AU726598B2 - Method for connection of railway point components to a rail - Google Patents

Method for connection of railway point components to a rail Download PDF

Info

Publication number
AU726598B2
AU726598B2 AU32851/95A AU3285195A AU726598B2 AU 726598 B2 AU726598 B2 AU 726598B2 AU 32851/95 A AU32851/95 A AU 32851/95A AU 3285195 A AU3285195 A AU 3285195A AU 726598 B2 AU726598 B2 AU 726598B2
Authority
AU
Australia
Prior art keywords
steel
connecting piece
rail
austenitic
carbon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
AU32851/95A
Other versions
AU3285195A (en
Inventor
Johannes Blumauer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voestalpine Railway Systems GmbH
Original Assignee
JEFFREY WINCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU80208/91A external-priority patent/AU646054B2/en
Application filed by JEFFREY WINCH filed Critical JEFFREY WINCH
Priority to AU32851/95A priority Critical patent/AU726598B2/en
Publication of AU3285195A publication Critical patent/AU3285195A/en
Application granted granted Critical
Publication of AU726598B2 publication Critical patent/AU726598B2/en
Assigned to VAE EISENBAHNSYSTEME AKTIENGESELLSCHAFT reassignment VAE EISENBAHNSYSTEME AKTIENGESELLSCHAFT Alteration of Name(s) in Register under S187 Assignors: WINCH, JEFFREY
Anticipated expiration legal-status Critical
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/42Undetachably joining or fastening track components in or on the track, e.g. by welding, by gluing; Pre-assembling track components by gluing; Sealing joints with filling components

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Description

P/00/011 Regulation 3.2
AUSTRALIA
PATENTS ACT 1990 COMPLETE
SPECIFICATION
FOR A STANDARD
PATENT
ORIGINAL
TO BE COMPLETED BY APPLICANT Name of Applicant: JEFFREY WINCH Actual Inventor: Johannes Blumauer .Adress for Service: CALLINAN LAWRIE, 278 High Street, Kew, 3101, Victoria, Australia I::Tvention Title: "METHOD FOR CONNECTION OF RAILWAY POINT COMPONENTS **TO A RAIL" The following statement is a full description of this invention, including the best method of performing it known to me:- -2- The present invention relates to a method for connection of railway point components, for example frogs, consisting of austenitic cast hard manganese steel, or manganese steel rails, to rails made from carbon steel, with the utilisation of an intermediate piece made from low-carbon austenitic steel, in which method the intermediate piece is first-of-all welded to the rail or connecting rail, following which, after cutting off the intermediate piece to a length of less than millimetres, in a second welding operation, the intermediate piece is welded to the component consisting of cast hard manganese steel or to the manganese steel rail.
A method of the type referred to initially has become known from the Austrian Patent Specification AT-PS 350 881. According to this known method, following a flash butt welding, by means of which the intermediate piece was connected to the standard rail, the intermediate piece was cut off to a length of 20 to 25 millimetres at the most, preferably 18 to 20 millimetres, following which a further flash butt welding was undertaken for connecting the intermediate piece with the cast hard manganese steel component. Following the second welding operation, there was a more rapid cooling operation than that following the first welding operation where, by means of the slower cooling, a hardening of the rail steel was to be avoided. The relatively short intermediate piece it is to take into account the condition that austenitic steels are generally less resistant to abrasion than the material of the frog so that, by keeping the intermediate piece very short, any risk of dents forming in the bearing surfaces of the intermediate piece is avoided.
However, because of the fact that such a short intermediate piece is desirable, during the second welding operation, owing to the shortness of the intermediate piece, the first weld seam between the rail and the intermediate piece is heated to a note-worthy extent. However, the heating occurs to temperatures of -3approximately 700 °C and, starting out from a temperature of this magnitude, embrittlement is no longer to be feared, even when cooling takes places in still air, without it being necessary to introduce any delaying action. The utilisation of the intermediate piece in this situation fundamentally serves to separate the two welding sites from the thermal point of view in order to be able to adhere to the particular required cooling conditions. Possible embrittlement of the cast hard manganese steel of the frog is, to a substantial degree, able to be attributed to the fact that, by diffusion at the welding site, a mixed zone arises in which an unfavourable structural formation can develop.
It has already been proposed in the German Patent Specification DE-PS 29 52 079 the welded connection referred to, between the working components consisting of austenitic cast hard manganese steel and rails made from carbon steel, with the utilisation of an intermediate piece made of austenitic material, should be carried out in such a manner so that the intermediate piece is first-of-all welded to the hard manganese steel by flash butt welding, following which the working piece is subjected to a heat treatment, consisting of a solution heat treatment and a quenching in water, subsequent to which the connection to the standard rail steel is effected by flash butt welding in such a manner that the hard manganese steel is cooled at the same time and the connection to the standard rail is cooled with a delay so that a transformation to finely-striated perlite is achieved. In this additional, already-proposed, method it was proposed to use, as especially preferred, a nickel-based alloy as the working material for the intermediate piece.
In the case of utilisation of austenitic steels, it was proposed to use conventional chromium-nickel-steels as well as manganese alloyed chromium-nickel-steels as the working materials for the intermediate piece.
The objective of the present invention is thus to develop thoroughly the method of the type referred to initially in such a manner that the second welding operation -4can be carried out with out the need to maintain special cooling parameters while, at the same time, improved fatigue strength and a more homogeneous structural formation throughout the entire welding zone is achieved. In particular, dispensing with a heat treatment after the second welding operation to the standard rail steel is intended to improve the reproducibility of the mechanical strength properties of the welded joint and, at the same time, improved load-deflection strength and fatigue strength are to be achieved. In order to solve these problems, thefundamental nature of the method in accordance with the present invention is such that an intermediate piece consisting of a low-carbon, austenitic, steel, in particular a chromium-nickel-steel, stabilised with niobium and/or titanium, is utilised and, following the first welding operation, a heat treatment, in particular a diffusionsolution at a temperature between 350 "C and 1000 is carried out. Because of the fact that an intermediate piece consisting of a low-carbon, austenitic, steel, in particular a chromium-nickel-steel, stabilised with niobium and/or titanium, is utilised, the content of free carbon is reduced and the diffusion of carbon which, has a negative influence on the mechanical characteristic values of the welded joint, is restricted. Because of the fact that, as the result of this first flash butt welding between the carbon steel of a rail and the intermediate piece, a positively directed heat treatment is undertaken, an equalisation of the concentration differences of the completely different alloys of the intermediate piece and the rail steel is achieved by diffusion and, at the same time, not only is an equalisation of concentrations in the welding zone achieved, but also any martensite, which might possibly have been formed, undergoes decomposition. After the cutting-off of the intermediate piece to the shortest length required for the second welding operation, the connection to the component consisting of cast hard manganese steel or to a manganese steel rail can be effected, can once again be effected by flash butt welding and where, subsequently, there are no special conditions to be maintained for the cooling. The second weld can be allowed to cool down in still air, which corresponds to a preferred form of embodiment, without it leading to new, undesired, hardening phenomena in the region of the first welded connection.
Overall, load-deflection values, for the total welded connection, are achieved with such a method of operation, which are up to twice as high as those load-deflection values which may be achieved with the use of known methods of operation and where, at the same time, fatigue-strength values of up to 250 N/mm 2 can be achieved without any difficulty.
The heat treatment is carried out over a period of 2 to 5 hours, which guarantees that the danger of martensite formation can be eliminated with certainty. The formation of martensite, even with positively directed operation of the method, cannot be avoided with certainty during the first welding operation and, in particular, with delayed cooling after said first welding operation where, by means of the positively directed heat treatment along with the elimination of any martensite which could possibly have formed, the concentration profile of the chemical elements in the welding region is equalised to the greatest possible 15 extent, because of which the higher values for mechanical strength and load deflection are the result.
*"*The heat treatment method is carried out in such a way that the heat treatment extends over a period of time from 2 to 5 hours, after which the cooling is allowed to take place in still air.
S: 20 In accordance with the present invention, therefore, there is provided a method of joining switch parts comprised of austenitic high manganese steel casting or Mn steel rails with a rail of carbon steel using a connecting piece made of low-carbon austenitic steel, in which firstly said connecting piece is welded to o the rail or junction rail by flash-butt welding and whereupon, after cutting of said connecting piece to a length of less than 25 mm, said connecting piece in a second welding operation is welded to said part comprised of austenitic high manganese steel casting or to said Mn steel rail by flash-butt welding and, after said second welding operation, is cooled under static air, wherein connecting a piece made of an Nb- and/or Ti-stabilised low-carbon austenitic steel is used, the Nb content of said steel of said connecting piece being chosen to be at least equal to ten times the C content and the Ti content being chosen to be at least equal to five times the C content, and wherein, following said first weld joint, diffusion S nealing is carried out at a temperature of between 350 0 C and 1000°C over a.
iod of from 2 to 5 hours, whereupon cooling is effected under static air.
17/07/00,jb8402spe, 5a Based upon the homogenisation of the concentration distributions in the welding region which can be achieved by the heat treatment after the first flash butt welding operation, and based upon the condition that any martensite which could possibly have been formed has been reliably eliminated, it is possible, according to a further preferred development of the method in accordance with the present invention, to proceed subsequently in such a way that, after the second welding operation, the cooling is effected in still air.
*a a *a* a a 17/07/00,jb8402.spe, 6.- It is an advantage to utilise steels for the intermediate piece of the quality 18 9, X10CrNiTi 18 10, X10CrNiNb 18 9 or X10CrNiNb 18 10. These types of niobium or titanium stabilised steels possess a maximum content of 0.06 percent by weight of carbon, in which case titanium or niobium for stabilisation are used in such amounts which, in the case of titanium is at least five times the amount of the carbon content and, in the case of niobium, it is at least ten times the amount of the carbon content. Here it has been found particularly advantageous if the intermediate piece has the following analytical composition C 0.06 max Cr 17.5 Ni Ti .or Nb 10 x C with the remainder being iron and usually-associated elements.
With the utilisation of the material proposed in accordance with the present invention for the intermediate piece and the maintenance of the conditions required for the heat treatment, it is possible for crack formation in the region of the flash butt welded connection to be completely avoided, in which case the resistance to fracture is increased and higher fatigue-strength values, as well as better loaddeflection values, can be achieved. Such types of welded connections are able to withstand even the high stresses and loadings of high-speed rail traffic.
4* With the intermediate piece proposed in accordance with the present invention to be made from hard manganese steel having an analytical composition of carbon 0.95 to 1.30, manganese 11.5 to 14 percent by weight in the cast, rolled or forged condition, as well as rolled hard manganese steel rails of analogous analytical composition, with austenitic intermediate pieces made from steel with the composition XO1CrNiNb 18 9, as well as XO1CrNiTi 18 9, likewise welded in cast, -7preferably forged or rolled condition where, in the case of rail steels, standard rails materials in accordance with UIC or head-hardened rails are utilised. The first welding operation between the carbon steel of the rail and the intermediate piece is undertaken here with an intermediate piece having a length of approximately 500 millimetres, whereupon, after the first flash butt welding, the intermediate piece which has already been connected to the standard rail, is cut-off to a length of 8 to millimetres, in order to guarantee that, after the second welding operation of the intermediate piece to the cast hard manganese steel piece or the manganese steel rail, an effective length of the intermediate piece of approximately 5 millimetres remains. Determined by the stabilising of the austenite by the niobium and/or titanium, during the first welding connection, which takes place at substantially higher temperatures than the following heat treatment, the diffusion of carbon is effectively restricted. A comparison between welded connections which can be achieved in accordance with the Austrian Patent Specification AT-PS 350 881 and the operational method in accordance with the present invention, has demonstrated that a substantial increase in the load-deflection values, by utilisation of the operational method in accordance with the present invention, maximally from 18 to 35 millimetres, can be achieved. The fatigue-strength values can be increased from 200 N/mm 2 to 250 N/mm 2 At the same time it was possible to work with a smaller supply of heat, by which means the formation of cracks could be considerably reduced. The former usual post-heating of the weld in the welding machine by electrical current pulses could be dispensed with during employment of the method in accordance with the present invention with the utilisation of the intermediate piece stabilised with niobium or titanium, resulting in increased economy of production. After the second welding connection, because of the heat treatment provided, it was possible to effect a more rapid cooling of the welded region, meaning, in particular, that the former usual post-heating procedure could be done without. The overall result is that, in accordance with the present invention, a shorter welding time is required and the welded connection has a longer working life.
-8- In what follows, the invention will be described in greater detail with reference to an example of embodiment which is represented diagrammatically in the drawing in which Fig. 1 is the frog of a cross-over with the attached standard rail made from carbon steel of UIC 860 quality, Fig. 2 is a section on a larger scale along the line HI-IH in Fig. 1, Fig. 3 is a section along the line II-II in Fig. 1.
The frog 1 consists of cast hard manganese steel. The standard rails 2 are welded.
to this frog with the interposition of the intermediate pieces 3 by flash butt welding.
Intermediate pieces approximately 500 millimetres long are damped into a flash butt welding machine (not depicted). The intermediate pieces have the same profile as a standard rail depicted in Fig. 3. These 500 millimetres long intermediate pieces are first-of-all connected to the standard rails 2 by flash butt welding, giving rise to the weld seam 4 as shown in Fig. 2. The region of this weld seam 4 is then subjected to the heat treatment described previously, in order to eliminate any formation of martensite. Following this, the free ends of the intermediate pieces are cut off so that their length measured by starting from the weld seam 4 is approximately millimetres, whereupon the second welding operation to the frog 1, likewise by flash butt welding, is carried out. During this second welding operation, a further short length of 5 to 10 millimetres is burnt off from the intermediate piece, so that the remaining intermediate piece has a length of at least 5 millimetres between weld seam 4 and weld seam 5 (see Fig. 2) which forms the connection between the manganese steel frog 1 and the intermediate piece 2.
-9- This application is a divisional of Australian Patent Application No.
80208/91, and the whole contents of the said Application No. 80208/91 are included herein by reference.
Finally, it is to be understood that the aforegoing description refers merely to preferred embodiments of the invention, and that variations and modifications will be possible thereto without departing from the spirit and scope of the invention, the ambit of which is to be determined from the following claims.
***9e 9 25/9/95GV8402.SPE,9

Claims (6)

1. A method of joining switch parts comprised of austenitic high manganese steel casting or Mn steel rails with a rail of carbon steel using a connecting piece made of low-carbon austenitic steel, in which firstly said connecting piece is welded to the rail or junction rail by flash-butt welding and whereupon, after cutting of said connecting piece to a length of less than 25 mm, said connecting piece in a second welding operation is welded to said part comprised of austenitic high manganese steel casting or to said Mn steel rail by flash-butt welding and, after said second welding operation, is cooled under static air, wherein a connecting piece made of an Nb- and/or Ti-stabilised low-carbon austenitic steel is used, the Nb content of said steel of said connecting piece being chosen to be at least equal to ten times the C content and the Ti content being chosen to be at least equal to five times the C content, and wherein, following said S first weld joint, diffusion annealing is carried out at a temperature of between 15 350°C and 1000°C over a. period of from 2 to 5 hours, whereupon cooling is effected under static air. S*
2. The method according to Claim 1, wherein said casting is a crossing and wherein said austenitic steel is a Cr-Ni steel.
3. The method according to Claim 1 or Claim 2, wherein said diffusion 20 annealing is carried out over a period of 3 hours at approximately 850 0 C.
4. The method according to any one of the preceding Claims, wherein an X10CrNiTi 18 9, X10CrNiNb 18 9, X1OCrNiTi 18 10 or X5CrNiNb 18 10 grade 9* steel is used as the material for said connecting piece.
The method according to any one of the preceding Claims, wherein said steel for the material of said connecting piece has a recommended analysis of: C 0.06 max Cr 17.5 Ni Ti 5x C or Nb> the balance being iron and usual iron-accompanying substances. 17/07/00,jb8402.spe,10 11
6. A method of joining switch parts, substantially as described herein with reference to the accompanying drawings. DATED this 17 th day of July, 2000. JEFFREY WINCH By his Patent Attorneys: CALLINAN LAWRIE 17/07/O0Jb8402.spe. 11
AU32851/95A 1990-07-20 1995-09-26 Method for connection of railway point components to a rail Expired AU726598B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU32851/95A AU726598B2 (en) 1990-07-20 1995-09-26 Method for connection of railway point components to a rail

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT1534/90 1990-07-20
AU80208/91A AU646054B2 (en) 1990-07-20 1991-07-05 Method for connection of railway point components to a rail
AU32851/95A AU726598B2 (en) 1990-07-20 1995-09-26 Method for connection of railway point components to a rail

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
AU80208/91A Division AU646054B2 (en) 1990-07-20 1991-07-05 Method for connection of railway point components to a rail

Publications (2)

Publication Number Publication Date
AU3285195A AU3285195A (en) 1997-04-10
AU726598B2 true AU726598B2 (en) 2000-11-16

Family

ID=3759476

Family Applications (1)

Application Number Title Priority Date Filing Date
AU32851/95A Expired AU726598B2 (en) 1990-07-20 1995-09-26 Method for connection of railway point components to a rail

Country Status (1)

Country Link
AU (1) AU726598B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4144442A (en) * 1976-05-18 1979-03-13 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Process for producing a component part of a railway switch or a railway crossing and component part of railway switches or railway crossings produced by such process
US4169745A (en) * 1977-08-19 1979-10-02 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Method of joining frogs of wear-resisting manganese steel castings to rails of carbon steel
EP0260233A1 (en) * 1986-09-10 1988-03-16 BREDA FUCINE MERIDIONALI S.p.A. A process to connect austenitic manganese steel frogs of point to carbon or low-alloy steel rails

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4144442A (en) * 1976-05-18 1979-03-13 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Process for producing a component part of a railway switch or a railway crossing and component part of railway switches or railway crossings produced by such process
US4169745A (en) * 1977-08-19 1979-10-02 Vereinigte Osterreichische Eisen- Und Stahlwerke-Alpine Montan Aktiengesellschaft Method of joining frogs of wear-resisting manganese steel castings to rails of carbon steel
EP0260233A1 (en) * 1986-09-10 1988-03-16 BREDA FUCINE MERIDIONALI S.p.A. A process to connect austenitic manganese steel frogs of point to carbon or low-alloy steel rails

Also Published As

Publication number Publication date
AU3285195A (en) 1997-04-10

Similar Documents

Publication Publication Date Title
AU646054B2 (en) Method for connection of railway point components to a rail
US6322642B1 (en) Process and steel for the manufacture of a pressure vessel working in the presence hydrogen sulfide
US20090242519A1 (en) Welding of an element of a track unit and a rail section without adding any material
Voigt et al. Study of heat-affected zone structures in ductile cast iron.
Bhatnagar et al. A review on weldability of cast iron
US4724890A (en) Process for connecting frogs consisting of austenitic manganese steel casting with rails consisting of carbon steel
AU726598B2 (en) Method for connection of railway point components to a rail
Chinese Society for Metals (CSM) et al. Use of niobium high strength steels with 450 MPA yield strength for construction
Rao et al. Study on arc and TIG welding of earthquake-resistant structural steels with a higher carbon equivalent
JP4002389B2 (en) Rotating welded joint of mild steel or 490 MPa class steel excellent in fatigue strength and method for producing the same
CS196235B2 (en) Method for thermal treatment of weldable constructional steels with high tensile strength
KR100387595B1 (en) Laser Welding Method In Martensitic Stainless Steel Of High Carbon
US20240150971A1 (en) Frog for switches and crossings
AU2018303285B2 (en) Frog for switches and crossings
Samanta et al. Review of weldability of E 450 grade high strength structural steel
JPH08276293A (en) Cored wire for rail welding
SU1145046A1 (en) High-strength welding steel
RU2129938C1 (en) Method of joining articles from high-carbon steel with article from high-manganese austenitic steel
Odesskii et al. High-strength hot-rolled I-beams for the construction industry
Mujahid et al. Structure--Property Studies of Copper-Containing HSLA-100 Steels
JPH07323392A (en) Low hydrogen type coated arc electrode and welding method
JPH06192786A (en) High strength steel excellent in brittle fracture occurrence characteristic
JPH11241119A (en) Manufacture of high tensile strength steel excellent in toughness in weld zone
AU2018303285A1 (en) Frog for switches and crossings
JPH02122057A (en) Method for preventing hot dip galvanizing cracking

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)