AT5718U1 - METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD - Google Patents

METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD Download PDF

Info

Publication number
AT5718U1
AT5718U1 AT0049901U AT4992001U AT5718U1 AT 5718 U1 AT5718 U1 AT 5718U1 AT 0049901 U AT0049901 U AT 0049901U AT 4992001 U AT4992001 U AT 4992001U AT 5718 U1 AT5718 U1 AT 5718U1
Authority
AT
Austria
Prior art keywords
parameters
rock
determined
mining
account
Prior art date
Application number
AT0049901U
Other languages
German (de)
Inventor
Egmont Dipl Ing Lammer
Karlheinz Dipl Ing Dr Gehring
Original Assignee
Voest Alpine Bergtechnik
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voest Alpine Bergtechnik filed Critical Voest Alpine Bergtechnik
Priority to AT0049901U priority Critical patent/AT5718U1/en
Priority to EP02780817A priority patent/EP1466077A2/en
Priority to US10/481,207 priority patent/US20040220783A1/en
Priority to PCT/AT2002/000178 priority patent/WO2003001032A2/en
Priority to AU2002350636A priority patent/AU2002350636B2/en
Publication of AT5718U1 publication Critical patent/AT5718U1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C39/00Devices for testing in situ the hardness or other properties of minerals, e.g. for giving information as to the selection of suitable mining tools

Abstract

Bei einem Verfahren zum Ermitteln und Bewerten des günstigsten Abbauverfahrens beim Vortrieb von Strecken oder Tunnels werden in einem ersten Verfahrensschritt die Gesteinsparameter wie Würfeldruckfestigkeit, Zähigkeit, Brüchigkeit ermittelt und in quantifizierter Form gespeichert. Anschließend werden umweltspezifische Parameter wie Bewetterung, Entstaubung und Parameter für die Gebirgssicherung, wie Einbringen von Ortsbeton oder Setzen von Ankern ermittelt und gespeichert, worauf in einem weiteren Verfahrensschritt mit dem Betrieb verbundene Kosten wie Verfügbarkeit, Stillstandszeiten, der Zeitaufwand, Investitionskosten sowie der Aufwand für die Logistik unterschiedlicher Arbeitsverfahren abgerufen werden, wobei in Abhängigkeit von den Gesteinsparametern unter Berücksichtigung der umweltspezifischen Parameter und der Parameter für die Gebirgssicherung und der für die Betriebskostenstrukturen relevanten Parameter unterschiedliche Abbauverfahren berechnet und gegenübergestellt werden.In a method for determining and evaluating the most favorable mining method when driving routes or tunnels, the rock parameters such as cube compressive strength, toughness, brittleness are determined in a first process step and stored in quantified form. Subsequently, environmental parameters such as ventilation, dedusting and parameters for rock protection, such as placing in-situ concrete or setting anchors, are determined and saved, whereupon in a further procedural step costs associated with the operation such as availability, downtimes, time, investment costs and the effort for the Logistics of different working methods are called up, depending on the rock parameters taking into account the environmental parameters and the parameters for rock protection and the parameters relevant for the operating cost structures, different mining methods are calculated and compared.

Description

       

   <Desc/Clms Page number 1> 
 



  AT 005 718 Ul 
Die Erfindung bezieht sich auf ein Verfahren zum Ermitteln und Bewerten des günstigsten Abbauverfahrens beim Vortrieb von Strecken oder Tunnels sowie auf eine Vorrichtung zur Durchfüh- rung dieses Verfahrens. 



   Beim Auffahren von Tunnels unter Tage zählen prinzipiell drei voneinander verschiedene Verfahrensweisen zum Stand der Technik. Neben dem mechanischen Abbruch des lichten Quer- schnittes durch Auffahren mittels Teilschnittschrämmaschinen und dem mechanischen Auffahren mittels Tunnelvortriebsmaschinen, wie beispielsweise Hartgesteinsmaschinen, Schildvortriebsmaschinen und speziellen Einrichtungen, mit welchen das Gestein während des Abbauens gestützt werden kann, wie z. B. EPB-Vortriebsmaschi- nen, ist auch die Verfahrensweise durch Bohren und Schiessen eine konventionelle Methode um untertägige Tunnel oder Strecken aufzufahren. Für die verschiedenen Verfahrensweisen sind unterschiedliche Erfordernisse an die Infrastruktur und die Logistik gestellt und die bekannten Verfahren unterliegen einer Reihe von Beschränkungen.

   Insbesondere gilt derzeit als Grenz- wert für den Einsatz von Teilschnittschrämmaschinen eine Gesteinsfestigkeit von etwa 100-150 MPa. Für den Einsatz von Tunnelvortriebsmaschinen, wie beispielsweise Tunnelbohrmaschi- nen, liegt die maximal abbaubare Gesteinsfestigkeit derzeit zwischen ca. 200 MPa und 300 MPa. Eine weitere Vortriebsmaschine ist in der Regel die konventionelle Verfahrensweise durch Bohren und Schiessen anwendbar. Eine derartige einfache Auswahl des jeweils geeigneten Abbauverfahrens in Abhängigkeit von der Gesteinsbeschaffenheit ist aber nicht geeignet die weiteren Kri- terien, die für eine wirtschaftliche Arbeitsweise ausschlagge- bend sind, hinreichend zu berücksichtigen.

   Um einen wirtschaft- lichen Vergleich unterschiedlicher Vortriebsmethoden anstellen zu können, ist neben den technischen Parametern, wie beispiels- weise die Gesteinsbeschaffenheit, auch die erforderliche Logi- stik und in weiterer Folge auch der Investitionsaufwand massgeb- lich. Weiters ist zu berücksichtigen, dass ein Vortrieb mit Bohren und Schiessen in aller Regel nur als diskontinuierliches Verfahren durchgeführt werden kann, wobei ein derartiges Ver- fahren weitere zwingende Parameter, die den Einsatz dieses Ver- 

 <Desc/Clms Page number 2> 

 AT 005718Ul fahrens einschränken, wie beispielsweise Bewetterung, Entstau- bung während des Bohrens und Schiessens und Massnahmen zur Gebirgssicherung berücksichtigen muss. 



   Insgesamt ergibt sich somit, dass mit den konventionellen Abschätzungen der Wirtschaftlichkeit des oder der jeweils an- wendbaren Verfahren eine vollständige Evaluierung nicht ohne weiteres gelingt. 



   Die Erfindung zielt daher darauf ab, ein Verfahren der ein- gangs genannten Art zu schaffen, bei welchem eine Reihe zusätz- licher Parameter erfasst und in entsprechend maschinenlesbarer Form eingegeben werden, sodass mit einer einfachen Datenverarbei- tungsanlage eine vollständige Evaluierung unter Berücksichtigung der jeweiligen Randbedingungen und zusätzlichen Parameter gelingt.

   Zur Lösung dieser Aufgabe besteht das erfindungsgemässe Verfahren im wesentlichen darin, dass in einem ersten Verfahrens- schritt die Gesteinspararmeter wie Würfeldruckfestigkeit, Zähig- keit, Brüchigkeit ermittelt und in quantifizierter Form gespeichert werden, dass anschliessend umweltspezifische Parameter wie Bewetterung, Entstaubung und Parameter für die Gebirgssiche- rung, wie Einbringen von Ortsbeton oder Setzen von Anker ermittelt und gespeichert werden und dass in einem weiteren Ver- fahrensschritt mit dem Betrieb verbundene Kosten wie Verfügbar- keit, Stillstandszeiten, der Zeitaufwand, Investitionskosten sowie der Aufwand für die Logistik unterschiedlicher Arbeitsver- fahren abgerufen werden,

   dass in Abhängigkeit von den Gesteins- parametern unter Berücksichtigung der umweltspezifischen Para- meter und der Parameter für die Gebirgssicherung und der für die Betriebskostenstrukturen relevanten Parameter unterschiedliche Abbauverfahren berechnet und gegenübergestellt werden. Gegenüber einer konventionellen Betrachtungsweise besteht somit das erfin- dungsgemässe Verfahren in einer geeigneten Unterteilung quantifi- zierbarer Grössen und damit in der Möglichkeit nicht nur einzelne Parameter miteinander in Vergleich zu setzen, sondern Gruppen von Parametern für die entsprechende Auswertung heranzuziehen. 



  Zu diesem Zweck ist es wesentlich, dass die Gesteinsparameter, wie Würfeldruckfestigkeit, Zähigkeit, Brüchigkeit ermittelt und in quantifizierter Form gespeichert sind und für sich gesehen 

 <Desc/Clms Page number 3> 

 AT 005 718Ul somit einen ersten Datensatz bilden und dass weitere Parameter gleichfalls gesondert gruppiert und entsprechend quantifiziert erfasst und gespeichert werden. Auf diese Weise gelingt es projektbezogene Aussagen zu treffen, wobei in einer derartigen projektbezogenen Aussage die einzelnen Parameter entsprechend gewichtet werden können, da sie gesondert erfasst wurden und gesondert gespeichert wurden.

   Die erfindungsgemässe Verfahrens- weise beschränkt sich somit nicht darauf die technischen Para- meter verschiedener Abbauverfahren unmittelbar miteinander zu vergleichen, sondern erlaubt globale Vergleiche anzustellen, welche projektspezifisch sind, wobei in einer derartigen glo- balen Betrachtungsweise auch Parameter wie der Investitionsauf- wand für bestimmte Verfahrensweisen die erforderliche Zeit für die Durchführung der Arbeit und die pro Arbeitseinheit bzw. 



  Raumeinheit aufzuwendenden Kosten gesondert berücksichtigt werden können. Die Anzahl der für die einzelnen voneinander ver- schiedenen Verfahren notwendigen Erfassungsschritte und die ent- sprechend gespeicherten Parameter können jeweils projektspezi- fisch miteinander in Verbindung gesetzt werden und verknüpft werden, sodass Aussagen möglich werden, wie sie mit bisherigen konventionellen Betrachtungen nicht möglich waren. Insbesondere ist es möglich den Einfluss einzelner der erfassten und in quanti- fizierter Form gespeicherten Parameter für verschiedene Ver- fahrensweisen einer Studie zu unterwerfen, wobei aus dem Ergeb- nis derartiger vergleichender Untersuchungen unter Betrachtung einzelner isolierter Parameter neue Fragestellungen und insge- samt eine neue Form der Evaluierung des jeweils günstigsten Abbauverfahrens erzielt werden können. 



   Mit Vorteil wird das erfindungsgemässe Verfahren hiezu so durchgeführt, dass die Parameter als quantifizierte Grösse je Zeiteinheit und je Raumeinheit des abzubauenden Materials einge- geben werden, wobei insbesondere in besonders vorteilhafter Weise die Schneid- bzw. Vortriebsleistung der Abbauvorrichtungen erfasst und gespeichert werden. 



   Die erfindungsgemässe Vorrichtung zur Durchführung dieses Verfahrens zeichnet sich im wesentlichen dadurch aus, dass sie einen Speicher für vorgegebene Parameter und eine Eingabemaske, 

 <Desc/Clms Page number 4> 

 AT 005718Ul in welche die für den Einzelfall charakteristischen Daten einge- geben werden und einen Komparator enthält, welcher unter Berück- sichtigung von Kennlinienfeldern der einzelnen vorgegebenen Parameter das geeignete Verfahren ermittelt.

   Aufgrund der ein- gangs vorausgesetzten Ermittlung und Speicherung der jeweils charakteristischen Parameter in quantifizierter Form und geson- dert voneinander und aufgrund der bereits angedeuteten Möglich- keit den Einfluss einzelner dieser Parameter zu analysieren, wird durch die erfindungsgemässe Verfahrensweise die Voraussetzung geschaffen Kennlinienfelder zu speichern, sodass der Einsatz der erfindungsgemässen Vorrichtung unmittelbar zu sinnvollen Aussagen führt. Der erfindungsgemäss vorausgesetzte Komparator kann näm- lich unter Berücksichtigung von Kennlinienfeldern der einzelnen vorgegebenen Parameter jeweils das geeignete Verfahren ermitteln, wodurch die eingangs vorausgesetzte globale Betrach- tungsweise zur korrekten Ermittlung und Bewertung des günstig- sten Abbauverfahrens gelingt.

   Die Anzahl der jeweils in den einzelnen Kennlinienfeldern berücksichtigten Abhängigkeiten von- einander unterschiedlicher Parameter kann beliebig gesteigert werden und neben umweltspezifischen Daten und für die benötigte Zeit, um das gewünschte Ziel zu erreichen, charakteristischen Daten auch Limitationen, wie beispielsweise Beschädigungen der Umwelt bei Verwendung bestimmter Verfahren mit Sicherheit erfassen. Wesentlich ist hiebei, dass für unterschiedliche Aus- wertungen jeweils die Parameter einzeln miteinander verknüpft werden können, um auf diese Weise aufgrund von gesonderten Berechnungen der einzelnen Abhängigkeiten eine entsprechend ganzheitliche Sicht zu ermöglichen.

   Zu dieser ganzheitlichen Betrachtung zählen naturgemäss auch Fragen des Abtransportes des abgebauten Materiales und die mit diesen Fragen verbundene Logistik, die Stillstandszeiten, die möglichen Arbeitszeiten pro Tag sowie die erforderlichen Ausbauarbeiten zur Sicherung und Stützung des Gesteins bis zur Fertigstellung des Tunnels. Geson- dert erfassbar und in die Kalkulation integrierbar sind naturge- mäss auch Logistikdaten, wie die erforderliche Belüftung der Strecke bzw. der Ortsbrust und die Wahl der geeigneten Abbau- werkzeuge bei Wahl eines bestimmten Abbauverfahrens, insbeson- 

 <Desc/Clms Page number 5> 

 dere die Wahl geeigneter Meissel und der günstigsten Betriebs- parameter, wie Rotationsgeschwindigkeit und Vorschubgeschwindig- keit in Abhängigkeit von jeweils ausgewählten weiteren Parametern.



   <Desc / Clms Page number 1>
 



  AT 005 718 Ul
The invention relates to a method for determining and evaluating the most favorable mining method when driving routes or tunnels, and to a device for carrying out this method.



   In principle, when driving tunnels underground, three different procedures belong to the state of the art. In addition to the mechanical breaking off of the clear cross-section by driving up with part-cutting machines and the mechanical driving up with tunnel boring machines, such as hard rock machines, shield boring machines and special devices with which the rock can be supported during mining, e.g. B. EPB tunneling machines, the procedure by drilling and shooting is also a conventional method for driving underground tunnels or lines. The different procedures have different infrastructure and logistics requirements and the known procedures are subject to a number of restrictions.

   In particular, a rock strength of around 100-150 MPa is currently the limit value for the use of part-cutting machines. For the use of tunnel boring machines, such as tunnel boring machines, the maximum degradable rock strength is currently between approx. 200 MPa and 300 MPa. Another tunneling machine is usually the conventional procedure by drilling and shooting applicable. However, such a simple selection of the appropriate mining method depending on the nature of the rock is not suitable to adequately take into account the other criteria that are crucial for an economical working method.

   In order to be able to make an economic comparison of different tunneling methods, in addition to the technical parameters, such as the nature of the rock, the necessary logistics and, subsequently, the investment costs are also decisive. It should also be taken into account that tunneling with drilling and firing can generally only be carried out as a discontinuous process, with such a process further mandatory parameters that determine the use of this process.

 <Desc / Clms Page number 2>

 AT 005718Ul restrict driving, such as ventilation, dedusting during drilling and shooting, and measures to protect the mountains.



   All in all, it follows that conventional assessments of the economic viability of the method or methods that can be used in each case do not make a complete evaluation easy.



   The invention therefore aims to create a method of the type mentioned at the outset, in which a number of additional parameters are recorded and entered in a correspondingly machine-readable form, so that with a simple data processing system, a complete evaluation taking into account the respective boundary conditions and additional parameters succeed.

   To achieve this object, the method according to the invention essentially consists in that in a first process step the rock parameters such as cube compressive strength, toughness, brittleness are determined and stored in quantified form, and then that environmental-specific parameters such as ventilation, dedusting and parameters for the mountain safety - How the placing of in-situ concrete or the setting of anchors are determined and saved and that in a further procedural step, costs associated with the operation such as availability, downtimes, the time required, investment costs and the effort for the logistics of different working methods are called up become,

   that depending on the rock parameters, taking into account the environmental parameters and the parameters for rock protection and the parameters relevant for the operating cost structures, different mining methods are calculated and compared. Compared to a conventional approach, the method according to the invention thus consists in a suitable subdivision of quantifiable variables and thus in the possibility not only of comparing individual parameters with one another, but of using groups of parameters for the corresponding evaluation.



  For this purpose, it is essential that the rock parameters, such as cube compressive strength, toughness, brittleness, are determined and stored in a quantified form and seen in isolation

 <Desc / Clms Page number 3>

 AT 005 718Ul thus form a first data record and that further parameters are also grouped separately and recorded and stored appropriately quantified. In this way, it is possible to make project-related statements, the individual parameters being able to be weighted accordingly in such a project-related statement, since they were recorded separately and stored separately.

   The method according to the invention is therefore not limited to directly comparing the technical parameters of different mining methods, but rather allows global comparisons to be made which are project-specific, with such a global approach also including parameters such as the investment required for certain methods the time required to carry out the work and the time per work unit or



  Space unit costs can be taken into account separately. The number of acquisition steps required for the different methods and the correspondingly saved parameters can be linked and linked to each other in a project-specific manner, making it possible to make statements that were not possible with previous conventional considerations. In particular, it is possible to subject the influence of individual parameters recorded and stored in quantified form for different procedures to a study, whereby new questions and a new form as a whole result from the result of such comparative investigations considering individual isolated parameters the evaluation of the most favorable mining method can be achieved.



   The method according to the invention is advantageously carried out in such a way that the parameters are entered as a quantified size per unit of time and per unit of space of the material to be mined, the cutting or propelling power of the mining devices being recorded and stored in a particularly advantageous manner.



   The device according to the invention for performing this method is essentially characterized in that it has a memory for predetermined parameters and an input mask,

 <Desc / Clms Page number 4>

 AT 005718Ul in which the data characteristic of the individual case are entered and contains a comparator which determines the suitable method taking into account characteristic curve fields of the individual predetermined parameters.

   On the basis of the determination and storage of the respective characteristic parameters in a quantified form and separately from one another and on the basis of the already indicated possibility of analyzing the influence of individual parameters, the procedure according to the invention creates the prerequisite for storing characteristic fields so that the use of the device according to the invention leads directly to meaningful statements. The comparator required according to the invention can determine the appropriate method, taking into account characteristic curve fields of the individual predetermined parameters, as a result of which the global view assumed at the outset succeeds in correctly determining and evaluating the most favorable dismantling method.

   The number of interdependencies of different parameters taken into account in the individual characteristic curve fields can be increased as desired and, in addition to environmentally specific data and for the time required to achieve the desired goal, characteristic data also limitations, such as damage to the environment when using certain methods grasp with certainty. It is essential here that the parameters can be individually linked to each other for different evaluations, in order in this way to enable a corresponding holistic view based on separate calculations of the individual dependencies.

   This holistic view naturally also includes questions about the removal of the dismantled material and the logistics associated with these questions, downtimes, the possible working hours per day and the necessary expansion work to secure and support the rock until the tunnel is completed. Logistics data, such as the required ventilation of the route or the face and the choice of suitable dismantling tools when selecting a specific dismantling method, are of course also separately recordable and can be integrated into the calculation.

 <Desc / Clms Page number 5>

 the choice of suitable chisels and the most favorable operating parameters, such as rotation speed and feed speed, depending on the other selected parameters.


    

Claims (4)

AT 005718 Ul A n s p r ü c h e 1. Verfahren zum Ermitteln und Bewerten des günstigsten Abbauverfahrens beim Vortrieb von Strecken oder Tunnels, dadurch gekennzeichnet, dass in einem ersten Verfahrensschritt die Gesteinspararmeter wie Würfeldruckfestigkeit, Zähigkeit, Brüchigkeit ermittelt und in quantifizierter Form gespeichert werden, dass anschliessend umweltspezifische Parameter wie Bewetterung, Entstaubung und Parameter für die Gebirgssicherung, wie Einbringen von Ortsbeton oder Setzen von Ankern ermittelt und gespeichert werden und dass in einem weiteren Verfahrens- schritt mit dem Betrieb verbundene Kosten wie Verfügbarkeit, Stillstandszeiten, der Zeitaufwand, Investitionskosten sowie der Aufwand für die Logistik unterschiedlicher Arbeitsverfahren abgerufen werden, AT 005718 Ul A n s p r ü c h e 1.Procedure for ascertaining and evaluating the most favorable mining method when driving routes or tunnels, characterized in that in a first process step the rock parameters such as cube compressive strength, toughness, brittleness are determined and stored in quantified form, that subsequently environmental parameters such as ventilation, dedusting and Parameters for securing the mountains, such as placing in-situ concrete or setting anchors, are determined and saved and that in a further procedural step, costs associated with the operation such as availability, downtimes, the amount of time, investment costs and the effort for the logistics of different working methods are called up, dass in Abhängigkeit von den Gesteinsparametern unter Berücksichtigung der umweltspezifischen Parameter und der Parameter für die Gebirgssicherung und der für die Betriebs- kostenstrukturen relevanten Parameter unterschiedliche Abbauver- fahren berechnet und gegenübergestellt werden.  that depending on the rock parameters, taking into account the environmental parameters and the parameters for rock protection and the parameters relevant to the operating cost structures, different mining methods are calculated and compared. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Parameter als quantifizierte Grösse je Zeiteinheit und je Raumeinheit des abzubauenden Materials eingegeben werden.  2. The method according to claim 1, characterized in that the parameters are entered as a quantified size per unit of time and per unit of space of the material to be mined. 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass die Schneid- bzw. Vortriebsleistung der Abbauvorrichtungen erfasst und gespeichert werden.  3. The method according to claim 2, characterized in that the cutting or propulsive power of the mining devices are detected and stored. 4. Vorrichtung zur Durchführung des Verfahrens nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass sie einen Speicher für vorgegebene Parameter und eine Eingabemaske, in welche die für den Einzelfall charakteristischen Daten einge- geben werden und einen Komparator enthält, welcher unter Berück- sichtigung von Kennlinienfeldern der einzelnen vorgegebenen Parameter das geeignete Verfahren ermittelt.  4. Device for carrying out the method according to one of claims 1 to 3, characterized in that it contains a memory for predetermined parameters and an input mask into which the data characteristic for the individual case are entered and a comparator which, taking into account consideration of characteristic curve fields of the individual predetermined parameters, the suitable method is determined.
AT0049901U 2001-06-22 2001-06-22 METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD AT5718U1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
AT0049901U AT5718U1 (en) 2001-06-22 2001-06-22 METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD
EP02780817A EP1466077A2 (en) 2001-06-22 2002-06-19 Method for determining and evaluating removal methods and device for carrying out said method
US10/481,207 US20040220783A1 (en) 2001-06-22 2002-06-19 Method for determining and evaluating removal methods and device for carrying out said method
PCT/AT2002/000178 WO2003001032A2 (en) 2001-06-22 2002-06-19 Method for determining and evaluating removal methods and device for carrying out said method
AU2002350636A AU2002350636B2 (en) 2001-06-22 2002-06-19 Method for determining and evaluating removal methods and device for carrying out said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT0049901U AT5718U1 (en) 2001-06-22 2001-06-22 METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD

Publications (1)

Publication Number Publication Date
AT5718U1 true AT5718U1 (en) 2002-10-25

Family

ID=3492216

Family Applications (1)

Application Number Title Priority Date Filing Date
AT0049901U AT5718U1 (en) 2001-06-22 2001-06-22 METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD

Country Status (5)

Country Link
US (1) US20040220783A1 (en)
EP (1) EP1466077A2 (en)
AT (1) AT5718U1 (en)
AU (1) AU2002350636B2 (en)
WO (1) WO2003001032A2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117574024A (en) * 2023-12-12 2024-02-20 中铁隧道局集团有限公司 Tunnel surrounding rock diameter deep medium field calculation method for broken rock mass

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2315468A1 (en) * 2000-08-10 2002-02-10 Thermax International Corp. Multi grouting system
US6516616B2 (en) * 2001-03-12 2003-02-11 Pomfret Storage Comapny, Llc Storage of energy producing fluids and process thereof

Also Published As

Publication number Publication date
AU2002350636B2 (en) 2008-04-03
EP1466077A2 (en) 2004-10-13
WO2003001032A2 (en) 2003-01-03
WO2003001032A8 (en) 2004-08-12
US20040220783A1 (en) 2004-11-04

Similar Documents

Publication Publication Date Title
DE3100984A1 (en) Method of determining, monitoring and reducing the risk of rock burst
AT5718U1 (en) METHOD FOR DETERMINING AND EVALUATING DEGRADATION METHODS AND DEVICE FOR CARRYING OUT THIS METHOD
Erben et al. Tunnel spoil–New technologies on the way from waste to raw material/Tunnelausbruch–Neue Technologien für den Weg vom Abfall zum Rohstoff
Bach et al. The use of TBM process data as a normative basis of the contractual advance classification for TBM advances in hard rock: Die Verwendung von Maschinenparametern und Betriebsdaten als normative Grundlage für die vertragliche Vortriebsklassifizierung für Tunnelvortriebsmaschinen im Festgestein
Moritz et al. Long‐term monitoring of railway tunnels
Junker Technical Developments at RAG over the past 50 Years.
Ekici et al. Selection of tunnelling methods for the New Semmering Base Tunnel/Auswahl der Vortriebsmethode beim Semmering‐Basistunnel neu
DE2927529C2 (en) Wet test drilling method in the coal
Pereira Performance Analysis Between Drilling Machines-Models Cat Md6420 (Rotatory Drill) and Atlas Copco T4bh (Rotary-Percussion Drill)-In Different Lithology
Jakobs How Long Can Mining Operations Still Afford not to Automate?-An Assessment.
Schretter et al. Process controlling for the hydroshield drives in the Lower Inn Valley (H3‐4 and H8)
DE19745766A1 (en) Sludge preparation station for tunnelling machine whose working tip consists of compressed sludge
Gerstner et al. Suitability and selection of excavation methods for headrace tunnels of high head hydropower plants
Wieser Quantifying the effect of stress changes on the deformation and cracking behavior of solid rock using acoustic emission techniques
Schneider et al. Contract models for TBM drives in hard rock–codes in Austria and Switzerland and their practical implementation/Vertragsmodelle für TBM Vortriebe im Festgestein–Regelwerke in Österreich und der Schweiz und deren praktische Umsetzung
Maidl et al. Predicting the performance of earth pressure shields in loose rock
Eshun et al. Analysis of Delays in Hard Rock Mine Lateral Development: A Case Study
DE2544395A1 (en) Optimum structural strength measurement for roof support - involves bracing roof struts to surpass normal resistance as function of position
DE805389C (en) Drilling rig for underground operations
Holzer et al. Revision of the Austrian standard ÖNorm B 2203‐2 for work contracts in continuous drives
DE2544391A1 (en) Procedure for determining optimum extraction direction - by examining zones of different reduction in tectonic forces to ascertain areas of strata movement
DE2454913A1 (en) Sprayed concrete tunnel wall - has concrete sprayed onto reinforced sealing concrete layer held on supporting knives
Kroker A Success Story: Bottrop and the Mining Industry.
Thomas Mine Rescue for the Future Underground.
DE102005013062B4 (en) Method of controlling longwall equipment in underground coal industry plants

Legal Events

Date Code Title Description
MM9K Lapse due to non-payment of renewal fee