AU2002324484A1 - Method and apparatus to monitor, control and log subsea oil and gas wells - Google Patents
Method and apparatus to monitor, control and log subsea oil and gas wellsInfo
- Publication number
- AU2002324484A1 AU2002324484A1 AU2002324484A AU2002324484A AU2002324484A1 AU 2002324484 A1 AU2002324484 A1 AU 2002324484A1 AU 2002324484 A AU2002324484 A AU 2002324484A AU 2002324484 A AU2002324484 A AU 2002324484A AU 2002324484 A1 AU2002324484 A1 AU 2002324484A1
- Authority
- AU
- Australia
- Prior art keywords
- alternative path
- path conduit
- conduit
- well
- subsea
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Description
METHOD AND APPARATUS TO MONITOR, CONTROL AND LOG SUBSEA OIL AND GAS WELLS
BACKROUND OF INVENTION Field of the Invention
The present invention is directed to methods and apparatus for logging and permanently monitoring subsea oil, gas, and injection wells; specifically to deploying photonic, electromagnetic or hydraulic conduits in an alternative path adjacent the production tubing in said wells. Description of the Prior Art
Subsea wells are broadly defined as wells that do not provide fixed access from the surface of the sea. Subsea wells have wellheads located at or very near the sea floor and produce into subsea pipelines or provide access only through long subsea umbilical cables to distant locations. Traditional offshore wells located on offshore platforms have wellheads located on a platform at or above the sea surface.
Fluid flowing from subsea wells proceeds out of the wellbore from one or more producing zones, through a system of continuous conduits, subsea wellheads, subsea flow lines and subsea pipelines to a surface production and storage facilities. Often, the well products have to travel many miles from the subsea well head to such storage facilities
As oil and gas becomes more and more difficult to find on land or in shallow coastal waters, the oil and gas industry has commenced exploration and development in deeper waters, miles from production and storage facilities. Prior to oil and gas being discovered in deep waters, the preferred method of producing the wells was to place the wellheads and the subsequent
control devices for the wells at the sea surface on a platform. The access to these wells for the purpose of placing monitoring devices or performing intervention logging services was easily performed from the off-shore platform with the many well known methods of wireline logging, continuous coiled tubing, or even hydraulically pump down logging and monitoring systems.
Obtaining access to subsea wells for logging, monitoring or control purposes generally requires a costly submersible connection from the sea surface to the wellhead. Current methods, for example, to repair permanently disposed monitoring equipment, or to insert a suite of well logging tools into sub-sea wells, require the mobilization of a surface vessel which contains an off shore rig known to those in the industry as a semi-submersible rig or a drill ship. In all cases, the entry into the subsea well of the logging tools or tools to replace and dispose permanent monitoring equipment is performed through the production tubing. Because such wells are very expensive to drill and bring on line, most oil and gas producers prefer to not reenter the well unless absolutely necessary.
Hence, subsea wells are difficult to log or access for the placement of monitoring equipment. Further, visual inspections of these subsea wells are impossible because of the depths and distances of the wellhead from the nearest maintenance and production platform facility. Abnormal subsea well conditions cannot be observed in the manner of offshore platform wells or land wells, where pressure gauges and visual leak detection may be maintained.
Monitoring of the subsea wells for safety, reservoir evaluation, and environmental reasons requires the instrumentation monitoring of the subsea
well to be done remotely. This requires the transmission of the data from subterranean sensors in the well and subsea monitoring sensors over large distances to a receiving and processing node. This transmission of data is normally done over copper or optic fiber transmission umbilicals connecting the sub-sea wells back to surface data receiving stations. Because of the long distances and depths, considerable expense must be incurred to utilize these subsea umbilicals.
Furthermore, the current monitoring methods to monitor subsea wells are further compromised by frequent failure of various subterranean gauges and instruments used to monitor oil and gas wells. Because of the remoteness of subsea wells from the surface of the sea and the need for rig interventions to access the subsea and subterranean monitoring devices, they require well maintenance to be performed from intervention rigs which are not always immediately available to perform such maintenance. The result of these failures and the difficulty of quickly repairing them generally results in the decision to continue producing deep-water wells without any subsea monitoring information for leaks and pressure anomalies and without subterranean monitoring of reservoir parameters. Such shortcuts are undesirable because they can lead to catastrophic failures of wells, hydrocarbon releases into the sea, and less than optimal reserve recovery.
The logging of wells has traditionally been done from platforms and on land wells to obtain additional information about a well's reservoir condition and the integrity of the well's structure. In subsea wells, logging is rarely done, as it requires the mobilization of very large and expensive semi- submersible rigs or drill ships. Furthermore, these subsea logging
interventions introduce the possibility of losing wireline equipment in the well and compromising the well's ability to produce. Also, sub-sea logging operations normally require the production of the well be reduced or curtailed during process of rigging up of the logging equipment. Because of the above-mentioned difficulties of logging and maintaining unreliable subterranean monitoring equipment and very long umbilical transmission lines, many sub-sea wells are produced while monitoring the produced fluid back at the process or storage facility many miles away. This monitoring does not yield any indication of where the fluids are coming from in the well (Le. which portion of the formation may be producing) which may be desired where production may be resulting from large perforated intervals in the well. Additionally, flow rate information monitored at the surface does not identify possible cross flow of fluids between reservoir intervals, changes in water, oil, and gas quantities as function of the depth of the well, the presence of leaks in well tubular conduits, and whether the reservoir is depleting in pressure.
It is desirable from both a reservoir engineering perspective as well as from a safety and environmental perspective to obtain real-time information from subsea wells relating to dynamic subterranean environment, fluid production parameters, and subsea well equipment integrity. Examples of parameters which are desirable to monitor on a real-time basis are fluid flow rates, water cut, resistivity of subterranean formations, spontaneous potential of subterranean reservoirs, pressure, temperature, sand production, steel wall thickness of tubulars, seismic energy from the reservoir or other sources, and other variables known to those familiar with oil and gas production. This
information is currently, gathered from either permanently disposed monitoring devices attached to the production tubing or from well intervention methods that insert the devices concentrically through the production tubing in the subsea well. The commonly disposed permanent monitoring devices include pressure sensors, flow meters, temperature sensors, geophones, accelerometers, seismic source broadcasters, and other sensors and instruments. These devices are inserted in subsea wells concentrically through the well's production tubing either using wireline, coiled tubing, and slickline, from a rig placed at the surface of the sea and connecting to the subsea well through the water by risers. Alternatively, these permanently disposed devices are inserted' in a well with the production tubing. The production tubing is also inserted into the well via the use a rig on the surface of the sea where again a large riser is run from the sub-sea wellhead at the sea floor up through the water to the rig. Therefore, when permanently disposed monitoring equipment is inserted in a well either with production tubing or the other forms of insertion of the devices concentrically through the production tubing, a surface rig is required.
All of these parameters are obtained traditionally on land or offshore platform wells using offshore platform wells via the art of well logging. However, in the case of sub-sea wells the methods have to date not been developed to allow for safe, simple, and rapid log intervention into wells. Likewise, the retrieval of down hole pressure gauges or other instruments on land or off-shore platform wells is often achieved by a well intervention with commonly known methods of wire line operations thereby not requiring a rig
to be mobilized to the land or off-shore platform location. Failure and need for retrieval of subterranean pressure gauges or other subterranean instruments in sub-sea wells can not be performed by wire line or logging interventions unless a semi-submersible rig or drill ship is deployed to the sub-sea well location. The present invention provides a rigless intervention method to access subsea wells.
Several subterranean data gathering systems are currently used to obtain data from the wells. This is commonly done using down hole
' permanent pressure gauges; and flow meters, that have long umbilical from the sub-sea well to a platform or floating production facility. The umbilical have electrical or optical cable to transmit data from the different permanently deployed instruments and devices in the well. The current method of gathering data from subsea wells practiced by the oil and gas industry requires the pressure gauges and pressure gauge electrical or optical data transmission line be disposed in the subsea well during the initial well construction, known to those familiar with the art as the well completions. It also requires that all down hole instruments be connected to data transmission lines, either electrical or optical lines, by a subsea wet connection. This connection then connects the subterranean data transmission lines to the subsea umbilical transmission lines. These connections are difficult to do at deep-water depths, which often have large currents, high hydrostatic pressures, and are at depths where only a very limited number of Remotely Operated Vehicles (ROVs) can operate and make such wet connections.
The deep-water wells are being placed further from land, platforms, or floating process facilities to which the umbilicals are connected. This results in very long umbilicals with large weights and costs. Therefore, each additional instrument data transmission requirement from the sub-sea well requires an additional line in the umbilical going from the sub-sea wellhead back to the host facility at the sea surface often many miles away.
When the pressure gauge fails or when the data transmission line fails, or when the data transmission's wet-mateable connection fails, the only recourse for repair of the data gathering system is an intervention into the well, using either a drill ship or a semi-submersible drilling rig resulting in the pulling of the well completion, and a significant number of days of lost production during the recompletion of the well, all as previously described.
The present invention provides a method and apparatus to intervene into these deepwater sub-sea wells without deploying a deepwater rig to hydraulically connect to the sub-sea wellhead and thereafter deploy logging instruments into the well has long been sought by the oil and gas industry. Another feature of the present invention permits the entry of sub-sea wells for the purpose of obtaining data without placing logging tools and wire line cable into the production tubing fluid flow stream of these sub-sea wells. The intrusion of logging tools into the flow stream of such wells presents a significant risk of losing the logging equipment in the well and obstructing fluid production. The present invention obviates the need for such interventions. SUMMARY OF THE INVENTION
A new method of logging, monitoring and controlling sub-sea oil and gas wells is provided. This invention describes a method and apparatus to
obtain continuous or periodic data (if desired) from reservoirs producing through sub-sea wells. This invention further describes the method and apparatus used to process, transmit, and archive said data into information for reservoir and well management. The present invention relates to a new method and apparatus for constructing sub-sea wells using an alternative path-conduit to connect the subterranean conduit to a submersible conduit proceeding from the wellhead to the surface of the sea.
The preferred embodiment of this invention consists of a dual conduit system with the dual conduits connected at the bottom in the well providing a U-connection at the ends of the dual conduit and the other ends proceeding through the well head terminating outside the well head in a pair of hydraulic wet connection devices. This then forms a continuous conduit starting at the sea floor near the sub-well down the well and then back up to the sub-sea surface outside the well terminating in the two sea floor hydraulic wet mate devices.
This invention further teaches the method of constructing a well by placing the alternative path conduits into one of the sub-sea wells casing conduits. This invention teaches the insertion of logging tools, instruments, wireline, optic fibers, electrical cable, and other tools and instruments through the inventions alternative path conduits. This alternative path tube is deployed in the well, proceeds upwards through the wellhead, sub-sea safety valves, through sub-sea hydraulic disconnects, and to the sea surface, where it can be accessed by surface service vessels which can deploy logging tools and other instruments into the alternative path. The invention further teaches
the method of inserting permanent sub-sea and subterranean monitoring devices through the alternative path conduits of this invention.
This invention further teaches the connection of the alternative path conduits to a surface instrument pod by connecting continuous conduit from the conduit proceed forth from the sub sea well and wellhead terminating at the hydraulic wet connects, where the inventions surface instrument pod remains on station above the sub-sea well at the sea surface. The invention further teaches that the instrument pod can have recording, processing and transrηission devices inside the pod where the devices record, processes, and transmits the data and information to receiving locations on land or offshore. The use of an umbilical connected back to a remote surface instrument pod from the alternative path conduit disposed in the sub-sea well avoids the need for long umbilical cables back along the sea floor to the host production facility miles from the sub sea well. An additional feature of this invention permits remote data transmission and well interaction. Commands can be transmitted from a remote station to the surface instrument pod, and then down the umbilical disposed in the sea, and into to the sub-sea well for the purpose of operating downhole devices, such as valves, gauges, sensors and the like in response to these remote commands. BRIEF DESCRIPTION OF THE DRAWINGS
Fig. 1 is a partial schematic representation of the invention as disposed in several subsea wells.
Fig. 2 is a cross-sectional schematic view of the invention showing the apparatus of the present invention disposed into a subsea well. Fig. 3 is a partial schematic view of a U-connection in a producing well.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT The Alternative Path Conduit
Referring now to Fig. 1 of the drawings, a plurality of wells W are shown located on the sea floor 5. The well is drilled from the surface of the sea 7 using a semi-submersible 100 or drillship drilling rig (not shown). One or more wells W are bored by the action of rotating a drill bit on the end of a drill pipe from the surface rig where the drill bit is inserted inside of risers pipes and the drill cuttings are flushed out of the well bore with a drilling fluid using method and apparatus well known to those in the oil and gas industry. As more clearly shown in Fig. 2, a subsea well is constructed by drilling a borehole 1 down into the earth to intersect subterranean fluid production intervals 2 located in the earth. The well is constructed with at least one diameter of casing 3 disposed into the annulus of the borehole 1 and grouted into place from the surface rig, using cement 4 placed between the annular space formed between the bore hole 1 and casing 3. This process can be repeated with at least one additional casing 13. The final casing, in this figure casing 13, is explosively penetrated using explosive charges forming perforation tunnels 10 connecting the borehole hydraulically with the subterranean fluids in the earth. A production tubing string 8 is inserted inside the casing 13 and deployed from a surface rig. The production tubing 8 can provide adjacent its lower end, a sealing element known as a packer 6. The packer 6 is inserted in the annulus of casing 13 with the production tubing and set in the casing 13 above the perforation tunnels 10 to form a seal between the production tubing 8 and the casing 13 using any of the methods known to those familiar with oil and gas well completion technology. The upper end of
the production tubing 8 is terminated and retained in a wellhead 9 forming a sealed hydraulic conduit between the production tubing and the casing with hydraulic communication with the reservoir or production zone 2 through the perforations 10. Preferred embodiments of the present invention include the insertion of at least one parallel tubing string 11 of a smaller diameter disposed parallel, but exterior, to the production string 8, forming an alternative path through the well head and into the well.
In one preferred embodiment, the parallel tubing string 11 is connected to the outer diameter of casing 13 and inserted in the well from the surface rig while the casing 13 is deployed into the annulus of the wellbore 1. In another embodiment, a parallel tubing string (not shown) may be attached to the production tubing 8 and inserted into the well as the production tubing 8 is deployed from the surface rig. In either embodiment, the parallel tubing string 11 is connected through the wellhead 9 and sealed therein forming a sealed alternative path conduit into the sub-sea well without communication with the production fluid from the production interval 2. In both embodiments, at least one parallel path-tubing conduit 14 is connected above the wellhead 9 to a hydraulic quick connection 12. This connection can be made either at the wellhead or several hundred feet away from the wellhead to avoid the possibility of ROV collisions with the wellhead structure.
In yet another embodiment more fully shown schematically in Fig. 3., the well is constructed with a parallel alternative conduit path formed by inserting two parallel conduits in the well attached at the bottom with a U-tube connection. These parallel conduits form an alternative path to the production
tubing 8 that goes down the well and then back through the sub-sea wellhead 9, with each end hydraulically connected above the well head with a hydraulic disconnect device 12. Each parallel conduit string 11 in each embodiment can provide a fluid control safety valve 15 disposed either above or below the wellhead 9. As may be readily seen from Fig. 3, the return conduit need not be of the same internal diameter as the ingress conduit. The continuous path of 14 to 11 through the wellhead 9 communicates through the egress side 11a and conduit 16a. In each manner of installation, the fluid control safety valve 15 is used to control the unwanted escape of fluids through the alternative path conduit system. Other hydraulic check valves may be placed at 12a as need to prevent escape of fluids upon disconnection of the conduit during operations.
This invention further includes the construction of at least one continuous hydraulic conduit path from below the sub-sea floor 5 into and through the subsea wellhead 9 to the surface of the sea 7 by connecting alternative path conduit 14 above the well head proceeding from the well to a submersible conduit 16, such that one end of the continuous path has one end at the surface of the sea 7. Referring back to Fig. 1 , conduit 16 can be partially supported by subsurface buoys 51. Referring still to Fig. 1 , the present invention further includes the connection of the submersible conduit 16 from the subsea wellhead 9 to a surface instrument pod 17. This surface instrument pod can be moored to the sea floor by a system of cables and anchors 18 to keep instrument pod 17 on station above the subsea wells. Alternatively, instrument pod 17 can be tethered by a single line providing resilient means to hold the pod in a set
position while permitting the pod to move with the movement of the waves. So far as is known to applicant, no alternative path subsea conduit path has ever been used to provide a means of communicating with or controlling a subsea producing well. Installation of the Alternative Path Pod and Lines
The present invention requires that the alternative path conduit be installed during completion of the well. Consequently, the installation of the alternative path conduit must be coordinated with the setting and grouting of the well structure. Accordingly, the well profile must be planned with the alternative path conduit. If the alternative path conduit is to provide a path for optic fiber cabling only, a ΛA inch tubing or similar can be installed and strapped to the final casing upon setting of the casing string from the drilling platform or ship. If the alternative path conduit is to provide a means for wireline logging tools, chemical injection lines or hydraulic control lines, larger diameter conduit can be used to permit subsequent use as a combination pathway for one or more of these methods. If the preferred U-shaped alternative path conduit is set in the completed well, a memory-tool (i.e. one having a means of sensing and preserve the information as it passes through the pipe at a fixed velocity) may also be pumped into and out of the well to log the well without any wireline connection. Since the alternative path conduit is set in the wellhead of each subsea well, the wellhead must be designed for the alternative path conduit as well. Once set in the wellhead, the alternative path conduit provides a useful and easy diagnostic tool for monitoring, controlling and logging the well. The casing and wellhead are set in a manner well known to those in the industry. The connection of the alternative path
conduit to the wetmate connection may be made either at the surface and installed with the wellhead or installed later. It is anticipated that most installations will be made after the installation of the wellhead is accomplished and flanged up on the sea floor. For installation, instrument pod 17 is connected to conduit 16 aboard a surface vessel, like a semi-submersible drilling rig, or other vessel that allows for the connection of the conduit 16 aboard the vessel having the same relative motion as the instrument pod 17 and the conduit 16 proceeding up from the sub sea well. The preferred embodiment disposes one or more instrument packages within the instrument pod 17 that permit the gathering of data coming various data transmission lines disposed inside the alternative path conduit 16 proceeding up from the well. These data lines are any of the well-known lines that are used for data transmission including but not limited to optical fiber, electrical conductors, and hydraulic fluids. The optical fiber can be connected to a light source. The electrical conductor can be connected to a logging system. In the case of hydraulic fluids, a pressure monitoring system can be connected to the conduit. Optical Fiber in the Alternative Path Conduit
Optical fibers may be inserted in the alternative path conduit by connecting a pump to the provided port on the instrument pod 17. Silicon gel or another fluid can be pumped into the annulus of the alternative path conduit and fiber optic cabling is fed into the pumping silicon gel (or other fluid) which carries the line into the well bore due to the frictional force of the silicon (or other fluid) against the fiber optic line. Upon reaching total depth, the pumped
fiber is fully deployed in the wellbore. Fluids that may be used for deployment include liquids such as water as well as gases such as air or nitrogen.
If the alternative path conduit has been connected with a U-connection within the wellbore, the fiber optic cabling will be transported through the tubing and either egress the well at the wellhead or be transported back to the instrument pod by the pumping. The disposition of the optic fiber in the wellbore permits the instrument pod 17 to sense with the use of the optical time domain reflectometry apparatus described in United States Patent No. 5,592,282 to Hartog which is incorporated herein by reference and made a part hereof for all purposes, the thermal profile (distributed temperature measurement) of each well into which the line is disposed providing inflow conformance. The disposed fiber optic line also permits monitoring of production or well conduit integrity thereby permitting detection of leaks in the casing or production string. The fiber optic line also permits the monitoring of gas lift valves from the thermal profile of the well.
In other embodiments, the fiber optic line may include one or multiple sensors or sensor locations. The sensors or sensor locations are adapted to measure a parameter of interest, such as temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof. The sensors may be fiber optic sensors, electrical sensors, or other types.
Further, the alternative path conduit can be used to pump both multi- mode and single mode optic fiber into the same well bore thereby permitting calibration and correlation of backscattering signals to improve the resolution of the optical time domain reflectometry analysis of deep subsea wells.
In an alternative embodiment, an electrical cable can be disposed in the alternative path conduit instead of the optical fiber. The electrical cable may include one or more sensors or sensor locations, as in the case of the optical fiber. The optical fiber and the electrical cable are generally referred to herein as a "cable."
Electrical Conductor in the Alternative Path Conduit
Well logging is often accomplished by disposing a tool down a wellbore with a variety of tools located thereon. These tools may be inserted into the well bore, adjacent the production flow line, and therefore never risk causing obstruction or damage to these very expensive deep water well projects. Any cased hole logging tool can be disposed and run from a tubular member adjacent the production tubing. These include, without limitation, neutron decay detector scanning, gamma ray logging, magnetic resonance logging, seismic sensing, and the like. For example, referring now to Fig. 3, if conduit 16 was 2 inches in diameter, normal well logging tools could be easily inserted in the well bore to the full extent of the well bore. These tools could be easily pumped down the annulus of conduit 16 through wellhead 9 and into the larger diameter side of the U-shaped subsea conduit 11. The logging techniques could be accomplished from the buoy, or the tools could be permanently deployed to allow all varieties of common logging techniques to be accomplished with the deployed tools. These tools could be inserted to the total well depth either from the moon pool of the drilling rig as it completes the well or from the instrument pod 17 after placement on the deck of a service vessel. Operation of the Alternative Path Pod and Lines
The alternative path conduit and instrument pod allows an extension of the wellhead to the sea surface for control, logging and sampling lines. The instrument buoy would be deployed after connection with the submersible conduit from a regular buoy tender vessel. Since the buoy is much closer to the subsea wellhead than the remote production platform, control lines may be easily used to log well inflow conformance by real-time temperature profiles. If more than one well in a field is provided with the alternative path conduit and buoy system, a real time reservoir profile may be developed by combining the information received from each alternative path instrument pod. This information may be transferred from each instrument pod to either a production platform or land based radio station and processed and provided over modern communication channels to knowledge workers interested in well production and characteristics.
The instrument pod may also be used as a staging area for remotely activated well shutoff controls which would shut-in a well as required by reservoir engineers for the reasons well known to those having skill in this industry. A command could be issued to the instrument pod which would thereafter executed either an acoustic, electrical, or photonic signal to a subsurface valve to shut in the well. Service and Repair of the Alternative Path Pod and Lines
Service of the alternative path pod and lines can be readily accomplished from regular surface vessels and remotely operated subsea vehicles (ROVs) presently used to service subsea wells. As required, the service vessel would be called to service each buoy with fuel (if required to run generators), glycol or other chemicals (if need to pump into the well zone),
or replace or service cabling or conduit run into the alternative path. The pod would be lifted onto the work vessel by crane or other lifting means. The rise and fall of the vessel would not prevent the servicing of the conduit. A pump would be connected to the conduit and the optic fiber line could be washed from the conduit. Alternatively, new lines may be inserted into the alternative path conduit by pumping in a manner well known to those providing current well service.
Since the conduit is continuous from the surface into the well bore and back to the surface in the preferred embodiment. The introduction of cabling, or conductors into the well bore can be enhanced by filing the conduit with a low-density hydraulic medium, such as nitrogen gas, and then pumping in the lines one side while bleeding off the gas from the other side of the continuous looped circuit.
It is noted that the alternative path conduit, through its different methods of communication as previously disclosed (such as optical fiber, electrical cable, and hydraulic fluid) can act as a means to send commands from the pod to devices located in the wellbore. For instance, a command to set the packer 6 may be sent from a remote location to the pod and from the pod down the alternative path conduit to the packer. Provided the command sent is the "set packer" command, the packer is then set. Besides a packer, devices that can be controlled include but are not limited to valves (such as flow control valves), perforating guns, and tubing hangers.
The preceding are examples of deploying permanent or temporary monitoring devices D within the alternative path conduit, including the deployment of cables, logging tools, memory tools, seismic arrays, and
sensors. Figure 3 schematically illustrates a device D being deployed within the alternative path conduit.
While particular embodiments of the invention have been described herein, this application is not limited thereto. It is intended that the invention be as broad in scope as the art may allow and that the specification and claims be interpreted as accordingly.
Claims (70)
- CLAIMS What is claimed: 1. A method for constructing a subsea well, comprising: inserting a casing string in the subsea well, the casing string having an alternative path conduit disposed proximate to the casing string; passing the alternative path conduit through a subsea wellhead; attaching a hydraulic wet connector to the alternative path conduit; inserting a production tubing into the casing string; and connecting the alternative path conduit to the hydraulic wet connector.
- 2. The method of claim 1 further comprising disposing the alternative path conduit between an exterior surface of the casing and a well bore.
- 3. The method of claim 1 further comprising disposing the alternative path conduit in an annulus between an exterior surface of the production tubing and an interior surface of the casing.
- 4. The method of claim 1 further comprising connecting a valve to the alternative path conduit.
- 5. The method of claim 1 further comprising inserting two alternative path conduits, each of the two conduits having a proximal end and a distal, the conduits connected to a common U-connection at their distal end, and passing through the subsea wellhead at their proximal ends.
- 6. The method of claim 1 wherein the alternative path conduit provides hydraulic injection.
- 7. The method of claim 1 further comprising flowing fluid through the alternative path conduit and dragging a cable through the alternative path conduit with the fluid flow.
- 8. The method of claim 1 wherein the alternative path conduit provides access for a wire line to subterranean reservoirs.
- 9. The method of claim 1 wherein the alternative path conduit is used to pump down memory recording devices.
- 10. The method of claim 1 further comprising deploying a well logging tool into the alternative path conduit.
- 11. The method of claim 1 further comprising cementing the alternative path conduit in place.
- 12. The method of claim 1 further comprising deploying non-permanent monitoring devices through the alternative path conduit.
- 13. The method of claim 1 further comprising deploying permanent monitoring devices through the alternative path conduit.
- 14. The method of claim 1 further comprising transmitting a command down the alternative path conduit to actuate a device located in the well.
- 15. The method of claim 1 wherein the alternative path conduit is disposed across a subterranean production interval.
- 16. The method of claim 1 wherein the alternative path conduit is disposed across a subterranean injection interval.
- 17. The method of claim 1 , wherein the alternative path conduit is hydraulically isolated from fluids produced in the well.
- 18. The method of claim 1 further comprising connecting a floatation pod to alternative path conduit through the hydraulic wet connector.
- 19. The method of claim 18, wherein the floatation pod is connected to the hydraulic wet connector by way of an additional conduit extending from the pod.
- 20. The method of claim 1 wherein the alternative path conduit provides a path for data transmission
- 21. The method of claim 20 wherein data transmission is performed by an optic fiber deployed in the alternative path conduit.
- 22. The method of claim 21 further compromising connecting a light source to the optic fiber.
- 23. The method of claim 22 further compromising detecting and processing backscattering light in the optic fiber in order to provide a distributed temperature measurement.
- 24. The method of claim 21 further compromising connecting a light source to both ends of the optic fiber.
- 25. The method of claim 20 wherein data transmission is performed by an electrical conductor deployed in the alternative path conduit.
- 26. The method of claim 25 further compromising connecting a well logging system to the electrical conductor.
- 27. The method of claim 20 wherein data transmission is fluidic.
- 28. The method of claim 27 further compromising connecting at least one pressure monitoring system attached to the fluidic alternative path conduit.
- 29. The method of claim 20 wherein the alternative path conduit provides the simultaneous transmission of optic, acoustic or electrical signals.
- 30. The method of claim 1 further comprising measuring a parameter of interest from within the alternative path conduit.
- 31. The method of claim 30 wherein the parameter of interest is temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof.
- 32. The method of claim 1 further comprising connecting a fluid control safety valve to the alternative path conduit wherein the control valve can be used to shut off flow through the alternative path conduit.
- 33. The method of claim 32, wherein the fluid control safety valve is located below the subsea wellhead.
- 34. The method of claim 32, wherein the fluid control safety valve is located above the subsea well head.
- 35. The method of claim 1 wherein the casing string comprises additional alternative path conduits.
- 36. A method of monitoring a subsea well comprising: deploying a floating instrument pod proximate to a sub sea well; connecting the pod to an alternative path conduit; deploying the alternative path conduit proximate to a casing string within the well; and communicating through the alternative path conduit between the instrument pod and the well.
- 37. The method of claim 36 further comprising partially supporting the alternative path conduit by a submerged flotation device.
- 38. The method of claim 36 further comprising attaching a subsea anchor to a subsea pile to maintain the instrument pod proximate to the well.
- 39. The method of claim 36 further comprising: receiving data at. the instrument pod from the well through the alternative path conduit;processing the data; andtransmitting the data from the instrument pod to a remote location.
- 40. An apparatus for logging, controlling, or monitoring a subsea well comprising: a casing string disposed in a subsea well; an alternative path conduit disposed proximate the casing string and passing through a subsea wellhead; the alternative path conduit connected to a hydraulic wet connector; a production tubing located within the casing string; and a floatation pod connected to the alternative path conduit through the hydraulic wet connector.
- 41. The apparatus of claim 40 wherein the alternative path conduit is U- shaped and provides an ingress and an egress on the wellhead.
- 42. The apparatus of claim 40 wherein the alternative path conduit is located between an exterior surface of the casing string and the wellbore.
- 43. The apparatus of claim 40 wherein a cable is deployed within the alternative path conduit.
- 44. The apparatus of claim 43 wherein the cable comprises an optical fiber.
- 45. The apparatus of claim 43 wherein the cable comprises an electrical cable.
- 46. The apparatus of claim 43 wherein the cable is deployed by fluid drag.
- 47. The apparatus of claim 40 wherein the alternative path conduit provides a path for data transmission.
- 48. The apparatus of claim 40 wherein a device is deployed within the alternative path conduit to measure a parameter of interest.
- 49. The apparatus of claim 48 wherein the parameter of interest is temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof.
- 50. The apparatus of claim 40 further comprising a memory recording device adapted to be deployed through the alternative path conduit.
- 51. The apparatus of claim 40 further comprising a logging tool adapted to be deployed through the alternative path conduit.
- 52. The apparatus of claim 40 wherein the alternative path conduit is cemented in place.
- 53. The apparatus of claim 52 wherein the alternative path conduit is cemented in place between an exterior surface of the casing string and the wellbore.
- 54. The apparatus of claim 40 wherein a monitoring device is deployed permanently in the alternative path conduit.
- 55. The apparatus of claim 40 wherein a monitoring device is deployed non-permanently in the alternative path conduit.
- 56. The apparatus of claim 40 wherein a command is transmitted through the alternative path conduit to control a device located in the well.
- 57. The apparatus of claim 40 comprising additional alternative path conduits disposed proximate the casing string and passing through a subsea wellhead.
- 58. A method of completing a subsea well, comprising: deploying a casing string within a subsea wellbore; deploying an alternative path conduit between an exterior of the casing string and the subsea wellbore; cementing the alternative path conduit in place; and providing hydraulic communication between the alternative path conduit and an instrumented pod proximate an ocean surface.
- 59. The method of claim 58, further comprising deploying a logging tool through the alternative path conduit.
- 60. The method of claim 58, further comprising deploying a monitoring device through the alternative path conduit on a permanent basis.
- 61. The method of claim 58, further comprising deploying a monitoring device through the alternative path conduit on a non-permanent basis.
- 62. The method of claim 58, further comprising transmitting a command through the alternative path conduit to control a device located in the subsea wellbore.
- 63. The method of claim 58, further comprising deploying a cable through the alternative path conduit by use of fluid drag.
- 64. The method of claim 63, further comprising pumping the cable through the alternative path conduit by fluid drag. .
- 65. The method of claim 63, wherein the cable is an optical fiber.
- 66. The method of claim 63, wherein the cable is an electrical cable.
- 67. The method of claim 58, further comprising measuring a parameter of interest from within the alternative path conduit.
- 68. The method of claim 67 wherein the parameter of interest is temperature, distributed temperature, pressure, acoustic energy, electric current, magnetic field, electric field, flow, chemical properties, or a combination thereof.
- 69. A subsea well construction, comprising: a casing string disposed within a subsea wellbore; an alternative path conduit disposed between an exterior of the casing string and the subsea wellbore; the alternative path conduit cemented in place; and the alternative path conduit being in hydraulic communication with an instrumented pod proximate an ocean surface.
- 70. A method of logging a subsea well, comprising: deploying a casing string within a subsea wellbore; deploying an alternative path conduit between an exterior of the casing string and the wellbore; cementing the alternative path conduit in place; and deploying a logging tool through the alternative path conduit to log the wellbore.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US30502001P | 2001-07-12 | 2001-07-12 | |
US60/305,020 | 2001-07-12 | ||
PCT/US2002/021880 WO2003006779A2 (en) | 2001-07-12 | 2002-07-10 | Method and apparatus to monitor, control and log subsea oil and gas wells |
Publications (2)
Publication Number | Publication Date |
---|---|
AU2002324484A1 true AU2002324484A1 (en) | 2003-05-22 |
AU2002324484B2 AU2002324484B2 (en) | 2007-09-20 |
Family
ID=23178959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2002324484A Ceased AU2002324484B2 (en) | 2001-07-12 | 2002-07-10 | Method and apparatus to monitor, control and log subsea oil and gas wells |
Country Status (5)
Country | Link |
---|---|
US (2) | US6640900B2 (en) |
AU (1) | AU2002324484B2 (en) |
GB (3) | GB2414756B (en) |
NO (1) | NO20040099L (en) |
WO (1) | WO2003006779A2 (en) |
Families Citing this family (81)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7234524B2 (en) * | 2002-08-14 | 2007-06-26 | Baker Hughes Incorporated | Subsea chemical injection unit for additive injection and monitoring system for oilfield operations |
GB2414756B (en) * | 2001-07-12 | 2006-05-10 | Sensor Highway Ltd | Method and apparatus to monitor, control and log subsea wells |
EP1319800B1 (en) * | 2001-12-12 | 2006-02-22 | Cooper Cameron Corporation | Borehole equipment position detection system |
GB0216259D0 (en) * | 2002-07-12 | 2002-08-21 | Sensor Highway Ltd | Subsea and landing string distributed sensor system |
US6758271B1 (en) * | 2002-08-15 | 2004-07-06 | Sensor Highway Limited | System and technique to improve a well stimulation process |
US6955218B2 (en) * | 2003-08-15 | 2005-10-18 | Weatherford/Lamb, Inc. | Placing fiber optic sensor line |
US20050199391A1 (en) * | 2004-02-03 | 2005-09-15 | Cudmore Julian R. | System and method for optimizing production in an artificially lifted well |
US7832500B2 (en) * | 2004-03-01 | 2010-11-16 | Schlumberger Technology Corporation | Wellbore drilling method |
US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
US7914266B2 (en) * | 2004-03-31 | 2011-03-29 | Schlumberger Technology Corporation | Submersible pumping system and method for boosting subsea production flow |
CA2563738C (en) | 2004-05-03 | 2013-02-19 | Exxonmobil Upstream Research Company | System and vessel for supporting offshore fields |
US7777643B2 (en) * | 2004-05-06 | 2010-08-17 | Halliburton Energy Services, Inc. | Optical communications with a bottom hole assembly |
US8522869B2 (en) * | 2004-05-28 | 2013-09-03 | Schlumberger Technology Corporation | Optical coiled tubing log assembly |
US7617873B2 (en) | 2004-05-28 | 2009-11-17 | Schlumberger Technology Corporation | System and methods using fiber optics in coiled tubing |
US20060004593A1 (en) * | 2004-06-30 | 2006-01-05 | Devon Energy Corporation | Method and system for gathering, transporting and marketing offshore oil and gas |
US7420475B2 (en) * | 2004-08-26 | 2008-09-02 | Schlumberger Technology Corporation | Well site communication system |
GB2434863B (en) * | 2004-11-03 | 2010-02-03 | Shell Int Research | Apparatus and method for retroactively installing sensors on marine elements |
US7493962B2 (en) * | 2004-12-14 | 2009-02-24 | Schlumberger Technology Corporation | Control line telemetry |
BRPI0608498A2 (en) * | 2005-03-23 | 2010-11-16 | Shell Intyernationale Res Mij | system and method for remotely detecting properties of an undersea structure |
US7554458B2 (en) * | 2005-11-17 | 2009-06-30 | Expro North Sea Limited | Downhole communication |
GB2433112B (en) * | 2005-12-06 | 2008-07-09 | Schlumberger Holdings | Borehole telemetry system |
US7793718B2 (en) | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US8056619B2 (en) * | 2006-03-30 | 2011-11-15 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US7712524B2 (en) | 2006-03-30 | 2010-05-11 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US7735555B2 (en) * | 2006-03-30 | 2010-06-15 | Schlumberger Technology Corporation | Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly |
US20070234789A1 (en) * | 2006-04-05 | 2007-10-11 | Gerard Glasbergen | Fluid distribution determination and optimization with real time temperature measurement |
GB0616330D0 (en) * | 2006-08-17 | 2006-09-27 | Schlumberger Holdings | A method of deriving reservoir layer pressures and measuring gravel pack effectiveness in a flowing well using permanently installed distributed temperature |
US20080179063A1 (en) * | 2007-01-25 | 2008-07-31 | Smith David R | Chemically enhanced gas-lift for oil and gas wells |
US7586617B2 (en) * | 2007-06-22 | 2009-09-08 | Schlumberger Technology Corporation | Controlling a dynamic signal range in an optical time domain reflectometry |
GB2464064B (en) * | 2007-08-10 | 2012-03-28 | Schlumberger Holdings | Methods and systems of installing cable for measurement of a physical parameter |
US8423397B2 (en) * | 2008-08-08 | 2013-04-16 | Pinnacleais, Llc | Asset management systems and methods |
US20100036866A1 (en) * | 2008-08-11 | 2010-02-11 | Pinnacleais, Llc | Piping Circuitization System and Method |
GB2474211B (en) * | 2008-08-13 | 2012-05-02 | Schlumberger Holdings | Umbilical management system and method for subsea well intervention |
GB2464481B (en) * | 2008-10-16 | 2011-11-02 | Dynamic Dinosaurs Bv | Method for installing sensors in a borehole |
EP2196621B1 (en) * | 2008-12-15 | 2017-03-08 | Services Pétroliers Schlumberger | A micro-logging system and method |
EP2196620B1 (en) | 2008-12-15 | 2012-06-27 | Services Pétroliers Schlumberger | A micro-logging system and method |
US20100193186A1 (en) * | 2009-02-03 | 2010-08-05 | Smith David R | Method and apparatus to construct and log a well |
US20100252269A1 (en) * | 2009-04-01 | 2010-10-07 | Baker Hughes Incorporated | System and method for monitoring subsea wells |
GB2482642B (en) * | 2009-05-27 | 2015-05-27 | Silixa Ltd | Apparatus for optical sensing |
GB2471108B (en) | 2009-06-17 | 2013-08-07 | Vetco Gray Controls Ltd | Monitoring of undesirable fluid ingress into subsea control modules |
EP2446117B1 (en) * | 2009-06-25 | 2019-09-11 | OneSubsea IP UK Limited | Sampling skid for subsea wells |
US20140290374A1 (en) * | 2013-03-28 | 2014-10-02 | David V. Brower | Apparatus to Monitor Flow Assurance Properties in Conduits |
US8839850B2 (en) | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US9388686B2 (en) | 2010-01-13 | 2016-07-12 | Halliburton Energy Services, Inc. | Maximizing hydrocarbon production while controlling phase behavior or precipitation of reservoir impairing liquids or solids |
US8505625B2 (en) | 2010-06-16 | 2013-08-13 | Halliburton Energy Services, Inc. | Controlling well operations based on monitored parameters of cement health |
EP2635771A1 (en) * | 2010-08-24 | 2013-09-11 | Stanley Hale | Leak detection and early warning system for capped or abandoned subsea wellheads |
EP2423429A1 (en) * | 2010-08-31 | 2012-02-29 | Vetco Gray Controls Limited | Valve condition monitoring |
US9772608B2 (en) * | 2010-12-20 | 2017-09-26 | Joe Spacek | Oil well improvement system—well monitor and control subsystem |
US8636063B2 (en) | 2011-02-16 | 2014-01-28 | Halliburton Energy Services, Inc. | Cement slurry monitoring |
US9389271B2 (en) * | 2011-03-25 | 2016-07-12 | Ohio University | Security system for underground conduit |
US9075155B2 (en) | 2011-04-08 | 2015-07-07 | Halliburton Energy Services, Inc. | Optical fiber based downhole seismic sensor systems and methods |
US9127531B2 (en) | 2011-09-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Optical casing collar locator systems and methods |
US9127532B2 (en) | 2011-09-07 | 2015-09-08 | Halliburton Energy Services, Inc. | Optical casing collar locator systems and methods |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
US9297767B2 (en) | 2011-10-05 | 2016-03-29 | Halliburton Energy Services, Inc. | Downhole species selective optical fiber sensor systems and methods |
US8725302B2 (en) * | 2011-10-21 | 2014-05-13 | Schlumberger Technology Corporation | Control systems and methods for subsea activities |
US20130105109A1 (en) * | 2011-10-31 | 2013-05-02 | Velma Jean Richards | Energy Thermostatic Thermos System (Heating and Cooling Containment) |
RU2488691C1 (en) * | 2012-01-13 | 2013-07-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of oil deposit at late stage |
US20130188168A1 (en) * | 2012-01-20 | 2013-07-25 | Arthur H. Hartog | Fiber optic formation dimensional change monitoring |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US10060250B2 (en) | 2012-03-13 | 2018-08-28 | Halliburton Energy Services, Inc. | Downhole systems and methods for water source determination |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
GB2503498B (en) * | 2012-06-29 | 2017-06-14 | Optasense Holdings Ltd | Fibre optic sensing |
GB201212701D0 (en) * | 2012-07-17 | 2012-08-29 | Silixa Ltd | Structure monitoring |
US8649909B1 (en) * | 2012-12-07 | 2014-02-11 | Amplisine Labs, LLC | Remote control of fluid-handling devices |
US9885848B2 (en) | 2013-07-02 | 2018-02-06 | The Penn State Research Foundation | Composite cable assembly with neutral buoyancy |
US9927263B2 (en) | 2013-07-02 | 2018-03-27 | The Penn State Research Foundation | Intrusion detection system for an undersea environment |
AU2013402080B2 (en) * | 2013-09-25 | 2017-06-29 | Halliburton Energy Services, Inc. | Workflow adjustment methods and systems for logging operations |
US20160024868A1 (en) * | 2014-07-24 | 2016-01-28 | Conocophillips Company | Completion with subsea feedthrough |
US20160024869A1 (en) * | 2014-07-24 | 2016-01-28 | Conocophillips Company | Completion with subsea feedthrough |
US9595884B2 (en) * | 2014-12-18 | 2017-03-14 | General Electric Company | Sub-sea power supply and method of use |
CA2982274C (en) * | 2015-05-15 | 2020-12-29 | Halliburton Energy Services, Inc. | Cement plug tracking with fiber optics |
WO2016195645A1 (en) * | 2015-05-29 | 2016-12-08 | Halliburton Energy Services, Inc. | Methods and systems employing a controlled acoustic source and distributed acoustic sensors to identify acoustic impedance boundary anomalies along a conduit |
WO2017062584A1 (en) * | 2015-10-06 | 2017-04-13 | The Penn State Research Foundation | Intrusion detection system for an undersea environment |
US10655455B2 (en) | 2016-09-20 | 2020-05-19 | Cameron International Corporation | Fluid analysis monitoring system |
US10472949B2 (en) | 2017-01-30 | 2019-11-12 | Cameron International Corporation | Gas-in-solution detection system and method |
US11415553B2 (en) * | 2019-07-23 | 2022-08-16 | The United States Of America, As Represented By The Secretary Of The Navy | Mobile automated non-destructive inspection system |
EP4056803A1 (en) * | 2021-03-12 | 2022-09-14 | Nexans | Remote communication downline system |
US20230296002A1 (en) * | 2022-03-17 | 2023-09-21 | China University Of Petroleum-Beijing | Deep-water drilling gas kick pilot-scale apparatus |
Family Cites Families (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3026940A (en) * | 1958-05-19 | 1962-03-27 | Electronic Oil Well Heater Inc | Oil well temperature indicator and control |
US3347319A (en) * | 1965-03-15 | 1967-10-17 | Fenix & Scisson Inc | Large diameter casing |
US3489219A (en) * | 1966-03-10 | 1970-01-13 | Halliburton Co | Method of locating tops of fluids in an annulus |
US3517110A (en) | 1968-04-01 | 1970-06-23 | North American Rockwell | Flexible underwater riser containing electrical conductors and material conduits |
US3612177A (en) * | 1969-10-29 | 1971-10-12 | Gulf Oil Corp | Deep water production system |
US3675713A (en) * | 1970-03-30 | 1972-07-11 | Regan Forge & Eng Co | Method and apparatus for separating subsea well conduit couplings from a remote floating vessel |
USRE27745E (en) * | 1971-04-09 | 1973-08-28 | Subsea production system | |
US4052703A (en) * | 1975-05-05 | 1977-10-04 | Automatic Terminal Information Systems, Inc. | Intelligent multiplex system for subsurface wells |
FR2421272A1 (en) | 1978-03-28 | 1979-10-26 | Europ Propulsion | SYSTEM FOR REMOTE CONTROL AND MAINTENANCE OF A SUBMERSIBLE WELL HEAD |
US4191250A (en) * | 1978-08-18 | 1980-03-04 | Mobil Oil Corporation | Technique for cementing casing in an offshore well to seafloor |
US4480690A (en) * | 1981-02-17 | 1984-11-06 | Geo Vann, Inc. | Accelerated downhole pressure testing |
GB2178717B (en) | 1985-07-19 | 1988-06-08 | Ferranti Subsea Systems | Communication arrangement between a sub-sea structure and floating vessel |
FR2600172B1 (en) * | 1986-01-17 | 1988-08-26 | Inst Francais Du Petrole | DEVICE FOR INSTALLING SEISMIC SENSORS IN A PETROLEUM PRODUCTION WELL |
GB8626884D0 (en) * | 1986-11-11 | 1986-12-10 | Myrmidon Subsea Controls Ltd | Subsea systems & devices |
FR2621646B1 (en) * | 1987-08-19 | 1995-08-25 | Inst Francais Du Petrole | PROCESS FOR MANEUVERING AT LEAST ONE DEVICE WITHIN A TUBING AND ASSEMBLY FOR IMPLEMENTING THE PROCESS |
US5163321A (en) * | 1989-10-17 | 1992-11-17 | Baroid Technology, Inc. | Borehole pressure and temperature measurement system |
US5166677A (en) | 1990-06-08 | 1992-11-24 | Schoenberg Robert G | Electric and electro-hydraulic control systems for subsea and remote wellheads and pipelines |
EP0470883B1 (en) | 1990-08-10 | 1995-10-18 | Institut Français du Pétrole | Installation and method for the exploitation of small offshore reservoirs |
US5381865A (en) * | 1990-12-13 | 1995-01-17 | Blandford; Joseph W. | Method and apparatus for production of subsea hydrocarbon formations |
FR2673672B1 (en) * | 1991-03-08 | 1993-06-04 | Inst Francais Du Petrole | METHOD AND DEVICE FOR PLACING PROBES AGAINST THE WALL OF A WELL. |
FR2681373B1 (en) * | 1991-09-17 | 1993-10-29 | Institut Francais Petrole | IMPROVED DEVICE FOR MONITORING A DEPOSIT FOR PRODUCTION WELLS. |
GB9315231D0 (en) | 1993-07-22 | 1993-09-08 | York Ltd | Optical time domain reflextometry |
US5517024A (en) * | 1994-05-26 | 1996-05-14 | Schlumberger Technology Corporation | Logging-while-drilling optical apparatus |
US5732776A (en) | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US5706896A (en) | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5503225A (en) * | 1995-04-21 | 1996-04-02 | Atlantic Richfield Company | System and method for monitoring the location of fractures in earth formations |
US5524709A (en) * | 1995-05-04 | 1996-06-11 | Atlantic Richfield Company | Method for acoustically coupling sensors in a wellbore |
GB9519880D0 (en) * | 1995-09-29 | 1995-11-29 | Sensor Dynamics Ltd | Apparatus for measuring pressure |
US5626192A (en) * | 1996-02-20 | 1997-05-06 | Halliburton Energy Services, Inc. | Coiled tubing joint locator and methods |
US6125935A (en) * | 1996-03-28 | 2000-10-03 | Shell Oil Company | Method for monitoring well cementing operations |
GB9606673D0 (en) * | 1996-03-29 | 1996-06-05 | Sensor Dynamics Ltd | Apparatus for the remote measurement of physical parameters |
US6532839B1 (en) * | 1996-03-29 | 2003-03-18 | Sensor Dynamics Ltd. | Apparatus for the remote measurement of physical parameters |
EP0938621B1 (en) * | 1996-11-14 | 2004-09-29 | Camco International Inc. | Communication conduit in a well tool |
NO310890B1 (en) | 1997-04-29 | 2001-09-10 | Kvaerner Oilfield Prod As | Dynamic control cable for use between a floating structure and a connection point on the seabed |
US6281489B1 (en) * | 1997-05-02 | 2001-08-28 | Baker Hughes Incorporated | Monitoring of downhole parameters and tools utilizing fiber optics |
GB2362462B (en) * | 1997-05-02 | 2002-01-23 | Baker Hughes Inc | A method of monitoring chemical injection into a surface treatment system |
US6070663A (en) * | 1997-06-16 | 2000-06-06 | Shell Oil Company | Multi-zone profile control |
US5884715A (en) * | 1997-08-01 | 1999-03-23 | Reddoch; Jeffrey | Method and apparatus for injecting drilling waste into a well while drilling |
US6173788B1 (en) * | 1998-04-07 | 2001-01-16 | Baker Hughes Incorporated | Wellpacker and a method of running an I-wire or control line past a packer |
US6026900A (en) * | 1998-06-15 | 2000-02-22 | Keller; Carl E. | Multiple liner method for borehole access |
NO315725B1 (en) * | 1998-06-18 | 2003-10-13 | Norges Geotekniske Inst | Device for measuring and monitoring resistivity outside a well pipe in a petroleum reservoir |
FR2780442B1 (en) | 1998-06-30 | 2000-07-28 | Inst Francais Du Petrole | POLYPHASIC PRODUCTION SYSTEM SUITABLE FOR LARGE WATER DEPTHS |
US6443228B1 (en) * | 1999-05-28 | 2002-09-03 | Baker Hughes Incorporated | Method of utilizing flowable devices in wellbores |
US6223675B1 (en) | 1999-09-20 | 2001-05-01 | Coflexip, S.A. | Underwater power and data relay |
US6360820B1 (en) * | 2000-06-16 | 2002-03-26 | Schlumberger Technology Corporation | Method and apparatus for communicating with downhole devices in a wellbore |
US6437326B1 (en) * | 2000-06-27 | 2002-08-20 | Schlumberger Technology Corporation | Permanent optical sensor downhole fluid analysis systems |
US6364021B1 (en) * | 2000-07-11 | 2002-04-02 | Halliburton Energy Services, Inc. | Well management system and method of operation |
GB2414756B (en) * | 2001-07-12 | 2006-05-10 | Sensor Highway Ltd | Method and apparatus to monitor, control and log subsea wells |
US6772840B2 (en) * | 2001-09-21 | 2004-08-10 | Halliburton Energy Services, Inc. | Methods and apparatus for a subsea tie back |
US20030234921A1 (en) * | 2002-06-21 | 2003-12-25 | Tsutomu Yamate | Method for measuring and calibrating measurements using optical fiber distributed sensor |
US6758271B1 (en) * | 2002-08-15 | 2004-07-06 | Sensor Highway Limited | System and technique to improve a well stimulation process |
-
2002
- 2002-07-10 GB GB0517372A patent/GB2414756B/en not_active Expired - Fee Related
- 2002-07-10 US US10/064,407 patent/US6640900B2/en not_active Expired - Lifetime
- 2002-07-10 GB GB0400275A patent/GB2395965B/en not_active Expired - Fee Related
- 2002-07-10 AU AU2002324484A patent/AU2002324484B2/en not_active Ceased
- 2002-07-10 GB GB0517457A patent/GB2414258B/en not_active Expired - Fee Related
- 2002-07-10 WO PCT/US2002/021880 patent/WO2003006779A2/en active Search and Examination
-
2003
- 2003-08-01 US US10/633,045 patent/US6913083B2/en not_active Expired - Lifetime
-
2004
- 2004-01-09 NO NO20040099A patent/NO20040099L/en not_active Application Discontinuation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2002324484B2 (en) | Method and apparatus to monitor, control and log subsea oil and gas wells | |
AU2002324484A1 (en) | Method and apparatus to monitor, control and log subsea oil and gas wells | |
US7255173B2 (en) | Instrumentation for a downhole deployment valve | |
CA2474998C (en) | Well system | |
US9187957B2 (en) | Method for motion compensation using wired drill pipe | |
CN103097656B (en) | Well | |
EP1335106A2 (en) | Casing data relay | |
US9074436B2 (en) | Methods for installing sensors in a borehole | |
WO2013045882A2 (en) | Fibre optic cable deployment, particularly for downhole distributed sensing | |
US11208885B2 (en) | Method and system to conduct measurement while cementing | |
WO1997008424A1 (en) | Downhole tool system | |
US10125604B2 (en) | Downhole zonal isolation detection system having conductor and method | |
US20210238979A1 (en) | Method and system to conduct measurement while cementing | |
US9404347B1 (en) | Apparatus and method for connecting a riser from an offshore rig to a subsea structure | |
Stalford et al. | Intelligent Casing-Intelligent Formation (ICIF) Design | |
CA2483527C (en) | Instrumentation for a downhole deployment valve | |
WO2017052511A1 (en) | Downhole tool with assembly for determining seal integrity | |
GB2443374A (en) | Instrumentation for downhole deployment valve | |
WO1999007975A1 (en) | Method and apparatus for drilling and completing wells |