AT339028B - LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS - Google Patents

LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS

Info

Publication number
AT339028B
AT339028B AT337975A AT337975A AT339028B AT 339028 B AT339028 B AT 339028B AT 337975 A AT337975 A AT 337975A AT 337975 A AT337975 A AT 337975A AT 339028 B AT339028 B AT 339028B
Authority
AT
Austria
Prior art keywords
press
emptying
loading
levels
level
Prior art date
Application number
AT337975A
Other languages
German (de)
Other versions
ATA337975A (en
Original Assignee
Fahrni Peter
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fahrni Peter filed Critical Fahrni Peter
Priority to AT337975A priority Critical patent/AT339028B/en
Publication of ATA337975A publication Critical patent/ATA337975A/en
Application granted granted Critical
Publication of AT339028B publication Critical patent/AT339028B/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B7/00Presses characterised by a particular arrangement of the pressing members
    • B30B7/02Presses characterised by a particular arrangement of the pressing members having several platens arranged one above the other
    • B30B7/023Feeding or discharging means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N3/00Manufacture of substantially flat articles, e.g. boards, from particles or fibres
    • B27N3/08Moulding or pressing
    • B27N3/20Moulding or pressing characterised by using platen-presses
    • B27N3/22Charging or discharging

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Press Drives And Press Lines (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



   Gegenstand der Erfindung ist eine heb- und senkbare   Formlingsbeschickungs- und Pressunterlagen-Ent-   leerungsvorrichtung für eine Mehretagenpresse einer Einstranganlage zum Herstellen von Platten, mit einer der Anzahl der Pressetagen entsprechenden Anzahl von Beschickungsetagen für das simultane Beschicken aller Pressetagen mit auf Pressunterlagen ruhenden Formlingen und einer gleichen Anzahl von Entleerungsetagen für das simultane Herausführen der Pressunterlagen aus der Presse. üblicherweise handelt es sich beim Herausführen der Pressunterlagen aus der Presse um solche, die von den gepressten Platten bereits befreit worden sind. Die Platten werden in diesen Fällen in der Presse von den   Pressunterlagen   getrennt und auf der andern Seite der Presse entnommen. 



   Anlagen, bei welchen die Pressunterlagen nicht durch die Presse geführt werden, bezeichnet man im allgemeinen als Einstranganlagen, weil die Förderwege für den Transport der Formlinge zu Beschickungsvorrichtung und den Rücktransport derselben zu der Formlingsbildungsstation übereinander liegen oder unter Umständen zusammenfallen. 



   Die Vorrichtung nach der Erfindung eignet sich beispielsweise in Verbindung mit Einstranganlagen zur 
 EMI1.1 
    oderHolzspanplatte   befreiten   Pressunterlagen   seit längerer Zeit verwendet worden. 



   Im Falle der bis zum heutigen Tage bekanntgewordenen, in Verbindung mit Mehretagenpressen benutzten Pressbeschickungs- und Entleervorrichtungen befindet sich jeweils ein Satz Beschickungsetagen über einem Satz Entleeretagen, wobei die Etagenzahl jedes Satzes der Anzahl der Etagen der normalerweise beheizten Presse entspricht. 



   Ein grundlegender Nachteil solcher Vorrichtungen liegt in der grossen Bauhöhe und im entsprechenden vertikalen Platzbedarf. Derartige Beschick-und Entleerungsgestelle erfordern für das Absenken eine tiefe Grube und benötigen ausserdem sehr viel freien Raum nach oben, damit sich das Gestell auf die gewünschte Tiefe senken bzw. auf die erforderliche Höhe anheben lässt. In der Praxis weisen aus diesem Grunde Pressen für Einstranganlagen nicht mehr als acht bis neun Etagen auf. Bei Anordnung von übereinanderliegenden Pressblechtransportwagen liegen dann die beiden Förderwege sehr weit auseinander, denn es ergibt sich 
 EMI1.2 
 Presse. Ungünstig ist ausserdem die dadurch bedingte hohe Lage des oberen Förderweges und schliesslich das langsame Arbeiten der Anlage.

   Diese Zeitverzögerungen sind einerseits auf die langen Hubwege der Beschickungsund Entleerungsvorrichtungen bzw. des Etagenkorbes der Vorrichtung und anderseits auf die Tatsache 
 EMI1.3 
 und EntleerzyklusFormling beladene Pressunterlage zuzuführen und gleichzeitig eine Unterlage von der Vorrichtung wegzuführen. 



   Spezifische Mängel zeigen auch Kleinanlagen mit einer   z. B.   zwei oder drei Etagen aufweisenden Presse und auf gleichem Niveau liegenden   Zufuhr- und Wegführtransportwegen.   Insbesondere stören die grossen Hubbewegungen und der hiefür erforderliche Raum. So ist man bei derartigen Kleinanlagen gezwungen, die Formlingsbildungsstation in einem verhältnismässig grossen Abstand von der Vorrichtung anzuordnen, damit eine gegenseitige Beeinträchtigung nicht eintreten kann. 



   Man erkennt, dass sowohl Gross- als auch Kleinanlagen mit bisher üblichen Beschickungs- und Entleerungsvorrichtungen sperrig sind und infolge der erforderlichen langen Vertikalbewegungen trotz einem vergleichsweise grossen Energieaufwand langsam arbeiten. 



   Die der Erfindung zugrundeliegende Aufgabe liegt in der Schaffung einer Vorrichtung der eingangs 
 EMI1.4 
 die verkürzten Hubwege bei. Im Prinzip ist eine totale Verschachtelung der Beschickungs- und Entleerungsetagen der Vorrichtung möglich, falls der Förderweg der beladenen Unterlagen zu der Vorrichtung auf dem gleichen Niveau liegt wie der Förderweg für das Wegführen der Unterlagen von der Vorrichtung. Eine derartige technische Ausgestaltung ist vor allem bei Kleinanlagen möglich und sinnvoll. Es lassen sich auf diese Art sehr gedrungene Anlagen bauen, bei denen ein Teil der für das Streuen der Formlinge benötigten Maschinenteile oberhalb der Entleer- und Beschickungsvorrichtung angeordnet ist.

   Dagegen ist bei einer Vorrichtung in Verbindung mit einer grösseren Anlage mit übereinanderliegenden, also getrennten Fördersträngen, der Grad der Verschachtelung einerseits durch den Etagenabstand der geöffneten Presse und anderseits durch den Mindestabstand bzw. die vertikale Platzbeanspruchung zwischen den beiden zu der Vorrichtung bzw. von dieser wegführenden Förderstränge gegeben. 



   Zweckmässigerweise sind in einer Vorrichtung, die dazu bestimmt ist, eine Mehretagenpresse zu beschicken 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 

 <Desc/Clms Page number 3> 

 



   In der aus Fig. l erkennbaren   Pressunterlagenentladestellung   des Gestells bzw.   Korbes --13-- sind   die untersten Etagen jedes Etagensatzes auf der einen Seite leicht nach unten gekippt, damit die rechte Kante der untersten Beschickungsetage auf das Niveau des   Förderbandes --18-- und   die rechte Kante der untersten
Entleeretage auf das Niveau des   Förderbandes --20-- zu   liegen kommt. Dieses leichte Verschwenken lässt sich etwa mit einem elektromotorisch angetriebenen Exzenter oder einen durch ein Fluid beaufschlagten Zylinder bewerkstelligen. 



   Nach Vollendung der beschriebenen Phase wird die ganze   Vorrichtung--13--in   die in Fig. 2 dargestellte
Beschickungsposition abgesenkt. Es handelt sich hiebei um eine vertikale Verschiebung, die der Distanz zwischen den oberen Trumen der Förderbänder --18 und 20--entspricht. Die oberen Flächen der Beschickungsetagen   --25-- sind   nun auf gleicher Höhe wie die oberen Pressflächen der beheizten Pressplatte. In dem in Fig. 2 festgehaltenen Moment werden die mit   Formlingen --15-- beladenen Pressbleche --14-- in   die Presse eingeschoben (Pfeil G). Gleichzeitig wird die erste beladene Unterlage der neu zu bildenden Beschickungscharge in die sechste Beschickungsetage (von oben) eingeführt   (Pfeil H).

   Während   dieser Phase wird ferner das erste unbeladene   Pressblech--14-der   vorangegangenen Entleerungscharge aus der   Vorrichtung --13-- geführt   und mittels des   Förderbandes --20-- zurücktransportiert   (Pfeil I). 



   In dem in Fig. 3 ersichtlichen Arbeitszeitpunkt ist die Presse--1--schon weitgehend geschlossen. Das   Gestell --13-- ist gegenüber   der Lage nach Fig. 2 um zwei Etagen abgesenkt. Ein beladenes Pressblech   --14--   wird nun auf diejenige Beschickungsetage geführt, deren Niveau mit dem Niveau der oberen   Förderbandfläche --18-- übereinstimmt   (Pfeil K). Zudem wird ein leeres   Pressblech --14-- aus   einer Entleerungsetage herausgeführt und durch das   Förderband --20-- zur Formlingsbildungsstation zurückgeführt   (Pfeil L). 



   Nach Ende der Arbeitsphase gemäss Fig. 3 wird ein beladenes Blech nach entsprechendem Senken des Gestells--13--auf die zweitoberste Beschickungsetage aufgelegt und gleichzeitig das leere   Pressblech   aus der zweitobersten Entleerungsetage herausgeführt. Hernach wird das Gestell in die unterste Lage gemäss Fig. 4 abgesenkt, so dass es nun möglich ist, eine beladene   Pressunterlage --14-- auf   die oberste Etage--25--zu führen (Pfeil M) und die oberste   Entleerungsetage --26-- vom   daraufliegenden   Pressblech --14-- zu   befreien (Pfeil N). 



   Nach Beendigung der soeben beschriebenen Phase wird das Gestell --13-- schrittweise angehoben. 



  Zwischen zwei Schritten, die jeweils entweder zwei Etagenhöhen oder einer Etagenhöhe entsprechen, wird jeweils ein beladenes Blech auf eine Beschickungsetage geschoben und gleichzeitig ein befreites Blech aus dem Gestell herausgenommen. Diese Vorgänge wiederholen sich, bis der Zustand nach Fig. l wieder erreicht und ein voller Zyklus beendet ist. 



   Der Grad der Verschachtelung beim ersten Ausführungsbeispiel der Vorrichtung ist aus den Zeichnungen leicht erkennbar. Tatsächlich sind im mittleren Teil des Gestells jeweils eine Beschickungsetage und eine Entleerungsetage zu einem Etagenpaar zusammengefasst. Es ist einleuchtend, dass die Bauhöhe des Gestells 
 EMI3.1 
 ohneFormlinge in die   Presse--1--nicht   behindert wird, ist dafür Sorge getragen, dass der jeweilige Abstand zwischen der oberen Beschickungsetagenfläche und der unteren Fläche der direkt darunter angeordneten Entleeretage nicht grösser ist als die Dicke einer   Platte --7-- der   Presse.

   
 EMI3.2 
 bei entsprechender Ausbildung der Antriebs- und Führungsmittel des   Gestells --13-- ein   Absenken auf ein derartiges Niveau zu vollführen, auf welchem sich ein auf irgendeiner   Beschickungsetage--25--liegender,   fehlerhafter Formling durch das   Förderband --20-- entfernen lässt,   ohne mit der Notwendigkeit konfrontiert zu werden, die   Grube--9--bedeutend   tiefer zu gestalten. Es genügt im diskutierten Beispiel eine zusätzliche Grubentiefe, die der Distanz der wirksamen Trume der beiden Förderbänder--18 und 20-entspricht. 



   Die Anlage nach den Fig. 5 bis 10 ist eine ausgesprochene Kleinanlage. Sie besteht im wesentlichen aus einer zwei Streustellen--27 und   28-- umfassenden Formlingsbildungsstation,   einer 2-Etagenpresse--29--, einem heb- und senkbaren   Beschickungs-und Entleerungsgestell--30--,   einem nicht eingezeichneten Plattenentnahmegestell, nicht ersichtlichen Fördermitteln und den Pressblechen-14--. Die Verschachtelung der Beschickungs- und Entleerungsetagen ist hier hundertprozentig,   d. h.   es befindet sich direkt unter jeder 
 EMI3.3 
 wovon die erstere feines Aussenschichtmaterial und die letztere gröberes Kernschichtmaterial streut, und das Zurückführen der mit Formlingen beladenen Bleche vollzieht sich auf der gleichen Ebene.

   Dies ergibt den besonderen Vorteil der Möglichkeit der Herstellung einer dreischichtigen Platte unter Verwendung von bloss zwei Streustellen. 



   Während eines vollen Arbeitszyklus spielen sich folgende Vorgänge   ab :  
Gemäss Fig. 5 werden von den beiden   Beschickungsetagen --31-- die   mit   Formlingen --15--   beladenen   Unterlagen --14-- in   die offene   Presse --29-- eingeführt   (Pfeil 0) und im selben Moment der erste Formling der nachfolgenden Charge auf die untere Beschickungsetage geschoben (Pfeil P). 



   Das Gestell wird nun ganz angehoben (Fig. 6). Die Presse ist praktisch geschlossen, und es wird aus der 

 <Desc/Clms Page number 4> 

 unteren Entleerungsetage das freie Pressblech heraus-und zu den   Streustationen--27   und   28-- geführt   (Pfeil Q). 



   Während des Streuvorganges wird das   Gestell --30-- in   die Lage nach Fig. 7 abgesenkt, so dass sich das Blech mit dem soeben gebildeten Formling auf die obere Beschickungsetage führen lässt (Pfeil R). 



   Nun wird das Gestell so weit angehoben, bis sich die obere Entleerungsetage auf dem   Förderniveau   befindet, so dass das dort liegende freie   Blech --14-- herausgezogen   werden kann (Fig. 8, Pfeil S). 



   Im Verlaufe der Phase nach Fig. 9 werden die von den gepressten   Spanplatten --16-- befreiten   Bleche auf die Entleerungsetagen geschoben (Pfeil T). Ferner wird unter der Streustelle ein Formling gebildet und zum   Gestell --30-- geführt (Fig. 10, pfeil   U). Damit ist der volle Arbeitszyklus, der in der Phase gemäss Fig. 5 seinen Anfang genommen hat, im wesentlichen vollendet. 



   Im Gegensatz zum ersten Ausführungsbeispiel befindet sich bei der in den Fig. 5 bis 10 illustrierten, ausgesprochen kompakten Konstruktion jeweils nie mehr als ein einziges Blech ausserhalb des die Presse --29-- und die   Vorrichtung --30-- umfassenden Press- und Beschickungsabschnittes.   Die Gesamtzahl der Bleche--14--richtet sich nach der Anzahl der Pressetagen und ist bei n Etagen gleich 2n   + 1.   Im Beispiel ergeben sich fünf Pressunterlagen. 



   Es ist weiter oben dargetan worden, dass die Fortschrittlichkeit der neuen Vorrichtung unter anderem im Umstand zu sehen ist, dass simultan Beschickungsetagen gefüllt und Entleerungsetagen von den Pressunterlagen befreit werden können. Es ist somit nicht möglich, das Beschicken der Presse und das Herausführen der Unterlagen aus derselben mit einem konventionellen Einstoss- respektive Auszugarm vorzunehmen. Dieses Problem ist jedoch sekundärer Natur und bereitet keine besonderen Schwierigkeiten. So ist es   z.

   B. möglich,   zwischen der Presse und der Vorrichtung nach der Erfindung einen innerhalb enger Grenzen parallel zur Beschickrichtung verschiebbaren Rahmen anzuordnen, dessen Hauptebene zur Beschickrichtung senkrecht liegt, und dessen vertikale Teile antreibbare Rollen tragen, mit denen die in der Presse liegenden Bleche an beiden Seitenrändern erfasst und in das Gestell transportiert werden, wogegen in einer zweiten Stellung des Rahmens und nach entsprechender Umkehr der Rollendrehrichtung die beladenen Pressbleche vom Gestell in die offene Presse befördert werden. 



   Eine andere Variante der Verschiebemittel ist in den   Fig. ll   bis 14 erkennbar. Im Falle dieser Konstruktion 
 EMI4.1 
 gemeinsame Antriebsmittel Verwendung finden. 



   Ausserdem sind jeder Etage des   Gestells --12-- zwei   horizontal verschiebbare, durch nicht zeichnerisch dargestellte Antriebe bewegte Greifarme--38--zugeordnet. An den freien Enden dieser Greifarme sitzen   U-förmige     Klauen--39--,   die dazu bestimmt sind, entsprechende   Haken --40-- der Pressbleche --14--   zu umfassen und dermassen bei einem entsprechenden Antrieb der Arme--38--ein Einziehen der beladenen Bleche in die Presse bzw. ein Ausstossen der freien Bleche aus der Presse zu ermöglichen. Die Gestaltung und örtliche Anordnung der   Klauen--39--ist   derart gewählt, dass jeweils beim Schliessen und öffnen der Presse das Ineinandergreifen von Haken und Klauen im richtigen Zeitpunkt stattfindet. 



   In der Stellung nach   Fig. ll   ist gerade ein mit einem   Formling --15-- belegtes,   auf einer Beschickungsetage--25--liegendes Blech--14--mit den zwei   Armen --38-- kraftschlüssig   verbunden. 



  In der nächsten Phase nach Fig. 12 ist dieses Blech mit dem Formling in die offene Presse eingeführt. Nach Beendigung des Pressvorganges werden die   Arme-38-um   ein weiteres Stück zurückgezogen, so dass die nun angetriebenen   Reibrollen-37-die verpresste Platte-16-erfassen   und in das   Gestell --12-- fördern   können (Fig. 13, Pfeil V). Die Fig. 14 zeigt schliesslich, wie das leere   Blech --14-- aus   der Presse auf eine   Entleerungsetage-26-des     Gestells-13-geschoben   wird (Pfeil W). 



   PATENTANSPRÜCHE : 
1. Heb- und senkbare   Formlingsbeschickungs- und Pressunterlagen-Entleerungsvorrichtung für   eine Mehretagenpresse einer Einstranganlage zum Herstellen von Platten, mit einer der Anzahl der Pressetagen entsprechenden Anzahl von Beschickungsetagen für das simultane Beschicken aller   Pressetagen   mit auf Pressunterlagen ruhenden Formlingen und einer gleichen Anzahl von Entleerungsetagen für das simultane 
 EMI4.2 
 Entleerungsetagen (25,31 bzw. 26,32) derart übereinander verschachtelt angeordnet sind, dass sich mindestens eine Entleerungsetage (26,32) zwischen zwei Beschickungsetagen (25,31) befindet.



   <Desc / Clms Page number 1>
 



   The subject of the invention is a lifting and lowering molding loading and pressing pad emptying device for a multi-daylight press of a single-line system for the production of panels, with a number of loading levels corresponding to the number of pressing levels for the simultaneous loading of all pressing levels with blanks resting on pressing pads and one the same number of emptying days for the simultaneous removal of the press documents from the press. Usually, when the press supports are taken out of the press, they are those which have already been freed from the pressed plates. In these cases, the plates are separated from the press supports in the press and removed on the other side of the press.



   Systems in which the press documents are not passed through the press are generally referred to as single-line systems, because the conveying paths for transporting the moldings to the loading device and for transporting them back to the molding formation station are on top of each other or may coincide.



   The device according to the invention is suitable for example in connection with single-line systems
 EMI1.1
    or chipboard-free press pads have been used for a long time.



   In the case of the press loading and unloading devices used in connection with multi-daylight presses which have become known to this day, there is one set of loading levels above a set of emptying levels, the number of levels of each set corresponding to the number of levels of the normally heated press.



   A fundamental disadvantage of such devices is the large overall height and the corresponding vertical space requirement. Such loading and emptying racks require a deep pit for lowering and also require a great deal of free space above so that the rack can be lowered to the desired depth or raised to the required height. In practice, for this reason, presses for single-line systems do not have more than eight to nine floors. If pressed sheet metal transport trolleys are arranged on top of one another, the two conveying paths are very far apart, because this results
 EMI1.2
 Press. The resulting high position of the upper conveying path and, ultimately, the slow operation of the system are also unfavorable.

   These time delays are due, on the one hand, to the long stroke paths of the loading and emptying devices or the tiered basket of the device and, on the other hand, to the fact
 EMI1.3
 and emptying cycle to supply molding-loaded press pad and at the same time to guide a pad away from the device.



   Specific shortcomings also show small systems with a z. B. two or three floors having press and on the same level supply and removal transport routes. In particular, the large lifting movements and the space required for them interfere. With such small systems, one is forced to arrange the molding formation station at a relatively large distance from the device so that mutual interference cannot occur.



   It can be seen that both large and small systems with conventional loading and emptying devices are bulky and, due to the long vertical movements required, work slowly despite a comparatively large amount of energy.



   The object on which the invention is based is to create a device as described in the introduction
 EMI1.4
 the shortened stroke distances. In principle, total nesting of the loading and emptying levels of the device is possible if the conveying path of the loaded documents to the device is at the same level as the conveying path for removing the documents from the device. Such a technical design is possible and useful, especially for small systems. In this way, very compact systems can be built, in which some of the machine parts required for spreading the briquettes are arranged above the emptying and loading device.

   In contrast, in the case of a device in connection with a larger system with superimposed, i.e. separate conveyor lines, the degree of nesting is determined on the one hand by the floor distance of the open press and on the other hand by the minimum distance or the vertical space requirement between the two leading to the device or away from it Given conveyor lines.



   Conveniently, they are in a device that is intended to feed a multi-daylight press

 <Desc / Clms Page number 2>

 
 EMI2.1
 

 <Desc / Clms Page number 3>

 



   In the press document unloading position of the frame or basket --13-- which can be seen in Fig. 1, the lowest levels of each tier set are tilted slightly down on one side so that the right edge of the lowest loading tier is level with the conveyor belt --18-- and the right edge of the bottom
Emptying floor comes to lie at the level of the conveyor belt --20--. This slight pivoting can be accomplished with an eccentric driven by an electric motor or a cylinder acted upon by a fluid.



   After completion of the phase described, the entire device - 13 - is converted into that shown in FIG
Loading position lowered. This is a vertical shift that corresponds to the distance between the upper strands of the conveyor belts - 18 and 20. The upper surfaces of the loading levels --25 - are now at the same height as the upper pressing surfaces of the heated press plate. At the moment recorded in Fig. 2, the pressing plates --14-- loaded with molded products --15-- are pushed into the press (arrow G). At the same time, the first loaded base of the new charging batch to be formed is introduced into the sixth charging level (from above) (arrow H).

   During this phase, the first unloaded press plate - 14 - of the previous emptying charge is also guided out of the device - 13 - and transported back by means of the conveyor belt - 20 - (arrow I).



   At the working time shown in FIG. 3, the press - 1 - is already largely closed. The frame --13 - is lowered by two levels compared to the position according to Fig. 2. A loaded press plate --14-- is now fed to the loading level whose level corresponds to the level of the upper conveyor belt surface --18-- (arrow K). In addition, an empty press plate --14-- is led out of an emptying floor and returned to the molding forming station by the conveyor belt --20-- (arrow L).



   After the end of the work phase according to FIG. 3, a loaded sheet is placed on the second top loading tier after the frame has been lowered accordingly and at the same time the empty press sheet is led out of the second top emptying tier. Then the frame is lowered into the lowest position according to Fig. 4, so that it is now possible to lead a loaded press pad --14 - to the top floor - 25 - (arrow M) and the top emptying floor - 26-- to be freed from the press plate --14-- lying on it (arrow N).



   After completing the phase just described, the frame is gradually raised --13--.



  Between two steps, each corresponding to either two storey heights or one storey height, a loaded sheet is pushed onto a loading tier and at the same time a freed sheet is removed from the frame. These processes are repeated until the state according to FIG. 1 is reached again and a full cycle has ended.



   The degree of nesting in the first embodiment of the device can easily be seen from the drawings. In fact, a loading tier and an emptying tier are combined to form a pair of tiers in the middle part of the frame. It is obvious that the overall height of the frame
 EMI3.1
 without moldings in the press - 1 - is not obstructed, care must be taken that the respective distance between the upper loading level surface and the lower surface of the emptying level arranged directly below is not greater than the thickness of a plate --7-- of the press .

   
 EMI3.2
 with appropriate design of the drive and guide means of the frame --13-- to lower it to a level at which a defective molding lying on any loading level - 25 - can be removed by the conveyor belt --20-- without being confronted with the need to make the pit - 9 - significantly deeper. In the example discussed, an additional pit depth is sufficient, which corresponds to the distance between the effective strands of the two conveyor belts - 18 and 20.



   The system according to FIGS. 5 to 10 is an extremely small system. It essentially consists of a molding station comprising two spreading points - 27 and 28 -, a 2-tier press - 29 -, a lifting and lowering loading and emptying rack - 30 -, a plate removal rack (not shown), not visible Funding and the press plates-14--. The nesting of the loading and unloading levels is one hundred percent here, i. H. it's right under each one
 EMI3.3
 of which the former scatters fine outer layer material and the latter scatters coarser core layer material, and the return of the sheets loaded with moldings takes place on the same plane.

   This gives the particular advantage of being able to produce a three-layer panel using just two scattering points.



   The following processes take place during a full working cycle:
According to Fig. 5, from the two loading levels --31-- the documents --14-- loaded with briquettes --15-- are introduced into the open press --29-- (arrow 0) and at the same moment the first briquette of the subsequent batch pushed onto the lower loading level (arrow P).



   The frame is now fully raised (Fig. 6). The press is practically closed and it's going out of the

 <Desc / Clms Page number 4>

 lower emptying level the free press plate out and out to the spreading stations - 27 and 28 - (arrow Q).



   During the spreading process, the frame --30 - is lowered into the position according to Fig. 7, so that the sheet metal with the molding that has just been formed can be guided to the upper loading tier (arrow R).



   Now the frame is raised until the upper emptying level is on the conveying level so that the free sheet --14-- lying there can be pulled out (Fig. 8, arrow S).



   In the course of the phase according to Fig. 9, the sheets freed from the pressed chipboard --16 - are pushed onto the emptying levels (arrow T). Furthermore, a molding is formed under the scattering point and guided to the frame --30-- (Fig. 10, arrow U). The full working cycle, which began in the phase according to FIG. 5, is thus essentially completed.



   In contrast to the first exemplary embodiment, in the extremely compact construction illustrated in FIGS. 5 to 10, there is never more than a single sheet metal outside the pressing and charging section comprising the press --29 - and the device --30 - . The total number of sheets - 14 - depends on the number of press days and is 2n + 1 with n floors. In the example there are five press documents.



   It has been shown above that the progressiveness of the new device is to be seen, among other things, in the fact that loading floors can be filled and emptying floors can be freed from the press supports at the same time. It is therefore not possible to load the press and remove the documents from it with a conventional push-in or pull-out arm. However, this problem is of a secondary nature and does not present any particular difficulties. So it is e.g.

   B. possible between the press and the device according to the invention to arrange a sliding frame within narrow limits parallel to the loading direction, the main plane of which is perpendicular to the loading direction, and the vertical parts of which carry drivable rollers with which the sheets lying in the press on both side edges are captured and transported into the frame, whereas in a second position of the frame and after a corresponding reversal of the direction of rotation of the rollers, the loaded press plates are transported from the frame into the open press.



   Another variant of the displacement means can be seen in FIGS. In the case of this construction
 EMI4.1
 find common drive means use.



   In addition, two horizontally displaceable gripping arms - 38 - which are moved by drives (not shown in the drawing) are assigned to each level of the frame --12 -. At the free ends of these gripping arms there are U-shaped claws - 39 - which are intended to encompass corresponding hooks --40-- of the press plates --14-- and so with a corresponding drive of the arms - 38- -to allow the loaded sheets to be drawn into the press or to allow the free sheets to be ejected from the press. The design and local arrangement of the claws - 39 - is selected in such a way that the hooks and claws interlock at the right time when the press is closed and opened.



   In the position according to Fig. 11, a sheet metal - 14 - which is covered with a molding --15 - and lying on a loading level - 25 - is frictionally connected to the two arms --38 -.



  In the next phase according to FIG. 12, this sheet with the molding is introduced into the open press. After completion of the pressing process, the arms 38 are pulled back a further piece so that the now driven friction rollers 37 grasp the pressed plate 16 and convey it into the frame 12 (Fig. 13, arrow V ). Finally, FIG. 14 shows how the empty sheet -14- is pushed out of the press onto an emptying floor -26-of the frame-13-(arrow W).



   PATENT CLAIMS:
1.Raisable and lowerable molding loading and emptying device for a multi-level press of a single-line system for the production of panels, with a number of loading levels corresponding to the number of press levels for the simultaneous loading of all press levels with molded items resting on press bases and an equal number of emptying levels for the simultaneous
 EMI4.2
 Emptying floors (25,31 or 26,32) are nested one above the other in such a way that at least one emptying floor (26,32) is located between two loading floors (25,31).

 

Claims (1)

2. Vorrichtung nach Anspruch 1, wobei der Förderstrang für das Zuführen von mit Formlingen beladenen Pressunterlagen oberhalb des Förderstranges für das Wegführen der Pressunterlagen angeordnet ist, EMI4.3 dasshöchstens jedoch fünf Entleerungsetagen (26) angeordnet sind, und dass sich über der obersten Entleerungsetage eine der Anzahl der vorgenannten Entleerungsetagen entsprechende Anzahl Beschickungsetagen befindet. <Desc/Clms Page number 5> 2. Device according to claim 1, wherein the conveying line for the supply of press supports loaded with moldings is arranged above the conveying line for the removal of the press supports, EMI4.3 that, however, at most five emptying levels (26) are arranged, and that above the top emptying level there is a number of loading levels corresponding to the number of the aforementioned emptying levels. <Desc / Clms Page number 5> 3. Vorrichtung nach Anspruch 2, gekennzeichnet durch eine derartige Ausbildung der Einrichtung für das Heben und Senken der Beschik- un Entleeretagen (25 bzw. 26), dass sich die Gesamtheit dieser Etagen zwecks Ausscheidung fehlerhafter Formlinge so weit absenken lässt, bis sich die oberste Beschicketage auf dem Niveau des für das Wegführen der Pressunterlagen (14) vorgesehenen unteren Förderstranges (19,20) befindet. 3. Apparatus according to claim 2, characterized by such a design of the device for raising and lowering the loading and emptying floors (25 or 26) that the entirety of these floors can be lowered so far for the purpose of eliminating defective briquettes until the top one Beschicketage is at the level of the lower conveyor line (19, 20) provided for removing the press documents (14). 4. Vorrichtung nach einem der Ansprüche 1 bis 3, d gekennzeichnet, dass die jeweils unterste Beschickungs-und Entleerungsetage innerhalb vorbestimmter Grenzen um eine zur Verschieberichtung von Pressunterlagen (14) und Formlingen (15) senkrechte Achse verschwenkbar angeordnet ist. 4. Device according to one of claims 1 to 3, d, characterized in that the respective lowermost loading and emptying floor is arranged pivotable within predetermined limits about an axis perpendicular to the direction of displacement of the press supports (14) and moldings (15). 5. Vorrichtung nach Anspruch 1, wobei ein einziger in zwei Richtungen wirksamer Förderstrang für das Zuführen von mit Formlingen beladenen Pressunterlagen zu einer höchstens vier Etagen aufweisenden Presse und das Zurücktransportieren der von den gepressten Platten befreiten Pressunterlagen vorgesehen ist, EMI5.1 5. The device according to claim 1, wherein a single conveyor line, which is effective in two directions, is provided for feeding press supports loaded with moldings to a press having at most four levels and for transporting back the press supports freed from the pressed plates, EMI5.1
AT337975A 1975-05-02 1975-05-02 LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS AT339028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT337975A AT339028B (en) 1975-05-02 1975-05-02 LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT337975A AT339028B (en) 1975-05-02 1975-05-02 LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS

Publications (2)

Publication Number Publication Date
ATA337975A ATA337975A (en) 1977-01-15
AT339028B true AT339028B (en) 1977-09-26

Family

ID=3549635

Family Applications (1)

Application Number Title Priority Date Filing Date
AT337975A AT339028B (en) 1975-05-02 1975-05-02 LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS

Country Status (1)

Country Link
AT (1) AT339028B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112077955A (en) * 2020-09-21 2020-12-15 湖南闽新人造板有限责任公司 Reciprocating type plywood apparatus for producing

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112388754A (en) * 2020-11-16 2021-02-23 安徽志昌竹木科技有限公司 Hot pressing process and device for producing high-performance bamboo-wood composite floor
CN112318646B (en) * 2020-11-20 2022-04-08 贵港市欣桐木业有限公司 A compression fittings for plywood processing
CN115816582B (en) * 2022-12-19 2023-06-27 湖南宏森新材料科技有限责任公司 Environment-friendly low-formaldehyde ecological plate hot pressing device and production process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112077955A (en) * 2020-09-21 2020-12-15 湖南闽新人造板有限责任公司 Reciprocating type plywood apparatus for producing

Also Published As

Publication number Publication date
ATA337975A (en) 1977-01-15

Similar Documents

Publication Publication Date Title
DE2612206C2 (en) Liftable and lowerable molding loading and emptying device for press supports for a multi-daylight press
DE2744158A1 (en) DEVICE FOR PACKAGING COMPRESSIBLE ARTICLES, E.G. DISPOSABLE DIAPERS OR DIGITAL, IN CARTONS
DE2938613A1 (en) DEVICE FOR THE FORMATION OF BLOCK-SHAPED CIGARETTE GROUPS FOR CIGARETTE PACKS FROM OVERLAYING CIGARETTE LAYERS
DE1653319A1 (en) Process and device for the production and transport of single or multi-layer chipboard
DE2537279A1 (en) PALLET UNLOADER
DE2701464A1 (en) METHOD AND DEVICE FOR FORMATION OF PACKAGES FOR A VARIABLE NUMBER OF STACKABLE TWO-DIMENSIONAL ELEMENTS
DE2547149A1 (en) METHOD AND DEVICE FOR MANUFACTURING PLATES OR PANELS FROM PULP, OR. FIBER OR CHARPING MATERIAL
DE2228244C3 (en) Device for loading and unloading a multi-daylight press
DE2411660A1 (en) DEVICE FOR COOLING THE PRESS MATERIAL IN THE COURSE OF THE PRODUCTION OF CHIPBOARD, FIBERBOARD AND THE LIKE.
AT339028B (en) LIFTING AND LOWERING FORM LOADING AND PRESS PAD EMPTYING DEVICE FOR A MULTI-DAY PRESS
DE3143913C2 (en) Press system with multi-tier presses
EP0422600A1 (en) Transporting device for plane work pieces
DE2852456C2 (en) Device for on and off panels in the manufacture of laminated panels
DE2226897C3 (en) Forming and pressing line for the manufacture of chipboard
DE925039C (en) Method and device for the automatic stacking of bricks
DE2236355C3 (en) System for loading multi-opening plate presses
DE834642C (en) Method and device for loading and unloading fiberboard presses
DE2920220C2 (en) Device for loading and unloading a single or multi-daylight press
DE1851963U (en) BRICK PRESS.
DE2431015A1 (en) METHOD OF MANUFACTURING A STACK OF ITEMS AND DEVICE FOR CARRYING OUT THIS METHOD
CH465850A (en) Process and device for the production and transport of single or multi-layer chipboard
CH576860A5 (en) Prodn. of plates of binder coated particles - uses multi-daylight press and specified moulding tray conveying between press and moulding station
AT214133B (en) Process and press for the production of endless chipboard strips
DE1703224C3 (en) Intermittent multi-daylight press for the production of chipboard or the like
DE1201983B (en) Device for loading presses, in particular multi-stage presses, in the production of chipboard, fiberboard or the like.

Legal Events

Date Code Title Description
ELJ Ceased due to non-payment of the annual fee
ELJ Ceased due to non-payment of the annual fee