AU2021102863A4 - Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough - Google Patents

Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough Download PDF

Info

Publication number
AU2021102863A4
AU2021102863A4 AU2021102863A AU2021102863A AU2021102863A4 AU 2021102863 A4 AU2021102863 A4 AU 2021102863A4 AU 2021102863 A AU2021102863 A AU 2021102863A AU 2021102863 A AU2021102863 A AU 2021102863A AU 2021102863 A4 AU2021102863 A4 AU 2021102863A4
Authority
AU
Australia
Prior art keywords
wall
frame
support frame
maintenance
collision wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
AU2021102863A
Inventor
Huijun Chang
Yubo CHEN
Shuang HE
Chenghong LIU
Liang Ma
Fengxi Sun
Yingmei WANG
Guoshen Zhao
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Third Group No 2 Engineering Co Ltd
China Railway Third Bureau Group Co Ltd
Original Assignee
China Railway Third Group No 2 Engineering Co Ltd
China Railway Third Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Third Group No 2 Engineering Co Ltd, China Railway Third Bureau Group Co Ltd filed Critical China Railway Third Group No 2 Engineering Co Ltd
Priority to AU2021102863A priority Critical patent/AU2021102863A4/en
Application granted granted Critical
Publication of AU2021102863A4 publication Critical patent/AU2021102863A4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/08Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks
    • E01F15/081Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks characterised by the use of a specific material
    • E01F15/083Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks characterised by the use of a specific material using concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility disclosed a high speed railway bridge anti-collision wall and cable trough vertical wall maintenance equipment, which belongs to the technical field of concrete wall maintenance, including a maintenance frame, a walking trolley and a water supply system. The maintenance frame comprises a support frame and a cantilever frame, the support frame is a door -shaped frame arranged outside the anti-collision wall, and the cantilever is mounted on one side of the support frame and connected with the top of the support frame,the maintenance frame is provided with a plurality of sprinklers to the anti-collision wall and the vertical wall of the cable Trough;The walking trolley is arranged on the top of the support frame. The water supply system provides pressurized water to the sprinkler on the maintenance frame, and the maintenance frame runs along the top of the anti-collision wall driven by the walking trolley. In the operation process of the maintenance frame, the sprinkler on the support frame carries out spray maintenance on the anti-collision wall, and the sprinkler on the cantilever frame carries out spray maintenance on the vertical wall of the cable trough. The utility model has the advantages of convenient construction, high working efficiency, uniform spraying water and good effect of less water for maintenance, replacing the long-time repeated sprinkling maintenance operation by construction personnel. 1 DRAWINGS 3 52 3 -- f E 3 02 Fig.1 1

Description

DRAWINGS
3 52 3 f -- 3 E
02
Fig.1
SPECIFICATION
Maintenance Equipment for Anti-collision Wall of
High-speed Railway Bridge and Vertical Wall of Cable
Trough
TECHNICAL FIELD The utility model belongs to the technical field of concrete wall maintenance, in
particular to maintenance equipment for anti-collision wall of high-speed railway
bridge and vertical wall of cable trough. BACKGROUND OF TECHNOLOGY In the auxiliary construction of high-speed railway bridge, after the concrete pouring
of the anti-collision wall and vertical wall of cable trough at the top of the bridge is
completed, the concrete shall be cured with the mold. After about 2 days, the strength
shall meet the requirements of mold removal. The formwork shall be removed and the
post-mold maintenance shall be carried out. In Fig. 1, the communication signal cable
trough 03 is between the anti-collision wall 01 and the vertical wall of cable trough 02,
and the power cable trough 04 is between the two vertical walls of cable trough 02.
After concrete pouring, the climate is hot and dry, if does not carry on the concrete
curing, the water in concrete will evaporate too fast, and lead to the cement particles
has formed gel is not fully hydrated, Can not be transformed into stable crystallization,
lack of enough cohesive force, thereby reducing concrete strength, when concrete has
not had enough strength, the premature evaporation of moisture will also produce
larger contraction deformation, appear stem shrinkage crack. The maintenance of the
anti-collision wall of the bridge deck and the vertical wall of the cable trough cannot
be carried out by large equipment. At present generally adopts the method of artificial
water, need special construction personnel repeat sprinkler maintenance work for a
long period of time, so that not only the construction cost is high, the construction
efficiency is low, possibly because of construction personnel negligence maintenance
is not timely, affect the strength of concrete, so the design can be automatically go line
and at the same time to prevent the wall, and cable trough vertical curing device is
necessary.
SPECIFICATION CONTENT OF UTILITY MODEL The utility model aims to solve the technical problem that provides a device that can
automatically run and simultaneously maintain the anti-collision wall and cable
trough, and can be convenient to water and maintain the concrete anti-collision wall
of the beam surface and the vertical wall of the cable trough, so as to improve the
work efficiency, save costs and ensure the quality of maintenance.
In order to solve the above technical problems, the technical scheme adopted by the
utility model is as follows:
The utility model relates to a maintenance equipment for anti-collision wall of
high-speed railway bridge and vertical wall of cable trough, which comprises a
maintenance frame, a trolley and a water supply system,the maintenance frame
comprises a support frame arranged on the outside of the anti-collision wall and a
cantilever frame arranged on the vertical wall of the cable trough, the support frame is
set on the outside of the anti-collision wall, the cantilever frame is arranged on one
side of the support frame, and the top of the support frame is connected with the
support frame;The maintenance frame is provided with a plurality of sprinklers
connected with the water supply system, through the sprinkler head to the
anti-collision wall and cable trough vertical wall water;The trolley is arranged on the
top of the support frame, and the trolley walks along the top of the anti-collision wall.
Preferably, the two walking trolleys are respectively driven by different motors, and
the motors are electrically connected with the controller.
Preferably, the water supply system comprises a water tank, a water pump and a water
pipe. The water tank is sent to the water pipe through a water pump, a number of
sprinklers are connected with the water pipe, and the water pump is electrically
connected with the controller.
Preferably, the water pipe comprises a connecting pipe, a main pipe and a branch pipe
connected in parallel with the main pipe, one end of the connecting pipe is connected
with the water pump outlet, the other end is connected with the main pipe, the main
pipe and the branch pipe are arranged on the maintenance frame;The main pipe is
three, a horizontal setting, two vertical setting, vertical setting of the main pipe are
SPECIFICATION connected with the horizontal setting of the main pipe;The horizontal main pipe is
arranged on the top end of the support frame and the cantilever frame, and the vertical
main pipe is arranged on the lateral end of the vertical part of the support frame;The
branch pipe is a plurality of branch pipes, a plurality of branch pipes are arranged in
parallel on the maintenance frame, one end of the branch pipe is closed, the other end
is communicated with the main pipe.
Preferably, the connecting pipe is a hose, and the main pipe and branch pipe are PVC
pipes.
Preferably, the water tank is arranged on the mobile device, and the water pump is
arranged in the water tank.
Preferably, the sprinkler is an atomizer, and the atomizer is distributed on the pipe
wall of the branch pipe.
Preferably, the sprinkler spacing is l5cm;The end distance of the cantilever frame is
1.4m from the support frame
Preferably, the vertical part of the support frame is provided with a pulley in contact
with the two sides of the anti-collision wall, and the two sides of the anti-collision
wall are respectively provided with two rows of pulleys; and the pulley is connected
with the support frame through an adjusting bolt.
Preferably, the support frame and the cantilever frame are made of steel pipes, and the
cantilever frame is a plurality of parallel steel pipes.
The beneficial effects of the above technical solutions are as follows: compared with
the existing technology, the utility model provides pressurized water to the sprinkler
of the maintenance frame through the water supply system, and the maintenance
frame runs along the top of the anti-collision wall driven by the walking trolley,during
the operation of the maintenance frame, the sprinkler on the support frame carries out
spray maintenance on the anti-collision wall, and the sprinkler on the cantilever frame
carries out spray maintenance on the vertical wall of the cable trough.
FIGURE LEGENDS
The following is a further detailed description of the utility model in combination
with the attached drawings and specific implementation methods.
SPECIFICATION Fig.1 is the use state diagram of a maintenance equipment for anti-collision wall of
high-speed railway bridge and vertical wall of cable trough provided by the
embodiment of the utility model;
Fig.2 is a structural schematic diagram of a high-speed railway bridge anti-collision
wall and vertical wall maintenance equipment of cable trough provided by an
embodiment of the utility model;
Fig.3 is the left view of the maintenance frame in Fig. 2;
Fig.4 is a top view of Fig. 3;
Fig.5 is the structure diagram of the maintenance frame in Fig. 2;
Fig.6 is the left view of Fig. 5;
Fig.7 is a top view of Fig. 6
In the picture: 01- anti-collision wall, 02- vertical wall of cable trough, 03
communication signal cable trough 04- power cable trough, 1- maintenance frame,
11- support frame, 110- beam, 111- pillar;12- cantilever frame, 13- inclined pole, 2
trolley, 3 - sprinkler, 4 - water tank, 5- water pipe, 51- connecting pipe, 52- main pipe,
53- branch pipe, 6 - pulley, 7- adjusting bolts.
MODE OF CARRYING OUT THE INVENTION
The following is an explicit and complete description of the technical scheme in the
embodiments of the utility model in combination with the attached drawings in the
embodiments of the utility model. Obviously, the described embodiments are only
part of the embodiments of the utility model, but not all of the embodiments. Based
on the embodiments in the utility model, all other embodiments obtained by ordinary
technicians in the field without making creative labor fall within the scope of
protection of the utility model.
A maintenance equipment for anti-collision wall of high-speed railway bridge and
vertical wall of cable trough, as shown in Figure 1-7, comprises a maintenance frame
1, a trolley 2 and a water supply system, the maintenance frame 1 comprises a support
frame 11 arranged on the outside of the anti-collision wall 01 and a cantilever frame
12 arranged above the vertical wall 02 of the cable trough, the support frame 11 is set
on the outside of the anti-collision wall 01 door-shaped frame, the cantilever frame 12
SPECIFICATION is arranged on one side of the support frame 11, and is connected with the top of the support frame 11; the maintenance frame 1 is provided with a plurality sprinkler 3 connected with the water supply system, through the sprinkler 3 to the anti-collision wall 01 and cable trough vertical wall 02 water; the trolley 2 is designed as two, the two trolleys 2 are arranged on the top of the support frame 11 at intervals, and the two trolleys 2 walk along the top of the anti-collision wall 01. The sprinkler head on the maintenance frame is provided with pressurized water through the water supply system, and the maintenance frame runs along the top of the anti-collision wall driven by the trolley. In the operation process of the maintenance frame, the sprinkler head on the support frame carries out spray maintenance on the anti-collision wall, and the sprinkler head on the cantilever frame carries out spray maintenance on the vertical wall of the cable trough. According to actual needs, the trolley can be electric or manual. As a preferred structure, as shown in Fig.7, the two trolleys 2 are respectively driven by different motors, which are electrically connected with the controller (not shown in the figure). Through the relay in the controller to control the two trolleys, the two trolleys respectively set the program to control the walking time and speed. When the front trolley is walking, the rear front trolley is driven and is not powered on. When the rear front trolley is walking, the front trolley is driven and is not powered on. In this way, the two walking trolleys can be energized in turn to realize the maintenance frame running in two directions. Set according to the data obtained from the actual situation to control the running interval and speed of the trolley. In a preferred embodiment of the utility model, as shown in Fig. 2, the water supply system comprises a water tank 4, a water pump (not drawn in the figure) and a water pipe 5, the water tank 4 through the water pump will be sent to the water pipe 5, a number of sprinklers 3 are connected with the water pipe 5, the water pump and the controller is electrically connected. When the maintenance frame moves, the controller controlling the water pump continues to work. When the two walking trolleys stop and the maintenance frame stands still, the controller controlling the water pump will power off and the sprinkler will stop spraying water.
SPECIFICATION In a specific embodiment of the utility model, as shown in Fig. 1-4, the water pipe 5
comprises a connecting pipe 51, a main pipe 52 and a branch pipe 53 connected in
parallel with the main pipe 52, one end of the connecting pipe 51 is connected with
the water pump outlet, the other end is connected with the main pipe 52, the main pipe
52 and the branch pipe 53 are arranged on the maintenance frame 1; The main pipe 52
is three, a horizontal setting, two vertical setting, the vertical setting main pipe 52 are
connected with the horizontal setting main pipe 52; The horizontal main pipe 52 is
arranged on the top end of the support frame 11 and the cantilever frame 12, and the
vertical main pipe 52 is arranged on the lateral end of the vertical part of the support
frame 11; The branch pipe 53 is a plurality, and a plurality of branch pipes 53 are
arranged in parallel on the maintenance frame 1. One end of the branch pipe 53 is
closed, and the other end is communicated with the main pipe. The vertical part of the
support frame 11 on both sides of the interval is provided with more than two middle
beam 110, the middle beam 110 for supporting branch pipe 53; The middle beam 110
is welded and fixed on pillar 111. Start the water pump, distribute the pressurized
water through the connecting pipe and main pipe to different branch pipes, and then
spray out through each sprinkler to realize the sprinkling maintenance of the
anti-collision wall and the vertical wall of the cable trough.
In order to facilitate the movement with the maintenance frame, the connecting pipe
51 chooses hose, and the main pipe 52 and branch pipe 53 are PVC pipes, which are
easy to make and light to run.
Because the length of the anti-collision wall and the vertical wall of the cable trough
is large, the water tank 4 is arranged on the moving device, and the water pump is
arranged in the water tank 4. By adopting this external water storage measure, there is
no water tank at the upper part of automatic move maintenance frame, so as to ensure
the stability of the device and reduce the influence on the anti-collision wall which
supports and stabilizes and does not reach the design strength.
In order to ensure the curing effect, the sprinkler 3 adopts the atomizing sprinkler, and
the atomizing sprinkler is distributed on the pipe wall of the branch pipe 53.
In the construction process, the sprinkler head 3 spacing can be selected 15cm; the
SPECIFICATION end distance of the cantilever frame 12 from the support frame 11 is 1.4m, which can
satisfy the maintenance of the anti-collision wall and the vertical wall of the cable
trough at the same time. Furthermore, the length of the hose is set at 20 meters and
moves back and forth with the maintenance frame.
In addition, the vertical part of the support frame 11 is provided with a pulley 6 and
the two sides of the collision wall 01 contact, the two sides of the collision wall 01 are
respectively provided with two rows of pulley 6; and the pulley 6 is connected with
the support frame 11 by adjusting the bolt 7. The same pulley 6 is installed in the
middle position of the top of the support frame to ensure the smooth operation of the
support frame. When the walking trolley is used manually, six rows of pulleys are
selected on the top and both sides of the support frame 11. The top pulley is used as
the walking trolley, and the pulleys on both sides contact the surface of the
anti-collision wall to ensure the stability of the support frame in the process of
walking. When the walking trolley is electric, the two ends of the top of the support
frame are driven by a motor.
When the specific processing is made, the support frame 11 and the cantilever frame
12 are made of square steel pipe, and the cantilever frame is arranged in parallel with
a number of steel pipes, and the vertical part of the cantilever frame and the support
frame is provided with a diagonal rod 13. The size of the support frame is slightly
larger than the width of the anti-collision wall, and the steel pipe of the cantilever
frame is arranged vertically with the branch pipe.
The specific working process of the utility model is as follows: through the controller
in the distribution box to control the trolley at one end of the support frame, in order
to prevent the concrete surface on the top of the wall from hitting the reference
surface. Through the relay control device in the controller, the two trolleys are set up
separately. The support frame moves by pulling the walking trolley at one end, while
the walking trolley on the other side has no power to follow. After changing direction,
the active driven walking trolley is transformed. 5 rows of symmetrical pulleys are
arranged on the support frame, with two rows on both sides and one at the top. The
outer side of the pulley and the steel pipe of the support frame are bolted and can be
SPECIFICATION adjusted for tightness. The inner side of the pulley is tightly attached to the concrete
anti-collision wall. The pulleys on both sides of the anti-collision wall hold the
anti-collision wall tightly to stabilize the support frame; The maintenance frame and
the door-shaped support frame are provided with PVC branch pipe, and the wall of
the pipe is evenly provided with atomizers. When the branch pipe enters the
pressurized water, the concrete is sprayed through the sprinkler to achieve the purpose
of wet concrete.
In conclusion, the utility model has the following advantages:
1. The utility model has the advantages of simple structure, easy processing and low
cost, and is arranged on the poured anti-impact wall through the door-shaped support
frame, and moves the sprinkling maintenance by itself, which takes the place of the
long-time repeated sprinkling maintenance operation by the construction personnel,
and makes the construction convenient and improves the efficiency.
2. The utility model adopts automatic moving sprinkling maintenance. As long as the
working time interval, speed and other parameters are set according to the actual
situation of the site, the utility model can maintain by itself, reduce artificial access,
and reduce the concrete quality problems caused by artificial maintenance in
individual time.
3. The utility model adopts an external water storage tank, and no water tank is
arranged on the part of the automatic moving maintenance frame, so as to ensure the
stability of the device and reduce the influence on the anti-collision wall which plays
a supporting and stabilizing role and does not reach the design strength.
4. The utility model has light weight, and each component is easy to disassemble and
move. After a section of the beam maintenance is completed, the maintenance
operation is easy to be carried out forward, and a better flow maintenance
construction can be organized.
5. The utility model adopts a new atomizer, which has the advantages of uniform
sprinkling, less waste of maintenance water, energy saving and environmental
protection.
6. The utility model has wide coverage of atomizing sprinkler and good curing effect.
SPECIFICATION In the above description describes many details in order to fully understand the utility model, but the utility model can also be implemented in other ways different from the description. The technical personnel in this field may make similar promotion without violating the connotation of the utility model, so the utility model is not restricted by the specific embodiments disclosed above.

Claims (10)

  1. CLAIMS 1. The utility model relates to a maintenance equipment for anti-collision wall of
    high-speed railway bridge and vertical wall of cable trough, which has the following
    characteristics: Comprises a maintenance frame, a trolley and a water supply system,
    the maintenance frame comprises a support frame arranged on the outside of the
    anti-collision wall and a cantilever frame arranged on the vertical wall of the cable
    trough, the support frame is set on the outside of the anti-collision wall, the cantilever
    frame is arranged on one side of the support frame, and the top of the support frame is
    connected with the support frame;The maintenance frame is provided with several
    sprinklers connected with the water supply system, through the sprinkler head to the
    anti-collision wall and cable trough vertical wall water;The walking trolley is
    arranged on the top of the support frame, and the walking trolley walks along the top
    of the anti-collision wall.
  2. 2. According to claim 1, the described maintenance equipment for the anti-collision
    wall of high-speed railway bridge and vertical wall of cable trough is characterized by
    two trolleys driven by different motors respectively, and the motors are electrically
    connected with the controller.
  3. 3. According to claim 2, the described maintenance equipment for the anti-collision
    wall of high-speed railway bridge and vertical wall of cable trough is characterized by
    the water supply system including water tank, water pump and water pipe. The water
    tank sends the water pump to the water pipe through the water pump, several
    sprinklers are connected with the water pipe, and the water pump is electrically
    connected with the controller.
  4. 4. According to claim 3, the described maintenance equipment for anti-collision wall
    of high-speed railway bridge and vertical wall of cable trough is characterized by the
    water pipe comprises a connecting pipe, a main pipe and a branch pipe connected in
    parallel with the main pipe, one end of the connecting pipe is connected with the
    water pump outlet, the other end is connected with the main pipe, the main pipe and
    the branch pipe are arranged on the maintenance frame;The main pipe is consist of by
    a horizontal setting and two vertical setting, the vertical setting of the main pipes are
    connected with the horizontal setting of the main pipe;The horizontal main pipe is
    CLAIMS arranged on the top end of the support frame and the cantilever frame, and the vertical main pipe is arranged on the lateral end of the vertical part of the support frame;The branch pipe is a plurality of branch pipes, a plurality of branch pipes are arranged in parallel on the maintenance frame, one end of the branch pipe is closed, the other end is communicated with the main pipe.
  5. 5. According to claim 4, the described maintenance equipment for the anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the connecting pipe is a hose, and the main pipe and branch pipe are PVC pipes.
  6. 6. According to claim 3, the described maintenance equipment for anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the water tank being arranged on the moving device, and the water pump is arranged in the water tank.
  7. 7. According to claim 4, the described maintenance equipment for anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the sprinkler as an atomizer, and the atomizer is distributed on the pipe wall of the branch pipe.
  8. 8. According to claim 1, the described maintenance equipment for the anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the sprinkler spacing is 15cm
  9. 9. According to claim 3, the described maintenance equipment for the anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the vertical part of the support frame is provided with a pulley in contact with the two sides of the anti-collision wall, and two rows of pulleys are respectively provided on both sides of the anti-collision wall; and the pulley is connected with the support frame through an adjusting bolt.
  10. 10. According to claim 1-9, the described maintenance equipment for the anti-collision wall of high-speed railway bridge and vertical wall of cable trough is characterized by the vertical part of the support frame is provided with a pulley in contact with the two sides of the anti-collision wall, and two rows of pulleys are respectively provided on both sides of the anti-collision wall; And the pulley is
    CLAIMS connected with the support frame through an adjusting bolt.
    Fig.1 DRAWINGS
AU2021102863A 2021-05-26 2021-05-26 Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough Active AU2021102863A4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2021102863A AU2021102863A4 (en) 2021-05-26 2021-05-26 Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AU2021102863A AU2021102863A4 (en) 2021-05-26 2021-05-26 Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough

Publications (1)

Publication Number Publication Date
AU2021102863A4 true AU2021102863A4 (en) 2021-10-21

Family

ID=78176930

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2021102863A Active AU2021102863A4 (en) 2021-05-26 2021-05-26 Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough

Country Status (1)

Country Link
AU (1) AU2021102863A4 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263360A (en) * 2021-12-31 2022-04-01 中国港湾工程有限责任公司 Concrete structure maintenance device and maintenance method thereof
CN115506286A (en) * 2022-10-12 2022-12-23 中铁三局集团有限公司 Bridge anticollision wall intelligence maintenance dolly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114263360A (en) * 2021-12-31 2022-04-01 中国港湾工程有限责任公司 Concrete structure maintenance device and maintenance method thereof
CN115506286A (en) * 2022-10-12 2022-12-23 中铁三局集团有限公司 Bridge anticollision wall intelligence maintenance dolly

Similar Documents

Publication Publication Date Title
AU2021102863A4 (en) Maintenance Equipment for Anti-collision Wall of High-speed Railway Bridge and Vertical Wall of Cable Trough
CN108678800B (en) Tunnel health preserving dust removing device and dust removing method
CN204443455U (en) A kind of extended position sprinkling truck automatically
CN210031522U (en) Foundation structure curing means is used in road and bridge construction
CN210262714U (en) High-speed railway bridge anti-collision wall and cable duct vertical wall maintenance equipment
CN219968346U (en) Bridge pouring construction device
CN211873903U (en) Cast-in-place box girder sprays curing means
CN204980940U (en) Multifunctional tower crane
CN108068206B (en) Spraying pipe network supporting device for concrete curing and automatic curing system thereof
CN217856893U (en) Release agent spraying device
CN217284248U (en) Sunlight greenhouse cantilever type removes sprinkling irrigation equipment
CN209128327U (en) A kind of concrete protection column spraying health promotion system
CN207944353U (en) A kind of cantilever box beam automatic spray curing means
CN215564508U (en) Concrete curing means is used in building engineering management
CN114800825A (en) Box girder spraying and curing device
CN210482086U (en) Concrete spraying and curing device for high-pier hanging basket construction
CN211229782U (en) Spraying dust fall construction fence system
CN208052230U (en) A kind of Intelligent fixed time movable type beam field curing means
CN210025732U (en) Automatic spraying system for maintaining prefabricated parts
CN206653509U (en) A kind of precast beam intelligence curing means
CN216108615U (en) Concrete curing device
CN111546480A (en) Self-propelled door type automatic spray curing means
CN220590413U (en) Concrete panel curing agent spraying system
CN220954761U (en) Cast-in-situ continuous beam intelligent maintenance equipment
CN220469268U (en) Hyperbolic spherical roofing concrete curing means

Legal Events

Date Code Title Description
FGI Letters patent sealed or granted (innovation patent)