SU726349A1
SU726349A1 SU772489960A SU2489960A SU726349A1 SU 726349 A1 SU726349 A1 SU 726349A1 SU 772489960 A SU772489960 A SU 772489960A SU 2489960 A SU2489960 A SU 2489960A SU 726349 A1 SU726349 A1 SU 726349A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shield
jumper
holes
rocks
mine
Prior art date
Application number
SU772489960A
Other languages
Russian (ru)
Inventor
Георгий Павлович Хавротин
Юрий Павлович Шокин
Михаил Михайлович Зайцев
Евгений Михайлович Богданов
Борис Иванович Рамоданов
Геннадий Иванович Швецов
Евгений Сергеевич Александров
Original Assignee
Всесоюзный научно-исследовательский и проектный институт галургии
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектный институт галургии filed Critical Всесоюзный научно-исследовательский и проектный институт галургии
Priority to SU772489960A priority Critical patent/SU726349A1/en
Application granted granted Critical
Publication of SU726349A1 publication Critical patent/SU726349A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

(54) ШАХТНАЯ ПЕРЕМЫЧКА(54) MINE SHIFT

Claims (2)

, , , , 1 Изобретение относитс  к горной промыш-ленности , а именно к перемычкам, устанавли ваемым в горных выработках шахт и руднико дл  изрл ции выработок от газов, воды, пожаров , а также задержани  закладочных и заиловочных материалов. Известна шахтна  перемычка, содержаща  тело перемычки, выполненное из бетона и уста новленное по врубе, выполненном по контуру горной выработки 1. Однако така  перемычка может быть разрушена под воздействием горного давлени , след ствием чего  вл етс  разгерметизаци . Известна также шахтна  перемычка (безврубова ), содержаща  щит, уплотнитель, расположенныи по периметру перемычки и контактирующий с породами выработки, и средства креплени  щита, состо щие- из уголков (скоб) и металлических щтырей, устанавливаемых в шпурах 2). Недостатком известной перемычки  вл етс  то, что она выполнена жесткой; под воздействием горного давлени  происходит нарушение целостности контакта перемычка-порода. трещйнообразование в окружающих породах, что в значительной степени снижает герметичность перемычки. Целью изобретени   вл етс  повышение герметичности и несущей способности перемычки. Это достигаетс  тем, что щнт перемычки выполнен из отдельных секций, уплотнитель размещен на боковой поверхности щита, устанавливаемой со стороны вруба, средства дл  креплени  щита выполнены в виде анкеров, а по наружному контуру щита выполнены отверсти , через которые пропущены анкеры, причем поперечные сечени  указанных отверстий выполнены с учетом конвергенции горных пород. На фиг. 1 представлена перемьрп а, установленна  в горной выработке, вид сбоку; на фиг. 2 - разрез А-А фиг. 1. Шахтна  перемычка содержит разборчый щит, состо щий из двух симметричных секций 1, который в собранном виде должен перекрывать сечение изолируемой выработки по ее ширине и высоте на 0,6-1,0 м. Секции 1 щита оедин ютс  между собой любым из известных,. способов, обеспечивающих герметичность соединени : сваркой, если щит металлический, боптовым соединением с прокладкой, если щит дерев нный, бетонный, железобетонный и т д. На боковой поверхности щита, устанавливаемой со стороны вруба, размещен уплотнитель 2, по наружному контуру щита выполнены компенсационные отверсти  3, через Которые пропущены анкеры 4, например типа .ШКС (сталеполимербетонна  щтангова  крепь на основе синтетических материалов). КомпенсадаЬнИЫе отверсти  3 имеют овальную форму дл  предотвращени  деформации или разрушени  щита в случае движени  пород и штанговой крепйТГт .е- с учетЬм конвергенции горных пород. Штангова  крепь, установленна  по периметру выработки, укрепл   породы, предотвращает разрушение перемычки под действием горного давлени , а также снижает трещинообразование и деформацию горных пород на контакте с перемычкой.;: Перемычку устанавливают следующим образом . Секции 1 щита перемычки, изготовленные :на поверхности или непосредственно в шахте, соедин ют между собой, в выработке по ее периметру создают вруб 5 глубиной 03-1,2 м, Ьдиа плоскость которого перпендикул рна оси выработки. Между боковой поверхностью щита кровлей и боковыми стенками вруба оставл ют зазор 6, который рассчитывают с учетом предполагаемой конвергенции пород. На рассто нии ,7 м от ;тенок выработки под углом 30-45° к оси, выработки пробуривают шпуры 7 глубиной 1,0-2,0 м, в которые устанавливают анкеры 4. Количество шпуров И их длин Ьтфейел ю в зависимости от площади попереч ного сечени  выработки, крепости пород, струк туры, а также от назначени  перемычки (гвдройзол илонна , вентил ционна , противопожар на ). Дл  обеспечени  надежной герметичности употнитель 2 размещают на боковой поверхности ита, устанавливаемой со стороны вруба, коорый при зат гивании гаек штанговой крепи (анкеров) деформируетс , заполнй  все неровости между плоскост ми щита и вруба, плото прилега  к породе и материалу щита перемычки за счет высокой адгезии уплотнител . Предлагаема  перемычка позвол ет снизить утечки воздуха, просачивание шахтных вод и т.д., уменьшить стоимость розведени  и эксплуатации ее за счет повышени  герметичности и несущей способности перемычки. Формула изобретени  Шахтна  перемычка, содержаща  щит, уплотнитель , расположенный по периметру перемычки, и средства дли креплени  щита, устанавливаемые в шпурах, отличающа с  тем, что, с целью повышени  ее герметичности и несущей способности, 1циг выполнен из отдельных секций, уплотнитель размещен на боковой повёрз :ности щита, устанавливаемой со стороны вруба, средства дл  креплени  щита выполнены в виде анкеров, а по наружному : койтуру щита выполнены отверсти , через которые пропущены анкеры, причем поперечные сечени  отверстий выполнены с учетом конвергенции горных пород. , Источники информации, прин тые Во внимание при экспертизе 1.Горное дело. Энциклопедический справочник , т. 6, М., 1959, с. 156. ,,,, 1 The invention relates to the mining industry, namely to bridges, installed in the mine workings of mines and mines to isolate the workings from gases, water, fires, as well as to detain filling and silting materials. A well-known bulkhead, containing a bulkhead, made of concrete and installed along the cutting section, made along the contour of the mine workout 1. However, such a bulkhead can be destroyed under the influence of the rock pressure, which is depressurized. Also known shaft jumper (bezrubova), containing the shield, seal, located on the perimeter of the jumper and in contact with the rocks, and means of mounting the shield, consisting of corners (brackets) and metal shtyry installed in the holes 2). A disadvantage of the known jumper is that it is made rigid; Under the influence of rock pressure, the integrity of the jumper-rock contact is disturbed. cracking in the surrounding rocks, which greatly reduces the leaktightness of the lintel. The aim of the invention is to improve the tightness and carrying capacity of the lintel. This is achieved by the fact that the jumper bridge is made of separate sections, the seal is placed on the side surface of the shield mounted on the side of the cut, the means for fastening the shield are in the form of anchors, and through the outer contour of the shield there are holes through which the anchors are passed, and the cross sections of these holes made with the convergence of rocks. FIG. Figure 1 shows the airbag, installed in the mine workings, side view; in fig. 2 - section A-A of FIG. 1. The mine bridge contains a disassembled shield, consisting of two symmetrical sections 1, which when assembled must overlap the cross section of the insulated excavation along its width and height by 0.6-1.0 m. Section 1 of the shield are connected to each other by any of the known , ways to ensure the tightness of the connection: by welding, if the shield is metallic, by bridging connection with the gasket, if the shield is wooden, concrete, reinforced concrete, etc. Sealant 2 is placed on the side surface of the shield mounted on the side of the fencing, 3, through which the anchors 4 are passed, for example, of the type .ShKS (steel-polymer concrete lining based on synthetic materials). The compensating holes 3 are oval-shaped to prevent deformation or destruction of the shield in the event of movement of rocks and rod crepeing. - taking into account the convergence of rocks. The shank support, installed along the perimeter of the excavation, strengthens the rock, prevents the jumper from collapsing under the influence of rock pressure, and also reduces the cracking and deformation of the rocks on contact with the jumper.;: The jumper is installed as follows. The sections 1 of the shield of the lintel, made: on the surface or directly in the mine, are interconnected, in the excavation along its perimeter a cut 5 is created with a depth of 03-1.2 m, the bia plane of which is perpendicular to the axis of the excavation. A gap 6 is left between the side surface of the shield and the side walls of the cut, which is calculated taking into account the assumed convergence of rocks. At a distance of 7 m from the shank of an excavation at an angle of 30-45 ° to the axis, holes 7 with a depth of 1.0-2.0 m are drilled into which the anchors are installed 4. The number of holes and their length depends on the area cross sections of mine workings, rock strength, structure, as well as the designation of the lintel (hot air, ventilation, fire protection). To ensure reliable tightness, the entrapment device 2 is placed on the side surface of the ita, installed on the side of the cutter, which deforms when tightening the sucker-rod nuts (anchors), fill all irregularities between the planes of the shield and the cutter, the jib adjacent to the rock and the shield material of the jumper due to high adhesion seal. The proposed bridge allows to reduce air leakage, infiltration of mine water, etc., to reduce the cost of raising and operating it by increasing the tightness and bearing capacity of the bridge. Claims of the mine shaft, containing a shield, a seal, located around the perimeter of the lintel, and means for fastening the shield mounted in the bore-holes, characterized in that, in order to increase its tightness and bearing capacity, the jig is made of separate sections, the seal is placed on the side the perforations of the shield, installed on the side of the cut, the means for fastening the shield are made in the form of anchors, and on the outer side: the shield coir of the shield has holes through which the anchors are passed, the cross sections of the holes ying considering convergence rocks. , Sources of information taken into account in the examination 1. Mountain case. Encyclopedic Reference, T. 6, M., 1959, p. 156. 2.Авторское свидетельство СССР по за вке Г 2428018/22-03, кл. Е 21 F 1/14, 1976 (прототип ) .2. USSR author's certificate in accordance with the application G 2428018/22-03, cl. E 21 F 1/14, 1976 (prototype). СWITH Ш//W // х;x; :: Фиг. 2FIG. 2
SU772489960A 1977-05-25 1977-05-25 Mine partition SU726349A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU772489960A SU726349A1 (en) 1977-05-25 1977-05-25 Mine partition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU772489960A SU726349A1 (en) 1977-05-25 1977-05-25 Mine partition

Publications (1)

Publication Number Publication Date
SU726349A1 true SU726349A1 (en) 1980-04-05

Family

ID=20710622

Family Applications (1)

Application Number Title Priority Date Filing Date
SU772489960A SU726349A1 (en) 1977-05-25 1977-05-25 Mine partition

Country Status (1)

Country Link
SU (1) SU726349A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA009800B1 (en) * 2007-01-23 2008-04-28 Открытое Акционерное Общество "Белгорхимпром" Method for protecting salt mine against flooding
EA015486B1 (en) * 2009-04-24 2011-08-30 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of self-sealing damp-proof bulkhead erection
RU2611095C1 (en) * 2013-08-14 2017-02-21 Чайна Шэньхуа Энерджи Компани Лимитед Distributed underground reservoir for coal mines artificial dam and its erection method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EA009800B1 (en) * 2007-01-23 2008-04-28 Открытое Акционерное Общество "Белгорхимпром" Method for protecting salt mine against flooding
EA015486B1 (en) * 2009-04-24 2011-08-30 Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") Method of self-sealing damp-proof bulkhead erection
RU2611095C1 (en) * 2013-08-14 2017-02-21 Чайна Шэньхуа Энерджи Компани Лимитед Distributed underground reservoir for coal mines artificial dam and its erection method
US9689128B2 (en) 2013-08-14 2017-06-27 China Shenhua Energy Company Limited Artificial dam of distributed coal mine underground reservoir and its constructing method

Similar Documents

Publication Publication Date Title
SU726349A1 (en) Mine partition
RU2219350C1 (en) Mine hydraulic insulation bridge
US4070866A (en) Tunnel liners and methods of making the same
EP0240996A2 (en) Blast shield
RU2060398C1 (en) Method for preparation of waterproofing stopping for operation under emergency conditions
US3417568A (en) Mine shaft bratticing
SU969868A1 (en) Storage for loose materials
SU848661A1 (en) Flexible roof
RU22682U1 (en) PROTECTING SHAFT SHUTTER
SU734423A1 (en) Partition for dampening air shock wave
SU929875A1 (en) Hydro-isolation mine partition
SU1576647A1 (en) Tunnel lining
SU1266988A1 (en) Method of working pillars
RU203434U1 (en) Explosion Proof Barrier Vessel
SU796462A2 (en) Explosion-proof mine partition
RU2215876C1 (en) Device for suppression of fire and air shock wave energy
SU939767A1 (en) Roof support for mine workings
SU1576646A1 (en) Lining of pressure hydro-engineering tunnel
PL146768B1 (en) Isolating explosion dam
SU1027331A1 (en) Lining for water spillway tunnel
RU2046948C1 (en) Stratum main drifts protection method
RU2190100C2 (en) Blast-proof stopping
RU2114377C1 (en) Combination lining of special underground structure
SU1146459A1 (en) Method of supporting mine workings in thick horizontal seams capable of rock bursts
SU1023167A1 (en) Method of preventing sudden outburst at excavating steep seams