KR101645520B1 - Firefighter supply and drainage apparatus in the House of Commons - Google Patents

Firefighter supply and drainage apparatus in the House of Commons Download PDF

Info

Publication number
KR101645520B1
KR101645520B1 KR1020160038539A KR20160038539A KR101645520B1 KR 101645520 B1 KR101645520 B1 KR 101645520B1 KR 1020160038539 A KR1020160038539 A KR 1020160038539A KR 20160038539 A KR20160038539 A KR 20160038539A KR 101645520 B1 KR101645520 B1 KR 101645520B1
Authority
KR
South Korea
Prior art keywords
water
buffer
sprinkler
pipe
connection
Prior art date
Application number
KR1020160038539A
Other languages
Korean (ko)
Inventor
허만일
Original Assignee
(주)한국전설엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한국전설엔지니어링 filed Critical (주)한국전설엔지니어링
Priority to KR1020160038539A priority Critical patent/KR101645520B1/en
Application granted granted Critical
Publication of KR101645520B1 publication Critical patent/KR101645520B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C35/00Permanently-installed equipment
    • A62C35/58Pipe-line systems
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C35/00Permanently-installed equipment
    • A62C35/58Pipe-line systems
    • A62C35/64Pipe-line systems pressurised
    • AHUMAN NECESSITIES
    • A62LIFE-SAVING; FIRE-FIGHTING
    • A62CFIRE-FIGHTING
    • A62C35/00Permanently-installed equipment
    • A62C35/58Pipe-line systems
    • A62C35/68Details, e.g. of pipes or valve systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K15/00Check valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L17/00Joints with packing adapted to sealing by fluid pressure
    • F16L17/02Joints with packing adapted to sealing by fluid pressure with sealing rings arranged between outer surface of pipe and inner surface of sleeve or socket
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/04Devices damping pulsations or vibrations in fluids
    • F16L55/045Devices damping pulsations or vibrations in fluids specially adapted to prevent or minimise the effects of water hammer

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The present invention relates to a firefighting water supply apparatus for an apartment house, which prevents the incorrect operation of a sprinkler caused by water hammering by installing a unit for reducing water hammering in a pipe between a firefighting pipe where firefighting water is supplied and the sprinkler in a household, and enables easy, rapid, and accurate inspection by improving the structure of an inspection window.

Description

공동주택의 소방수 급배수 장치{Firefighter supply and drainage apparatus in the House of Commons}BACKGROUND OF THE INVENTION Field of the Invention [0001] The present invention relates to a fire-

본 발명은 소방 기술 분야 중 공동주택의 소방수 급배수 장치에 관한 것으로, 보다 상세하게는 소방수 공급라인에서 펌프 급가동시 발생되는 수충격(Water Hammer)을 완화시켜 스프링클러의 오작동을 방지하고 위급상황시 정확한 소화기능을 달성할 수 있도록 개선된 공동주택의 소방수 급배수 장치에 관한 것이다.The present invention relates to a fire-fighting water supply and drainage system for a residential house in a fire-fighting technology field, and more particularly, to a fire-fighting water supply and drainage system for a fire-fighting water supply system that prevents a malfunction of a sprinkler by mitigating a water hammer, The present invention relates to an improved fire-fighting water supply and drainage system for a multi-family house.

일반적으로, 많은 가구가 밀집되어 생활하는 공동주택 및 아파트의 급수방식은 수돗물이나 지하수를 고층 옥상에 있는 물탱크로 올려 보낸 후 저장하고, 각 가구로 내려보내어 사용하도록 되어있다.Generally, the watering system of apartment houses and apartments where many households are concentrated is to send tap water or ground water to a water tank on a high-rise roof, store it, and send it down to each furniture.

이때, 보통은 동일 물탱크를 이용하여 가구내 스프링클러 설비와 연결시켜 소화수를 공급할 수 있도록 구성된다.At this time, usually, the same water tank is used to connect the sprinkler equipment in the furniture to supply the fire water.

그런데, 이 경우에는 수압이 떨어지기 때문에 위급시 효과적인 소화기능을 수행하지 못하는 경우가 발생되어 도 1의 예시와 같이, 급수펌프(6)를 직렬로 여러대 조합하고, 각 급수펌프(6)에 대한 제어는 절전형 인버터(5)의 자동제어패널에서 연계동작을 이루면서 피드백 제어와 순차적인 시이퀀스제어를 진행시킴으로써 각각의 급수펌프(6)의 회전수 및 사용 급수펌프(6)의 댓수를 조절하도록 하며, 급수압력 및 급수량의 변화에 대응하기 위하여 인버터(5)에 의하여 급수펌프(6)의 댓수 및 급수펌프의 회전수를 제어하여 소방배관(4)을 통하여 각 가정으로 직접 물을 공급하도록 한 예가 있다.However, in this case, since the water pressure drops, an effective extinguishing function may not be performed when an emergency occurs. As shown in Fig. 1, several water feed pumps 6 are combined in series and each water feed pump 6 The control is performed by feedback control and sequential sequential control in the automatic control panel of the power saving inverter 5 so as to adjust the number of revolutions of the respective feed pumps 6 and the number of the feed pumps 6 In order to cope with the change of the water supply pressure and the water supply amount, the number of the water supply pump 6 and the number of rotation of the water supply pump are controlled by the inverter 5 so that water is directly supplied to each household through the fire pipeline 4 There is an example.

이 경우, 관리사무소 등에 설치된 중앙감시기(7)를 이용하여 인버터(5)를 제어하여 각 가정으로 공급되는 급수의 양을 제어할 수도 있는데, 이것은 기존처럼 물탱크(1)로부터 세대공급관(3)을 통해 세대로 공급하는 방식이 아니라, 저수조(2)에서 소방배관(4)을 통해 각 가정으로 직접 공급되는 직결식을 의미한다.In this case, it is possible to control the amount of water supplied to each household by controlling the inverter 5 by using the central monitor 7 installed in the management office. This can be controlled from the water tank 1 to the generation supply pipe 3, Not directly to the household through the fire pipe 2, but directly through the fire pipe 2 to the homes.

한편, 이러한 소방배관(4)에 하자가 발생한 경우에는 소방배관(4)에 채워진 소방수를 빼낸 후, 점검을 하여야 하므로 소방수를 배수하는데, 이 경우에 드레인 밸브(미도시)의 개폐에 의하여 소방배관의 소방수를 드레인 배관을 통하여 외부로 배수할 수 있도록 구성되어 있다.On the other hand, when defects are generated in the fire-fighting pipe 4, the fire-fighting water filled in the fire-fighting pipe 4 is taken out to be inspected and thus the fire-fighting water is discharged. In this case, by opening and closing a drain valve (not shown) So that the water can be drained to the outside through the drain pipe.

아울러, 드레인밸브 주변에는 소방수가 채워져 있는지를 가시적으로 확인할 수 있도록 점검창이 마련되어 있는데, 통상은 수압계 혹은 원형 투명창 형태로 작게 설계되어 있어 점검시 이를 확인하기도 어려울 뿐만 아니라, 형식적인 수준에 그치고 있어 위급시 소방수가 없을 경우 커다란 인명사고로 이어지게 된다.In addition, there is a check window around the drain valve to visually check whether the water is filled. Usually, it is designed to be small in the form of a hydraulic pressure gauge or a circular transparent window, which is not only difficult to check at the time of inspection, If there is no firefighter in case of emergency, it will lead to a big accident.

뿐만 아니라, 급수 여부를 확인하는 점검과정 혹은 급수펌프가 오동작하여 가동될 때 급수펌프는 맥동을 갖기 때문에 급가동시 연속적인 급수 흐름을 갖는 것이 아니라 펄스 형태로 퍽퍽하고 급수하기 때문에 이것은 수충격으로 변환되어 배관의 말단에서는 현저히 큰 수압을 작용시키게 되어 스프링클러 등이 오동작하거나 혹은 파손되는 문제를 초래하기도 한다.In addition, since the water pump has a pulsation when the water pump is operated by checking the water supply or the water pump is malfunctioning, it does not have a continuous water flow when the water pump is in operation, So that the water pressure at the end of the pipe is considerably large, which may cause malfunction or breakage of the sprinkler or the like.

대한민국 특허 등록번호 제10-0481091호(2005.03.25.) '공동주택의 급수시스템'Korea Patent Registration No. 10-0481091 (March 25, 2005) 'Water supply system of apartment house'

본 발명은 상술한 바와 같은 종래 기술상의 제반 문제점들을 감안하여 이를 해결하고자 창출된 것으로, 소방수가 공급되는 소방배관과 세대내 스프링클러 사이의 배관 상에 수충격을 완화시킬 수 있는 유닛을 설치하여 수충격에 따른 스프링클러의 오동작을 방지하고, 나아가 점검창 구조를 개량하여 쉽고 빠르면서 정확한 점검이 가능토록 한 공동주택의 소방수 급배수 장치를 제공함에 그 주된 목적이 있다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems in the prior art, and it is an object of the present invention to provide a fire extinguishing system capable of mitigating a water impact on a pipeline between a fire- The present invention has a main purpose of providing a fire-fighting water supply and drainage system of a multi-family house which can prevent malfunction of the sprinkler according to the present invention and further improve the structure of the inspection window to enable easy, quick and accurate inspection.

본 발명은 상기한 목적을 달성하기 위한 수단으로, 지상 또는 지하에 설치된 저수조로부터 급수펌프(100)를 통해 소화배관(200)을 타고 각 세내내 스프링클러(300)로 직접 공급되는 직수식 구조를 갖는 공동주택의 소방수 급배수 장치에 있어서;In order to achieve the above-mentioned object, the present invention provides a sprinkler system having a linear structure in which water is supplied from a water reservoir installed on the ground or underground to a sprinkler (300) through a water supply pump (100) In a fire-fighting water supply and drainage system of a multi-family house,

상기 소화배관(200)의 하단부에는 지면에서 확인할 수 있는 점검창(400)이 마련되고; An inspection window 400 is provided on the lower end of the digestion pipe 200,

상기 소화배관(200)에는 각 세대로 연결되는 다수의 스프링클러공급관(310)이 연결되며; A plurality of sprinkler supply pipes 310 connected to the respective generations are connected to the extinguishing pipe 200;

상기 스프링클러공급관(310)에는 길이방향으로 간격을 두고 다수의 스프링클러(300)가 설치되고;A plurality of sprinklers 300 are installed in the sprinkler supply pipe 310 at intervals in the longitudinal direction;

상기 스프링클러(300)가 설치된 지점 앞쪽의 상기 스프링클러공급관(310) 상에는 우회관(340)을 갖는 수충격완충기(320)를 설치하되, 상기 수충격완충기(320)는 일단에 확경된 접속플랜지(321)를 갖는 완충기접속관(322) 한 쌍을 포함하며, 상기 완충기접속관(322)의 타단 외주면 일부에는 일정반경을 갖는 우회관접속공(323)이 형성되고, 상기 우회관접속공(323)이 형성된 쪽 단부인 타단 외주면에는 일정 피치로 체결나사부(324)가 형성되어 스프링클러공급관(310)과 나사체결되며, 상기 접속플랜지(321)의 내부턱(325)에는 오링(326)이 안착되어 씰링 기능을 수행하고, 상기 접속플랜지(321) 속으로는 상기 오링(326)을 압착하면서 완충림돌출단(327)이 삽입되며, 상기 완충림돌출단(327)은 링형상의 완충림(328)의 양측면에서 일정길이 돌출되어 형성되고, 상기 완충림(328)의 내경 일부에서는 일체로 연결된 후 나선상으로 연장된 완충나선편(329)이 형성되며, 상기 완충나선편(329)의 단부에는 원판 형상의 충격흡수편(330)이 고정되고, 상기 완충림(328)의 둘레에는 90°간격을 두고 4개의 코일스프링(331)의 일단이 고정되며, 상기 코일스프링(331)의 타단은 상기 충격흡수편((330)의 둘레 일부에 각각 고정되고;A water shock cushion 320 having a right tube 340 is installed on the sprinkler supply pipe 310 in front of a point where the sprinkler 300 is installed and the water shock cushion 320 has a connection flange 321 A right tube connection hole 323 having a predetermined radius is formed in a part of the outer circumferential surface of the other end of the buffer connection tube 322 and the right tube connection hole 323 is formed in the right tube connection hole 323, And an O-ring 326 is seated in the inner flange 325 of the connection flange 321 and is fixed to the inner flange 325 of the connection flange 321. The O-ring 326 is fixed to the inner flange 325 of the connection flange 321, And a buffer rim protruding end 327 is inserted into the connection flange 321 while compressing the O-ring 326. The buffer rim protruding end 327 is inserted into the ring-shaped buffer rim 328, The protrusions 328 are formed to protrude by a predetermined length from both sides of the buffer rim 328, Shaped shock absorber 330 is fixed to the end of the buffer helix piece 329 and the buffer rim 328 is fixed to the end of the buffer helix piece 329, One end of the coil spring 331 is fixed at an interval of 90 degrees around the circumference of the coil spring 331 and the other end of the coil spring 331 is fixed to a part of the circumference of the shock absorbing piece 330;

상기 우회관접속공(323)에는 '∩' 형상의 우회관(340)이 연결되는데, 연결을 위해 양단에 상기 우회관(340)의 양단에는 후크형 접속부(342)가 마련되고, 링형 씰링재(344)의 개재하에 후크결합되는 형태로 상기 우회관접속공(323)에 커플링된되며, 상기 우회관(340)의 길이 중심에는 체크밸브(346)가 설치되어 역류를 방지한 것을 특징으로 하는 공동주택의 소방수 급배수 장치를 제공한다.Shaped connection pipe 342 is provided at both ends of the right-side pipe 340 at both ends to connect the right-side pipe 340 to the right-side pipe connection hole 323, and a ring- And a check valve (346) is installed at the center of the length of the right-side pipe (340) to prevent reverse flow. The check valve (346) is connected to the right-side pipe connecting hole Provides fire-fighting water supply and drainage system of apartment house.

본 발명에 따르면, 소방수가 공급되는 소방배관과 세대내 스프링클러 사이의 배관 상에 수충격을 완화시킬 수 있는 유닛을 설치하여 수충격에 따른 스프링클러의 오동작을 방지하고, 나아가 점검창 구조를 개량하여 쉽고 빠르면서 정확한 점검이 가능한 효과를 얻을 수 있다.According to the present invention, it is possible to prevent malfunction of the sprinkler caused by water impact by providing a unit for relieving the water impact on the piping between the fire-fighting pipe to which the fire-fighting water is supplied and the sprinkler in the household, It is possible to obtain a quick and accurate inspection effect.

도 1은 종래 기술에 따른 공동주택의 소방수 급배수 장치를 보인 개략적인 구성도이다.
도 2는 본 발명에 따른 공동주택의 소방수 급배수 장치를 구성하는 요부를 분리하여 보인 예시도이다.
도 3은 본 발명에 따른 공동주택의 소방수 급배수 장치를 구성하는 점검창의 예시도이다.
도 4는 본 발명에 따른 공동주택의 소방수 급배수 장치를 구성하는 급수펌프의 개량 구조를 보인 예시도이다.
1 is a schematic view showing a fire-fighting water supply and drainage system of a conventional apartment house.
FIG. 2 is an exemplary view showing a main part constituting a fire-fighting water drainage system of a multi-family house according to the present invention.
3 is an illustration of an inspection window constituting a fire-fighting water supply and drainage system of a multi-unit house according to the present invention.
4 is an exemplary view showing an improved structure of a water supply pump constituting a fire-fighting water supply and drainage system of a multi-unit house according to the present invention.

이하에서는, 첨부도면을 참고하여 본 발명에 따른 바람직한 실시예를 보다 상세하게 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명 설명에 앞서, 이하의 특정한 구조 내지 기능적 설명들은 단지 본 발명의 개념에 따른 실시예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 개념에 따른 실시예들은 다양한 형태로 실시될 수 있으며, 본 명세서에 설명된 실시예들에 한정되는 것으로 해석되어서는 아니된다.Before describing the present invention, the following specific structural or functional descriptions are merely illustrative for the purpose of describing an embodiment according to the concept of the present invention, and embodiments according to the concept of the present invention may be embodied in various forms, And should not be construed as limited to the embodiments described herein.

또한, 본 발명의 개념에 따른 실시예는 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있으므로, 특정 실시예들은 도면에 예시하고 본 명세서에 상세하게 설명하고자 한다. 그러나, 이는 본 발명의 개념에 따른 실시예들을 특정한 개시 형태에 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경물, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.In addition, since the embodiments according to the concept of the present invention can make various changes and have various forms, specific embodiments are illustrated in the drawings and described in detail herein. However, it should be understood that the embodiments according to the concept of the present invention are not intended to limit the present invention to specific modes of operation, but include all modifications, equivalents and alternatives falling within the spirit and scope of the present invention.

도 2에 도시된 바와 같이, 본 발명에 따른 공동주택의 소방수 급배수 장치는 기존 물탱크로부터 분배 공급되는 자연낙수식 구조가 아니라 지상 또는 지하에 설치된 저수조로부터 급수펌프(100)를 통해 소화배관(200)을 타고 각 세내내 스프링클러(300)로 직접 공급되는 직수식 혹은 직결식 구조를 갖는다.As shown in FIG. 2, the fire-fighting water supply and drainage system of the apartment house according to the present invention is not a natural drainage type structure that is distributed and supplied from existing water tanks, but a water storage tank installed in the ground or underground from the water storage tank 200 and directly supplied to the sprinkler 300 throughout each of the three years.

그리고, 상기 소화배관(200)의 하단부에는 지면에서 접근하기 쉬운 위치에 점검창(400)이 마련되고, 상기 점검창(400)은 급수 확인을 아주 쉽게 할 수 있도록 개량되는데 이에 관하여는 후술한다.An inspection window 400 is provided at a lower end portion of the fire extinguishing piping 200 so as to be easily accessible from the ground. The inspection window 400 is improved to facilitate confirmation of water supply, which will be described later.

아울러, 상기 소화배관(200)에는 각 세대로 연결되는 다수의 스프링클러공급관(310)이 연결되고, 상기 스프링클러공급관(310)에는 길이방향으로 간격을 두고 다수의 스프링클러(300)가 설치된다.In addition, a plurality of sprinkler supply pipes 310 connected to each generation is connected to the extinguishing pipe 200, and a plurality of sprinklers 300 are installed in the sprinkler supply pipe 310 at intervals in the longitudinal direction.

다만, 도 2에서는 하나만 예시적으로 도시하였다.However, only one example is shown in Fig.

그런데, 앞서 설명하였듯이 급수 여부를 확인하는 점검과정 혹은 급수펌프(100)가 오동작하여 가동될 때 스프링클러공급관(310)에서는 갑작스런 가동에 의해 정지수와 유동수 사이의 극심한 변동으로 스프링클러(300)의 오동작을 유발시킬 수 있다.However, as described above, when the water pump 100 is operated by mistake, or when the water pump 100 is operated by a malfunction, the sprinkler supply pipe 310 is suddenly operated to cause a malfunction of the sprinkler 300 due to extreme fluctuations between the stationary water and the flowing water. .

특히, 급수펌프(100)는 맥동을 갖기 때문에 급가동시 연속적인 급수 흐름을 갖는 것이 아니라 펄스 형태로 퍽퍽하고 급수하기 때문에 이것은 수충격으로 변환되어 배관의 말단에서는 현저히 큰 수압을 작용시키게 되어 스프링클러(300)의 오동작 뿐만 아니라 파손을 초래하기도 한다.Particularly, since the water supply pump 100 has pulsation, it does not have a continuous water supply flow at the time of rapid operation, but is pulsed and watered in a pulsed form, so that it is converted into a water impact and a significantly large water pressure is applied at the end of the pipe, 300) as well as malfunctions.

이에, 본 발명에서는 수충격완충기(320)를 설치하고, 상기 수충격완충기(320)를 사이에 두고 이를 우회하는 우회관(340)을 더 구비하여 충격을 완화시킬 수 있도록 구성되어 수충격, 즉 워터햄머 현상에 의한 스프링클러(300)의 파손을 미연에 방지할 수 있도록 구성된다.Accordingly, in the present invention, there is provided a water shock absorber 320, and further includes a water pipe 340 which bypasses the water shock absorber 320, So that the breakage of the sprinkler 300 by the water hammer phenomenon can be prevented in advance.

이를 위한 수충격완충기(320)는 일단에 확경된 접속플랜지(321)를 갖는 완충기접속관(322) 한 쌍을 포함한다.The water shock absorber 320 for this purpose includes a pair of shock absorber connecting pipes 322 having a connecting flange 321 which is enlarged at one end.

그리고, 상기 완충기접속관(322)의 타단 외주면 일부에는 일정반경을 갖는 우회관접속공(323)이 형성된다.A right-hand pipe connecting hole 323 having a certain radius is formed in a part of the outer circumferential surface of the other end of the buffer connecting pipe 322.

아울러, 상기 우회관접속공(323)이 형성된 쪽 단부인 타단 외주면에는 일정 피치로 체결나사부(324)가 형성되어 스프링클러공급관(310)과 나사체결된다.In addition, a fastening screw portion 324 is formed at an outer circumferential surface of the other end, which is an end portion on which the right-hand pipe connecting hole 323 is formed, at a predetermined pitch, and is screwed into the sprinkler supply pipe 310.

따라서, 상기 스프링클러공급관(310)은 상기 수충격완충기(320)를 설치하기 위해 일정길이별로 분절되어 형성되며, 상호 나사체결되어 배관 길이에 맞게 조립된다.Accordingly, the sprinkler supply pipe 310 is divided into a predetermined length for installing the water shock absorber 320, and the sprinkler supply pipe 310 is screwed together and assembled to fit the pipe length.

또한, 상기 접속플랜지(321)의 내부턱(325)에는 오링(326)이 안착되어 씰링 기능을 수행하며, 상기 접속플랜지(321) 속으로는 상기 오링(326)을 압착하면서 완충림돌출단(327)이 삽입된다.The O-ring 326 is seated on the inner flange 325 of the connection flange 321 to perform a sealing function. The O-ring 326 is compressed into the connection flange 321, 327 are inserted.

상기 완충림돌출단(327)은 대략 링형상의 완충림(328)의 양측면에서 일정길이 돌출되어 형성되는데, 그 형상은 도 2의 단면도와 같다.The buffer rim protruding end 327 is formed by protruding a predetermined length from both sides of the substantially ring-shaped buffer rim 328, and the shape thereof is the same as the sectional view of Fig.

다만, 설명을 위해 완충림돌출단(327)을 제외한 완충림(328) 부분만 따로 떼어 사시도 형태로 예시하였다.However, only the portion of the cushion rim 328 excluding the cushion rim protruding end 327 is separated and illustrated in a perspective view.

그리고, 상기 완충림(328)의 내경 일부에서는 일체로 연결된 후 나선상으로 연장된 완충나선편(329)이 형성되고, 상기 완충나선편(329)의 단부에는 원판 형상의 충격흡수편(330)이 고정된다.A shock absorbing piece 330 having a disk shape is attached to the end of the cushioning helix piece 329. The cushioning helix piece 329 is connected to the cushioning hemi- .

즉, 상기 완충나선편(329)은 대략 '나선형 모기향'과 같은 형상을 가지며, 상기 충격흡수편(330)은 수압을 받는 면적을 높이도록 구비된다.That is, the buffer helix piece 329 has a shape similar to a 'helical moxibustion shape', and the shock-absorbing piece 330 is provided so as to increase the area receiving the water pressure.

아울러, 상기 충격흡수편(330)이 수압을 받아 수압이 가해진 반대방향으로 돌출되면서 꼬깔 형상을 이룰 때 이를 다시 원래 위치로 복귀시킬 수 있도록 상기 완충림(328)의 둘레에는 90°간격을 두고 4개의 코일스프링(331)이 설치된다.In addition, when the shock absorbing piece 330 receives water pressure and protrudes in a direction opposite to the water pressure, the cushion rim 328 is spaced 90 ° apart from the circumference of the cushion rim 328, Coil springs 331 are provided.

이 코일스프링(331)은 상기 충격흡수편(330)의 홈포지션 복귀를 위한 탄성체로서, 일단은 상기 완충림(328)에 고정되고, 타단은 상기 충격흡수편((330)의 둘레 일부에 각각 고정된다.One end of the coil spring 331 is fixed to the cushion rim 328 and the other end of the coil spring 331 is fixed to a part of the circumference of the shock absorbing piece 330 .

이에 따라, 수충격이 발생되어 맥동에 따른 수압 변동이 극심하게 생기게 되어 그 파동이 전달될 때 상기 충격흡수편(330)에 집중적으로 가해지게 되며, 그 압에 의해 충격흡수편(330)은 수압이 가해진 반대방향으로 이동하면서 완충나선편(329)이 펼쳐지게 되는데, 대략 꼬깔 모양으로 펼쳐진다.As a result, a water impact is generated and the water pressure fluctuation due to the pulsation is extremely generated. When the shock is transmitted, the shock absorbing piece 330 is concentratedly applied to the shock absorbing piece 330, The buffer helix piece 329 is unfolded and spreads in a substantially cocoon shape.

이 과정에서 코일스프링(331)은 늘어나게 되므로 이 코일스프링(331)도 수압을 완충시키는 역할을 하게 된다.In this process, since the coil spring 331 is stretched, the coil spring 331 also serves to buffer the water pressure.

즉, 충격량은 어떤 시간내에서 운동량의 변화이므로 완충나선편(329)이 펼쳐지면서 운동량이 변하는 시간을 길게 하여 충격량이 작아지도록 하는 것이다.That is, since the amount of the impact is a change in the amount of momentum within a certain time, the amount of time required for the momentum to change while the buffer helix 329 is unfolded is made longer,

따라서, 맥동에 의한 수충격은 흡수되면서 작아지고, 이러한 것들이 여러 곳을 거치는 동안 완전히 흡수되게 되어 스프링클러(300)의 파손을 막을 수 있게 된다.Therefore, the water impact due to the pulsation becomes small as it is absorbed, and these are completely absorbed while passing through various places, so that breakage of the sprinkler 300 can be prevented.

여기에서, 충격흡수력을 더욱 더 증대시킬 수 있도록 상기 우회관접속공(323)에는 대략 '∩' 형상의 우회관(340)이 연결된다.Here, a substantially '∩' -shaped woofer tube 340 is connected to the right-hand pipe connecting hole 323 so as to further increase the shock absorbing force.

상기 우회관(340)은 연결을 위해 양단에 후크형 접속부(342)가 마련되고, 링형 씰링재(344)의 개재하에 후크결합되는 형태로 커플링된다.The right-side pipe 340 is coupled at its both ends with a hook-shaped connecting portion 342 and hooked under the ring-shaped sealing member 344.

뿐만 아니라, 상기 우회관(340)의 길이 중심에는 체크밸브(346)가 설치되어 역류를 방지한다.In addition, a check valve 346 is provided at the center of the length of the right tube 340 to prevent backflow.

그러면, 상기 완충나선편(329)이 펼쳐지는 동안 저항을 받은 물의 일부는 우회관(340)을 통해 우회되므로 그 만큼 시간차가 더 커져 완충효과가 급격히 향상되게 된다.Then, a part of the water having resistance during the spreading of the buffer helix piece 329 is detoured through the center tube 340, so that the time difference becomes larger as the buffer helix 329 is expanded, and the buffer effect is drastically improved.

덧붙여, 상기 스프링클러(300) 및 스프링클러공급관(310)의 외주면에는 화재시 난연성을 증대시켜 쉽게 녹지 않도록 난연액이 일정 두께로 코팅되는데, 상기 난연액은 폴리스티렌수지 100중량부에 대해 팽창흑연 12중량부; 지르코늄 4중량부; 백유(white spirit) 6중량부, 나프텐 증류액 5중량부, 지방산 그리시딜 에스테르(fatty acid glycidyl esters) 10중량부, 무수프탈산(phthalic anhydride) 5중량부; 아크릴모노머 10중량부; 규산나트륨 5중량부; 에틸트라이메틸벤조일페닐포스피네이트 3중량부로 조성된다.The flame-retardant solution is coated on the outer circumferential surface of the sprinkler 300 and the sprinkler supply pipe 310 to a certain thickness so as not to easily melt due to increased flame retardancy in the case of fire. The flame retardant solution includes 12 parts by weight of expanded graphite ; 4 parts by weight of zirconium; 6 parts by weight of white spirit, 5 parts by weight of naphthene distillate, 10 parts by weight of fatty acid glycidyl esters, 5 parts by weight of phthalic anhydride, 10 parts by weight of an acrylic monomer; 5 parts by weight of sodium silicate; 3 parts by weight of ethyl trimethyl benzoyl phenylphosphinate.

여기에서, 상기 폴리스티렌수지는 내열성과 내충격성이 뛰어나며 혼용성을 높이기 위해 첨가된다.Here, the polystyrene resin is excellent in heat resistance and impact resistance and is added to enhance compatibility.

그리고, 상기 팽창흑연(Exandable Graphite)은 그라파이트의 층상 구조를 갖기 때문에 그 층상 사이에 원자나 작은 분자를 집어 넣고 열을 가할 경우 아코디언처럼 분리가 되면서 입자가 수 백배 팽창하게 되는 현상을 이용하여 난연 플라스틱, 난연 EPS, 난연 우레탄폼 등 다양한 분야에서 활용되는 물질이다.Because the expanded graphite has a layered structure of graphite, when particles or small molecules are inserted between the layers and heat is applied, the particles are separated as an accordion and are expanded several hundred times, , Flame retardant EPS, and flame retardant urethane foam.

또한, 상기 지르코늄은 화재발생시 공기중의 산소와 결합하여 산화물 또는 질소화물로 된 보호피막을 형성하여 내화성과 난연성을 증대시키기 위해 첨가된다.Further, the zirconium is added in order to increase the fire resistance and the flame retardancy by forming a protective film made of oxide or nitrogen, in combination with oxygen in the air when a fire occurs.

아울러, 상기 백유는 유화성을 갖추고 있으므로 산소와 습기에 저항하여 녹 발생 원인을 제거하기 위해 첨가되고, 나프텐 증류액은 일종의 용제이며, 지방산 그리시딜 에스테르와 무수프탈산은 유연성을 부여하기 위해 첨가한다.In addition, the white oil is added to remove the cause of rust due to oxygen and moisture because it has emulsifying property. Naphthene distillate is a kind of solvent, and fatty acid glycidyl ester and phthalic anhydride are added for imparting flexibility .

또한, 상기 아크릴모노머는 상온안정성을 증대시켜 부착력을 강화함으로써 코팅제 역할을 수행하기 위해 첨가되고, 상기 규산나트륨은 주로 물유리(Water Glass)로 통칭되는 것으로 화재 등에 의해 발열시 주변에 본 발명 조성물에 함유된 금속이온과 반응하여 겔화되면서 필름을 형성하게 되고, 이 필름에 의해 불연성이 증대되게 된다.Also, the acrylic monomer is added to enhance the stability at room temperature and to enhance the adhesion, so that it acts as a coating agent. Sodium silicate is generally referred to as water glass, and when it is heated by fire or the like, Reacted with the metal ions to form a film while being gelled, and this film increases the incombustibility.

그리고, 상기 에틸트라이메틸벤조일페닐포스피네이트는 염기성 가수분해를 억제하기 위해 첨가된다.And, the ethyl trimethyl benzoyl phenylphosphinate is added to suppress basic hydrolysis.

본 발명에 따른 난연액이 코팅된 코팅층의 내화특성을 확인하기 위해, 상술한 조성으로 이루어진 난연액을 철판에 5mm의 두께로 코팅한 후 경화시켰다.In order to confirm the fire resistance characteristics of the coating layer coated with the flame retardant solution according to the present invention, the flame retardant solution having the above composition was coated on the steel sheet to a thickness of 5 mm and cured.

그런 다음, 내화도 테스트 방법인 KS F2271에 의해 검측하였으며, 검측 결과 내화 2등급을 만족하는 결과를 얻을 수 있었다.Then, the fire resistance test method, KS F2271, was used to measure the fire resistance.

다른 한편, 상기 점검창(400)은 도 3의 도시와 같이, 소화배관(200)의 하단부에 나사체결식으로 연결되며, 상기 점검창(400)이 설치된 직상부에는 메인개폐밸브(210)가 설치된다.3, the inspection window 400 is connected to the lower end of the extinguishing piping 200 in a screw-tight manner, and a main opening / closing valve 210 is provided at a portion directly above the inspection window 400 Respectively.

상기 메인개폐밸브(210)는 상기 점검창(400)을 통해 점검할 때 밀폐하여 안전한 점검이 이루어지도록 하기 위한 것이다.The main opening / closing valve 210 is configured to be sealed when performing the inspection through the inspection window 400 to perform a safe inspection.

그리고, 상기 점검창(400)의 설치를 위해 상기 소화배관(200)의 내부에는 고정보스(BOS)가 일체로 성형되어 구비되고, 상기 점검창(400)을 구성하는 우회안내블럭(410)의 하단을 관통한 고정볼트(420)가 상기 고정보스(BOS)의 중앙을 관통하여 볼트체결됨으로써 상기 우회안내블럭(410)을 견고히 고정한다.In order to install the inspection window 400, a fixing boss (BOS) is integrally formed inside the extinguishing piping 200, and a bypass guide block 410 of the inspection window 400 The fixing bolt 420 passing through the lower end is bolted through the center of the fixing boss BOS to fix the detour guide block 410 securely.

특히, 상기 위회안내블럭(410)은 급수펌프(100)로부터 공급된 물이 고압상태로 공급되기 때문에 고압을 최소화시키기 위해 하단 일부가 밀폐되고 측방 일부가 개방된 대략 'ㄷ' 형상으로 형성되며, 개방된 반대쪽 측면에는 점검연결챔버(430)가 형성된다.Particularly, since the water supplied from the water supply pump 100 is supplied in a high pressure state, the counter guide block 410 is formed in a substantially 'C' shape with a lower part partially closed and a side part opened to minimize a high pressure, A check connection chamber 430 is formed on the open opposite side.

여기에서, 상기 점검연결챔버(430)를 도시와 같은 위치에 둔 이유는 수압이 가장 작게 작용하는 곳에 위치되게 하여 점검시 편의성을 높이기 위한 것이다.Here, the reason why the check connection chamber 430 is placed at the same position as shown in the drawing is that it is located at a position where the water pressure is the smallest so as to improve the convenience in the inspection.

또한, 상기 고정볼트(420)에는 유동환(440)이 끼워지고, 상기 유동환(440)의 둘레에는 90°간격을 두고 4개의 점검볼(450)이 고정되며, 상기 유동환(440)의 하단에는 유동스프링(460)이 고정되는데, 상기 유동스프링(460)의 하단은 상기 고정보스(BOS) 상에 고정된다.Four check balls 450 are fixed to the fixing bolt 420 at intervals of 90 degrees around the fluid circulation 440 and flow channels 440 are formed at the bottom of the fluid circulation 440. [ A spring 460 is fixed, and the lower end of the floating spring 460 is fixed on the fixed boss (BOS).

그리고, 상기 점검창(440)은 투명한 재질로 형성된다. 따라서, 내부를 볼 수 있도록 구성된다.The inspection window 440 is formed of a transparent material. Therefore, it is configured to see the inside.

아울러, 상기 점검연결챔버(430)에는 외부점검관(470)이 연결되고, 상기 외부점검관(470)에는 점검밸브(480)가 설치된다.In addition, an external check pipe 470 is connected to the check connection chamber 430, and a check valve 480 is installed in the external check pipe 470.

따라서, 점검시 상기 메인개폐밸브(210)를 닫고 상기 점검밸브(480)를 열게 되면 점검창(400) 내부의 물이 점검연결챔버(430) 쪽으로 이동하면서 외부점검관(470)을 통해 배출된다.Accordingly, when the main opening / closing valve 210 is closed and the check valve 480 is opened, the water in the check window 400 moves toward the check connection chamber 430 and is discharged through the external check pipe 470 .

그러면, 물이 유동되므로 물의 흐름방향으로 점검볼(450)이 떠 오르게 되고, 이것은 가시적으로 금방 확인된다.Then, as the water flows, the check ball 450 floats in the flow direction of the water, and this is visually confirmed immediately.

때문에, 급수상 문제가 있는지 없는지 여부를 즉시 확인할 수 있다.As a result, you can immediately check whether there is a problem with the award.

점검이 완료되면 점검밸브(480)를 닫고, 메인개폐밸브(210)를 연다.When the check is completed, the check valve 480 is closed and the main on-off valve 210 is opened.

그러면, 신장되었던 유동스프링(460)이 수축되면서 점검볼(450)은 원래 위치로 복귀하여 다음 점검을 위해 대기하게 된다.Then, as the elongated flow spring 460 contracts, the check ball 450 returns to its original position and waits for the next check.

이와 같이, 본 발명은 개량된 점검창(400)을 구비함으로써 실시간 목측이 가능하여 점검 기능이 강화되고 정확한 점검이 가능하게 된다.As described above, since the present invention includes the improved inspection window 400, the inspection function can be enhanced and accurate inspection is possible by real-time observation.

이에 더하여, 도 4에서와 같이, 급수펌프(100)의 경우에도 입수구를 통해 유입되는 물이 와류유도비드(110)에 부딪혀 회전되면서 와류를 생성할 때 직수(직선으로 유입되는 물)가 수직하게 입수된 후 직각방향으로 회전되면서 와류를 형성해야 하므로 그에 따른 급수펌프(100)의 내벽 침식이 커 펌프의 수명이 단축되는 단점이 있다.In addition, as shown in FIG. 4, even in the case of the water supply pump 100, the water introduced through the inlet port is rotated by colliding against the vortex inducing bead 110 to generate a vortex, It is necessary to form a vortex while being rotated in a direction perpendicular to the direction of rotation of the feed pump 100. Accordingly, the inner wall of the feed pump 100 is eroded and the life of the pump is shortened.

따라서, 본 발명에서는 유입되는 직수가 와류유도비드(110)에 부딪히기 전에 와류유도비드(110)와의 접촉각이 직각이 아닌 예각을 이루도록 하여 침식을 줄이도록 함으로써 사용수명을 연장하도록 구성된다.Therefore, in the present invention, the contact angle with the vortex inducing bead 110 is made to be an acute angle rather than a right angle, so that the erosion is reduced to extend the service life before the incoming direct water hits the vortex inducing bead 110.

이를 위해, 상기 급수펌프(100)의 입수구(미도시)의 내부에 입수구와 동일 외경을 갖는 예각수유도관(120)을 설치하고, 상기 예각수유도관(120)의 내부면에는 유선형 플랩(130)을 일체로 성형하여 이를 거친 직수가 예각수(와류유도비드에 부딪힐 때 예각을 이루는 물)로 변하도록 구성된다.The acute angle feeding conduit 120 having the same outer diameter as the inlet port is provided in the inlet port of the feed pump 100 and the streamlined flap 130 is formed on the inner surface of the acute angle feeding conduit 120. [ And the rough running water is changed into an acute angle water (water at an acute angle when hitting the vortex inducing bead).

이와 같이 구성하면 와류유도비드(110)에 부딪히는 수충격도 줄일 수 있어 사용수명을 연장하는데 매우 효과적이다.With this configuration, water impact against the vortex inducing bead 110 can be reduced, which is very effective in extending the service life.

100: 급수펌프 200: 소화배관
300: 스프링클러 400: 점검창
100: water pump 200: fire pipe
300: sprinkler 400: inspection window

Claims (1)

지상 또는 지하에 설치된 저수조로부터 급수펌프(100)를 통해 소화배관(200)을 타고 각 세내내 스프링클러(300)로 직접 공급되는 직수식 구조를 갖는 공동주택의 소방수 급배수 장치에 있어서;
상기 소화배관(200)의 하단부에는 지면에서 확인할 수 있는 점검창(400)이 마련되고;
상기 소화배관(200)에는 각 세대로 연결되는 다수의 스프링클러공급관(310)이 연결되며;
상기 스프링클러공급관(310)에는 길이방향으로 간격을 두고 다수의 스프링클러(300)가 설치되고;
상기 스프링클러(300)가 설치된 지점 앞쪽의 상기 스프링클러공급관(310) 상에는 우회관(340)을 갖는 수충격완충기(320)를 설치하되, 상기 수충격완충기(320)는 일단에 확경된 접속플랜지(321)를 갖는 완충기접속관(322) 한 쌍을 포함하며, 상기 완충기접속관(322)의 타단 외주면 일부에는 일정반경을 갖는 우회관접속공(323)이 형성되고, 상기 우회관접속공(323)이 형성된 쪽 단부인 타단 외주면에는 일정 피치로 체결나사부(324)가 형성되어 스프링클러공급관(310)과 나사체결되며, 상기 접속플랜지(321)의 내부턱(325)에는 오링(326)이 안착되어 씰링 기능을 수행하고, 상기 접속플랜지(321) 속으로는 상기 오링(326)을 압착하면서 완충림돌출단(327)이 삽입되며, 상기 완충림돌출단(327)은 링형상의 완충림(328)의 양측면에서 일정길이 돌출되어 형성되고, 상기 완충림(328)의 내경 일부에서는 일체로 연결된 후 나선상으로 연장된 완충나선편(329)이 형성되며, 상기 완충나선편(329)의 단부에는 원판 형상의 충격흡수편(330)이 고정되고, 상기 완충림(328)의 둘레에는 90°간격을 두고 4개의 코일스프링(331)의 일단이 고정되며, 상기 코일스프링(331)의 타단은 상기 충격흡수편(330)의 둘레 일부에 각각 고정되고;
상기 우회관접속공(323)에는 '∩' 형상의 우회관(340)이 연결되는데, 연결을 위해 상기 우회관(340)의 양단에는 후크형 접속부(342)가 마련되고, 링형 씰링재(344)의 개재하에 후크결합되는 형태로 상기 우회관접속공(323)에 커플링되며, 상기 우회관(340)의 길이 중심에는 체크밸브(346)가 설치되어 역류를 방지한 것을 특징으로 하는 공동주택의 소방수 급배수 장치.
1. A fire-fighting water supply / drainage system for a building having a straight structure in which water is supplied from a water reservoir installed on the ground or underground through a water supply pump (100) to a sprinkler (300)
An inspection window 400 is provided on the lower end of the digestion pipe 200,
A plurality of sprinkler supply pipes 310 connected to the respective generations are connected to the extinguishing pipe 200;
A plurality of sprinklers 300 are installed in the sprinkler supply pipe 310 at intervals in the longitudinal direction;
A water shock cushion 320 having a right tube 340 is installed on the sprinkler supply pipe 310 in front of a point where the sprinkler 300 is installed and the water shock cushion 320 has a connection flange 321 A right tube connection hole 323 having a predetermined radius is formed in a part of the outer circumferential surface of the other end of the buffer connection tube 322 and the right tube connection hole 323 is formed in the right tube connection hole 323, And an O-ring 326 is seated in the inner flange 325 of the connection flange 321 and is fixed to the inner flange 325 of the connection flange 321. The O-ring 326 is fixed to the inner flange 325 of the connection flange 321, And a buffer rim protruding end 327 is inserted into the connection flange 321 while compressing the O-ring 326. The buffer rim protruding end 327 is inserted into the ring-shaped buffer rim 328, The protrusions 328 are formed to protrude by a predetermined length from both sides of the buffer rim 328, Shaped shock absorber 330 is fixed to the end of the buffer helix piece 329 and the buffer rim 328 is fixed to the end of the buffer helix piece 329, One end of the coil spring 331 is fixed at an interval of 90 degrees around the circumference of the shock absorber 330 and the other end of the coil spring 331 is fixed to a part of the circumference of the shock absorber 330;
Shaped hooking tube 340 is connected to the right tube connecting hole 323. A hook type connecting part 342 is provided at both ends of the right tube 340 for connection and a ring type sealing member 344 is provided at both ends of the right tube 340, And a check valve (346) is provided at the center of the length of the right-side pipe (340) to prevent reverse flow. The check valve (346) is coupled to the right-side pipe connecting hole (323) Fire fighting water supply and drainage system.
KR1020160038539A 2016-03-30 2016-03-30 Firefighter supply and drainage apparatus in the House of Commons KR101645520B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160038539A KR101645520B1 (en) 2016-03-30 2016-03-30 Firefighter supply and drainage apparatus in the House of Commons

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160038539A KR101645520B1 (en) 2016-03-30 2016-03-30 Firefighter supply and drainage apparatus in the House of Commons

Publications (1)

Publication Number Publication Date
KR101645520B1 true KR101645520B1 (en) 2016-08-12

Family

ID=56714996

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160038539A KR101645520B1 (en) 2016-03-30 2016-03-30 Firefighter supply and drainage apparatus in the House of Commons

Country Status (1)

Country Link
KR (1) KR101645520B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101754379B1 (en) 2016-12-20 2017-07-06 세종종합기술주식회사 Water Pressure for Controlling for Fire Fighting
KR101847438B1 (en) 2017-04-27 2018-04-23 (주)진광건설엔지니어링 Installation Of Sprinkler pressure regulator for building fire fighting
KR102159384B1 (en) * 2020-03-06 2020-09-23 (주)다산기술단 Fire water supply and drain system in apartment building
CN111765317A (en) * 2020-07-15 2020-10-13 石东琴 Self-adaptive buffer adjustable hanger
CN112664747A (en) * 2021-01-18 2021-04-16 石家庄闻索科技有限公司 Flange leak protection device capable of inhibiting water hammer influence

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200292303Y1 (en) * 2002-07-30 2002-10-18 임관섭 Water hammering preventive device
KR100481091B1 (en) 2002-04-16 2005-04-07 주식회사 해인물산 Water supply system of a apartment house
KR100831714B1 (en) * 2007-02-27 2008-05-22 (주)원바다 The same axis double check valve type reverse-flowing breaker
KR100935550B1 (en) * 2009-03-13 2010-01-07 주식회사 아세아유니온 Alarm valve assembly of sprinkler system with verification function
KR20120032154A (en) * 2010-09-28 2012-04-05 주식회사 우당기술산업 Drain valve assembly having bellows pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100481091B1 (en) 2002-04-16 2005-04-07 주식회사 해인물산 Water supply system of a apartment house
KR200292303Y1 (en) * 2002-07-30 2002-10-18 임관섭 Water hammering preventive device
KR100831714B1 (en) * 2007-02-27 2008-05-22 (주)원바다 The same axis double check valve type reverse-flowing breaker
KR100935550B1 (en) * 2009-03-13 2010-01-07 주식회사 아세아유니온 Alarm valve assembly of sprinkler system with verification function
KR20120032154A (en) * 2010-09-28 2012-04-05 주식회사 우당기술산업 Drain valve assembly having bellows pipe

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101754379B1 (en) 2016-12-20 2017-07-06 세종종합기술주식회사 Water Pressure for Controlling for Fire Fighting
KR101847438B1 (en) 2017-04-27 2018-04-23 (주)진광건설엔지니어링 Installation Of Sprinkler pressure regulator for building fire fighting
KR102159384B1 (en) * 2020-03-06 2020-09-23 (주)다산기술단 Fire water supply and drain system in apartment building
CN111765317A (en) * 2020-07-15 2020-10-13 石东琴 Self-adaptive buffer adjustable hanger
CN112664747A (en) * 2021-01-18 2021-04-16 石家庄闻索科技有限公司 Flange leak protection device capable of inhibiting water hammer influence
CN112664747B (en) * 2021-01-18 2022-07-05 临海市三江工程机械制造有限公司 Flange leak protection device capable of inhibiting water hammer influence

Similar Documents

Publication Publication Date Title
KR101645520B1 (en) Firefighter supply and drainage apparatus in the House of Commons
US6076608A (en) Fire-suppression sprinkler system and method for installation and retrofit
KR101796309B1 (en) Structure for piping of firefighting water pipe of apartment house
KR101976522B1 (en) Always operable fire suppression sprinkler system connected with potable water pipeline without operation failure
KR101597753B1 (en) System for unifying chilled beam air conditioning equipment and fire extinguishing equipment
KR101753809B1 (en) Apparatus for sensing opening and shutting valve using electric device of building
KR101507141B1 (en) Overpressure protection device
RU2433354C1 (en) Electric circulation system of water heating
Global Property Loss Prevention Data Sheets 2-1
US2944563A (en) Safety oil tank
KR101738879B1 (en) Sprinkler apparatus of fire fighting using electric device of apartment house
KR20170037803A (en) Heating water distributor having delicate flow control valve
JP2016047261A (en) Fire hydrant device
KR20120016742A (en) Drain valve having sight glass
KR20080001532U (en) Test velve for operating test of alarm valve
KR100935550B1 (en) Alarm valve assembly of sprinkler system with verification function
CN212745504U (en) Fire-fighting water pump outlet soft joint
KR100874616B1 (en) Leakage prevention device of water supply pipe of indoor water use equipment
KR20190010930A (en) Combination Check Valve with Condrol Device for Adjusting Opening of Fire Check Valve
KR102628915B1 (en) A Fire Fighting Pump Integration System Have A Integrated Test And Discharge Function Outlet Pipe and A Fire Fighting Pump With Earthquake-Proof Function Using Thereof
KR200497999Y1 (en) Extinguishing box mounted in the celling for sprinkler
KR20140140454A (en) Alarm valve
JP2013248181A (en) Fire extinguishing system
JP2016030981A (en) Water supply structure
RU146038U1 (en) FOAM NOZZLE FOR INSTALLING AN UNDERFLOWER EXTINGUISHING

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20190123

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20200122

Year of fee payment: 5