KR102587630B1 - Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same - Google Patents
Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same Download PDFInfo
- Publication number
- KR102587630B1 KR102587630B1 KR1020220155207A KR20220155207A KR102587630B1 KR 102587630 B1 KR102587630 B1 KR 102587630B1 KR 1020220155207 A KR1020220155207 A KR 1020220155207A KR 20220155207 A KR20220155207 A KR 20220155207A KR 102587630 B1 KR102587630 B1 KR 102587630B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- bracket
- tension member
- guide bracket
- hanging
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0046—Production methods using prestressing techniques
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
본 발명은 말뚝의 배면측 중간부에 가이드브라켓을 설치하고, 상기 말뚝의 하단부에 걸이형 브라켓을 설치하며, 상기 가이드브라켓과 걸이형 브라켓 사이에 인장재를 정착시킨 후, 상기 인장재를 긴장시킴으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없고, 도심지의 협소한 공간에서도 말뚝의 배면측 지반부지의 광협에 관계없을 뿐만 아니라 굴착을 실시하기 전후에 관계없이 흙막이 가시설을 구축하도록 한 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법을 제공하는데 그 목적이 있다.
상기한 목적을 달성하기 위한 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝은 소정의 형상으로 이루어진 말뚝과; 상기 말뚝의 일측 중간부에 결합되는 가이드브라켓과; 상기 말뚝의 일측 하단부에 결합되는 걸이형 브라켓과; 상기 걸이형 브라켓에 일단이 고정되고, 타단이 가이드브라켓을 통과하여 연장되는 인장재로 구성됨을 특징으로 한다.
또한, 상기한 목적을 달성하기 위한 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법은 지반을 일정한 간격을 두고, 소정의 직경 및 깊이로 굴착하여 천공홀을 형성하는 단계; 상기 천공홀에 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 굴착배면측을 향하도록 한 상태로 근입하는 단계; 상기 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝에 설치된 인장재를 소정의 힘으로 긴장하는 단계로 이루어짐을 특징으로 한다.The present invention installs a guide bracket in the middle of the rear side of the pile, installs a hanging bracket at the lower end of the pile, fixes a tension member between the guide bracket and the hanging bracket, and then tensions the tension member, Even without installing a separate support material on the excavation side, there is no risk of the pile falling or collapsing into the excavation space, and even in a narrow space in the city, it is not only independent of the narrowness of the ground site on the back side of the pile, but also before and after excavation. The purpose is to provide thumb piles using guide brackets and hanging brackets for constructing temporary earth retaining facilities regardless of the structure, and a construction method for temporary earth retaining facilities using the same.
A thumb pile using a guide bracket and a hanging bracket according to the present invention to achieve the above object includes a pile having a predetermined shape; A guide bracket coupled to the middle portion of one side of the pile; A hanging bracket coupled to the lower end of one side of the pile; It is characterized by being composed of a tension member whose one end is fixed to the hanging bracket and whose other end extends through the guide bracket.
In addition, the method of constructing temporary earth retaining facilities using thumb piles using guide brackets and hanging brackets according to the present invention to achieve the above object involves excavating the ground at regular intervals and excavating to a predetermined diameter and depth to form a drilling hole. step; Inserting a thumb pile using a guide bracket and a hanging bracket into the drilling hole with the thumb pile facing the back of the excavation; It is characterized by tensioning the tension member installed on the thumb pile using the guide bracket and hanging bracket with a predetermined force.
Description
본 발명은 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법에 관한 것으로, 특히 말뚝의 배면측 중간부에 가이드브라켓을 설치하고, 상기 말뚝의 하단부에 걸이형 브라켓을 설치하며, 상기 가이드브라켓과 걸이형 브라켓 사이에 인장재를 정착시킨 후, 상기 인장재를 긴장시킴으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없을 뿐만 아니라 도심지의 협소한 공간에서도 안전하게 터파기 작업을 저비용으로 수월하게 할 수 있도록 한 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법에 관한 것이다.The present invention relates to a thumb pile using a guide bracket and a hanging bracket and a method of constructing a temporary earth retaining facility using the same. In particular, a guide bracket is installed in the middle of the rear side of the pile, and a hanging bracket is installed at the lower end of the pile, By fixing the tension member between the guide bracket and the hanging bracket and then tensioning the tension member, not only is there no risk of the pile falling or collapsing into the excavation space without installing a separate support material on the excavation side, but also the This is about thumb piles using guide brackets and hanging brackets that enable excavation work to be done safely and easily even in small spaces at low cost, and a method of constructing temporary earth retaining facilities using the same.
지하구조물의 시공을 위하여, 작업영역을 둘러 흙막이 구조물을 설치하는데, 이는 엄지말뚝 토류벽, 다이아프램월, 시트파일, C.I.P. 등 다양한 공법이 적용되고 있다.For the construction of underground structures, earth retaining structures are installed surrounding the work area, which include thumb pile earth walls, diaphragm walls, sheet piles, and C.I.P. Various construction methods are being applied.
이와 같은 종래의 흙막이 공법은 다음과 같은 문제점이 있다.This conventional earth retaining method has the following problems.
터파기 공사를 수행하는 경우, 흙막이 벽체만으로는 배후토사의 토압에 저항할 수 없으므로, 이를 보강하기 위하여 많은 수의 지보재(Strut, Earth Anchor, Raker 등)를 사용해야 한다.When carrying out excavation work, a retaining wall alone cannot resist the earth pressure of the background soil, so a large number of support materials (Strut, Earth Anchor, Raker, etc.) must be used to reinforce it.
그런데 상기한 어스 앵커공법은 인접부지를 10M 이상 근입하여 어스앵커를 정착하지만 인접부지의 이용이 제한될 경우에는 굴착고 약 2.5m 마다 스트러트 또는 레이커 방식을 적용할 수밖에 없어 경제성 및 공사 여건상 크게 불리한 문제가 있다.However, the above-mentioned earth anchor method involves planting an earth anchor by digging into the adjacent site more than 10m, but when the use of the adjacent site is restricted, the strut or raker method has no choice but to be applied every 2.5m of excavation height, which is greatly disadvantageous in terms of economic feasibility and construction conditions. there is a problem.
또한, 버팀보 및 앵커홀을 이용한 종래의 공법은 버팀보를 터파기 수직방향으로 2∼3m 간격으로 촘촘하게 설치함으로써 작업공간이 협소하여 중장비 사용에 불편함을 초래하고, 또한 앵커를 활용할 경우에는 도심지 굴착에서 사유지 침범 및 기존 구조물 파손과 인근 지하수가 유입되어 공사에 상당한 어려움을 초래하는 문제가 있다.In addition, the conventional method using braces and anchor holes tightly installs braces at intervals of 2 to 3 m in the vertical direction of the excavation, which narrows the work space and causes inconvenience in the use of heavy equipment. In addition, when anchors are used, it is difficult to use heavy equipment in urban excavations. There are problems causing significant difficulties in construction due to invasion of private land, damage to existing structures, and inflow of nearby groundwater.
이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로, 말뚝의 배면측 중간부에 가이드브라켓을 설치하고, 상기 말뚝의 하단부에 걸이형 브라켓을 설치하며, 상기 가이드브라켓과 걸이형 브라켓 사이에 인장재를 정착시킨 후, 상기 인장재를 긴장시킴으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없고, 도심지의 협소한 공간에서도 말뚝의 배면측 지반부지의 광협에 관계없을 뿐만 아니라 굴착을 실시하기 전후에 관계없이 흙막이 가시설을 구축하도록 한 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법을 제공하는데 그 목적이 있다.Accordingly, the present invention was developed to solve the problems described above. A guide bracket is installed in the middle of the rear side of the pile, a hanging bracket is installed at the lower end of the pile, and the guide bracket and the hanging type are installed. By fixing the tension member between the brackets and then tensioning the tension member, there is no risk of the pile falling or collapsing into the excavation space even without installing a separate support material on the excavation side, and the back of the pile is maintained even in narrow spaces in urban areas. The purpose is to provide thumb piles using guide brackets and hanging brackets and a method of constructing temporary earth retaining facilities using the same, which allows construction of temporary earth retaining facilities regardless of the narrowness of the side ground site as well as before and after excavation.
상기한 목적을 달성하기 위한 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝은 소정의 형상으로 이루어진 말뚝과; 상기 말뚝의 일측 중간부에 결합되는 가이드브라켓과; 상기 말뚝의 일측 하단부에 결합되는 걸이형 브라켓과; 상기 걸이형 브라켓에 일단이 고정되고, 타단이 가이드브라켓을 통과하여 연장되는 인장재로 구성됨을 특징으로 한다.A thumb pile using a guide bracket and a hanging bracket according to the present invention to achieve the above object includes a pile having a predetermined shape; A guide bracket coupled to the middle portion of one side of the pile; A hanging bracket coupled to the lower end of one side of the pile; It is characterized by being composed of a tension member whose one end is fixed to the hanging bracket and whose other end extends through the guide bracket.
또한, 상기한 목적을 달성하기 위한 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법은 지반을 일정한 간격을 두고, 소정의 직경 및 깊이로 굴착하여 천공홀을 형성하는 단계; 상기 천공홀에 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 굴착 배면측을 향하도록 한 상태로 근입하는 단계; 상기 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝에 설치된 인장재를 소정의 힘으로 긴장하는 단계로 이루어짐을 특징으로 한다.In addition, the method of constructing temporary earth retaining facilities using thumb piles using guide brackets and hanging brackets according to the present invention to achieve the above object involves excavating the ground at regular intervals and excavating to a predetermined diameter and depth to form a drilling hole. step; Inserting a thumb pile using a guide bracket and a hanging bracket into the drilling hole with the thumb pile facing the back of the excavation; It is characterized by tensioning the tension member installed on the thumb pile using the guide bracket and hanging bracket with a predetermined force.
이상에서 설명한 바와 같이, 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝 및 이를 이용한 흙막이 가시설 시공방법은 다음과 같은 효과가 있다.As described above, the thumb pile using a guide bracket and a hanging bracket according to the present invention and the temporary earth retaining facility construction method using the same have the following effects.
첫째, 본 발명은 말뚝의 일측 중간부에 가이드브라켓를 설치하고, 상기 말뚝의 일측 하단부에 걸이형 브라켓을 설치하며, 상기 가이드브라켓과 걸이형 브라켓에 인장재를 정착시킨 후, 상기 인장재를 긴장시킴으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없는 이점이 있다.First, the present invention installs a guide bracket in the middle part of one side of the pile, installs a hanging bracket in the lower part of one side of the pile, fixes the tension member to the guide bracket and the hanging bracket, and then tensions the tension member, There is an advantage in that there is no risk of the pile falling or collapsing into the excavation space without installing a separate support material on the excavation side.
둘째, 본 발명은 도심지의 협소한 공간에서도 말뚝의 배면측 지반부지의 광협에 관계없을 뿐만 아니라 굴착을 실시하기 전후에 관계없이 흙막이 가시설을 구축할 수 있는 효과가 있다.Second, the present invention has the effect of constructing a temporary earth retaining facility regardless of the narrowness of the ground site on the back side of the pile even in a narrow space in the city center, regardless of before or after excavation.
셋째, 본 발명은 터파기측에 지보재나 띠장 등의 설치를 최소화할 수 있으므로 작업공간의 확보가 용이할 뿐만 아니라 작업성이 향상되는 이점이 있다.Third, the present invention has the advantage of minimizing the installation of support materials or strips on the excavation side, which not only makes it easier to secure work space but also improves workability.
도 1은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 사시도,
도 2는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 정면도,
도 3은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 평면도,
도 4는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 단면도,
도 5는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 분해 사시도,
도 6은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 가이드브라켓을 도시한 사시도,
도 7은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 가이드브라켓을 도시한 정면도,
도 8은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 가이드브라켓을 도시한 평면도,
도 9는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 가이드브라켓을 도시한 측면도,
도 10은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 걸이형 브라켓을 도시한 사시도,
도 11은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 걸이형 브라켓을 도시한 정면도,
도 12는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 걸이형 브라켓을 도시한 평면도,
도 13은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝의 걸이형 브라켓을 도시한 측면도,
도 14는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용하여 흙막이 가시설을 시공하는 상태를 도시한 시공도.Figure 1 is a perspective view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 2 is a front view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 3 is a plan view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 4 is a cross-sectional view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 5 is an exploded perspective view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 6 is a perspective view showing a guide bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 7 is a front view showing a guide bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 8 is a plan view showing a guide bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 9 is a side view showing a guide bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 10 is a perspective view showing a hanging bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 11 is a front view showing a hanging bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 12 is a plan view showing a hanging bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 13 is a side view showing a hanging bracket for a thumb pile using a guide bracket and a hanging bracket according to the present invention;
Figure 14 is a construction diagram showing the state of constructing a temporary earth retaining facility using thumb piles using a guide bracket and a hanging bracket according to the present invention.
이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the attached illustration drawings.
[가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝][Thumb stake using guide bracket and hanging bracket]
도 1은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 사시도이고, 도 2는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 정면도이며, 도 3은 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 평면도이며, 도 4는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 단면도, 도 5는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 분해 사시도이다.Figure 1 is a perspective view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention, Figure 2 is a front view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention, and Figure 3 is a view showing the thumb pile using a guide bracket and a hanging bracket according to the present invention. It is a plan view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention, Figure 4 is a cross-sectional view showing a thumb pile using a guide bracket and a hanging bracket according to the present invention, and Figure 5 is a guide bracket according to the present invention. This is an exploded perspective view showing a thumb pile using a and hanging bracket.
이들 도면에 도시된 바와 같이, 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)은 소정의 형상으로 이루어진 말뚝(100)과; 상기 말뚝(100)의 일측 중간부에 결합되는 가이드브라켓(200)과; 상기 말뚝(100)의 일측 하단부에 결합되는 걸이형 브라켓(300)과; 상기 걸이형 브라켓(300)에 일단이 고정되고, 타단이 가이드브라켓(200)을 통과하여 인장되는 인장재(400)로 구성된다.As shown in these drawings, the thumb pile (P) using a guide bracket and a hanging bracket according to the present invention includes a pile (100) having a predetermined shape; A
즉, 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)은 말뚝(100)과 가이드브라켓(200)과 걸이형 브라켓(300) 및 인장재(400)가 유기적으로 결합되어 이루어진 구조체이다.That is, the thumb pile (P) using a guide bracket and a hanging bracket according to the present invention is a structure formed by organically combining a pile (100), a guide bracket (200), a hanging bracket (300), and a tension member (400). .
여기서, 상기 말뚝(100)은 형강, H형강, I형강, ㄷ형강, ㄱ형강, 강관, 중공관, 원형강관, 사각각관, 형강 중의 어느 하나로 구성된다.Here, the
특히, 상기 형강은 H형, L형 등 일정한 단면 모양으로 미리 성형된 긴 강철의 총칭으로, 주로 토목, 건축용 기둥이나 들보, 기초 말뚝과 기계 제품 등에 사용되며, 단면의 형태에 따라 다양한 형강이 있고, 역학적 합리성과 사용 목적에 따라 가려 쓴다.In particular, the section steel is a general term for long steel pre-formed into a certain cross-sectional shape such as H-type or L-type. It is mainly used in civil engineering, architectural columns or beams, foundation piles and mechanical products, etc. There are various section steels depending on the shape of the cross section. , it is used according to epidemiological rationality and purpose of use.
또한, 상기 H형강은 건축물, 선박 등의 대형 구조물의 골조나 토목공사에 널리 사용되는 단면이 H형인 형강으로 열간압연에 의해서 만들어진다.In addition, the H-beam steel is a section steel with an H-shaped cross section that is widely used in the framing of large structures such as buildings and ships or in civil engineering work, and is made by hot rolling.
여기서, 상기 H형강 중앙의 가로봉에 해당하는 부분을 웨브, 양쪽의 세로봉에 해당하는 부분을 상, 하부플랜지라고 하고, 상기 상, 하부플랜지가 300mm 이하인 것을 주니어 사이즈, 300mm 이상인 것을 시니어 사이즈라고 한다.Here, the part corresponding to the horizontal bar in the center of the H-beam is called the web, and the parts corresponding to the vertical bars on both sides are called the upper and lower flanges. The upper and lower flanges of 300 mm or less are called junior size, and those of 300 mm or more are called senior size. .
그리고, 상기 H형강과 비슷한 단면의 I형강이 있는데, H형강에서는 상, 하부플랜지의 두께가 끝부분까지 일정한 점, 상, 하부플랜지 끝부분이 둥그스름하지 않은 점, I빔에서는 너비가 높이보다 작으나 H형강에서는 너비가 높이와 같은 치수인 것도 있다는 점 등이 다르다.In addition, there is an I-beam with a cross section similar to the H-beam. In the H-beam, the thickness of the upper and lower flanges is constant all the way to the end, the ends of the upper and lower flanges are not rounded, and in the I-beam, the width is smaller than the height. The difference in H-beam steel is that the width is the same as the height.
너비가 넓은 것은 와이드 플랜지 H형강이라 하는데, 전체적으로 단면이 정사각형 모양으로 건물의 기둥으로 사용하기 쉽다.The wider one is called wide flange H-beam steel, and its overall cross-section is square, making it easy to use as a building pillar.
규격은 KS D 3503에, 모양, 치수는 KS D 3051에 규정되어 있다.The specifications are specified in KS D 3503, and the shape and dimensions are specified in KS D 3051.
한편, 강관은 철과 탄소의 합금으로 만들어진 건축자재로서, 단면이 원형관 또는 각형관의 중공인 것을 의미하며, 필요에 따라 사각관 및 다양한 형상의 관을 사용할 수도 있음을 밝혀둔다.Meanwhile, a steel pipe is a construction material made of an alloy of iron and carbon, meaning that the cross section is a circular pipe or a hollow rectangular pipe. It should be noted that square pipes and pipes of various shapes can be used as needed.
특히, 원형관을 사각관 및 폐곡관 등의 다양한 관으로 전용하여 사용함에 있어서 특별한 기술적 사항을 요구하지 않음을 밝혀둔다.In particular, it should be noted that no special technical requirements are required when using a circular pipe as a variety of pipes such as square pipes and closed bend pipes.
또한, 상기 가이드브라켓(200)은 도 6 내지 도 9에 도시된 바와 같이, 일정한 거리를 두고, 상하로 배치되는 상, 하부수평판(210, 220)과 상기 상부수평판(210)과 하부수평판(220) 사이에 배치되는 수직판(230); 상기 수직판(230)에 고정 설치되는 반원형 고정풀리(240)와; 상기 수직판(230)으로부터 일정거리 이격된 상태로 고정 설치되는 걸림판(250)으로 구성된다.In addition, as shown in FIGS. 6 to 9, the
즉, 상기 가이드브라켓(200)은 다수개의 강판(210, 220, 230, 250)을 종횡으로 용접하여 브라켓을 형성하고, 상기 브라켓의 수직판(230) 상에 반원형 고정풀리(240)가 설치된다.That is, the
여기서, 상기 가이드브라켓(200)에는 걸이형 브라켓(300)에 설치된 인장재(400)를 삽입 관통하기 위한 걸림홈이 걸림판(250)에 형성되고, 상기 걸림홈에 통과된 인장재(320)는 반원형 고정풀리(240)에 걸려서 반원형 고정풀리(250)에 의해 각도가 변경되어 말뚝(100)의 중간부를 향해 수평으로 연장된다.Here, the
그리고, 상기 걸이형 브라켓(300)은 도 10 내지 도 13에 도시된 바와 같이, 일정한 두께 및 폭을 갖는 사각형상으로 이루어진 수직판(310)과; 상기 수직판(310)의 단부로부터 직각으로 꺾여 형성되는 수평판(320)과; 상기 수평판(320)의 단부로부터 직각으로 꺾여 형성되는 걸이판(330)과; 상기 수직판(310)과 수평판(320) 간에 경사지게 배치되며, 삼각형상으로 이루어진 경사판(340)과; 상기 수평판(320)에 일정한 직경을 갖도록 다수개가 천공 형성된 정착공(350)으로 구성된다.And, as shown in FIGS. 10 to 13, the hanging
여기서, 상기 수직판(310)과 수평판(320) 및 경사판(340)의 형상을 각각 다르게 한 이유는 정착공(350)에 설치되는 인장재(400)의 긴장에 따른 걸이형 브라켓(200)의 변형을 방지하고, 강재량을 감소시키기 위함이다.Here, the reason why the shapes of the
즉, 상기 걸이형 브라켓(300)은 수직판(310), 수평판(320), 경사판(340) 및 정착공(350)이 유기적으로 결합된 부재이다.That is, the hanging
여기서, 상기 수평판(320)은 수직판(310)과 경사판(340)에 비하여 두께가 더 두껍게 형성된다.Here, the
이와 같이 수평판(320)을 더 두껍게 형성한 이유는 걸이형 브라켓(300)의 정착공(350)에 설치되는 인장재(400)를 효율적으로 긴장하기 위해 두께를 다르게 형성하고, 상기 수직판(310)과 경사판(340)은 두께가 동일하게 형성된다.The reason why the
한편, 상기 경사판(340)은 수직판(310)에 부착시 수직판(310)의 내측에는 복수의 큰 경사판(340)이 설치되고, 상기 큰 경사판(340)의 외측에 작은 경사판(340)이 설치된다.Meanwhile, when the
이와 같이 경사판(340)의 크기를 다르게 한 이유는 인장재(400) 긴장시 힘을 많이 받는 부분은 경사판(340)의 크기를 크게 하고, 힘을 적게 받는 부분은 경사판(340)의 크기를 작게 하여 불필요한 강재의 낭비를 방지하기 위함이다.The reason for changing the size of the
한편, 상기 걸이형 브라켓(300)은 상기 가이드브라켓(200)으로부터 하향 수직으로 일정거리 유지된 상태로 엄지말뚝(100)의 단부에 설치된다.Meanwhile, the hanging
여기서, 상기 걸이형 브라켓(200b)을 가이드브라켓(300)에 대향되는 위치인 엄지말뚝(100)의 최하단에 수직으로 설치하는 것이 구조적으로 유리하다.Here, it is structurally advantageous to install the hanging bracket 200b vertically at the lowermost end of the
또한, 상기 가이드브라켓(200)과 걸이형 브라켓(300) 사이에 전장이 너무 길어질 경우, 엄지말뚝(100)의 소정의 위치에 중간간격재를 설치할 수 있음을 밝혀둔다.In addition, it should be noted that if the overall length between the
한편, 상기 인장재(400)는 고강도 구조용 강봉 또는 강선으로 구성할 수도 있음을 밝혀둔다.Meanwhile, it should be noted that the
또한, 상기 인장재(400)는 말뚝(100)의 중간부에 설치된 가이드브라켓(200)과 말뚝(100)의 하단부에 설치된 걸이형 브라켓(200)에 고정 설치된다.In addition, the
상기한 바와 같은 구성으로 이루어진 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)은 말뚝(100)의 배면측 중간부에 가이드브라켓(200)을 설치하고, 말뚝(100)의 하단부에 걸이형 브라켓(300)을 설치하며, 상기 걸이형 브라켓(300)으로부터 가이드브라켓(200)을 향해 인장재(400)를 설치하여 정착시킨 후, 상기 인장재(400)를 소정의 힘으로 긴장시킴으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝(100)이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없을 뿐만 아니라 도심지의 협소한 공간에서도 안전하게 터파기 작업을 저비용으로 수월하게 할 수 있다.The thumb pile (P) using the guide bracket and hanging bracket according to the present invention configured as described above is installed with the guide bracket (200) in the middle of the rear side of the pile (100), and the lower end of the pile (100). A hanging
[흙막이 가시설 시공방법][Construction method for temporary earth retaining facilities]
도 14는 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 도시한 시공도이다.Figure 14 is a construction diagram showing a thumb pile using a guide bracket and a hanging bracket according to the present invention.
이 도면에 도시된 바와 같이, 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법은 지반(G)을 일정한 간격을 두고, 소정의 직경 및 깊이로 굴착하여 천공홀을 형성하는 단계; 상기 천공홀에 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)을 굴착배면측을 향하도록 한 상태로 근입하는 단계; 상기 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)에 설치된 인장재(400)를 소정의 힘으로 긴장하는 단계로 이루어진다.As shown in this drawing, the method of constructing temporary earth retaining facilities using thumb piles using guide brackets and hanging brackets according to the present invention involves excavating the ground (G) at regular intervals and excavating to a predetermined diameter and depth to create a drilling hole. forming step; Inserting a thumb pile (P) using a guide bracket and a hanging bracket into the drilling hole with it facing the back of the excavation; It consists of tensioning the
즉, 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법은 오거 등의 굴착기에 의해 지반(G)을 굴착하여 천공홀을 형성하고, 상기 천공홀에 소정의 형상으로 이루어진 말뚝(100)과; 상기 말뚝(100)의 중간부에 결합되는 가이드브라켓(200)과; 상기 말뚝(100)의 하단부에 결합되는 걸이형 브라켓(300)과; 상기 걸이형 브라켓(300)에 일단이 고정되고, 타단이 가이드브라켓(200)을 통과하여 연장되는 인장재(400)로 구성되고, 상기 말뚝(100)은 형강, 강관 중의 어느 하나로 구성되며, 상기 가이드브라켓(200)은 일정한 거리를 두고, 상하로 배치되는 상, 하부수평판(210, 220)과 상기 상부수평판(210)과 하부수평판(220) 사이에 배치되는 수직판(230); 상기 수직판(230)에 고정 설치되는 반원형 고정풀리(240)와; 상기 수직판(230)으로부터 일정거리 이격된 상태로 고정 설치되는 걸림판(250)으로 구성되며, 상기 걸림형 브라켓(300)은 일정한 두께 및 폭을 갖는 사각형상으로 이루어진 수평판(310)과; 상기 수평판(310)의 단부로부터 직각으로 꺾여 형성되며, 상부가 호형으로 형성되는 수직판(320)과; 상기 수평판(310)과 수직판(320) 간에 경사지게 배치되며, 삼각형상으로 이루어진 경사판(330)과; 상기 수직판(320)에 일정한 직경을 갖도록 다수개가 천공 형성된 정착공(340)으로 구성된 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)을 소정깊이까지 근입하여 구축한다.That is, the method of constructing temporary earth retaining facilities using thumb piles using guide brackets and hanging brackets according to the present invention involves excavating the ground (G) using an excavator such as an auger to form a drilling hole, and forming a hole in the drilling hole with a predetermined shape. consisting of a pile (100); A guide bracket 200 coupled to the middle portion of the pile 100; A hanging bracket 300 coupled to the lower end of the pile 100; It is composed of a tension member 400 whose one end is fixed to the hanging bracket 300 and the other end extends through the guide bracket 200, and the pile 100 is composed of either a section steel or a steel pipe, and the guide The bracket 200 includes upper and lower horizontal plates 210 and 220 arranged vertically at a certain distance, and a vertical plate 230 disposed between the upper and lower horizontal plates 210 and 220; a semicircular fixing pulley 240 fixed to the vertical plate 230; It consists of a locking plate 250 that is fixedly installed at a certain distance from the vertical plate 230, and the locking bracket 300 includes a horizontal plate 310 in a rectangular shape with a certain thickness and width; a vertical plate 320 formed by bending at a right angle from an end of the horizontal plate 310 and having an arc-shaped upper portion; an inclined plate 330 disposed inclined between the horizontal plate 310 and the vertical plate 320 and having a triangular shape; A thumb pile (P) using a guide bracket and a hanging bracket composed of a plurality of fixing holes 340 drilled to have a certain diameter is built into the vertical plate 320 to a predetermined depth.
이어서, 상기 가이드브라켓(200)과 걸이형 브라켓(300)에 설치된 인장재(400)를 긴장력을 도입한 상태에서 말뚝(100)의 정착구에 인장재(400)를 정착시킨다.Next, the
즉, 말뚝(100)의 하단부에 설치된 걸이형 브라켓(300)에 고정된 인정재(400)가 수직으로 긴장됨과 동시에 점차 상향으로 긴장력을 받고, 궁극적으로 상기 말뚝(100)의 중간부에 설치된 가이드브라켓(200)의 반원형 고정풀리(250)를 거치면 인장재(400)는 상기 반원형 고정풀리(400)에 의해서 수직에서 수평으로 인장재(400)의 방향이 전환된다.That is, the
상기한 바와 같이, 가이드브라켓(200)에 의해서 인장재(400)의 긴장방향이 수직에서 수평으로 전환된 상태에서 인장재(400)에 긴장력이 작용함으로써 말뚝(100)의 배면측의 지반(G) 부지의 광협에 관계없이 말뚝(100)에 수평력을 부여하여 말뚝(100)의 굴착영역으로 말뚝(100)의 쓰러짐을 방지할 수 있다.As described above, when the direction of tension of the
상기한 바와 같은 단계로 이루어진 본 발명에 따른 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법은 지반(G)을 천공하여 천공홀을 형성하고, 상기 천공홀에 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)을 근입하고, 상기 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)의 말뚝(100) 중간부와 하단부에 각각 설치된 가이드브라켓(200)과 걸이형 브라켓(300)에 고정 설치된 인장재(400))에 일정한 긴장력으로 긴장함으로써, 터파기 측에 별도의 지보재를 설치하지 않아도 말뚝(100)이 터파기 공간으로 넘어지거나 붕괴되는 등의 우려가 없을 뿐만 아니라 도심지의 협소한 공간에서도 안전하게 터파기 작업을 저비용으로 수월하게 할 수 있다.The method of constructing temporary earth retaining facilities using thumb piles using guide brackets and hanging brackets according to the present invention, which consists of the steps described above, involves drilling the ground (G) to form a hole, and forming a hole in the hole with a guide bracket and a hanging type. A thumb pile (P) using a bracket is inserted, and a guide bracket (200) and a hanging bracket (300) are installed at the middle and lower portions of the pile (100) of the thumb pile (P) using the guide bracket and hanging bracket, respectively. By tensioning the tension member (400) fixedly installed at a certain tension level, not only is there no risk of the pile (100) falling or collapsing into the excavation space even without installing a separate support material on the excavation side, but it can also be used in narrow spaces in urban areas. Excavation work can be done easily and safely in a space at low cost.
또한, 그리고, 터파기측에 지보재나 띠장 등의 설치를 최소화할 수 있으므로 작업공간의 확보가 용이할 뿐만 아니라 작업성이 향상되는 작용효과가 있다.In addition, since the installation of support materials or strips on the excavation side can be minimized, it is not only easy to secure work space but also has the effect of improving workability.
본 발명의 상세한 설명에 기재한 바람직한 실시예는 예시적인 것으로서 한정적인 것은 아니며, 본 발명의 범위는 첨부된 특허청구범위에 의해서 나타나 있고, 그들 특허청구범위의 의미중에 들어가는 모든 변형예는 본 발명에 포함되는 것이다.The preferred embodiments described in the detailed description of the present invention are illustrative and not limiting, and the scope of the present invention is indicated by the appended claims, and all modifications that fall within the meaning of the claims are included in the present invention. It is included.
100: 말뚝 120: 웨브
130: 플랜지 200: 가이드브라켓
210: 상부판 220: 하부판
230: 수직판 240: 반원형 고정풀리
250: 걸림판 300: 걸이형 브라켓
310: 수평판 320: 수직판
330: 경사판 340: 정착공
400: 인장재
G: 지반
P: 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝100: pile 120: web
130: Flange 200: Guide bracket
210: upper plate 220: lower plate
230: Vertical plate 240: Semicircular fixed pulley
250: hanging plate 300: hanging bracket
310: horizontal plate 320: vertical plate
330: Inclined plate 340: Fixing hole
400: Tension member
G: ground
P: Thumb pile using guide bracket and hanging bracket
Claims (9)
지반(G)을 일정한 간격을 두고, 소정의 직경 및 깊이로 굴착기에 의해 굴착하여 천공홀을 형성하는 단계; 상기 천공홀에 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)을 굴착배면측을 향하도록 한 상태로 근입하는 단계; 상기 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝(P)에 설치된 인장재(400)를 소정의 힘으로 긴장하는 단계로 이루어짐으로써, 말뚝(100)이 터파기 공간으로 넘어지거나 붕괴되는 우려가 없을 뿐만 아니라 도심지의 협소한 공간에서도 안전하게 터파기 작업을 저비용으로 수월하게 할 수 있도록 구성함을 특징으로 하는 가이드브라켓과 걸이형 브라켓을 이용한 엄지말뚝을 이용한 흙막이 가시설 시공방법.
A pile (100) made of a predetermined shape; A guide bracket 200 coupled to the middle portion of the pile 100; A hanging bracket 300 coupled to the lower part of the pile 100; It consists of a tension member 400 whose one end is fixed to the hanging bracket 300 and the other end extends through the guide bracket 200, and the pile 100 is made of section steel, and the guide bracket 200 is a vertical plate 230 disposed between the upper and lower horizontal plates 210 and 220 and the upper and lower horizontal plates 210 and 220 at a certain distance from each other; a semicircular fixing pulley 240 fixed to the vertical plate 230; It consists of a locking plate 250 that is fixedly installed at a certain distance from the vertical plate 230, and the guide bracket 200 has a hook for inserting and penetrating the tension member 400 installed on the hanging bracket 300. A groove is formed in the locking plate 250, and the tension member 320 passing through the locking groove is caught on the semicircular fixing pulley 240 and the angle is changed by the semicircular fixing pulley 250 to move toward the middle of the pile 100. It extends horizontally, and the hanging bracket 300 includes a horizontal plate 310 formed in a rectangular shape with a certain thickness and width; a vertical plate 320 formed by bending at a right angle from an end of the horizontal plate 310 and having an arc-shaped upper portion; an inclined plate 330 disposed inclined between the horizontal plate 310 and the vertical plate 320 and having a triangular shape; It is composed of a plurality of fixing holes 340 drilled to have a certain diameter in the vertical plate 320, and the tension member 400 is composed of a high-strength structural steel bar or steel wire, and is installed at the lower end of the pile 100. The tension member 400 fixed to the bracket 300 is tensioned vertically and simultaneously receives a tension force upward, and when passed through the semicircular fixing pulley 250 of the guide bracket 200 installed in the middle of the pile 100, the tension member ( 400) is a temporary earth retaining facility construction method using thumb piles using a guide bracket and a hanging bracket in which the direction of the tension member 400 is changed from vertical to horizontal by the semicircular fixing pulley,
forming a drill hole by excavating the ground (G) at regular intervals with an excavator to a predetermined diameter and depth; Inserting a thumb pile (P) using a guide bracket and a hanging bracket into the drilling hole with it facing the back of the excavation; By tensioning the tension member 400 installed on the thumb pile P using the guide bracket and the hanging bracket with a predetermined force, there is no risk of the pile 100 falling or collapsing into the excavation space. A temporary earth retaining facility construction method using thumb piles using guide brackets and hanging brackets, characterized in that it allows excavation work to be done safely and easily at low cost even in narrow spaces in urban areas.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220155207A KR102587630B1 (en) | 2022-11-18 | 2022-11-18 | Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220155207A KR102587630B1 (en) | 2022-11-18 | 2022-11-18 | Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20230030561A KR20230030561A (en) | 2023-03-06 |
KR102587630B1 true KR102587630B1 (en) | 2023-10-10 |
Family
ID=85509747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020220155207A KR102587630B1 (en) | 2022-11-18 | 2022-11-18 | Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102587630B1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101949086B1 (en) * | 2018-06-26 | 2019-02-15 | 백진명 | Self reliance pile and Self reliance retaining wall construction method using the same |
KR102162467B1 (en) * | 2019-12-26 | 2020-10-06 | (주)토네이도건설 | Thrust pile with prestress and self-supporting type pile construction using it |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101498711B1 (en) | 2013-09-09 | 2015-03-05 | 이대동 | Soil retaining wall and construction method thereof |
KR20150088406A (en) * | 2014-01-24 | 2015-08-03 | (주)정건설 | Soil guard structure and construction method thereof |
KR102312008B1 (en) * | 2019-08-02 | 2021-10-12 | 백진명 | Two Rows type Self reliance retaining wall construction method Using the Prestressed pile |
-
2022
- 2022-11-18 KR KR1020220155207A patent/KR102587630B1/en active IP Right Grant
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101949086B1 (en) * | 2018-06-26 | 2019-02-15 | 백진명 | Self reliance pile and Self reliance retaining wall construction method using the same |
KR102162467B1 (en) * | 2019-12-26 | 2020-10-06 | (주)토네이도건설 | Thrust pile with prestress and self-supporting type pile construction using it |
Also Published As
Publication number | Publication date |
---|---|
KR20230030561A (en) | 2023-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102393645B1 (en) | Thrust pile with prestress and self-supporting type pile construction using it | |
KR20190036591A (en) | Thrust pile with prestress and self-supporting type pile construction using it | |
KR102162467B1 (en) | Thrust pile with prestress and self-supporting type pile construction using it | |
KR101974110B1 (en) | Prestressed steel pipe pile and self-supporting type pile construction | |
KR20080005109A (en) | Structure for supporting retaining wall of earth with arch material and method constructing the arch structure | |
KR100642341B1 (en) | A pile for retaining wall | |
KR100831332B1 (en) | Underground retaining wall for public works and method for constructing the same | |
KR102637150B1 (en) | Thumb pile using guide bracket and support bracket and construction method for retaining temporary facility using the same | |
KR20230130783A (en) | Self-supporting retaining structure and its construction method | |
KR102626433B1 (en) | Temporary earth retaining facility using guide bracket and ground anchor and its construction method | |
KR102555541B1 (en) | Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method | |
KR20230030532A (en) | Thumb pile using guide bracket and ground anchor and construction method of retaining temporary facility using the same | |
KR102587630B1 (en) | Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same | |
KR102558051B1 (en) | Thumb piles introduced with inclined and crossed prestress and construction method for self-supporting temporary retaining using the same | |
KR102626432B1 (en) | Temporary retaining facility using guide bracket and ground anchor for step-by-step support of deep excavation and its construction method | |
KR102617795B1 (en) | Retaining wall system combine H-piles with steel reinforcement structure | |
KR102587627B1 (en) | Thumb pile using upper cap-type guide bracket and ground anchor and method of constructing temporary retaining facility using the same | |
KR102626431B1 (en) | Thumb pile using guide bracket and bottom part of drilling diameter ground anchor and construction method for retaining temporary facility using the same | |
KR102610817B1 (en) | Temporary earth retaining facility using guide bracket and ground anchor and its construction method | |
KR20240047107A (en) | Thumb pile using guide bracket and hanging bracket and construction method for retaining temporary facility using the same | |
KR102382845B1 (en) | Thrust pile with prestress and self-supporting type pile construction using it | |
KR20230032050A (en) | Grouting at the bottom of the drilling hole, a fixed prestressed thumb pile for displacement suppression and a self-supporting temporary retainer construction method using the same | |
KR20240047110A (en) | Thumb pile using the smallest guide bracket and ground anchor and construction method for retaining temporary facilities using the same | |
KR102195496B1 (en) | Pile for earth self-retaining wall using cast in place concrete pile with double I beam | |
KR20210098162A (en) | Under ground structure using column steel pipe wall and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
G15R | Request for early publication | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |