CA1052544A - Apparatus and method for manufacturing prestressed concrete railway ties - Google Patents

Apparatus and method for manufacturing prestressed concrete railway ties

Info

Publication number
CA1052544A
CA1052544A CA239,823A CA239823A CA1052544A CA 1052544 A CA1052544 A CA 1052544A CA 239823 A CA239823 A CA 239823A CA 1052544 A CA1052544 A CA 1052544A
Authority
CA
Canada
Prior art keywords
mould
sections
concrete
cutting
wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CA239,823A
Other languages
French (fr)
Inventor
Cipriano Da Re
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Canfarge Ltd
Original Assignee
Canfarge Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Canfarge Ltd filed Critical Canfarge Ltd
Priority to CA239,823A priority Critical patent/CA1052544A/en
Priority to BR7607306A priority patent/BR7607306A/en
Application granted granted Critical
Publication of CA1052544A publication Critical patent/CA1052544A/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/06Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

ABSTRACT OF THE DISCLOSURE

A continuous piece of concrete is first cast in an elongated casting mould mounted on a prestressing bench, after transfer of the prestressing force to the hardened concrete, the continuous piece of concrete is cut into a series of sections, each containing a certain number of railway ties.
These sections are then removed from the casting mould, placed on a roller conveyor and then brought to a second cutting station where they are cut to form individual units. The invention also concerns a novel construction of a casting mould for the specific manufacture of such tie.

Description

105'~54~

FIELD OF THE INVENTION
This invention relates to an apparatus and method for manufacturing prestressed concrete railway ties and, more particularly, to the manufacture of a multiplicity of these ties without affecting the properties of each individual tie.
BACKGROUND OF THE INVENTION
The use of concrete railway ties in replacement of the standard wood ties is increasingly accepted in the con-struction of railways. However~ the manufacture of individual prestressed concrete ties is expensive and time-consuming so that there is a need for providing a method and apparatus whereby a series of ties may be simultaneously formed for each concrete pouring operation, a method and apparatus which would also permit a high degree of mechanisation of the production processes.
An important requisite for the performance in service of a precast tie is the bond developed between the high tensile steel and the concretei the bond must transfer the full pre-stressing force into the concrete as close as possible from the end of the tie to permit the presence of this force in the rail seat area. Pouring of the precast ties as a continuous piece of concrete provides the best conditions to develop the best possible bond. Furthermore because of the sawing operations, which cut the concrete as well as the wires, the end of the prestressed steel penetration from the concrete face can be measured and the anchor length of the prestressing force be computed. Each tie can also be visually inspected for the meeting of this essential requirement.
However, it is difficult to make the ties as a con-tinuous piece of concrete due to the particular shape of arailway tie. Indeed, the monobloc concrete railway tie must 1C~5ZS44 include, as an integral part thereof, iron shoulders to anchor track fastening devices; therefore, the casting mould must be capable of holding these anchoring shoulders in position until the concrete is set. Secondly, the concrete railway tie must be prestressed; hence, the casting mould must be particularly constructed to allow it to move as the tension on the pre-stressing wires is transferred to the concrete.
STATEMENT OF THE I NVE NT I ON
The problems in the making of a multiplicity of pre-stressed concrete railway ties are overcome by the provisionof an apparatus that includes an elongated casting mould particularly constructed to allow the securing and positioning of these iron shoulders as well as the movement of the casting mould after the transfer to the concrete of the tensioning force of the prestressing wires.
The elongated casting mould of the present apparatus is formed of a series of inter-connected individually-movable mould sections having bottom and side walls and each corre-sponding in shape to that of individual railway ties; each bottom wall includes a series of appropriately located openings for securing therein a series of rail anchor devices; means are provided at opposite ends of the longitudinal casting mould to exert a pull on the casting mould to provide a gap of pre-determined extent between each of the interconnected movable mould sections, the gap being closed by the transfer of the prestressing force of the wires to the continuous piece of concrete; cutting means are provided for a first cutting of the continuous piece of concrete into a plurality of tie sections having a given number of individual railway ties while means are provided for removing the sections from the mould for a second cutting of these sections into individual 105'~544 railway ties.
The invention also relates to a novel method of manufacturing multiple prestressed concrete railway ties with a longitudinal casting mould which is formed of a series o~ interconnected, individually movable mould sections, comprising the steps of:
- exerting a pull at opposite ends of the casting mould to provide a gap to a predetermined extent between each of the interconnected mould sections;
- securing in a series of openings appropriately located in the bottom wall a longitudinal casting mould, a corre-sponding number of rail anchor deYices;
- placing longitudinally in the mould a series of pre-stressing wires;
- anchoring the wires at opposite ends of the mould and exerting on the wires a predetermined prestressing force;
- pouring concrete in the mould around the anchor devices and the wires to form a continuous piece of prestressed concrete;
- curing the piece of concrete;
- transferring the prestressing force to the concrete whereby the predetermined force tends to close said gap;
- effecting a first cutting of the piece of concrete to form a plurality of tie sections, each having a,given number of individual railway ties;
- removing the sections from the mould and depositing the sections on conveyor means; and - effecting a second cutting in the sections to form a plurality of individual ties.
BRIEF DESCRIPTION OF THE DRAWINGS
Other objects, purposes and characteristic features ~ - ~

105'~544 of the present invention will be, in part, obvious from the accompanying drawings, and in part, pointed out as the description of the invention progresses. In describing the invention in details, reference will be made to the accompany-ing drawings, in which like reference characters designatecorresponding parts throughout several views.
Figure 1 is a top plan view showing a lay-out of some of the components of the apparatus used in carrying out the method of the present invention;
Figure 2 is a perspective view showing a portion of one tie-containing section after a first cutting stage;

-'3a -105i~544 Figure 3 is a perspective, partly broken away, view of a portion of the longitudinal casting mould;
Figure 4 is a top plan view showing a portion of the longitudinal casting mould wi~h the means for securing the anchor devices in position;
Figure 5 is a cross-sectional view taken along lines 5-5 of Fig. l;
Figure 6 is an elevational view of a lifting device used in the present invention;
Figure 7 is an elevation cross-sectional view showing the concrete pouring cart in operation on the working bench;
and Figure 8 is an elevational view showing the clamping devices at the second cutting station.
DESCRIPTION OF PREFERRED EMBODIMENTS
With reference to Fig. 1, there is shown a general lay-out of some of the components used in the carrying out of the method of the present invention.
In the embodiment illustrated, there is shown a first longitudinally extending bench 10 on which is mounted an elongated casting mould, generally denoted as 12, and including, in side-by-side arrangement two identically shaped forms 13;
the number of these forms may evidently vary. In the de-scription given hereinbelow, reference will be made to a mould even though the steps of the method described will be carried out, usually simultaneously, on both forms. Mould 12 is first cleaned and coated with a releasing agent, either manually or mechanically, with the assistance of a cart 14 which is adapted to be mounted and to roll on bench 10. A second roller cart 16 is then mounted on the bench and serves in the placing of iron shoulders and prestressing wires 18 in the casting 1~5~549~

mould. These wires are anchored to stressing heads 20 provi ded at each end of the casting mould and then, tensioned by means of hydraulic jacks 22. The pouring and f;n;shing of the concrete in the longitudinal mould is performed by a self-prope11ed machine 24 which is also adapted to travel along bench 10.
Insulated curing covers 26 are then placed over the casting mould and curing is carried out. The prestressing force in the wires is transferred to the concrete when the latter is suf-ficiently hardened. The continuous piece of concrete formed is cut directly in position in the casting mould by means of a longitudinally displaceable cutt;ng dev;ce 27 to thereby form tie sect;ons having a given number of individual ra;lways ties.
These tie sections are then picked up by a lifter 28, which is longitudinally displaceable along the bench, and are deposited on a roller conveyor 30 runn;ng parallel to the prestressing bench. The t;e sections are then moved to a second cutting station 32 where, after being mechanically located and clamped, they are cut ;nto individual railway ties. As the concrete ties move over the conveyor, before and after the second cutting operation, the ties are inspected for concrete geometry, position of rail anchor devices, position and penetration of prestressing wires from the face of the side walls of the concrete tie, and for surface appearance of concrete. At this point, the ties are handled by overhead hoist, cubed and rolled outside of the production area for yarding by a lift truck or to a tester 34 where individual ties are subjected to static loading tests at the rail seat.
In Fig. 1, a second bench 11 is illustrated to show that two longitudinally extending benches may be provided so that, during the carrying out of some of the first steps of the method, curing may be carried out on this second bench.

~ _ 105;~54~

Referring to Fig. 2 there is shown a portion of a tie section immediately after having gone through the first cutt;ng operation and after it has been removed by lifter 28 from the casting mould 12. This tie section contains a series of indi-vidual ties (preferably five, however, only two ties 36 and 38have been partly shown in the drawings) having a bottom face 40, opposite inclined side faces 42 and 44 and an upper face which includes two slightly inclined railway seat portions 46, 48, two further inclined faces 50 and 52 and one flat central portion 54. Each seat portion includes a pair of malleable iron shoulders 56 and 58 which are integrally cast with the tie, as described hereinbelow. These shoulders serve to anchor rail fastening devices, such as rubber bearing pads, nylon lined steel clips (providing track gage control between the shoulders and electrical insulation), and spring steel anchors which are inserted in and over the shoulder to secure the rail to the tie, these rail fastening devices have not been shown since they are not part of the present invention. Between ties 36 and 38 illustrated in Fig. 2, a slit 60 is provided and its function and mode of making will hereinafter be described.
A series of prestressing wires 62 (or strands) are embedded in the railway tie and their arrangement and number are determined by the specific use of the railway tie and are not, as such, part of the present invention.
Referring to Fig. 3, casting mould 12 is formed of a series of contiguous interconnected mould sections 64, each including faces 66,68,70,72,74,76 and 78 corresponding in shape to faces 42,44,46,48,50,52 and 54, respectively, of the con-crete tie 36. These mould sections are mounted for movement on rollers 80 over bench 10 and are appropriately attached lengthwise by suitable joint means, such as bolts 82, ;nter-1~)5i~544connecting adjacent flanges 84 and 86 of two adjacent mould sections 64. A transverse gap forming a slot 88 is left between two adjacent mould sections; a separator plate 90 is received in the lower portion of this slot, and rests on the bottom wall of the casting mould. The separator plates 90 will form slits 60 in the concrete wh;ch serve to reduce concrete area for both first and second cutting operat;ons.
Since the first cutting operation is carried out when the piece of concrete is still in the casting mould, it may be preferable to ha~e the width of the slots used in connection with the first cutting operation, slightly larger than the other slots so as to allow suitable access for the cutting saw 27. The positioning of the cutting saw 27 relative to the casting mould 12 is carried out by means of guiding holes 83 in the central protruding portion 81 of the mould; locking pin means (not shown) extend through holes 83 when in registry with holes 85 of the cutting saw means 27.
The purpose of slots 88 is to allow, once the pre-stressing force in the wires is transferred to the concrete, a certain movement of the mould section 64 as a result of the slight longitudinal contraction of the concrete. The absence of such slots would cause deformation of and damage to the casting mould once the prestressing force is released at opposite ends of the casting mould. This movement of the casting mould is assisted by the supporting rollers 80 situated there-beneath. After the tie sections are removed from the casting mould, it is necessary to stretch the casting moulds to regain their original casting position. This is accomplished by tensioning devices 87, shown at one end of bench 10 in Fig. 1.
The stretching of the mould sections is carried out until the heads of bolts 82 abut against their corresponding mould 105~544 flanges 8~.
Each ~ould 64 includes in its bottom wall four open-ings 92 to receive the head portion of the rail anchor devices 56 and 58. Referring to Fig. 4, these anchor devices are secured in openings 92 by means of two movable lugs 94 and 96 of a locking mechanism, generally denoted 98, the lugs fitting into bore 100 of the anchor heads. A locking rod 102 extends outside the casting mould side wall to allow movement of locking lugs 94 and 96 in and out of bore 100.
Figure 5 shows the working bench 10 on which is mounted the casting mould 12. The working bench 10 includes on opposite sides thereof a pair of flanges 104 and 106 acting as rails on which the various carts are adapted to roll and as support for a curing frame 108. This frame is covered with curing covers 26 prefabricated in short section and preferably insulated. The casting mould 12, as indicated above, is mounted on rollers 80 and is spaced from the upper surface of the working bench 10 by means of spacing elements 112 and 114 so as to allow the running of two steam lines 11~ and 118.
Referring to Fig. 6, lifter 28 is a overhead sus-pended device which includes, at one end thereof, pivotable air suction means 120 which become fixedly attached to the tie sections to remove them from the casting mould and rotate them 180 whereby they are subsequently deposited on roller conveyors 30 (see Fig. 1).
Referring to Fig. 7, the concrete feeder 24 is mounted on rollers 128 so that it may longitudinally travel on the opposite rail flanges 104 and 106 of the working bench 10. The cart is self-propelled and includes a platform 122 for the operator. It also includes a hopper 124 in ~hich are mounted internal vibrator means 126 to assist in the dispensing of lOS;~S44 concrete in the casting nlould. The machine further includes external vibrator means (not shown) and a trowelling plate 126 to finish off the bottom face of the tie being cast. A
cylindrical roller 128 having a series of small projecting heads is also mounted at the rear to form small cavities in the upper face of the piece of concrete to provide better friction in service between the tie and the ballast. At the opposite end of the feeder, a pair (for each casting fo~m) of wire supporting and positioning devices 127 are mounted and serve to accurately position the wires, which were pre-cut and stored in the bench side trough 131 (see F;gure 5), in the casting moulds just prior to concrete feeding.
Referring to Fig. 8, the second cutting station 32 is shown where sections of railway ties are cut into individual units. In order to fixedly secure tie section 36 for the second cutting operation, there is provided a clamping device that includes air jack means 132 and which lift section 36 off the roller conveyor 136 and push it against stoppers 140 (as illustrated by the dotted lines). To accurately position this tie section 36 relative to the saw 130, device 138, which is fixed relative to saw 130, includes two spring-biased arms 142 and 144 which bear against the inside faces of the two shoulder heads 56 and 58 respectively. When it is fixedly secured and positioned, the saw is aligned with slits 60 which, as explained above, were formed by the separator plates 90 to produce a reduction in the cutting operation.
To recapitulate a brief description of one preferred form of carrying out the method of the present invention will now be given. First, the casting mould 12 is stretched to provide the desired spacing 88 between each mould section 64.
Then, the casting mould 12 is cleaned and oiled. Dividing 10~'~44 plates 90 are placed at their proper location in spacings 88.
The prestressing steel wires 18 are cut to length and placed in trough 131 adjacent the bench 10. The rail anchor devices 56,58 are placed in the casting mould together with the wires 18.
The anchor devices are secured in place in their proper openings by operating locking rod 102 in each mould section. The wires are anchored at head 20 and tensioned by means of hydraulic jacks 22. The concrete is then poured in the casting mould, the device 127 ensuring the exact positioning of the wires.
The concrete is then covered and cured. After a predetermined time interval, tension on the mould is released and the pre-stressing force in the wires is transferred to the concrete by releasing jacks 22. The mould is then uncovered and a first cutting operation of concrete and wires is carried out directly in the casting mould to produce sections of multiple ties.
The next step consists in stripping these sections, turning them upside down by means of lifter 28 and positioning them on top of roller conveyors 30. Then, the sections are moved to a second cutting station 32 where they are cut into individual ties. The following steps may consist in inspecting and testing the ties. The individual ties are then cubed and rolled outside the plant for yarding.

Claims (23)

The embodiments of the invention in which an exclu-sive property or privilege is claimed are defined as follows:
1. In an apparatus for manufacturing multiple pre-stressed concrete railway ties, a longitudinal casting mould to first form a continuous piece of concrete containing a series of longitudinally extending prestressing wires therein and to which the prestressing force of said wires is transferred, said mould being formed of a series of inter-connected individually-movable mould sections having bottom and side walls and each corresponding in shape to that of individual railway ties, each said bottom wall having therein at predetermined locations a series of openings for receiving therein a series of rail anchor devices; means at opposite ends of said longitudinal casting mould to exert a pull on said existing mould to provide a gap of predetermined extent between each of said interconnected movable mould sections, said gap being closed by the transfer of the prestressing force of said wires to said continuous piece of concrete; cutting means to effect a first cutting of said continuous piece of concrete into a plurality of sections having a given number of indi-vidual ties; means for removing said sections from said mould for a second cutting thereof into individual railway ties.
2. In an apparatus as defined in Claim 1, an elongated horizontal bench supporting said casting mould.
3. In an apparatus as defined in Claim 2, roller means disposed between said bench and said mould sections for allowing relative movement of said mould sections to one another.
4. In an apparatus as defined in Claim 3, joint means inter-connecting adjacent mould sections; said joint means allowing said relative movement of said mould sections.
5. In an apparatus as defined in Claim 1, separator plates received in said gap adjacent the bottom wall of each mould section; said plates forming in said continuous piece of concrete transverse slits serving to reduce said first and second cutting operations.
6. In an apparatus as defined in Claim 1, guide means consisting of a series of holes on said mould adjacent said gap for locating said cutting means for said first cutting operation.
7. In an apparatus as defined in Claim 1, means adjacent said bottom wall for securing said rail anchor devices in said openings.
8. In an apparatus as defined in Claim 2, curing means mounted on said bench; said curing means including a dome-like frame supporting a heat-resistant cover to form an enclosed area over said bench; and steam conduit means extend-ing longitudinally under said mould to circulate curing vapour therearound.
9. In an apparatus as defined in Claim 2, trough means on sidewalls of said bench for storing said prestressing wires prior to being used in- said continuous piece of concrete;
cart means adapted to move longitudinally on said bench for removing said wires from said support means and for positioning said wires in said mould; means at opposite ends of said mould for supporting and tensioning said wires.
10. In an apparatus as defined in Claim 2, self-propelled means adapted to move longitudinally on said bench for feeding concrete in said casting mould.
11. In an apparatus as defined in Claim 12, vibrator means in said concrete feeding means to assist in the placing of said concrete in said casting mould.
12. In an apparatus as defined in Claim 1, said cutting means consist of saw means adapted to move longitudi-nally adjacent said mould for cutting said continuous piece of concrete into tie sections of a given number of railway ties.
13. In an apparatus as defined in Claim 1, conveyor means extending adjacent said mould; said means for removing said sections out of said casting mould depositing said sections on said conveyor means.
14. In an apparatus as defined in Claim 13, said removing means including air suction means adapted to be fixedly attached to said sections and rotating means for effecting a 180° rotation of said sections before being deposited on said conveyor means.
15. In an apparatus as defined in Claim 1, station means for effecting said second cutting including a circular saw and fixing means for accurately positioning said sections relative to said saw; said fixing means including clamping means and a pair of arms adapted to be fixedly received between two adjacent rail anchor devices of a railway tie;
and means for lifting said sections in fixed engagement with said clamping means.
16. In an apparatus as defined in Claim 1, said casting mould consists of two longitudinally parallel casting forms of identical shape and construction.
17. A method of manufacturing multiple prestressed concrete railway ties with a longitudinal casting mould which is formed of a series of interconnected, individually movable mould sections, comprising the steps of:
(a) exerting a pull at opposite ends of the casting mould to provide a gap to a predetermined extent between each of said interconnected movable mould sections, (b) securing in a series of openings appropriately located in the bottom wall of said longitudinal casting mould, a corresponding number of rail anchor devices, (c) placing longitudinally in said mould a series of pre-stressing wires, (d) anchoring said wires at opposite ends of said mould and exerting on said wires a predetermined prestressing force, (e) pouring concrete in said mould around said anchor devices and said wires to form a continuous piece of pre-stressed concrete, (f) curing said piece of concrete, (g) transferring said prestressing force to said piece of concrete whereby the prestressing force tends to close said gap, (h) effecting a first cutting of said piece of concrete to form a plurality of sections, each section having a given number of individual railway ties, (i) removing said sections from said mould and depositing said sections on conveyor means, and (j) effecting a second cutting in said sections to provide a plurality of individual railway ties.
18. A method as defined in Claim 17, cleaning said casting mould and coating said mould with a releasing agent prior to said anchor positioning step.
19. A method as defined in Claim 17, vibrating said concrete while pouring.
20. A method as defined in Claim 17, wherein said curing is carried out by covering said mould with a dome-like covered frame and by circulating steam from running steam-lines located under said mould.
21. A method as defined in Claim 17, wherein two parallel casting moulds are provided in side-by-side arrangement and wherein said steps are simultaneously carried out on both moulds.
22. A method as defined in Claim 17, mechanically locating and clamping said sections prior to said second cutting step.
23. A method as defined in Claim 17, placing in said gap between said mould sections, prior to said anchor positioning step, a series of separator plates for reducing cutting area in said concrete piece, removing said plates during said curing step.
CA239,823A 1975-11-17 1975-11-17 Apparatus and method for manufacturing prestressed concrete railway ties Expired CA1052544A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA239,823A CA1052544A (en) 1975-11-17 1975-11-17 Apparatus and method for manufacturing prestressed concrete railway ties
BR7607306A BR7607306A (en) 1975-11-17 1976-11-01 APPLIANCE AND PROCESS FOR MANUFACTURING CONCRETE DORMENTES PROTENDED FOR RAILS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA239,823A CA1052544A (en) 1975-11-17 1975-11-17 Apparatus and method for manufacturing prestressed concrete railway ties

Publications (1)

Publication Number Publication Date
CA1052544A true CA1052544A (en) 1979-04-17

Family

ID=4104540

Family Applications (1)

Application Number Title Priority Date Filing Date
CA239,823A Expired CA1052544A (en) 1975-11-17 1975-11-17 Apparatus and method for manufacturing prestressed concrete railway ties

Country Status (1)

Country Link
CA (1) CA1052544A (en)

Similar Documents

Publication Publication Date Title
US4102957A (en) Apparatus and method for manufacturing prestressed concrete railway ties
FI65183C (en) SAETT ATT TILLVERKA BETONGSLIPERBLOCK SAMT MATRISUPPSAETTNING FOER UTFOERANDE AV SAETTET
CA1178795A (en) Apparatus and method for making prestressed concrete products
US4952129A (en) Plant to manufacture elongated elements of prestressed reinforced concrete
US3055073A (en) Method and apparatus for the continuous production of prestressed concrete members
US2394227A (en) Production of prestressed reinforced concrete units
US4242071A (en) Concrete railroad tie casting and handling system
US4495127A (en) Method of manufacturing concrete sleeper blocks
US2394228A (en) Apparatus and method for the production of prestressed concrete sleepers
CA1052544A (en) Apparatus and method for manufacturing prestressed concrete railway ties
CA1043078A (en) Apparatus for producing concrete reinforced ties
US4240776A (en) Process and apparatus for continuously prestressing concrete products
US3128521A (en) Apparatus for molding pre-stressed concrete members
CA2212644A1 (en) An apparatus and method to manufacture cast panels
US4253817A (en) Concrete railroad tie casting and handling system
US3694118A (en) Production of prestressed concrete
US5035592A (en) Apparatus for concrete supply and form vibration
CA1079498A (en) Manufacturing benches for moulded construction elements
US3274659A (en) Apparatus for forming concrete articles
CN107288347A (en) A kind of concrete placing installation and the concreting method using the equipment
EP0558590B1 (en) Apparatus for manufacturing prestressed concrete railway ties, and ties manufactured using such apparatus
CA1167240A (en) Moulding reinforced concrete articles
US3732053A (en) Apparatus for removing cured concrete articles from pallets
CN108394014A (en) Track plates Production line system and method
US4165215A (en) Slab preparation apparatus