BR112012033080A2 - sistema e método para controle de comformidade em um reservatório - Google Patents
sistema e método para controle de comformidade em um reservatórioInfo
- Publication number
- BR112012033080A2 BR112012033080A2 BR112012033080A BR112012033080A BR112012033080A2 BR 112012033080 A2 BR112012033080 A2 BR 112012033080A2 BR 112012033080 A BR112012033080 A BR 112012033080A BR 112012033080 A BR112012033080 A BR 112012033080A BR 112012033080 A2 BR112012033080 A2 BR 112012033080A2
- Authority
- BR
- Brazil
- Prior art keywords
- storage capacity
- reservoir
- compliance
- flow
- controlling
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 4
- 238000002347 injection Methods 0.000 abstract 2
- 239000007924 injection Substances 0.000 abstract 2
- 239000003550 marker Substances 0.000 abstract 2
- 239000004215 Carbon black (E152) Substances 0.000 abstract 1
- 230000002708 enhancing effect Effects 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 230000035699 permeability Effects 0.000 abstract 1
- 238000011084 recovery Methods 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/11—Locating fluid leaks, intrusions or movements using tracers; using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/162—Injecting fluid from longitudinally spaced locations in injection well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
sistema e método para controle de comformidade em um reservatório. são divulgados um sistema e método para otimizar o projeto de um tratamento de controle de comformidade para um reservatório subterrâneo. o sistema e o método incluem executar análise de marcador de desempenho entre um poço de injeção e um poço de produção. uma curva de capacidade de fluxo e de capacidade de armazenamento é construída a partir da análise do marcador. uma capacidade de armazenamento associada a um tempo de residência limiar é determinada utilizando a curva de capacidade de fluxo e de capacidade de armazenamento. é determinado um tratamento de controle de comformidade para a capacidade de armazenamento associada ao tempo de residência limiar. um tampão químico é injetado no poço de injeção para aumentar a resistência ao fluxo nas regiões de permeabilidade elevada de um reservatório subterrâneo intensificando, desse modo, a recuperação de hidrocarbonetos do reservatório.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US35831210P | 2010-06-24 | 2010-06-24 | |
PCT/US2011/041458 WO2011163369A2 (en) | 2010-06-24 | 2011-06-22 | A system and method for conformance control in a subterranean reservoir |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112012033080A2 true BR112012033080A2 (pt) | 2016-11-22 |
Family
ID=45353329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112012033080A BR112012033080A2 (pt) | 2010-06-24 | 2011-06-22 | sistema e método para controle de comformidade em um reservatório |
Country Status (8)
Country | Link |
---|---|
US (1) | US9121271B2 (pt) |
EP (1) | EP2598712A4 (pt) |
AU (1) | AU2011270916A1 (pt) |
BR (1) | BR112012033080A2 (pt) |
CA (1) | CA2801657A1 (pt) |
GB (1) | GB2496529A (pt) |
NO (1) | NO20130043A1 (pt) |
WO (1) | WO2011163369A2 (pt) |
Families Citing this family (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BRPI0923090A2 (pt) * | 2008-12-15 | 2016-02-10 | Chevron Usa Inc | método implementado por computador |
US8646525B2 (en) | 2010-05-26 | 2014-02-11 | Chevron U.S.A. Inc. | System and method for enhancing oil recovery from a subterranean reservoir |
US20130132052A1 (en) * | 2011-11-18 | 2013-05-23 | Chevron U.S.A. Inc. | System and method for assessing heterogeneity of a geologic volume of interest with process-based models and dynamic heterogeneity |
CN103556990B (zh) * | 2013-10-30 | 2016-03-16 | 大庆市永晨石油科技有限公司 | 一种采油井产能跟踪与评价方法 |
US20150226061A1 (en) * | 2014-02-13 | 2015-08-13 | Chevron U.S.A. Inc. | System and method for estimating flow capacity of a reservoir |
CN104265259A (zh) * | 2014-08-07 | 2015-01-07 | 员增荣 | 产能跟踪与评价方法 |
US10718186B2 (en) * | 2014-08-22 | 2020-07-21 | Chevron U.S.A. Inc. | Flooding analysis tool and method thereof |
CN104806215B (zh) * | 2015-04-02 | 2017-04-05 | 中国石油大学(华东) | 一种用于化学驱注入采出井动态关联度的识别方法 |
WO2018013096A1 (en) * | 2016-07-13 | 2018-01-18 | Halliburton Energy Services, Inc. | Methods for reducing fluid communication between wells |
CN107341567B (zh) * | 2017-06-19 | 2020-10-13 | 武汉大学 | 梯级水库群的库容置换计算方法 |
US10858931B2 (en) * | 2017-10-17 | 2020-12-08 | Saudi Arabian Oil Company | Enhancing reservoir production optimization through integrating inter-well tracers |
CN107939372B (zh) * | 2017-10-23 | 2020-03-06 | 南京特雷西能源科技有限公司 | 针对小断块油藏的最优井位部署方法和装置 |
CN107989600B (zh) * | 2017-12-13 | 2023-09-12 | 捷贝通石油技术集团股份有限公司 | 一种水基痕量化学示踪剂及用于测量注水井井间连通性的方法 |
US11280164B2 (en) * | 2019-04-01 | 2022-03-22 | Baker Hughes Oilfield Operations Llc | Real time productivity evaluation of lateral wells for construction decisions |
EP3976665B1 (en) | 2019-05-29 | 2023-11-29 | Saudi Arabian Oil Company | Flow synthesis of polymer nanoparticles |
US11566165B2 (en) | 2019-05-30 | 2023-01-31 | Saudi Arabian Oil Company | Polymers and nanoparticles for flooding |
US11773715B2 (en) | 2020-09-03 | 2023-10-03 | Saudi Arabian Oil Company | Injecting multiple tracer tag fluids into a wellbore |
US11660595B2 (en) | 2021-01-04 | 2023-05-30 | Saudi Arabian Oil Company | Microfluidic chip with multiple porosity regions for reservoir modeling |
US11534759B2 (en) | 2021-01-22 | 2022-12-27 | Saudi Arabian Oil Company | Microfluidic chip with mixed porosities for reservoir modeling |
CN113653486A (zh) * | 2021-09-03 | 2021-11-16 | 捷贝通石油技术集团股份有限公司 | 一种缓释型长效示踪剂及其制备方法 |
US11668182B1 (en) * | 2021-11-24 | 2023-06-06 | Saudi Arabian Oil Company | Determining sweet spots and ranking of a basin |
US12000278B2 (en) | 2021-12-16 | 2024-06-04 | Saudi Arabian Oil Company | Determining oil and water production rates in multiple production zones from a single production well |
WO2024058815A1 (en) * | 2022-07-06 | 2024-03-21 | Patina IP LLC | Continuous characterization and communication of chemical tracer |
CN116861714B (zh) * | 2023-09-05 | 2023-11-24 | 西南石油大学 | 一种确定缝洞型油藏水驱波及程度的方法 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3973629A (en) * | 1972-11-06 | 1976-08-10 | Knight Bruce L | Injection profiles with radiation induced copolymers |
US4159037A (en) * | 1978-05-01 | 1979-06-26 | Texaco Inc. | High conformance oil recovery process |
US4223725A (en) * | 1978-12-26 | 1980-09-23 | Texaco Inc. | Method for reservoir fluid drift rate determination |
US4299709A (en) * | 1979-05-09 | 1981-11-10 | Texaco Inc. | Tracer fluids for enhanced oil recovery |
US4287951A (en) * | 1980-06-30 | 1981-09-08 | Marathon Oil Company | Process for improving conformance and flow profiles in a subterranean sandstone formation |
US4445573A (en) | 1982-11-04 | 1984-05-01 | Thermal Specialties Inc. | Insulating foam steam stimulation method |
US4683949A (en) * | 1985-12-10 | 1987-08-04 | Marathon Oil Company | Conformance improvement in a subterranean hydrocarbon-bearing formation using a polymer gel |
US4903768A (en) | 1989-01-03 | 1990-02-27 | Mobil Oil Corporation | Method for profile control of enhanced oil recovery |
US5105884A (en) * | 1990-08-10 | 1992-04-21 | Marathon Oil Company | Foam for improving sweep efficiency in subterranean oil-bearing formations |
GB2255360A (en) | 1991-05-03 | 1992-11-04 | British Petroleum Co Plc | Method for the production of oil |
US6454001B1 (en) | 2000-05-12 | 2002-09-24 | Halliburton Energy Services, Inc. | Method and apparatus for plugging wells |
US6454003B1 (en) | 2000-06-14 | 2002-09-24 | Ondeo Nalco Energy Services, L.P. | Composition and method for recovering hydrocarbon fluids from a subterranean reservoir |
CA2481735A1 (en) | 2004-09-15 | 2006-03-15 | Alberta Science And Research Authority | Method for controlling water influx into cold production wells using sandy gels |
MX2008010008A (es) | 2006-02-10 | 2008-11-20 | Exxonmobil Upstream Res Co | Adaptacion a traves de materiales sensibles a estimulos. |
GB2471977B (en) | 2008-04-21 | 2012-10-24 | Nalco Co | Composition and method for recovering hydrocarbon fluids from a subterranean reservoir |
US8260595B2 (en) * | 2008-09-02 | 2012-09-04 | Schlumberger Technology Corporation | Intelligent completion design for a reservoir |
BRPI0923090A2 (pt) | 2008-12-15 | 2016-02-10 | Chevron Usa Inc | método implementado por computador |
-
2011
- 2011-06-22 US US13/166,259 patent/US9121271B2/en active Active
- 2011-06-22 GB GB1221475.5A patent/GB2496529A/en not_active Withdrawn
- 2011-06-22 EP EP11798847.7A patent/EP2598712A4/en not_active Withdrawn
- 2011-06-22 AU AU2011270916A patent/AU2011270916A1/en not_active Abandoned
- 2011-06-22 WO PCT/US2011/041458 patent/WO2011163369A2/en active Application Filing
- 2011-06-22 BR BR112012033080A patent/BR112012033080A2/pt not_active IP Right Cessation
- 2011-06-22 CA CA2801657A patent/CA2801657A1/en not_active Abandoned
-
2013
- 2013-01-09 NO NO20130043A patent/NO20130043A1/no unknown
Also Published As
Publication number | Publication date |
---|---|
CA2801657A1 (en) | 2011-12-29 |
US9121271B2 (en) | 2015-09-01 |
NO20130043A1 (no) | 2013-01-09 |
WO2011163369A3 (en) | 2012-04-12 |
AU2011270916A1 (en) | 2012-12-20 |
WO2011163369A2 (en) | 2011-12-29 |
GB2496529A (en) | 2013-05-15 |
EP2598712A4 (en) | 2016-03-30 |
EP2598712A2 (en) | 2013-06-05 |
US20110320128A1 (en) | 2011-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112012033080A2 (pt) | sistema e método para controle de comformidade em um reservatório | |
MX2015009248A (es) | Metodos y composiciones para tratar formaciones subterraneas con materiales dilatables de perdida de circulacion. | |
GB201301473D0 (en) | Implementing Enhanced Data Partial-Erase for Multi-Level Cell (MLC) Memory Using Threshold Voltage-Drift or Resistance Drift Tolerant Moving Baseline Memory | |
BR112014010082A8 (pt) | método, sistema de computador e meio não transitório lido por computador armazenando um programa | |
BR112014018245A8 (pt) | Composição e método para a recuperação de fluidos de hidrocarbonetos a partir de um reservatório subterrâneo | |
BR112018010294A2 (pt) | métodos para tratar uma formação portadora de hidrocarbonetos subterrânea ou um furo de poço e para aumentar eficiência de varredura | |
BR112014019875A8 (pt) | Método de recuperação de petróleo de um reservatório petrolífero subterrâneo | |
GB201301474D0 (en) | Implementing enhanced data read for multi-level cell (MLC) memory using threshold voltage-drift or reistance drift tolerant moving baseline memory data | |
BR112013018450A2 (pt) | sistema técnico, método e usos para a dosagem de pelo menos um meio de tratamento líquido em água de injeção para um poço de injeção | |
BR112014002036A2 (pt) | processo de fratura com água contendo material particulado | |
EA201590468A1 (ru) | Композиции для обслуживания ствола скважины и способы их получения и применения | |
MX2015004516A (es) | Procedimientos y sistemas para optimizar el sistema de cultivo de celulas de perfusion. | |
BR112016008830A2 (pt) | Método para produzir uma substância alvo | |
GB2531216B (en) | Method, system, and optimization technique to improve oil reservoir recovery in the water-alternating-gas injection process by using downhole control valves | |
GB201301472D0 (en) | Implementing Enchanced Data Write for Multi-Level Cell (MLC) Memory Using Threshold Voltage-Drift or Resistance Drift tolerant Moving Baseline Memory Data | |
AR092740A1 (es) | Formulacion de un tensioactivo para la liberacion de fluidos fosiles subterraneos | |
BR112016022909A8 (pt) | método de formação de um buraco de minhoca em um meio poroso, método, e modelo computadorizado para simular um tratamento de estimulação envolvendo uma reação química entre um fluido de tratamento e um meio poroso em uma formação subterrânea | |
郑泽宇 et al. | Visible research on remaining oil after nitrogen flooding in fractured-cavity carbonate reservoir | |
BR112013029667A2 (pt) | Método para injeção de água com baixa salinidade | |
BR112015021710A2 (pt) | inibição de produção de metano durante descloração redutiva anaeróbica | |
BR112013026173A2 (pt) | sistema de poço com furo principal lateral e furos laterais estrategicamente dispostos e métodos de formar | |
EA201200268A1 (ru) | Органические соли для уменьшения проницаемости породы | |
BR112015031904A2 (pt) | abordagem híbrida para casamento de histórico auxiliado em reservatórios grandes | |
GB2465312A (en) | Diverting agents for water shut off | |
BR112013011703A2 (pt) | método para controlar fluxo de fluido através de um ou mais caminhos em uma ou mais formações rochosas penetradas por um poço em um poço subterrâneo, método para curar circulação perdida em um poço subterrâneo penetrado por um poço, e método de tratamento de uma formação subterrânea penetrada por um poço |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] | ||
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |