CA1247885A - Seamless tube mill - Google Patents

Seamless tube mill

Info

Publication number
CA1247885A
CA1247885A CA000455211A CA455211A CA1247885A CA 1247885 A CA1247885 A CA 1247885A CA 000455211 A CA000455211 A CA 000455211A CA 455211 A CA455211 A CA 455211A CA 1247885 A CA1247885 A CA 1247885A
Authority
CA
Canada
Prior art keywords
mill
billet
diescher
elongator
mandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA000455211A
Other languages
French (fr)
Inventor
Dezsoe A. Pozsgay
Robert J. Rau
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mannesmann Demag Corp
Original Assignee
Italimpianti of America Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Italimpianti of America Inc filed Critical Italimpianti of America Inc
Application granted granted Critical
Publication of CA1247885A publication Critical patent/CA1247885A/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B23/00Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

SEAMLESS TUBE MILL
ABSTRACT OF THE DISCLOSURE
The disclosure is directed to a process and a mill installation for the production of seamless tubes of high quality, in production mills having relatively modest production requirements. The mill installation comprises a cross roll piercing mill for piercing and initially elongating a solid cylindrical billet.
Preferably, but not in all cases, the cross roll piercer is followed by a second cross roll "piercer" which functions purely as an elongator, and which functions to substantially elongate the pierced billet, typically in conjunction with an increase in O.D. and reduction in wall thickness. As a key feature, the pierced billet, previously processed by either one or two cross roll piercer/elongators, is thereafter further elongated by means of a Diescher-type elongator, and most particularly a novel form of such Diescher type elongator incorporating a restrained mandrel bar feature. From the Diescher mill, the highly elongated tube is processed on a sizing mill for finish sizing and typically some additional elongation. Although the Diescher type elongator is a well known mill in a general sense, its use in the context of this invention is unique, as is its use in conjunction with a restrained mandrel. The new mill complex makes it economically feasible to install a seamless tube mill for the production of high quality tubing at production levels as low as 200,000 - 250,000 tons per year.

Description

7~

S~ARqLESS TUBE I~ILL
The present invention is directed to the production of seamless tubing, and more particularly to the provision of new proeedures and a new complex of mill equipment for the production of high quality seamless tubing on an economical basis, at relatively low production levels.
The production of seamless tubing is, in general, an old and well known art. Typically, a heated billet is pierced, either in a press piercing mill or by way of a cross roll piercer. The pierced billet then undergoes one or more elongation stages for increasing the length of the billet while reducing its wall thickness and adjusting its diameter. Typica~ly, the principal elongation stage involves the use of a mandrel mill, Assel mill, plug mill or push bench for example. Of these, the mandrel mill is generally accepted as the most productiYe. However, the mandrel mill is an expensive installation and thus not easily adapted for the economical production of seamless tubing at relatively low production levels as contemplated by the present invention. The other mentioned elongation pro¢esses, on the other hand, while being less costly to install have certain quality limitations that tend to restrict the end use of the resulting product. For exarnple, because of the relatively abrupt $ransitional change in the roll diameter of the Assel mill, the surface of the resulting tubular product often has a somewhat "crazed" appe~lrance, making it relatively unacceptable for oil field use, for example, because OI concerns over failure.
The present invention is directed to a new seamless tube pro¢ess which, at relatively low capital cost, more or less competitive with Assel mill installations, for example, nevertheless enables a uniquely high quality of seamless tubing to be produced, without the limitations characteristic of the Assel mill.More specifically, pursuant to the process and installation of the invention, the primary elongator facility is a Diescher type mill provided with a restrained mandrel system. With this arrarigement, it is possible in a seamless tube mill of so-called "mini-mill" proportions, to produce tubing of very high quality, ina wide range of sizes up to ten inches and more in diameter and in s~called "double length" sections, up to ninety-six feet in length.

Optimum quality and economy considerations are balanced in the procedure of the present invention by the use of so-called No. 1 and No. 2 crossroll piercers in advance of the Diescher type, restrained bar elongator. With this arrangement, it is possible to produce double length tubing to a high quality level in terms of ~ncentricity and uniformity of wall thickness. Production ~f tubing in double length also provides for significant economies in terms of reduced crop end loss, as will he readily understood.
For a more complete understanding of the above and other features and advantages of the invention, reference should be made to the following lû detailed description of a preferred embodiment, and to the accompanying drawing.
Figs. 1 and 2 are simplified plant layout arrangements for the mill complex according to the invention, the installation of Fig. 1 utili~ing a single cross roll piercer whereas the installation of Fig. 2 employs two cross roll piercers as in the capacity of No. 1 and No. 2 piercers, respectively.
~ig. 3 is a highly simplified schematic illustration of the primary steps involved in the productîon of seamless tubing in accordance with the teachings of the invention.
Figs. 4-8 are sequential views illustrating the movements of shell and mandrel in the restrained mandrel Diescher mill.
In the plant layout illustration of Pig. 1, a billet inlet table 10 supplies billets~ typically cyJindrical in shape, to a rotary furnace 11 of a known type.The individual Wlets progress through the furnace 11, in a rotary direction, and are discharged one by one onto a hot billet conveyor 12. The conveyor 12 advances the billets onto a piercer inlet table 13, where the billet is center punched by means of a centering machine 14. The piercer inlet table 13 then transfers the billet into a Mannesmann type cross ro~l piercer 159 which drives the heated billet in a spiral fashion over a piercing mandrel in a well known manner, converting the solid cylindrical billet into a pierced, elongated tubular shelL
After e~ckaction of the piercing mandrel, the shell is moved laterally by the piercer outlet transfer section 17 onto a shell inserter section 18 of a 3~S

Diescher type elongator. The Diescher type elongator is, per se, of known construction as reelected in, for example, the Diescher UOS. patent No. 1,946,933 and the Diescher U.S. patent No. 1,951,348 The Diescher mill is a well known, although not widel~ used, type of cross roU piercer/elongator utilizing relatively large diameter guide discs in conjunction with opposed, angularly related cross rollsO
Pursuant to a significant aspect of the invention, the Diescher mill, designated by the reference numeral 19, is used in the capacity of an elongator and is provided with a mandrel bar inserter section 20 OI a restrained mandrel 10 type. The restrained mandrel principle is, in itself, well known and is described in, for example, the William Rodder U.S. patent No. 3,593,553. The restrained bar mandrel arrangement 2û provides for insertion of the mandrel into a shell disposed on the shell inserter section 18, followed by the simultaneous insertion of the shell and mandrel into the rolls of the Diescher elongator 19. Once the tubular shell is in the grip of the elongator rolls, the mandrel bar movement is restrained and controlled by the bar inserter mechanism, such that the movement of the mandrel is greatly reduced in relation to the movement of the tubular shell through the elongator mill. Indeed, the mandrel may at times be stationary or even moving oppositely to the movement of the shell. In all cases, the 20 mandrel is restrained from normal free floating movement through the elongator mill as is conventional. In this respect, the use of restrained bar mandrel arrangements is known for use in conjunction with mandrel mills, Assel mills, and so-caUed Transval mills. However, insofar as the applicants are aware, the restrained bar principle has never been applied to a Diescher mill and is unique in that application.
After passage through the restrained bar Diescher elongator 19, the now substantially elongated tubular shell is conveyed to a conventional sizing mill 21, from which it is deposited on a cooling bed 22. The elongated hlbular shells are slowly advanced laterally along the cooling tableg carried through a 30 water bosh 23 and eventually removed on a run out conveyor 24.
The plant layout arrangement of Fig. 2 is similar in principle to that ~J~

of Fig. 1, except that an additional stage of elongation is provided by a No. 2 Mannesmann type piercer/elongator In the system of Fig. 2, heated billets from the rotary furnace 30 are centere~ at the eentering machine 31 and advanced by the piercer inlet table 32 into the first stage Mannesmann rotary type piercer 33, where the solid cylindrical billet is pierced and initially elongated to form a tubular shell. The shell is received by the outlet table 34 and transferred to the inlet table section of a so-caUed No. 2 piereer 35 of the Mannesmann type. The No. 2 Mannesmann piercer is of course not used in a piercing capacity, but is used as an elongator to provide a first stage of elongation o~ the pierced shell. The elongated shell is then transferred from the outlet table 36 to the inlet section 37 of a restrained bar Diescher type elongator 38 as generally described in connection with the layout of Fig. 1. A bar inserter 39 of the restrained mandrel type inserts a mandrel into a shell resting on the shell inserter 37, and both the shell and mandrel are then inserted into the Diescher type elongator 38, with the movement of the mandrel being controllably restrained during the advancement of the tubular shell through the Diescher elongator. The twice elongated shell is then passed through a sizing mill 4~, cooling table 41, water bosh 42 and run out conveyor 43, in the manner of the layout of Fig. lo Fig. 3 is a highly schematic illustration of the various stages involved in the layout of Fig. 2, illustrating the loading of a billet B into the rotary furnace 30 and discharge of the hot billet therefrom. The heatedJ solid billet is then pierced in the first stage Mannesmann piercer 30. In the second stage, the Mannesmann mill 35 is used as an elongatoe (No. 2 piercer), reducing the wall thickness of the tubular shell and elongating the shell correspondingly. In the restrained bar Diescher mill 38, the shell is elongated ~urther and its wall thickness reduced. ~ the sizing mill 40, the diameter of the shell is reduced somewhat, and this typically is accompanied by a slight increase in wall thickness and some degree of elongation.
One of the unique and advantageous aspects of the new tube mill configuration is that the use of the restrained bar Diescher mill as the final stage elongator enables uniquely high quality output to be achieved in a mill ofmodest capital requirements fully suitable for so-called "mini mill" utilization, with tonnages in the area of 200,000 - 250,000 tons per year capacity.
In typical operation of a mill according to the layout of Fig. 1, processing may be carried out generally in accordance with the "Typical Rolling Schedule I'l. Typical starting materials are billets of five-ten inch diameter range, ranging in length from 4.79 feet minimum to 13.08 feet maximum. In this respect, the minima and maxima referred ~o in the typieal rolling schedulesare not in any sense limitations on the invention, but are merely minima and 10maxima of the particular rolling schedules illustrated.
In the first series of rolling schedules~ the results of the piercing of the billet in the Mannesmann piercer are reflected under the heading "Piercer (Hot)". For example, the first billet size indicated, with an OD of 5.000 inches, length 7.50 feet, the OD is increased in the piercing operation to 5.250 inches and the Mllet is elongated by a factor of 2.90, to a length of 22.4 feet. Insidediameter ~ID) after piercing is 4.36 inches and wall thickness is 0.446 inches.
The same billet, after processing in the restrained bar Diescher elongator, is further elongated by a factor of 2.36, to an overall length 52.85 feet, OD of 4.823 inches and wall thickness of 0.19S inches. Continuing to 20trace the same billet through the si~ing mill, it will be observed that there is a further elongation of 1.24 in the si~ing mill, to an overall length of 65.3 feet.
The OD in the sizing mill is reduced to 3.548 with an accompanying increase in wall thickness to 0.219 inches. The finished tube, after cooling and end cropping, has an OD of 3.500, a length of 64.00 feet and a wa~l thickness of 0.216 inches~
In the Typical RoIlir;g Schedule I, for the layout of Fig. 1, typical maximum/minimum starting lengths for a five inch billet are 13.08 feet and 6~15 feet. For a ten inch billet, typical maximum/minimum starting lengths are 9.99 feet and 5.86 feet. Range of elongation for a five inch billet typically 30would be 1.69 to 2.92; for a ten billet the equivalent range would be 2.77 to 3.62. Typical elongation in the Diescher restrained bar elongator, for a five ~ ~L~

inch billet would range from 2.05 to 2.48. For a ten inch billet, elongation will range froTrl about 1.73 to about 2.26. In the sizing mill, elongation of a five inch billet ranges from abut 124 to about 1.28. For a ten inch billet, elongation in the sizing mill is minimal, about 1.02.
The finished tubes are of course cropped, to remove the out of spec.
end sections. In ffnished form, the five inch billets will range in length from forty-five feet to sixty-four feet; finished OD is constant at 3.500; in wall thickness, the biLllets will range from 0.216 to 0.449. For ten inch billets, the schedules provides for a constant length of forty-eight feet and constant OD of 9.625 inches, with ~ range of waU thicknesses from 0.312 to 0.545. The main variable, wall thickness, for the ten inch billet, is primarily a function of the original length of the billet, as will be observed by comparison of starting billet length to finished wall thickness.
The layout of Pig. l of the invention is especiaIly advantageous for mill requirements where R high level of concentricity is not a primary requirement and/or where it is either unneeessary ~r wldesirable to provide for extremely high degrees of overall elongation from billet to final tube. Where the requirements are more stringent, the layout of Figure 2 is more desirable, at the expense of providing an additional Mannesmann type piercer functioning as 20 an elongator.
For the plant layout reflected in Fig. 2, "Typical Rolling Schedule Il" is applicable. The illustrated schedule No. 11 provides for initial bi~let diameters in the range 5.375 inches to 10.5 inches, with initial billet lengths ranging, for the five inch billets, from 9.71 feet to 19.24 feet and for the ten inch billets 10.51 feet to 15.92 feet. It will be understood, in this respect, that the term "five inch billets" and "ten inch billets" as used in connection with Typical Rolling Schedule lI, refers to a billet diameter of 5.375 and 10.5 inches respectively.
In the No. 1 Mannesmann piercer, the billets are processed without 30 significant change in OD. The five inch billets are elongated by a factor of 1.35 to 1.78, while the ten inch billets are elongate~ in the range ot 1.71 to ` ~

1.96. ~Lax/min in wall thicknesses for the five inch bi~lets at the No. 1 piercer are respectively 0.911 and 1.315 inches. For the ten inch billets, wall thicknesses range from 1.578 to 1.863 inches.

~ ` Q ~ > ~ L~ L~ Lt~ Lt~ ~I C9 6~

_ O g O O O O L~ L~ L~ Lt~ L~ L~ Lt~ Lt~ L~ L~ g O
_ oooooor-~ c-~c-c-c-~oo ~ Q ~ oo co oo x co o o 6~
~ Zj O S~ ~ ~ Lr~
CÇ OD 00 0 0~ ~ Lt~
~:i ~ ~ ~ w ~ c~ o c~
~ 1- ¦ W ~I W 1--~ ~I W r~ ;l C~ N ~I C;l _I W C;l W ~;1 W

~ ;~ ~ ~ ~ et~ ep di Cl~ L~ Lr~ u~ CO U~ co ~ oo ~ oo P ~ oo P$
~i ~ ~ ~ ~D co ,, $ ~ ~ ~ ~ ~ d"~, ~ o ~ ~ ~ o . cn ~ ~ . . . . CD ~ ~ ~ CO LD Ot1 CD cn CD a~
o~oooo~ooooooooooôoo O O O O C~ L~ L~ In L~ L~ Lt~ Lt~ L~ Ll~ L~ O O O O
~ ~ o ~ o . o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .~, ~ ,~ .~
O u~ L~ L~ ~ Lt~ Ll~ ~ O O

: u O U~ ~ ~ ~ O O U~ ~ O C- CO ~ C~ ~ 0~
~ c~ o e~ c~ el~ C3 ~ C~ C~ O C~ 0~ ~ ~ C~ ~ ~ C- C~ C-::
~ C`2 ~ ~ r- u~ ,1 o ~ u~ CD u~ ell c5~ ~1 ~ ~ cs o U C~OCOo~OOoOe.~oQo~C~CD~OO~o cr~co u~cou~d~e.~e~d ~~ ~ C: ~ o ~ o U~
i~O ~1 ~ u~
~1 1~ ¢ ~ c~ o~ ~ c~
U~_ 1~ ~ o o o o o o o o o o o o o o o o o o o o ~3 cD r~ x e~ o ~ o P~ ~ ~ ~ c~ C`2 ~ '~' ~ -' ~
~oooooooooôooooooooo ~ ~1 ~
O ~ ~ c~
. c3oo o~ $ o~ o o ~~ C~ o o g g r~CO tD ~ ~ ~ O O O ta O o 0~ ~

i--co o ~~ ~ o ~ i--~ ~ ~ C- ~ O ~ ~ G~ ~ U~ ~ CD CO ~ C~ _I ~ CO CO C~
¢ ~ ~'~ N C`~ O O 1 c~ o u~ u~ o ~ c~
~ ~ ~ ~ a~ ~ ~ ~ ~ ~ o~ ~ ~ CD ~0 '~O ~ ~ O O ~ CD

g ~
O ~ 00 C~ tD ~ cr~ N C~
1~ C~ r l O O C~ 1 0 0 ~1 ~1 0 0 0 0 0 0 C~

U~ ~ tS:~ d~ ~D dl d~ dl ~ ~ ~ el' ~t~ ~ d~

- ¦ ~ Lt l I J~ Ltll Lt~ O L~ CC:I _I L~ l CO L~ ~ ~ X L~
,/ u~ o o ~ C~l C~ d~ o cv:l o t9 ~ L~l l~c OOOO

P~ ~ O O d! d~
¦ It~ ~ ~ D ~ L~ i~ ~1 ~
It~ IQ O O 1~ O O U~ 1~ L-- O O C~ L~ ~ ~ L--~¦ O c~ C.~ CD CD L--L~ L~-- L-- 00 00 C~ 0 E~
C:~ g 0 0 C~ O O 0 8 $ $ O O

CC~ O ~ U~ O I~ C`l O O ~ ~ ~ ~ U~
i~ ¢ r-l ~ C:l ~ i~ C~ a~ o C~ ~ C" ~ L-- ~ O C~l O 1 Q 3: o o o o o o o o o o o o o o o o o o o o ~ ~ oooooooooou~oou~
O O O c~ O o O o o e~ ~ o O e~
11~ L~ O O Lt l Lt~ O O 1$~ CD O O CD Ct l C~l Ct l CD Cl l u~ ,l ~ cn ~ o o ~ c~ c~
1 1 ~ ~ I c~o cx~ ~P ~ c9 CD C~7 C~ C10 C:~ 1~ 1~ C~ a~ CD CO
¢ ~, T P

a c~ c,O O c~ ~ ~ O ~ c~ , ' ~ ~ .~ i C~ C~ CX~ C~
o P~ ~ 0~ ~ ~ c~ , ~ ~ c~ ,, o c~ co cJ~ O g ~ce~ ce~ c~ cC~ ~ c ;~ O O

tq c~ c o~ c c~ cn c~ c~ cn o _~ cn c ~1 c.~ c~ c~ dl c~ u~ c r~l ....................
_ C- ~ CS~ C- C~ cn c~i cc ;i c~n c~ cn~ c~ c~ ~w c7~ co ~i ~ ~ CJ~ ~ C;~ ~ ~ c~ o c- ~ ~1 u~ C~ C~
~ ~ ¢ ~ ~c~ 3 ;: ~
~, Y c~ r.~ LO u~ c ;i c.~ ~n c~ cD a~ c~ CD t--1~ 0 0 ~ ~ C10 CC
T ~ ~ It~ CD CD c.0 CD t-- C~ 1 cn c~ c~ c~
, ~ ~1 u~ ~ c~ o. u~ ~ o, c~ ~ ~ c~ o C- C- ~ C- ~ ~
~ O ~ coco~c- c-~c~co cJ~c~

-; k ,., ~i 0, c3 c~ c ~ '? ~ '? c~ u~ ca ca c~ cU~ O c~ c ~ c;~
~ C~ c~ O e~ O c CD c CJ~ c CD O O~ C0 CD CO cC~o CD C~ ~o oo ~;5 w ~ ~ ~D C C~7 o ~--1 ~ CD o rDI ~ 5~ C-- ~ ~ O C~i ~ --I
E-l c~ c.~:i c~ c~ u~ cY~ ~ e~ ~ c;l ~ c-~ c~ c~ c~ u7 !~ . ~ .. , .. ,,,,, ..... ,, . ~ .
~ ~_ OOOOOOOOOOOOOOOOOC~OO

O O O O O O O O O O U~ U~ O C~ U~
rr r~ o O c~ o o o o o o o c;l C~;i c ~ O w e~ w c.~;i c~;l c~
_~ ~, ~ ~ o o L~ u~ '? c~ u~ u~ CD CD O O C~ CD CD CD CD CD

C~ l C~ CD CO 1~ ~ 1:--C C~ CC 0~ C5) ~c~

~ O U~ ~ C~ ~ ~ ~ CD C- ~ ~ ~ O~ ~ O ~ O C~ O
C~ l-i ~ w C~ O ~i ~ i O C~

eD

o ~i!; ~ ~ e3~ ~ O O 0~ O O~ O 0 ~1 ell ~ U~ 00 ~ C5~ ~ C~ ~ CD O ~ ~ p. CS~ CD ~ C~ CO O
oooooooooooooooooooo ~~ ~ U~ o o o o o o o o o o o o U~ U~
O ~ r~ ~ U~~ ~ ~ ~ ~ O. O. C~

~a ~ ~5 !~i O E~ X CC~ ~ O O U~ ~ o ~ oD ~ c~
O ~ C~ O C~
~3 o~ ~ o c~
C~ C~ CO O 10 cn o C`~ c~ co o ~S Cl e~

o u~ o u~ O u~
~ ~ ~ o o o o o o o o o o o o o o o o o o o CJ~ O O ~ C~ CD U~ ~ ~
P~ ¢ ~ _I C~ ~ C~ ~ C~ ~ ~ ~ ~ ~ ~ ~ ~ ~ U~ ~ ~ ~ ~
~ ~ ooooo~oooc~oooooooooo ~ o ~ ~ ~ u~ oo ~ o ~
o o o o o o u~ ~ ~ ~ ~ cr~ ~ c;l ~ ~l ~ ~ c9 c9 N C;l C3 C`;l CO OD CO 00 0 O ~1 ~1 ~ o o O ~ ~ U'~ 1~ O O O O O o O o O o O o g o P~ ~ $ o O $ O O u~ sO~ O

~ u ~ ~ c~ u~ ~. ~. ~. ~ ~ o c~ o. ~. ~ ~
~ooO~C-~ooo~o~c~a~ou~

~ ~ooogoo~oogooo~
~- c~ c~ c`~ ~ o o o o o o o o o o o o ~
~ O ~ O

; 0 ~1 ~ C~ ~ CO ~ ~ C~ ~ O. C~
U CD C~ C5~ r i ~-i C~ t- C9 ~i It:~ ~ 00 ~ ~~ C~ CO ~1 ~ O ':D

P~

1 ~ ", "",, ""~ ~ o 0 0 O g O O C o o 8 c~ c~ ~ o o c~ o o o o o ~ o o o u~ ~
n ~ ~ u~ ~ ~ ~ ~- ~ ~ ~ ~ ~ O~ cn cr~ o o J~

In the plant layout of Fig. 2, a first stage of elongation is carried - out in the so-called No. 2 Mannesmann piercer elongator. Five inch bille~s are el~ngated in the range of 1.35 to 1.78, while ten inch billets are elongated in the range of 1.71 to 1.96. With significant reduction in wall thickness, as reflected in the rolling schedule under the headings piercer No. 1 and piercer No. 2.
In the procedure of the invention, a second stage of elongation is earried out in the restrained bar Mescher mill. Pcr the five inch billet, elongation in the Diescher mill may be in the range of 2.û6 to 2.47. For the tench inch billet, elongation may range from 1.74 to 2.28, ngain with significant reduction in wall thickness. Over the spectrum of starting billet diameters and lengths for Typical Rolling Schedule II, shell length after elongation in the Diescher mill may range from about 67.76 feet to about 94.84 feet, with corresponding substantial reduction in wall thickness from the No. 2 piercer.
In the sizing mill, further elongation may range from about 1.û9 to about 1.32, for the five inch billet and at about 1.06 for the ten inch billet.
After cooling and cropping, tubing diameters typically will range from 3.5 to 9.625 inches OD, tubing length from 80.95 to 96.00 feet and wall thicknesses from 0.216 to 0.625 inch. In this respect, it is understood that any shell length 20 over 96 feet after the sizing mill is cropped off to a standard maximum length of ninety-six feet~
In either of its basic illustrated forms, the procedure of the invention is substantially advantageous in providing for a mill procedure for the production of relatively high quality seamless tubing with a rather simple installation of equipment, requiring a minimal capital investment, for economical and efficacious operation on a mini-mill basis.
One of the key aspects of the new mill arrangement is the utilization of a restrained bar Diescher mill as the final elongator stage. In this respectS
the Diescher mill is unique in several respects. First, because of the utilization 30 therein of a restrained mandrel which, although known for other types of rolling mills has not, to the best of applicant knowledge, been utilized in a Diescher mill. Second, in the procedure of the invention, it LS desirable and effeetive to drive the Diescher mill guide discs at a peripheral speed which is approximately equal to or only minimally faster than the theoughput rate of the Diescher mill, being the rate of which the elongated tubing emerges from the discharge side of the mill. l~xisting Diescher elongator installations, insofar as the applicants are aware, are operated with disc peripheral speeds in the range of two to three times the throughput speed of the mill, although some Diescher mills, used strictly for piercing, utilize disc speeds substantially in the range of the output speed of the mill.
~or operation of the Diescher mill in a restrained bar mode, pursuant to the invention, the bar inserter mechanism is designed for high speed advance and retraction, as well as low speed, controlled movement during mill operation.
The bar inserter of course must accommodate full retrac tion of the mandrel bar beyond the end of the maximum pierced and (in the case of plant layout of Fig. 2) elongated shell. As reflected in the Typical Rolling Schedule 11, the maximum length of elongated shell after leaving the No. 2 piercer may be approximately forty-eight feet. Pursuant to the invention, the mandrel bar may have a working area, at its forward end, on the order of ten feet in length, and a nonworking or "dummy" portion of the bar which is substantially longer, for example sixty-three feet in length.
Figs. 4-8 illustrate a typical sequence of operations of the restrained bar mandrel and tubular shell during elongation in the restrained bar Diescher elongator. The mlmerals 18, 20 designate genera~ly the shell inserter and bar inserter sections on the loading side of the Diescher mill, which is generally designated by the reference numeral 19. In the loading eonfiguration, the mandrel bar 50 is fully retracted to a position in which the tip seetion 51 of the mandrel clears the shell ir~erter section sufficiently for loading of a tubular shell 52 of whatever length is being processed.
After loading of a shell onto the shell inserter section, the mandrel thrust block 53 is actuated Eorwardly to advance the mandrel 50 through the interior of the hollow shell 52 until the tip area 51 of the mandrel emerges from the leading end of the tubular shell. The mandrel may be projected s~ightly out of the forward end of the shell. A distance of about two feet is typical.
During the bar insertion stage, forward movement of the tubular shell 52 is restrained by a retaining plate 54, which is elevated to a position to engage the tu~ular shell9 while allowing passage of the mandre]L.
After the initial insertion of the mandrel b~r, the shell retainer plate 54 is retracted and a shell pusher plate 55 is advaneed, along with the thrust block 53, to move the shell and mandrel bar together into the throat of the Diescher elongator 19.
Once the she~l 52 is engaged by the working rolls of the Diescher elongator, further movement of the shell is under the control of those rolls.
At this stage, the thrust block 53 is restrained, such that its forward motion may continue, although at a subtantiaUy lower rate of speed than the speed of a free floating mandrel bar.
For example9 during the advance of a thirty foot long incoming shell through the mill, resulting in a Diescher-elongated shell of seventy-seventy-five feet, the restrained mandrel bar may be permitted to advance forward a distance of, say, six feet.
As the trailing end of the tubular shell clears the throat of the 20 Diescher mill, the mandrel and shell are caused to advance together for a short distance, until the trailing end of the elongated tube reaches a stripping facility, which may be a set of rolls or a retractable stripper plate. At this stage, the mandrel is retracted relative to the elongated tube, completely separating the mandrel and a~lowing the tube to continue on its own to the next stage of operation, which is the sizing mill. The mandrel is thereupon fully retracted through the throat of the mill and to a position upstream of the shell inserter, in preparation for the introduction of the next shell to the Diescher elongator stage.
As the trailing end of the shell leaves the throat of the elongator, 30 as reflected in Fig. 7, the mandrel thrust bloclc 53 is released for forward movement with the shell to a point slightly beyond a stripper plate 56 (see Fig.

8). The stripper plate is then elevated to engage the trailing end of the shell, after wh;ch the mandrel bar 50 is retracted by the thrust block 53 to strip the mandrel from the elongated shell and allow the shell to be further processed in the sizing mill and subsequent processing stages. The mandrel bar 50 is, at this juncture, fully retracted in preparation for the loading of the next shell.
Depending upon operating conditions, the mandrel rnay be immediately relubricated and reused, or it may be removed for cooling and/or lubrication and replaced by a fresh mandrel.
A significant aspect of the new process is the use of a Diescher mill in a restrained bar mode, wherein the mandrel bar, instead of floating free with the shell, as the shell is passed through the Diescher mill, is phsically restrained to ddvance at a fraction of the discharge speed of the shell from the Diescher el~ngator. In a typical case, for example, the advance of the mandrel would be at a rate of one sixth or less of the rate of advance of the elongated she~l from the discharge side of the Dieseher elongator. Additionally, the guide discs provided on the Diescher mi~l are operated more in the mode typical of a modern Diescher piercing mill, rather than a Diescher elongator, in that the peripheral speed of the guide discs is approximately the output speed of the elongated tube, rather than two to three times that speed as is more typical of known conventional practice.
The layout reflected in Fig. 2 is particularly advantageous for the processing of long billets, to achieve so-called "double length" pipe, up to ninety-six feet cropped length. ~Jsing two stages of Mannesmann piercers, the first for piercing purposes and the second as a No. 2 piercer (elongator), followed by a Diescher elongator. In accordance with the invention, it is possible to achieve high quality seamless tubing with overall elongations, billet to finished tubing, of eleven-to-one and greater7 as output from the sizing mill. With a relatively modest capital investment, in relation to typical high production seamless tube mills, it is possible to provide for production of quality seamless tubing at rates in excess of 200,000 tons per year.
It should be understood, of course, that the specieic forms of the :
invention herein illustrated ~nd described are intended to be representative only, as cert~in changes may be made therein without departing fro~ the clear teachings of the disclosure. Aecordingly, reference should be made to the following appended claims in determining the full scope of the invention.

Claims (4)

The embodiments of the invention in which an exclusive property or privilege is claimed are defined as follows:-
1. The process of making seamless tubing, which comprises (a) furnishing a heated, solid billet of predeter-mined length and diameter, (b) piercing said billet in a Mannesmann type cross roll piercer to effect elongation of said billet in an amount of from about 60% to about 270%, (c) further elongating the pierced billet in an amount of from about 60% to about 160% by means of a Diescher type cross roll elongator having an internal mandrel and opposed guide discs engaging the surface of the pierced billet, (d) restraining the mandrel of said Diescher elongator to advance at a rate not more than about one sixth the rate of advance of elongated tubing on the discharge side of said Diescher mill.
2. The process of claim 1, further characterized by (e) operating the guide discs of said Diescher mill at peripheral speeds not substantially in excess of the output speed of the elongated tubing being discharged from said mill.
3. The process of claim 1, further characterized by performing an intermediate elongating step by means of a Mannesmann type cross roll piercing type elongator.
4. The process of making seamless tubing, which comprises (a) furnishing a heated billet of predetermined length and diameter, (b) piercing said heated billet using cross roll piercer equipment and so conducting said piercing operation as to elongate said billet in the amount of from about 60% to about 270%, (c) elongating said pierced heated billet by means of a Diescher type cross roll elongator having an internal mandrel and opposed guide discs engaging the surface of said pierced billet, (d) during said elongating operation, restraining movement of said mandrel, relative to the discharge velocity of the pierced billet down-stream of the working rolls of said elongator, to a rate of approximately one sixth or less of said discharge velocity, (e) driving said guide discs to rotate at a surface speed not substantially in excess of the discharge velocity of said tubular shell, and (f) so carrying out said elongating step that the pierced billet is further elongated from about 60%
to about 160%.
CA000455211A 1983-08-02 1984-05-25 Seamless tube mill Expired CA1247885A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US51956483A 1983-08-02 1983-08-02
US519,564 1983-08-02

Publications (1)

Publication Number Publication Date
CA1247885A true CA1247885A (en) 1989-01-03

Family

ID=24068848

Family Applications (1)

Application Number Title Priority Date Filing Date
CA000455211A Expired CA1247885A (en) 1983-08-02 1984-05-25 Seamless tube mill

Country Status (6)

Country Link
JP (1) JPS6076207A (en)
CA (1) CA1247885A (en)
DE (1) DE3426224A1 (en)
FR (1) FR2550719B1 (en)
GB (1) GB2144352B (en)
ZA (1) ZA845090B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101927260A (en) * 2010-07-13 2010-12-29 江苏振达钢管集团 Seamless steel pipe hot-rolling multiple perforation production process
DE102015212905B4 (en) * 2015-07-09 2020-10-01 Sms Group Gmbh Apparatus and method for manufacturing seamless tubes

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT141728B (en) * 1931-04-04 1935-05-10 Diescher & Sons S Process for the production of seamless tubes.
US1949933A (en) * 1932-03-25 1934-03-06 Grasselli Chemical Co Sulphur burner
US1946933A (en) * 1932-03-31 1934-02-13 Diescher Tube Mills Inc Tube-making apparatus
US1951348A (en) * 1932-09-02 1934-03-20 Diescher Tube Mills Inc Method of cross-rolling
US2006336A (en) * 1933-05-22 1935-07-02 Diescher Tube Mills Inc Tube elongating apparatus and method
US2048925A (en) * 1933-10-19 1936-07-28 Diescher Tube Mills Inc Tube manufacturing apparatus
US3593553A (en) * 1968-07-12 1971-07-20 Blaw Knox Co Method and apparatus for rolling tubes
GB1575859A (en) * 1977-04-18 1980-10-01 Aetna Standard Eng Co Process for the production of seamless tubular products
FR2443884A1 (en) * 1978-12-15 1980-07-11 Vallourec MANUFACTURING OF TUBES WITHOUT WELDING OF STRONG DIAMETERS
GB2089702B (en) * 1980-12-19 1984-08-30 Nippon Kokan Kk Method of manufacturing seamless steel pipes
GB2099346B (en) * 1981-04-16 1985-03-13 Head Wrightson Mach Tube rolling mill

Also Published As

Publication number Publication date
DE3426224C2 (en) 1992-01-02
JPS6076207A (en) 1985-04-30
GB8416450D0 (en) 1984-08-01
GB2144352A (en) 1985-03-06
FR2550719A1 (en) 1985-02-22
ZA845090B (en) 1985-05-29
GB2144352B (en) 1986-06-04
DE3426224A1 (en) 1985-02-21
JPH0224162B2 (en) 1990-05-28
FR2550719B1 (en) 1987-08-07

Similar Documents

Publication Publication Date Title
US4798071A (en) Seamless tube production
US6089066A (en) Process for the production of seamless tubes
US4578974A (en) Seamless tube mill
CN1019276B (en) Method and apparatus for tube-rolling of reducing tube bloom extremity
US3392565A (en) Manufacture of seamless tubing
US4318294A (en) Method of manufacturing seamless metal pipes and tubes
US4416134A (en) Process for manufacturing seamless metal tubes
CA1247885A (en) Seamless tube mill
US4289011A (en) Continuous pipe rolling process
US4487049A (en) Working mandrel and method of rolling elongate hollow pieces in a multi-stand continuous mill on same working mandrel
JPH0536121B2 (en)
US4406143A (en) Return pass practice for the high mill of a seamless-pipe mill
GB2128121A (en) Producing seamless pipes by rolling
US4491006A (en) Method and apparatus for coiling strip between the roughing train and the finishing train
US4353238A (en) Method for manufacture of seamless metal tubing by continuous rolling
GB1575859A (en) Process for the production of seamless tubular products
SU1022760A1 (en) Method of longitudinal rolling of tubes
US4178789A (en) Simultaneous plug-mill rolling for increased production and enhanced tube quality
US2216718A (en) Manufacturing metallic tubular articles
US2050236A (en) Apparatus for forming tubular blanks
JPS6035206B2 (en) Seamless steel pipe manufacturing method
RU2823281C1 (en) Method of longitudinal rolling of pipes at automatic pipe rolling mill
US721214A (en) Art of elongating tubes.
SU863021A1 (en) Screw rolling mill
US1970570A (en) Method and apparatus for tube manufacture

Legal Events

Date Code Title Description
MKEX Expiry
MKEX Expiry

Effective date: 20060103