AU610372B2 - Shaft construction method - Google Patents

Shaft construction method Download PDF

Info

Publication number
AU610372B2
AU610372B2 AU32314/89A AU3231489A AU610372B2 AU 610372 B2 AU610372 B2 AU 610372B2 AU 32314/89 A AU32314/89 A AU 32314/89A AU 3231489 A AU3231489 A AU 3231489A AU 610372 B2 AU610372 B2 AU 610372B2
Authority
AU
Australia
Prior art keywords
hardener
ground
shaft
mixed region
columnar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
AU32314/89A
Other versions
AU3231489A (en
Inventor
Yoshinobu Koiwa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Little Rock KK
Kelbin Co Ltd
Original Assignee
Little Rock KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP63079049A external-priority patent/JPH0637768B2/en
Priority claimed from JP63088622A external-priority patent/JP2864243B2/en
Application filed by Little Rock KK filed Critical Little Rock KK
Publication of AU3231489A publication Critical patent/AU3231489A/en
Application granted granted Critical
Publication of AU610372B2 publication Critical patent/AU610372B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

1.25 I 1 111.6 ZAXMAfismdONW1IrH)a]DOV 18d. 0 1.25 14 0 COMMONWEALTH OF AUSTRALIA^~ Patents Act 1952-1969 0 COMPLETE SPECIFICATION
(ORICINAL)
FOR OFFICE USE: Class Int, Class Application Number Lodged Complete Application No, Specification Lodged Published Priority: cIOCUl~entI contains the~ Related art: dtlrjnents niade undjer Qctgn 9 and is corr (t for TO BE COMPLETED BY APPLICANT Name of Applicant: Kabushild. Kaisha LITTLE ROCK of 703, San1~o}uoho, Chiba-shi, Chiba-pref.
JAPAN, Yoshinobu KOIWA of 172-14, Kotehashicho, Chiba-shi, Chiba-pref.
JAPAN; KELBIN Co.,I Ltd. of 2-8 Roppongi 2-chorne, Minato-ku, Tokyo, d IA JAPN and Shuichi VUJIMORI of 19-5, Kuqenurna-Matsugaoika 2-chome, Adress of Appcan- ujisawa-shi, Kanagawa-pref. JAPANI *Actual Inventor: Yoghinobu KoiWA Address for Service: COM 1 ISON CO., General Accident Builiding, 117 King W iliam Street, Adelaide SA 5000 Complete Specification for the Invention entitled: "SHAFT CONSTRUCTION METH.OD"I The following statement Is a full description of this Invention,, Including the best method of performing It known to mo, us-, YOSHINOBU KOIWA No Ical w ll 01 1 other w ne rciut cd TO; The Commissioner of Patents SHAFT CONSTRUCTION METHOD BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a method of constructing a shaft with improved operating efficiency.
Description of the Prior Art When a scheduled building construction site has poor ground, the ground is generally given improvement treatment prior to the construction. Such ground treatment usually consists of hardening the soil by permeating it with a Shardening agent. One method that has come into extensive S. use in recent years is the injection mixing method in which 00 0 o air and hardener are forced into the ground under high pressure to form a pile-shaped solid mass. The apparatus oa for implementing the injection mixing method consists of a 0"a* high-pressure pump for pumping the cement or the like that constitutes the hardener; a compressor to supply the air; and a machine to operate a double-walled boring pipe the tip of which is provided with a nozzle.
o:0 The high-pressure pump is usually a plunger-type pump, which is used to pump the hardener from a mixer under very high pressure. The machine mixes the air and hardener and injects it into the ground from the nozzle of the double-walled boring pipe. For this, the boring pipe is inserted into a borehole in the ground, and for the pinjection process is revolved while being raised up from the bottom part of the hole. A columnar mixed region of soil and hardener is thereby formed in the ground, which the setting of the hardener forms into a pile-shaped solid mass.
The injection mixing method is widely employed because it provides good operational efficiency. However, the diameter of the columnar mixed region is dependent on soil condition and pump performance, and in sandy soil or i0°° clay the standard effective diameter is limited to 2000 ±200 mm.
Figure 6 illustrates the method generally employed t t to construct a shaft having an inside diameter of 3500 mm, as shown in Figure 5, using the injection mixing method.
The double-walled boring pipe of the operating machine is inserted into the bottom 101 of the shaft 100 in sequence S" from al to a4 to inject the hardener and form a columnar mixed region 102. The double-walled boring pipe is then inserted from bl to blo around the perimeter of the shaft 2,9 100 to form a columnar mixed region 103. After the hardener has set the inner portion of the mixed region 102 is excavated to thereby produce the shaft 100 having the prescribed diameter.
With the conventional shaft construction method described above, the operation of removing the portion indicated in the drawing by shading to produce the 2 i-: i ii i 4( 44 r, C0 0 00 0d 4 requisite diameter D is rendered difficult owing to the fact that the hardener has set, which has kept operating efficiency down. In addition, the need to form numerous columnar mixed regions 102 and 103 requires much time.
SUMMARY OF THE INVENTION It is therefore an object of the invention to provide a shaft construction method that enables shafts of the requisite diameter, together with a continuous wall, to be constructed quickly.
The present invention realizes this object by providing a shaft construction method comprising a first step in which air and a ground hardener are injected by the depthwise operation of a revolving jetting element to form a columnar mixed region of soil and hardener in the ground; a second step in which an inhibitor that inhibits the hardening of the hardener is injected into the inner side of the columnar mixed region by the depthwise operation of the jetting element, wherein the injection pressure is set to produce a diameter that is smaller than that of the columnar mixed region; and the removal of the portion of the ground the hardening of which was inhibited by the inhibitor.
The shaft construction method further comprises a first step in which air and a ground hardener are injected by the depthwise operation of a revolving jetting element to form a columnar mixed region of soil and hardener in the 0$ 4444 44 4* 41 4 I
I]:
ground; a second step in which an inhibitor that inhibits the hardening of the hardener is injected into the inner side of the columnar mixed region before the columnar mixed region has hardened to a specified strength; and the removal of the portion of the ground the hardening of which was inhibited by the inhibitor.
The shaft construction method further comprises the depthwise operation of a revolving operating pipe that is revolved within a prescribed range and operated to inject id': s or jet ground hardener from jetting elements provided on the side of the operating pipe to form a columnar mixed region of soil and hardener in the ground, wherein these columnar mixed regions are prorvided side by side, to form a continuous wall of shafts.
The shaft construction method further comprises the depthwise operation of a revolving operating pipe that is revolved within a prescribed range and operated to inject or jet ground hardener from jetting elements provided on the side of the operating pipe to form a columnar mixed 2P region of soil and hardener in the ground, wherein the jetting element is operated at a prescribed spacing around the perimeter of a circle or an ellipse to f(crm columnar mixed regions on the outer side of the circle or ellipse.
The shaft construction method also comprises the depthwise operation of a revolving operating pipe that is i revolved within a prescribed range and operated to inject 4i or jet ground hardener from jetting elements provided on the side of the operating pipe to form a columnar mixed region of soil and hardener in the ground, wherein the jetting element is operated beforehand at the bottom part of the shaft to form a pile of a set thickness ,at the bottom part of the shaft.
BRIEF DESCRIPTION OF THE DRAWINGS The objects and features of the present invention will become more apparent from a consideration of the 13 6 00 following detailed description taken in conjunction with o070 the accompanying drawings in which: '0a S* Figure 1 is a drawing showing an overall view of the a shaft construction method according to the present o 0 invention; Figure 2 is a cross-sectional view of the higho o0 u pressure pump employed in the present invention; Figure 3 and Figures 4a to 4f are cross-sectional views illustrating the steps of the shaft construction method of this invention; Figure 5 is a cross-sectional view of a shaft; Figure 6 is a general view illustrating a conventional shaft construction method; Figure 7 is a perspective view showing a wall constructed using the shaft construction method of the invention; and 1 Figures to 11 are drawings illustrating the construction of round or ellipsoid shafts by the method of the present invention.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT The invention will now be described in detail with reference to the drawings.
Figure 1 shows an example of an apparatus used in the construction method of this invention. In Figure 1, reference numeral 1 denotes a machine for raising/lowering I and revolving a double-walled boring pipe 2; reference i l numeral 3 denotes a high-pressure pump for pumping hardener mixed by a mixer 4 and an agitator 5; 6 is a hydraulic unit *S that drives the high-pressure pump 3; and 7 is a compressor for mixing air in with the hardener pumped by the highpressure pump 3. A pump (not shown) is used to supply the o e n mixer 4 with water from a water tank 8.
0 a The end of the double-walled boring pipe 2 of the machine 1 is provided with a nozzle (not shown) from which hardener pumped by the pump 3 is injected into the ground.
The machine 1 is equipped with a drive section for general rotation of the double-walled boring pipe 2 and a drive section for rotating the double-walled boring pipe 2 wLthin a prescribed range, and is provided with a switch- (,ver device for selecting the drive.
The drive sections rotate the double-walled boring pipe 2 by means of a rack and pinion arrangement, for 6 1 1 6 L -Iii example, with the pinion imparting a reciprocating action to the rack. As one example, a projecting portion is provided at each end of the rack to operate a microswitch, for example, and thereby change the direction of rotation of the boring pipe 2. The degree of rotation of the double-walled boring pipe 2 can be controlled by shifting the position of the projecting portions on the rack, thereby changing the position at which the microswitches are operated.
i0o'" An example of the high-pressure pump 3 will now be t f described with reference to Figure 2. The high-pressure pump 3 is comprised of a valve box 10 provided with a valve chamber 9, a plunger box 12 provided with a plunger 11, and a box 13 forming a pressure action chamber 13a disposed between the valve box 10 and the plunger box 12.
The valve box 10 has an inlet passage 14 and an outlet passage 15 that communicate with the valve chamber 9 and which are provided with an inlet valve 16 and an outlet valve 17, respectively. The inlet valve 16 and the outlet valve 17 each have a seat 19 having a valve seat formed into a concave, semi-spherical shape and a multiplicity of small holes 18 that extend axially from the concave valve seats; a valve-piece 20 that has a spherical shape corresponding to the said concave valve seats; and a valve spring 21 that urges the valve-piece 20 against the 7 seat 19. The holes 18 are for limiting the in-flow of particles that exceed a given size.
In the side wall 22 of the valve box 10 is a passage 23 that connects the pressure-action chamber 13a with the interior of the valve chamber 9, and provided at the opening of the passage at the pressure-action chamber 13& end is a screening member 24 constituted of a mesh screen or the like that limits the entry of particles that exceed a given size.
,The end of the plunger 11,i which is maintained within a cylinder 25 in the plunger box 12 via a V-packing 26 so as to project into the pressure action chamber 13a, is reciprocated at high speed by a drive means (not illustrated).
A resilient membrane 27 is provided in the pressure- S, action chamber 13a to divide the pressure-action chamber 13a into a cylinder 25 side A and a valve chamber 9 side B.
:'The cylinder 25 side A of the resilient membrane 27 is filled with an operating medium 28, such as oil.
~Construction of a shaft, such as the one shown in Figure 3, using the above apparatus will now be described.
The double-walled boring pipe 2 of the machine 1 is positioned at the location where the shaft is to be constructed. The boring pipe is then used to bore a hole to 'he required depth, using an appropriate pipe rotationZ and boring rate for the conditions of the ground concerned 8 (Figure 4a). The double-walled boring pipe 2 uses highpressure jetting from its nozzle to bore the hole, penetrating into the ground 29 under its own weight.
Alternatively, the boring pipe 2 may by inserted after the hole has been bored by another means.
After the hole has been bored to the required depth, the revolving boring pipe 2 is then withdrawn up the borehole 30 (Figure 4b) while the high-pressure pump 3 is operated to inject hardener from the nozzle. The rate at 16' which the boring pipe 2 is withdrawn up the borehole and the rate at which the pipe is rotated are set in accordance with the nature and softness of the ground concerned. The hardener consists of cement such as portland cement, for example, as the main constituent and an admixture of a water-reducing agent such as montmorillonite or calcium, 4 suitably combined with a cement based ground improvement agent, with the proportions of the constituent components S" being changed to suit the ground concerned, and mixed with water.
(|c0 .The injection of the hardener breaks up the texture of the soil ground and forms a columnar pile 31 in the ground, such as shown in Figure 4c. The double-walled boring pipe 2 is then inserted in the center of the pile 31. This insertion of the boring pipe 2 is preferably done after the pile 31 has hardened to some extent. For example, the insertion is started after the initial 9 hardening of the cement. The boring pipe 2 is inserted to a depth that is slightly above the depth to which it was inserted to inject the hardener. The high-pressure pump 3 is then operated to pump in an inhibitor that inhibits the setting of the hardener. The main constituent of the hardener being cement, which is alkaline, an acid inhibitor is employed. The pump delivery rate for pumping the inhibitor is set below the rate used to inject the hardener.
lQO As it revolves, the double-walled boring pipe 2 is gradually raised up from the bottom part of the pile 31 while the injection of the inhibitor from the nozzle proceeds (Figure 4d), whereby the inhibitor forms a pile 3 within the pile 31 (Figure 4e) Thus, the hardener is inhibited from setting at the inner part of the pile 31 and only sets at the outer part 33. This inner part which does not harden owing to the action of the inhibitor can then be easily excavated to thereby form the required shaft (Figure 4f).
0 The use of the above apparatus to construct the cortinuous wall illustrated in Figure 7 Will now be described. In the same way as when constructing the shaft described above, the double-walled boring pipe 2 of the machine 1 is positioned at the location where the continuous wall is to be constructed and the boring pipe is used to bore a hole to the required depth, using an *1
,E
appropriate pipe rotation and boring rate for the conditions of the ground concerned (Figure 4a). The double-walled boring pipe 2 uses high-pressure jetting from its nozzle to bore the hole, penetrating into the ground 29 under its own weight. Alternatively, the boring pipe 2 may by inserted after the hole has been bored by another means.
After the hole has been bored to the required depth, the revolving boring pipe 2 is then withdrawn up the borehole 30 (Figure 4b) while the high-pressure pump 3 is operated to inject hardener from the nozzle. The rate at which the boring pipe 2 is withdrawn up the borehole and the rate at which the pipe is rotated are set in accordance with the nature and softness of the ground concerned. The composition of the hardener is the same as that of the hardener used for the above shaft construction.
The injection of the hardener breaks up the texture of the soil ground and forms a columnar pile 31 with a fanshaped cross-section, as shown in Figure 4c. These piles 31 having a semicircular cross-section are formed with an 2G overlap between adjacent piles, This results in the formation of a continuous wall 72 of columnar piles 71, as shown in Figure 7, Figure 8 shows a shaft 34 having a prescribed inside diameter D, constructed by the following method. The double-walled boring pipe 2 is inserted into the ground to a fixed depth and rotated to inject hardener to form a
II
_I
columnar pile 35 having a diameter that is at least D. The pile 35 thus formed has a has a set thickness Z at the position that forms the bottom of the shaft 34. Next, with reference to Figure 9, the double-walled boring pipe 2 is operated at evenly spaced positions bl to bl0 around the perimeter of a circle 36 of a diameter D to form fan-shaped columnar piles 37 on the outside of the circle 36 with a partial overlap between adjacent piles 37. Earth and sand, etc., are then removed from an inner portion 38 enclosed by 0H," the piles 37 to thereby form the shaft 34.
Figures 10 and 11 are for illustrating a method of constructing an ellipsoid shaft 39. In this case, when constructing the bottom 39a of the shaft 39, tha doublewalled boring pipe 2 is operated twice at points a and which are offset relative to each other by a set distance, The double-walled boring pipe 2 is then operated at evenly spaced positions bi to bl0 around the perimeter of an ellipsoid 40 to form to form fan-shaped columnar piles 41 around the ellipsoid 40 with a partial overlap between adjacent piles 41, to thereby form a side wall 39b of the shaft 39. The ellipsoid shaft 39 is then formed by removing the soil from an inner portion 42 enclosed by the piles 41.
As has been described in the foregoing, the shaft construction method according to the present invention t i offers numerous features, advantages and effects, which will now be summarized with reference to the claims.
In claim 1, a hardening inhibitor is injected into the interior of a large-diameter columnar mixed region formed by injection mixing using a high-pressure pump, which thereby enables a large-diameter shaft to be produced simply by removing the soil from the inner portion, which considerably shortens the required construction time, compared with the conventional method of shaft construction by injection mixing. It is also economical, because by just chaning the pump delivery rate the same nozzle can be used for the injecting of the inhibitor as well as the hardener. Also, as the setting of the hardener is inhibited in the portion injected with the inhibitor, it is easy to excavate.
In accordanc4 with claim 2, an inhibitor is injected into the inner portion of a large-diameter columnar mixed region formed by the injection mixisg method. This inhibits the setting of the hardener in tnat portion, which 2^ make, the formation of the required shaft a simple matter of excavating the inner portion.
claim 3 describes using a pump-driven injection mixing method in which the pipe element is rotated stepwise by prescribed degrees to construct piles side by side with some overlap, which makes it easy to form a continuous wall where it is desired to avoid the injection of hardener.
13 l I i 1~r i-; This is ideal when it is necessary to prevent hardener flowing into a nearby river, for example.
Claim 4 describes the construction of a circular or elliptical shaft in which the excavation of the central portion is facilitated, improving construction efficiency.
With reference to the method of claim 5, because the high-pressure pump used has 2.5 or 3 times more output capacity than the pumps used in the prior art, the injection mixing method can be used to constrvc t a columnar id" pile at the bottom of the shaft in a single step.
Moreover, as the size of the radius of the semicircular p.piles is proportional to the pump output, compared with the prior art, it takes fewer injection operations to construct a shaft, and is therefore more efficient.
n, C, I D G

Claims (4)

1. A method for constructing a shaft comprising: injecting air and a ground hardener in a depthwise direction through a revolving jetting element and forming a columnar mixed region of soil and hardener in the ground; injecting an inhibitor which inhibits the hardening of the hardener into the columnar mixed region in a depthwise direction through the jetting element at a pressure producing a diameter that is smaller than the diameter of the columnar mixed region, and removing the portion of the ground the hardening of which was inhibited by the inhibitor.
2. A method for constructing a shaft comprising: injecting air and 1 5 a ground hardener in a depthwise direction through a revolving jetting element and forming a columnar mixed region of soil and hardener in the ground; injecting an inhibitor which inhibits the hardening of the hardener into the interior portion of the columnar mixed region before said columnar mixed region has hardened to a specified strength, and removing the portion of the ground the hardening of which was ,inhibited by the inhibitor.
3. A method according to claim 2, comprising revolving an S operating pipe provided with jetting elements on the side thereof 2:5 within a prescribed range in a depthwise direction and forming a shaft, injecting ground hardener through said jetting elements and S forming a columnar mixed region of soil and hardener in the ground, said jetting elements being activated initially at the bottom part of said shaft and forming a pile of a set thickness at the bottom part of the shaft.
4. A shaft construction method substantially as hereinbefore described with reference to the drawings. Dated this 25th day of January 1991, KABUSHIKI KAISHA LITTLE ROCK, YOSHINOBU KOIWA, KELBIN CO. LTD. SHUICHI FUJIMORI By their Patent Attorneys COLLISON CO. 7 \tr O$ L i
AU32314/89A 1988-03-31 1989-03-30 Shaft construction method Ceased AU610372B2 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP63079049A JPH0637768B2 (en) 1988-03-31 1988-03-31 Vertical shaft construction method
JP63-79049 1988-03-31
JP63-88622 1988-04-11
JP63088622A JP2864243B2 (en) 1988-04-11 1988-04-11 Shaft construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
AU69931/91A Division AU632656B2 (en) 1988-03-31 1991-01-24 Shaft construction method

Publications (2)

Publication Number Publication Date
AU3231489A AU3231489A (en) 1989-10-05
AU610372B2 true AU610372B2 (en) 1991-05-16

Family

ID=26420121

Family Applications (1)

Application Number Title Priority Date Filing Date
AU32314/89A Ceased AU610372B2 (en) 1988-03-31 1989-03-30 Shaft construction method

Country Status (2)

Country Link
AU (1) AU610372B2 (en)
DE (1) DE68925740T2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11891892B2 (en) 2020-11-04 2024-02-06 Chengdu Xinhao Foundation Engineering Co., Ltd. Square pile construction method and equipment of a rotary drilling rig

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMO20070402A1 (en) * 2007-12-21 2009-06-22 Gualtiero Cenni SYSTEM AND METHOD TO CONSOLIDATE A FOUNDATION GROUND OF A BUILDING

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU500543B2 (en) * 1976-11-12 1979-05-24 Nelson Shields, C. JR. Pressure grouting underwater; pile to jacket
AU504773B2 (en) * 1976-11-12 1979-10-25 Nelson Shields, C. JR. Grouting of offshore structures
AU8812882A (en) * 1981-09-22 1983-03-31 Fudo Construction Co. Ltd. Compacting soils

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU500543B2 (en) * 1976-11-12 1979-05-24 Nelson Shields, C. JR. Pressure grouting underwater; pile to jacket
AU504773B2 (en) * 1976-11-12 1979-10-25 Nelson Shields, C. JR. Grouting of offshore structures
AU8812882A (en) * 1981-09-22 1983-03-31 Fudo Construction Co. Ltd. Compacting soils

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11891892B2 (en) 2020-11-04 2024-02-06 Chengdu Xinhao Foundation Engineering Co., Ltd. Square pile construction method and equipment of a rotary drilling rig

Also Published As

Publication number Publication date
AU3231489A (en) 1989-10-05
DE68925740D1 (en) 1996-03-28
DE68925740T2 (en) 1996-07-04

Similar Documents

Publication Publication Date Title
CA1334130C (en) Shaft construction method
CN1111230C (en) Making method for non-annular borehole cast-in-place pile
US4063424A (en) Device for constructing a foundation in soft soil formations
AU610372B2 (en) Shaft construction method
AU632656B2 (en) Shaft construction method
GB2062072A (en) Method of and Apparatus for the Construction of Mixed or Augered-in-place Piles
JP2864243B2 (en) Shaft construction method
JPH09317373A (en) Method of shaft construction
JPH06193046A (en) Pit construction method
EP1520936A2 (en) Boring method and apparatus
EP1676009B1 (en) Apparatus and method to prepare in-situ pilings with pre-selected physical properties
KR100531023B1 (en) Constructing method for anchor as foundation
JPH03119219A (en) Jet grout type underground retaining wall building method
KR100491876B1 (en) UCM method and drilling road of ground drilling rigs using UCM method
JPH01247611A (en) Construction and device for foundation improvement with the joint use of agitator and jet
JP2941590B2 (en) Rotary impact drilling tools and drilling methods
JPH086308B2 (en) Deformation ground improvement body construction method
CN108978641A (en) The construction method of compound strength stake
JP7073326B2 (en) How to remove buried objects
JPH01250517A (en) Constructing method for vertical pile
JPH018587Y2 (en)
JP2000345546A (en) Improvement method for soft ground containing hard stratum
KR200314982Y1 (en) UCM method and drilling road of ground drilling rigs using method
JP3125032B2 (en) Construction method of improved wall
JPH07109093B2 (en) Ground hardening material High pressure injection injection method