AU783488B2 - Process of leaching a lateritic ore for preparing metal extraction - Google Patents
Process of leaching a lateritic ore for preparing metal extraction Download PDFInfo
- Publication number
- AU783488B2 AU783488B2 AU89338/01A AU8933801A AU783488B2 AU 783488 B2 AU783488 B2 AU 783488B2 AU 89338/01 A AU89338/01 A AU 89338/01A AU 8933801 A AU8933801 A AU 8933801A AU 783488 B2 AU783488 B2 AU 783488B2
- Authority
- AU
- Australia
- Prior art keywords
- suspension
- acid
- ore
- mixing line
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B3/00—Extraction of metal compounds from ores or concentrates by wet processes
- C22B3/04—Extraction of metal compounds from ores or concentrates by wet processes by leaching
- C22B3/06—Extraction of metal compounds from ores or concentrates by wet processes by leaching in inorganic acid solutions, e.g. with acids generated in situ; in inorganic salt solutions other than ammonium salt solutions
- C22B3/08—Sulfuric acid, other sulfurated acids or salts thereof
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B23/00—Obtaining nickel or cobalt
- C22B23/04—Obtaining nickel or cobalt by wet processes
- C22B23/0407—Leaching processes
- C22B23/0415—Leaching processes with acids or salt solutions except ammonium salts solutions
- C22B23/043—Sulfurated acids or salts thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Description
P/00/011 28/5/91 Regulation 3.2(2)
AUSTRALIA
Patents Act 1990 COMPLETE SPECIFICATION STANDARD PATENT Application Number: Lodged: Invention Title: Process of Leaching a Lateritic Ore for Preparing Metal Extraction The following statement is a full description of this invention, including the best method of performing it known to us A 8020 mg technologies ag Bockenheimer Landstr. 73-77 D-60325 Frankfurt/Main Case No. 00 00 23 C Process of Leaching a Lateritic Ore for Preparing Metal Extraction This invention relates to a process of leaching a lateritic ore, which contains nickel oxide and/or cobalt oxide, for preparing the extraction of at least one metal.
It is known that a tubular reactor plant substantially comprises three sections, namely the indirectly heated preheating zone, the reaction zone in the form of a dwell time tube, and finally the cooling and expansion system. During expansion, temperature and pressure are decreased by partial evaporation of the suspension. The steam obtained thereby can be used in the preheating zone.
When leaching oxide, it is known to add the chemicals which effect the digestion to the ore-water suspension before the preheater. The consequence is that the digestion reaction can already start before the dwell time tube at a reduced reaction rate, so that the entire reaction time is prolonged. It is disadvantageous that already during preheating with rising temperature various digestion products can be formed, which are undesired. Moreover, products of the digestion already starting in the preheater can form crusts therein, which can 2 greatly impede the transfer of heat. This encrustation can lead to increased maintenance costs and an only restricted availability of the plant.
It is the object underlying the invention to perform the above-mentioned process as inexpensively as possible and to ensure that there is no encrustation in the preheating zone.
In accordance with the invention, this is achieved in that from water and comminuted ore, of which at least 80 wt-% have grain sizes of not more than 0.5 mm, a pumpable suspension is formed, that the ore-containing suspension is passed through an indirectly heated preheating tube, the suspension being heated to 150 to 250 0 C, that the heated suspension is passed through a mixing line in which an acid in a minimum amount of kg and preferably at least 50 kg per 100 kg ore, calculated anhydrous, is admixed to the suspension, and that the acid-containing suspension is passed through a dwell time tube in which the dwell time of the suspension is at least 0.1 minutes and preferably at least 1 minute. Now, encrustation or disturbing corrosion need no longer be expected in the preheating tube.
Advantageously, the ore-containing suspension is pumped into the preheating tube, and in the preheating tube a static pressure of 30 to 200 bar and preferably at least 120 bar is maintained. Expediently, the increased pressure is also maintained in the mixing line and in the dwell time tube. The increased pressure leads to an increase of the boiling temperature and provides for higher operating temperatures. Leaching "is thereby intensified quite considerably, but without overproportionally increasing the investment costs. Surprisingly, sulfuric acid will be admixed to the suspension in the mixing line, but there may also be used some other mineral acid to improve leaching. It may be recommended to introduce the sulfuric acid or some other acid into the mixing line after hav- 3 ing been preheated to temperatures e.g. in the range from to 200 0 C and preferably at least 80 0
C.
The dwell time tube mostly is of considerable length, in order to achieve the desired dwell time of the suspension. The length of the dwell time tube usually is above I00 m and may also be more than 1000 m. To achieve the desired effect, the acid-containing suspension will be withdrawn from the dwell time tube with temperatures in the range from 250 to 350 0
C.
By means of the inventive process it is achieved that moving parts, which get in contact with the acid-containing suspension, can be omitted.
Embodiments of the process will be explained with reference to the drawing, in which: Fig. 1 shows a flow diagram of the process, Fig. 2 shows the region of the mixing line in a longitudinal section, and Fig. 3 shows an enlarged cross-section along line III-III of Fig. 2.
A container contains an ore-water suspension, which by means of the high-pressure pumpe is first of all passed through the preheating tube then through the mixing line and through the dwell time tube Subsequent to the dwell time tube an expansion container is provided, which may also have a multi-stage design. Subsequently, the suspension flows through line to the extraction known per se for metal recovery. The preheating tube is surrounded by a heating jacket through which flows a heating fluid steam or heat transfer oil). The preheating tube may 4 also be divided in several portions which are heated differently.
The mixing line is represented in a longitudinal section in Fig. 2 and in a cross-section in Fig. 3. The outer metal tube (4a) surrounds an inner lining in the form of acidresistant molded bricks (10) which are joined in an interlocked way. The molded bricks are conically tapered in certain portions in the direction of the flow direction (11) of the suspension. This results in a deliberate irregularity of the inside of the flow region of the mixing line. The acid which is added to the suspension through the feed line (12) is mixed due to the strong turbulence formed in the flow region after a short flow path. In contrast to the representation of Fig. 2, the desired turbulence for quickly mixing suspension and acid in the vicinity of the mixing line (4) can also be achieved by other stationary flow obstacles in the flow region of the suspension.
From the preheating tube the suspension usually comes with a temperature in the range from 150 to 250C and in the mixing line absorbs the acid in the necessary amount. The amount of acid addition depends on the composition of the ore, in particular with respect to oxidic components which react with the acid. When adding sulfuric acid, reaction heat is produced in the desired way by exothermal formation of sulfate. Subsequent to the mixing line the dwell time tube is provided, which usually has a length of more than 100 m and occasionally more than 1000 m.
In the vicinity of the preheating tube, the mixing line and the dwell time tube, there is usually ensured a static pressure of 30 to 200 bar and preferably at least 120 bar, in order to optimally achieve the desired digestion. The relief of pressure then is effected in the expansion container 5 where steam is released, which escapes via line This steam can be used e.g. in the heating jacket Example: In a plant corresponding to the drawing, lateritic nickel ore is treated, and in the container an aqueous suspension with a solids content of 32 wt-% and a density of 1.24 kg/l is provided. Per hour, 18 m 3 of this suspension are first introduced into the preheating tube and are then passed through the mixing line and the dwell time tube For the mixing line the following is applicable: Pressure at the inlet: 98 bar The temperature of the suspension at the inlet is 234 0 C and at the outlet 266 0
C.
Dwell time: 5 seconds Flow rate of the suspension: 1.5 m/sec Length of the mixing line: 7.5 m Inside diameter: 70-85 mm *.*.Thickness of the acid-resistant brick lining: about 150 mm.
Through line 1.74 t/h sulfuric acid with 98 wt-% H 2
SO
4 S are supplied, which has a temperature of 30'C. The dwell time tube has a length of 600 m, the dwell time of the suspension therein is 8 min. At the end of the tube the pressure is about 108 bar and the temperature is about 273 0
C.
Claims (6)
1. A process of leaching a lateritic ore, which contains nickel oxide and/or cobalt oxide, for preparing the ex- traction of at least one metal, characterized in that from water and comminuted ore, of which at least 80 wt-% have grain sizes of not more than 0.5 mm, a pumpable suspension is formed, that the ore-containing suspension is passed through an indirectly heated preheating tube, the suspension being heated to 150 to 250 0 C, that the heated suspension is passed through a mixing line in which an acid in a minimum amount of 10 kg per 100 kg ore, calculated anhydrous, is admixed to the suspension, and that the acid-containing suspension is passed through a dwell time tube, in which the dwell time of the suspension is at least 0.1 minutes.
2. The process as claimed in claim 1, characterized in that the ore-containing suspension is pumped into the pre- heating tube and in the preheating tube a static pres- .":.sure of 30 to 200 bar is maintained.
3. The process as claimed in claim 1 or 2, characterized in that sulfuric acid is admixed to the suspension in the mixing line.
4. The process as claimed in any of claims 1 to 3, charac- terized in that the acid-containing suspension is with- drawn from the dwell time tube with temperatures in the range from 250 to 350 0 C. The process as claimed in claim 1 or any of the preced- ing claims, characterized in that the suspension and the acid in the mixing line are guided along stationary flow obstacles. 7
6. The process as claimed in claim 1 or any of the preced- ing claims, characterized in that the acid is preheated to temperatures in the range from 40 to 2000C before they are introduced into the mixing line.
7. The process as claimed in claim 1 or any of the preced- ing claims, characterized in that the mixing line is at least partly brick-lined. DATED this 8th day of November 2001. )STI? mg tecehnloies ag 0CIhemg c 1 7 Of WATERMARK PATENT TRADEMARK ATTORNEYS 290 BURWOOD ROAD HAWTHORN. VIC. 3122.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10055550A DE10055550A1 (en) | 2000-11-09 | 2000-11-09 | Process for leaching lateritic ore containing nickel oxide and/or cobalt oxide comprises forming a pumpable suspension made from water and crushed ore, feeding through a preheating tube |
DE10055550 | 2000-11-09 |
Publications (2)
Publication Number | Publication Date |
---|---|
AU8933801A AU8933801A (en) | 2002-05-16 |
AU783488B2 true AU783488B2 (en) | 2005-11-03 |
Family
ID=7662698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU89338/01A Ceased AU783488B2 (en) | 2000-11-09 | 2001-11-08 | Process of leaching a lateritic ore for preparing metal extraction |
Country Status (5)
Country | Link |
---|---|
AU (1) | AU783488B2 (en) |
CA (1) | CA2360704A1 (en) |
CO (1) | CO5380041A1 (en) |
DE (1) | DE10055550A1 (en) |
MY (1) | MY134152A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA009675B1 (en) * | 2003-07-14 | 2008-02-28 | БиЭйчПи БИЛЛИТОН ЭсЭсЭм ТЕКНОЛОДЖИ ПТИ ЛТД. | Process for recovery of nickel and cobalt by heap leaching of low grade nickel or cobalt containing material |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4541994A (en) * | 1983-07-22 | 1985-09-17 | California Nickel Corporation | Method of liberating nickel- and cobalt-enriched fines from laterite |
US6379937B1 (en) * | 2000-12-18 | 2002-04-30 | Council Of Scientific And Industrial Research | Process for the preparation of a mixture of 19 hydroxyelcosatetraenoic acid and 20 hydroxyeicosatetracnoic acid (10 hete and 20 hete) |
-
2000
- 2000-11-09 DE DE10055550A patent/DE10055550A1/en not_active Withdrawn
-
2001
- 2001-10-31 CA CA002360704A patent/CA2360704A1/en not_active Abandoned
- 2001-11-02 CO CO01094591A patent/CO5380041A1/en not_active Application Discontinuation
- 2001-11-08 AU AU89338/01A patent/AU783488B2/en not_active Ceased
- 2001-11-09 MY MYPI20015166A patent/MY134152A/en unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4541994A (en) * | 1983-07-22 | 1985-09-17 | California Nickel Corporation | Method of liberating nickel- and cobalt-enriched fines from laterite |
US6379937B1 (en) * | 2000-12-18 | 2002-04-30 | Council Of Scientific And Industrial Research | Process for the preparation of a mixture of 19 hydroxyelcosatetraenoic acid and 20 hydroxyeicosatetracnoic acid (10 hete and 20 hete) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EA009675B1 (en) * | 2003-07-14 | 2008-02-28 | БиЭйчПи БИЛЛИТОН ЭсЭсЭм ТЕКНОЛОДЖИ ПТИ ЛТД. | Process for recovery of nickel and cobalt by heap leaching of low grade nickel or cobalt containing material |
Also Published As
Publication number | Publication date |
---|---|
CO5380041A1 (en) | 2004-03-31 |
DE10055550A1 (en) | 2002-05-23 |
CA2360704A1 (en) | 2002-05-09 |
AU8933801A (en) | 2002-05-16 |
MY134152A (en) | 2007-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5489326A (en) | Gold recovery using controlled oxygen distribution pressure oxidation | |
US5071477A (en) | Process for recovery of gold from refractory ores | |
US5536297A (en) | Gold recovery from refractory carbonaceous ores by pressure oxidation and thiosulfate leaching | |
US4110400A (en) | Selective precipitation of nickel and cobalt sulfides from acidic sulfate solution | |
CN102203307B (en) | Method for treating nickel laterite ore | |
TW200912009A (en) | Process for precious metal recovery from a sulphide ore or concentrate or other feed material | |
KR20130135724A (en) | Process for the receovery of metals and hydrochloric acid | |
US5393320A (en) | Leaching process for nickel cobalt and manganese ores | |
CA2768021C (en) | Process of recovery of base metals from oxide ores | |
AU783488B2 (en) | Process of leaching a lateritic ore for preparing metal extraction | |
AU2017227985B2 (en) | Process for the separation of vanadium | |
US7998430B2 (en) | Production of synthetic rutile by continuous leaching | |
JP2549614B2 (en) | Liquid phase oxidation | |
US4629502A (en) | Pressurized reaction of refractory ores with heat recovery | |
JP7005858B2 (en) | Process of recovering titanium dioxide from titanium-containing materials | |
KR20080102383A (en) | Supercritical oxidation process for the treatment of corrosive materials | |
US4361541A (en) | Method for extraction of uranium from ores | |
CA1179510A (en) | A process and an apparatus for pressure leaching a mineral material in the form of a metal ore | |
CN106399682A (en) | Method for extracting valuable metal from copper, cobalt and nickel sulfide | |
CN107531507A (en) | The ore dressing of titanium-containing materials | |
AU2002215692B2 (en) | Production of synthetic rutile by continuous leaching | |
CN101392321A (en) | Method for treating nickel-containing laterite by microwave reducing roasting-hematite precipitation conversion method | |
US414713A (en) | William a | |
RU2423535C1 (en) | Procedure for hydro-metallurgical treatment of minerals | |
US3153575A (en) | Treatment of spent pickle liquor and preparation of sulfuric acid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PC1 | Assignment before grant (sect. 113) |
Owner name: OUTOKUMPU OYJ Free format text: THE FORMER OWNER WAS: MG TECHNOLOGIES AG |