific method for determining the X production system in the step 2 comprises the following steps:
a. when mine engineering aims to increase a mining rate of coal resources, taking a coal pillar-less gob-side entry retaining system as the X, and forming an "exploitation, separation and filling and retaining" exploitation mode;
b. when the mine engineering aims to purely treat gangue, taking the filling and caving synergistic production system as the X, and forming an "exploitation, separation and filling and treatment" exploitation mode;
c. when the mine engineering aims to simultaneously exploit coal and gas, taking the gas three-dimensional extraction system as the X, and forming an "exploitation, separation and filling and extraction" exploitation mode; and d. when the mine engineering aims to realize water-preserved harmonious exploitation of coal under a water-bearing bed, safe exploitation of a coal seam group under a hard roof and non-destructive exploitation of an "under-three" deep coal resource, taking the filling effect control feedback system as the X, and forming an "exploitation, separation and filling and control" exploitation mode.
4. The mine "exploitation, separation and filling and X" exploitation method based on coal gangue separation and on-site filling according to claim 3, wherein a specific method for designing the goaf filling rate in the step 3 comprises the following steps:
a. when the exploitation mode is "exploitation, separation and filling and retaining", controlling the stability of a roadside filling body by controlling the goaf filling rate to replace a coal pillar support roof to displace coal resources, thereby increasing the mining rate of the coal resources and realizing exploitation of many coal resources;
b. when the exploitation mode is "exploitation, separation and filling and treatment", controlling gangue treatment capacity by controlling the goaf filling rate, thereby realizing wasteless exploitation of the coal resources;
c. when the exploitation mode is "exploitation, separation and filling and extraction", changing coal seam permeability by controlling the goaf filling rate to achieve an objective of harmonious simultaneous exploitation of coal and gas, thereby realizing simultaneous exploitation of coal associated resources; and d. when the exploitation mode is "exploitation, separation and filling and control", controlling height of a water flowing fractured zone of a water-preserved exploitation mine, a critical breaking distance of a hard roof of a hard roof coal seam, and critical equivalent mining height of the "under-three" coal mine by controlling the goaf filling rate, thereby realizing water-preserved harmonious exploitation of coal under the water-bearing bed, safe exploitation of the coal seam group under the hard roof, and non-destructive exploitation of an "under-three" deep coal resource.
CA3065842A 2018-09-30 2019-04-01 Mine exploitation, separation and filling and x exploitation mode Abandoned CA3065842A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201811157750.4A CN109209379B (en) 2018-09-30 2018-09-30 Mine mining, selecting, filling and X mining method
CN201811157750.4 2018-09-30
PCT/CN2019/080749 WO2020062821A1 (en) 2018-09-30 2019-04-01 Mine mining, seperation and filling + x mining mode

Publications (1)

Publication Number Publication Date
CA3065842A1 true CA3065842A1 (en) 2020-03-30

Family

ID=64982662

Family Applications (1)

Application Number Title Priority Date Filing Date
CA3065842A Abandoned CA3065842A1 (en) 2018-09-30 2019-04-01 Mine exploitation, separation and filling and x exploitation mode

Country Status (6)

Country Link
US (1) US20210148228A1 (en)
CN (1) CN109209379B (en)
AU (1) AU2019284024A1 (en)
CA (1) CA3065842A1 (en)
RU (1) RU2733255C1 (en)
WO (1) WO2020062821A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209379B (en) * 2018-09-30 2020-04-24 中国矿业大学 Mine mining, selecting, filling and X mining method
CN110424966B (en) * 2019-07-25 2020-05-26 中国矿业大学 Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN110700835B (en) * 2019-11-07 2021-08-06 北京矿冶科技集团有限公司 Shallow underground mining, selecting and charging integrated system for lead-zinc ores
CN113027460B (en) * 2021-04-25 2022-03-15 中国矿业大学 Coal and coal series symbiotic bauxite coordinated mining system and downward exploitation extension method thereof
CN114247560B (en) * 2021-12-20 2023-02-07 长沙矿山研究院有限责任公司 Full-size ore pretreatment process and device
CN116956649B (en) * 2023-09-21 2023-12-15 山东新巨龙能源有限责任公司 Coal mining filling demonstration system based on simulation technology

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1745936A1 (en) * 1990-03-27 1992-07-07 Сибирский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела Method of exploitation of thick pitching seams
RU2396429C1 (en) * 2009-07-09 2010-08-10 Анатолий Николаевич Осипов Procedure for weakening marginal massif of mine workings at development of coal beds
CN101775985B (en) * 2010-02-10 2012-04-18 东北大学 Deeply buried iron mineral resource underground mining and concentrating integration system
CN101905189B (en) * 2010-08-19 2012-10-31 北京圆之翰煤炭工程设计有限公司 Method for realizing underground separation of raw coal
CN102162364B (en) * 2011-03-21 2012-12-12 山东新阳能源有限公司 Layout method for underground dense-medium shallow-slot coal preparation in coal mine
RU2472931C1 (en) * 2011-06-08 2013-01-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Control method of poorly caving roof at mining of gas-bearing formations in faces with mechanised complexes
CN103899352B (en) * 2014-04-08 2016-08-17 中国矿业大学 The design of solid filling Full Ratio and control method in coal mining
CN104033152A (en) * 2014-06-25 2014-09-10 中国矿业大学 Solid filling mining design method under building
CN104033153A (en) * 2014-06-25 2014-09-10 中国矿业大学 Coal mine underground mining, dress and filling integral method
CN104373126A (en) * 2014-12-04 2015-02-25 中国矿业大学 Method and equipment for filling gangue by aid of drilling and production process
CN104963687B (en) * 2015-07-09 2017-02-22 太原理工大学 Method for recycling upper part residual coal and backfilling goaf by utilizing full-mechanized caving mining in extremely thick coal seam
RU2629308C1 (en) * 2016-03-29 2017-08-28 Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр угля и углехимии Сибирского отделения Российской академии наук" (ФИЦ УУХ СО РАН) Method for selective extraction of coal bed of variable thickness
CN106401586B (en) * 2016-06-24 2019-02-22 中国矿业大学 The coal petrography sorting and the method for utilizing of a kind of coal petrography with mining face
CN106321102B (en) * 2016-09-08 2018-04-13 中国矿业大学 A kind of closely knit strip filling coal-mining method of colliery solid
CN106761754A (en) * 2017-03-31 2017-05-31 中国矿业大学 A kind of girdle comprehensive mining and gas control network one cooperative control system and method
CN108547657B (en) * 2018-02-24 2020-05-08 通用技术集团工程设计有限公司 Analysis and evaluation method for coal mine underground mining, selecting and charging integrated design
CN109209379B (en) * 2018-09-30 2020-04-24 中国矿业大学 Mine mining, selecting, filling and X mining method

Also Published As

Publication number Publication date
CN109209379A (en) 2019-01-15
CN109209379B (en) 2020-04-24
WO2020062821A1 (en) 2020-04-02
US20210148228A1 (en) 2021-05-20
RU2733255C1 (en) 2020-09-30
AU2019284024A1 (en) 2020-04-16

Similar Documents

Publication Publication Date Title
US20210148228A1 (en) Mine exploitation, separation and filing, and x exploitation
CA3060277C (en) Mine exploitation method based on stopping, seperation and filling control
Zhang et al. Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining
CN108060924B (en) High-dipping multi-seams thin deposit mechanization combinations for mining methods
CN103527200B (en) Bottom-column-free sectional Rhombic room afterwards filling mining method
CN103899352B (en) The design of solid filling Full Ratio and control method in coal mining
CN103902780B (en) Solid filling coal mining earth's surface Deformation prediction method
Cheng et al. Definition, theory, methods, and applications of the safe and efficient simultaneous extraction of coal and gas
CA2986062C (en) Fully mechanized mining-filling mixed mining working face filling section length determination method
CN112360462A (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN103362540A (en) High gas coal seam pressure relief gas extraction method
CN109899109B (en) Grouting filling method for irregular goaf
CN107829736A (en) A kind of colliery Striping noise and filling displacement coal column method
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN102031971B (en) Method for determining structure and thickness of open-pit-to-underground covering layer
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
Fan et al. Opencast to underground iron ore mining method
CN106088107A (en) A kind of method that tailings impoundment produces surface subsidence hole, mine in Caving Method with Large Space
CN109519218B (en) Method for filling goaf by utilizing aeolian sand dry-type filling net cage bearing body
CN106948860B (en) The method for cooperateing with progressive draining coal seam gas with directional drilling based on U-shaped well
Liang Study on critical, modern technology for mining in gassy deep mines
CN105370284A (en) Method for forming cover layer transitioned from open pit to underground mining by utilization of tipping backfill of rock step
CN113982581B (en) Stability control method for overburden seepage isolation zone based on low-carbon mining
Feng et al. Study on application of goaf management and residual mining technology in niujuan deposit
Dong-sheng et al. Aquifer-protective mining technique and its application in shallowly buried coal seams in Northwest of China

Legal Events

Date Code Title Description
EEER Examination request

Effective date: 20200430

FZDE Discontinued

Effective date: 20211221