SU1158663A1 - Method of layer-wise compacting of stone filling in dam construction - Google Patents
Method of layer-wise compacting of stone filling in dam construction Download PDFInfo
- Publication number
- SU1158663A1 SU1158663A1 SU843702762A SU3702762A SU1158663A1 SU 1158663 A1 SU1158663 A1 SU 1158663A1 SU 843702762 A SU843702762 A SU 843702762A SU 3702762 A SU3702762 A SU 3702762A SU 1158663 A1 SU1158663 A1 SU 1158663A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- layer
- pipes
- previously
- compaction
- stone
- Prior art date
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
СПОСОБ ПОСЛОЙНОГО У1Ш9ТНЕНИЯ КАМЕННОЙ НАБРОСКИ ПРИ ВОЗВЕДЕНИИ ПЛОТИНЫ, включающий отсьтку сло каменной наброски на ранее уплотненный слой, о т л.и ч а ющ и и с тем, что, с целью повышени качества уплотнени , снижени трудоемкости и повышени эффективности строительства, на ранее уплотненный слой укладывают горизонтально трубы, на которые отсыпают неуплотненный слой грунта, после этого в трубы ввод т линейно прот женные зар ды взрьгечатого вещества , взрывом которых уплотн ют ранее неуплотненный слой грунта. тMETHOD OF LAYERING STONE DETECTION WHEN CONSTRUCTING A DAM, INCLUDING A Laying Layer Layer On A Previously Compacted Layer, Is About So That, In order To Improve The Quality Of Compaction, Reduce Labor-Consuming And Increase Construction Efficiency, On Previously Compacted The layer is laid horizontally onto the pipes on which the unconsolidated soil layer is poured, after which linearly charged charges of explosive substance are introduced into the pipes, the explosion of which consolidates the previously unconsolidated soil layer. t
Description
I t Изобретение относитс к строител ству и может быть использовано при возведении например, каменно-набро ных пластин. Известен способ послойного уплот нени каменной наброски при возведе . нии плотины, включаюпщй бурение скв жины, установку обсадньгх труб, опус кание в них гидрризолированньк зар дов, извлечение осадных труб и взры вание зар дов CiJ. Недостатком этого способа вл етс высока трудоемкость, в званна необходимостью бурени скважин, установки и извлечени обсадных труО. Известен также способ послойного уплотнени каменной наброски при возведении плотины, включающий отсы ку последующего сло каменной наброски на ранее уплотненный слой и уплотнение струей воды под давлением Недостатками данного способа вл ютс высока трудоемкость, боль ша длительность процесса уплотнени струей воды, низкое качество уплотнени обусловленные вьмыванием мелких фракций камн , а Tajgse необходимость организации водоотвода. Целью изобретени вл етс повышение качестве уплотнени , снижение трудоемкости и повьп ение эффективности строительства-. Указанна цель достигаетс тем, что на ранее уплотненный слой укладывают горизонтально трубы, на 32 которые отсыпают неуплотненный слой грунта, после этого в трубы ввод т линейно прот женные зар ды взрывчатого вещества, взрывом уплотн ют ранее неуштотненного сло грунта. На чертеже показана схема осуществлени способа. Предложенный способ осуществл етс следующим образом. На ранее уплотненный слой 1 ук- ладывают горизонтально трубы 2 из материала, сохран ющего свою форму при нагрузке, например из асбоцемента . Поверх труб-2 насыпают рыхлый слой каменной наброски 3. Ввод т в трубы 2 линейно прот женные зар ды 4 и взрывают их с замедлением, например в 1 с. Экспериментальным путем установлено , что при уплотнении каменной наброски масса зар да 1у| равна : 0,5 + t кг/м. Рассто ние между трубами (а) определ етс по формуле а 2,5У. Мощность уплотн емого сло (Н) принимаетс (2+3)а; Предлагаемый способ по сравнению с известным позвол ет сократить трудоемкость работ и врем проведени операций, повысить качество уплотнени каменной наброски. Нормативный экономический эффект от использовани Предлагаемого способа послойного уплотнени каменной наброски при воздействии плотины может составить свыщё 100 руб. на 1000 м отсыпанного грунта.I t The invention relates to construction and can be used in the construction of, for example, rock-filled plates. There is a method of layer-by-layer compaction of the stone draft during erection. the dam, including the drilling of a well, installation of casing pipes, the insertion of hydrolyzed charges in them, the extraction of siege pipes and the explosion of charges CiJ. The disadvantage of this method is the high labor intensity, due to the necessity of drilling wells, installing and extracting casing. There is also known a method of layer-by-layer compaction of a rock layer during the construction of the dam, including moving a subsequent layer of rock layer onto a previously compacted layer and compaction with a water jet under pressure. The disadvantages of this method are high labor intensity, a longer compaction time with a water jet, poor quality of compaction due to the penetration of small fractions of stone, and Tajgse need to organize drainage. The aim of the invention is to increase the quality of compaction, reduce labor intensity and increase the efficiency of construction. This goal is achieved by placing horizontally pipes onto the previously compacted layer, onto 32 which the unconsolidated soil layer is poured, after which linear explosive charges of explosive are introduced into the pipes, compaction of the previously non-dry soil layer is exploded. The drawing shows a scheme for implementing the method. The proposed method is carried out as follows. Pipe 2 is laid horizontally onto a previously compacted layer 1 of a material that retains its shape under load, for example, asbestos cement. A loose layer of stone bedding 3 is piled on top of pipes-2. Linear charges 4 are introduced into pipes 2 and blown up with deceleration, for example, in 1 s. It was established experimentally that when compacting a rocky outline, the mass of the charge is 1y | equal to: 0.5 + t kg / m. The distance between the pipes (a) is determined by the formula a 2.5U. The thickness of the layer to be compacted (H) is assumed to be (2 + 3) a; The proposed method, in comparison with the known, allows to reduce the laboriousness of the work and the time of the operations, to improve the quality of compaction of the rock layer. The standard economic effect from the use of the proposed method of layer-by-layer compaction of a rock layer under the influence of a dam can amount to more than 100 rubles. per 1000 meters of ground spilled.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843702762A SU1158663A1 (en) | 1984-02-16 | 1984-02-16 | Method of layer-wise compacting of stone filling in dam construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843702762A SU1158663A1 (en) | 1984-02-16 | 1984-02-16 | Method of layer-wise compacting of stone filling in dam construction |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1158663A1 true SU1158663A1 (en) | 1985-05-30 |
Family
ID=21104293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843702762A SU1158663A1 (en) | 1984-02-16 | 1984-02-16 | Method of layer-wise compacting of stone filling in dam construction |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1158663A1 (en) |
-
1984
- 1984-02-16 SU SU843702762A patent/SU1158663A1/en active
Non-Patent Citations (1)
Title |
---|
1. Иванова П.Л. Уплотнение малрсв зных грунтов взрывами. М., Недра , 1983, с. 18, рис. 5.9 г. 2. Гришин М.М. Справочник по гидротехнике. М., Госиздат по, строительству и архитектуре. 1955, с. 643 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746505A (en) | Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting | |
CN106522191A (en) | Transformer substation foundation treatment method and application thereof | |
SU1158663A1 (en) | Method of layer-wise compacting of stone filling in dam construction | |
GB862630A (en) | Method of and apparatus for the construction of piles cast in situ from concrete | |
Abelev | Compacting loess soils in the USSR | |
RU121274U1 (en) | ARTIFICIAL REINFORCED BASIS FOR ESTABLISHED OR RECONSTRUCTED BUILDING | |
CN213143069U (en) | Pouring type impervious core earth-rock dam structure | |
CN107129251A (en) | A kind of curing agent and processing method for explosion discharging consolidation soft soil foundation | |
SU1125331A1 (en) | Method of compacting sagging soils | |
GB1252244A (en) | ||
JPS57108328A (en) | Formation of basement | |
SU718541A1 (en) | Method of consolidating clayey soils with earth-fill piles | |
SU1599481A1 (en) | Method of erecting building foundation in heaving soil | |
RU1791536C (en) | Method for removal of soil subsidence | |
CN107327314B (en) | Construction method of ultra-thick backfill layer pile foundation | |
RU2059044C1 (en) | Method for compacting dispersed soils | |
CN106759225A (en) | The deep barged-in fill vacuum pre-pressed joint explosion reinforcement means of high-moisture | |
SU987028A1 (en) | Method of consolidating sagging soils | |
GB496581A (en) | An improved method of driving tunnels under water or in water-bearing strata | |
SU897942A1 (en) | Method of providing counter-filtration screen in incoherent soils | |
Popa et al. | Haws occurring in sewer construction—Solutions for consolidation | |
JPS5733616A (en) | Forming method for steel pipe pile | |
SU1159981A1 (en) | Method of consolidating sagging loess soil | |
RU2059749C1 (en) | Method for erecting walls in ground | |
SU1486569A1 (en) | Method of filling-up drainage trench |