KR100971564B1 - A paper board drain machine and the used method - Google Patents

A paper board drain machine and the used method Download PDF

Info

Publication number
KR100971564B1
KR100971564B1 KR1020090093836A KR20090093836A KR100971564B1 KR 100971564 B1 KR100971564 B1 KR 100971564B1 KR 1020090093836 A KR1020090093836 A KR 1020090093836A KR 20090093836 A KR20090093836 A KR 20090093836A KR 100971564 B1 KR100971564 B1 KR 100971564B1
Authority
KR
South Korea
Prior art keywords
equipment
drilling
ground
rail
drain
Prior art date
Application number
KR1020090093836A
Other languages
Korean (ko)
Inventor
나승국
정윤성
김재선
송해식
Original Assignee
나승국
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 나승국 filed Critical 나승국
Priority to KR1020090093836A priority Critical patent/KR100971564B1/en
Application granted granted Critical
Publication of KR100971564B1 publication Critical patent/KR100971564B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PURPOSE: A paper drain construction equipment with an excavator is provided to perform a smooth excavating process without an excavator. CONSTITUTION: A paper drain construction equipment with an excavator comprises a main body(10), a rail(20), a wire(30), a wire drum(40) and a boring machine(60). The main body is operated by the manipulation of a user. The rail guides a paper drain board and is located in the main body. The wire lifts the paper drain board of the rail. The wire drum reels the wire. The boring machine is attached and detached to and from the front side of rail.

Description

천공장비가 부착된 페이퍼 드레인 시공장비 및 이를 이용한 시공방법{A PAPER BOARD DRAIN MACHINE AND THE USED METHOD}Paper drain construction equipment with perforation equipment and construction method using same {A PAPER BOARD DRAIN MACHINE AND THE USED METHOD}

본 발명은 페이퍼 드레인 시공 장비를 이용한 연약지반 개량 시공 장비 및 시공방법에 관한 것으로, 지반 간에 견고한 층이 혼재되어 있어 페이퍼 드레인 보드의 압입이 원활하지 못한 경우에도, 크레인과 같은 별도의 시공 장비 없이 드레인 시공 장비에 천공장비를 장착하여 지반을 천공할 수 있고, 이를 통한 전반적인 시공시간을 대폭 절약할 수 있는 천공장비가 부착된 페이퍼 드레인 시공 장비 및 이를 이용한 시공방법에 관한 것이다.The present invention relates to a soft ground improvement construction equipment and a construction method using a paper drain construction equipment, even if a solid layer is mixed between the ground, even if the press-fit of the paper drain board is not smooth, drain without additional construction equipment such as a crane The present invention relates to a paper drain construction equipment equipped with a drilling equipment equipped with a drilling equipment, which can be equipped with a drilling equipment, and can greatly reduce the overall construction time.

일반적으로 해안이나 하천, 호스, 항만 등을 간척이나 준설 또는 매립하여 형성시킨 지반은 그 지표면에 점성토 또는 물과 개펄이 혼합된 습지를 형성하고, 그 지반 내부에는 간극수가 내재되어 지반 전체적인 강도가 매우 약한 연약지반을 형성하게 되고, 이러한 연약지반은 부지활용도를 낮추는 주요인이 되기 때문에 이러한 연약지반을 개량하는 선행 작업을 하게 된다.In general, the ground formed by reclamation, dredging, or reclamation of coasts, rivers, hoses, and harbors forms wetland mixed with viscous soil or water and gulf on the surface of the ground. Weak weak ground will be formed, and this soft ground will be the main cause of lowering the site utilization, so it will be a preliminary work to improve the soft ground.

이와 같은 연약 지반을 개량하기 위해서는 각종 드레인 보드를 연약 지반 상에 압입하여 사용하는 드레인 시공 장비를 사용하는데, 연약 지반을 개량하는 시공방법에 따라 샌드 드레인(sand drain) 공법, 페이퍼 드레인(paper darin)공법, 상기 페이퍼 드레인 공법을 이용하여 드레인 보드를 케이싱에 의하여 지반에 압입시켜 지중의 간극수를 지표면으로 배출시키는 수직배수공법, 모래다짐말뚝을 지반에 형성시켜 지중 간극수의 배출시키면서도 지반의 지지력을 보강하는 샌드 컴펙션 파일(sand compaction pile)공법, 산토 매립 등에 의한 강제치환 공법, 석회기둥을 이용한 림컬럼(lime column)공법 등 시공 현장 여건에 따라서 다양하게 채택되어 사용되고 있다.In order to improve such a soft ground, drain construction equipment which presses various drain boards onto the soft ground is used. According to the construction method for improving the soft ground, a sand drain method and a paper drain are used. The vertical drainage method, which presses the drain board into the ground by the casing and discharges the gap water to the ground by using the paper drain method, and forms a sand compaction pile on the ground to reinforce the bearing capacity of the ground while discharging the ground gap water. It is widely used depending on the construction site conditions such as sand compaction pile method, forced replacement method by landfill, etc., and lime column method using lime pillar.

이중에서도 통상적으로 널리 사용하고 있는 페이퍼 드레인 공법은, 도 1에서와 같은 드레인 시공 장비의 레일(100)에 설치된 드레인 케이싱(110)을 이용하여 페이퍼 드레인 보드를 지반에 압입시켜 매립하게 되는데, 이처럼 드레인 케이싱(110)을 지반 내에 압입시키기 위해 승, 하강용 와이어 드럼을 각각 설치하고, 각 와이어 드럼의 조작에 의해 드레인 케이싱이 승, 하강 되면서 연약 지반 내에 압입된다.The paper drain method, which is generally widely used, is press-filled into the ground by using a drain casing 110 installed on the rail 100 of the drain construction equipment as shown in FIG. 1. In order to press the casing 110 into the ground, a wire drum for raising and lowering is provided, respectively, and the drain casing is pushed into the soft ground while the drain casing is raised and lowered by the operation of each wire drum.

그러나 이처럼 드레인 케이싱을 연약지반 내에 압입하기 위해 승, 하강용 와이어에만 의존하여 작업을 하기 때문에 와이어에 많은 부하가 발생하고, 이에 의해 와이어의 수명이 짧아져 교체주기가 짧아지는 문제가 있다.However, in order to press the drain casing into the soft ground in this way, since the operation depends only on the wires for lifting and lowering, a lot of loads are generated on the wires, thereby shortening the life cycle of the wires, thereby shortening the replacement cycle.

또한 연약지반이라 하더라도 때때로 단단한 층이 혼재되어 있을 수 있고, 이 경우에는 와이어에 더욱 큰 부하를 주기 때문에 작업 도중에 단선되는 문제도 발생한다.In addition, even in soft ground, sometimes there may be a mixture of hard layers, in which case the wire is more loaded, causing a problem of disconnection during operation.

특히 연약지반의 상부층이 견고한 경우에는 드레인 케이싱을 압입하기 어려워 시공이 어려울 뿐만 아니라 장비가 파손될 우려가 있다.In particular, when the upper layer of the soft ground is firm, it is difficult to press-fit the drain casing, which makes construction difficult and may cause damage to the equipment.

이에 의해 연약지반 간에 견고한 층이 혼재되어 있으면 별도의 크레인 장비를 사용하여 견고한 층을 천공한 다음, 다시 드레인 보드를 압입하여 시공을 계속하게 된다.As a result, if a solid layer is mixed between the soft grounds, a separate crane equipment is used to drill the solid layer, and then press-fit the drain board to continue construction.

크레인 장비는 드레인 시공 장비보다 더 크고 무겁기 때문에 상대적으로 무거운 크레인 장비가 연약지반 내로 이동하여 작업하려면 크레인 장비의 무게를 버틸 수 있을 정도로 연약지반의 상부층의 강도 보강할 필요가 있다.Since the crane equipment is larger and heavier than the drain construction equipment, the relatively heavy crane equipment needs to reinforce the strength of the upper layer of the soft ground so that the crane equipment can bear the weight of the crane equipment.

즉, 연약지반의 개량시공과는 무관하게 장비가 투입될 수 있도록 상부층을 개량하기 때문에 많은 시간과 비용 및 인력이 투입되게 되며, 이러한 부분은 연약지반을 개량하는 전반적인 시공 시간과 비용을 증대시키는 요인이 된다.In other words, since the upper floor is improved so that equipment can be input irrespective of the improved construction of the soft ground, a lot of time, cost, and manpower are invested, and this part increases the overall construction time and cost to improve the soft ground. Becomes

또한 크레인 장비는 연약지반을 천공하는 과정에서 그 수직도를 관리할 수 없기 때문에 차후 시공되는 페이퍼 드레인 보드 역시 그 수직도를 관리할 수 없게 되는 문제가 있고, 이 때문에 연약지반 개량시공의 품질이 낮아지는 문제가 있다.In addition, since the crane equipment cannot manage the verticality during the drilling of the soft ground, subsequent construction of the paper drain board also cannot manage the verticality. Therefore, the quality of the soft ground improvement construction is low. There is a problem.

본 발명은 상기와 같은 종래기술의 문제점을 개선하기 위한 것으로, 연약지반을 개량 시공하기 위한 드레인 시공 장비 중에서, 페이퍼 드레인 보드를 지중에 압입하여 개량 시공하는 경우, 지반에 견고한 층이 혼재되어 있어 이를 원활하게 압입하여 시공할 수 없던 문제를 해소하기 위해 천공장비가 탈부착 되는 드레인 시공장비를 제공하는 데에 그 목적이 있다.The present invention is to improve the problems of the prior art as described above, in the case of improving the construction by pressing the paper drain board in the ground of the drain construction equipment for improving the soft ground, the solid layer is mixed on the ground The purpose of the present invention is to provide a drain construction equipment in which the drilling equipment is detachable in order to solve a problem that cannot be press-fitted smoothly.

또한 상기에서 제공되는 드레인 시공 장비를 이용한 연약지반 개량 시공방법을 제공하는 데에 또 다른 목적이 있다.In addition, there is another object to provide a soft ground improvement construction method using the drain construction equipment provided above.

상기와 같은 목적에 따른 본 발명의 장치로는 사용자의 조작에 의해 운행되는 본체와; 상기 본체에 구비되어 페이퍼 드레인 보드를 가이드하는 레일과; 상기 레일의 페이퍼 드레인 보드를 승강시키는 와어어 및; 상기 와이어를 권취하는 와이어드럼을 포함하는 페이퍼 드레인 시공장비에 있어서, 상기 레일의 양측면에에 구비되는 탈착부와, 상기 탈착부에 장, 탈착되는 천공장치를 포함하여 된 것에 의해 달성된다.The apparatus of the present invention according to the above object and the body which is operated by the user's operation; A rail provided in the main body to guide a paper drain board; A wire for elevating a paper drain board of the rail; In the paper drain construction equipment comprising a wire drum for winding the wire, it is achieved by including a detachable portion provided on both sides of the rail, and a fabric mill to be attached to the detachable portion.

상기 천공장치는 유압에 의해서 승하강되는 해머와; 상기 해머를 가이드하는 실린더 및; 상기 실린더의 상하측 각각에 유체가 공급 및 배출되는 유압라인을 포 함한다.The cloth mill is hammered up and down by hydraulic pressure; A cylinder for guiding the hammer; It includes a hydraulic line for supplying and discharging fluid to each of the upper and lower sides of the cylinder.

한편, 시공방법으로는 연약지반 사이에 견고한 층이 내재되어 있는지를 판단하는 지반 표층 분석단계와; 드레인 시공 장비의 양측면의 탈착부에 천공장비를 장착하는 천공장비 설치단계와; 본체에서 레일을 세워 천공장치를 지면에 수직으로 세우는 수직도 조절 단계와; 천공장치의 수직도를 조절한 다음, 천공장치를 작동시켜 천공파일을 지반 내의 적정 깊이로 압입하는 지반천공단계 및; 천공 완료 후, 천공장치를 탈거하고 레일에 페이퍼 드레인 보드를 설치하여 드레인 보드를 지반 내에 압입하는 보드 압입단계로 이루어지는 것에 의해 달성된다.On the other hand, the construction method includes a ground surface analysis step of determining whether a solid layer is embedded between the soft ground; A drilling equipment installation step of mounting the drilling equipment on the detachable parts of both sides of the drain construction equipment; A verticality adjustment step of setting up the rails in the main body and making the fabric mill perpendicular to the ground; A ground drilling step of adjusting the verticality of the drilling device and then pressing the drilling mill to press the drilling pile to an appropriate depth in the ground; After completion of the drilling, it is achieved by removing the fabric mill and installing a paper drain board on the rail to press-fit the drain board into the ground.

본 발명의 사용으로 연약지반을 개량하면서 지반에 견고한 층이 혼재되어 있더라도 드레인 보드 시공 장비에 천공장비를 장착하는 것만으로 견고한 지반을 천공할 수 있고, 이 때문에 크레인을 이용한 천공장비 없이도 원활하게 작업을 수행할 수 있다.Even if a solid layer is mixed in the ground while improving the soft ground by using the present invention, the solid ground can be drilled simply by mounting the drilling equipment on the drain board construction equipment, and thus the work can be performed smoothly without the drilling equipment using a crane. Can be done.

또한 크레인 장비를 사용하기 위해 상부 지반을 보강하지 않아도 되며, 상부 층 보강 작업에 투입되는 인력과 시간 및 비용을 절약할 수 있다.It also eliminates the need for reinforcing the upper ground to use crane equipment and saves manpower, time and money spent on reinforcing upper floors.

또한 크레인 장비는 천공되는 수직도를 조절할 수 없기 때문에 작업의 품질이 떨어지게 되는데, 드레인 시공 장비는 페이퍼 드레인 보드의 수직도를 조절할 수 있는 기능이 있기 때문에 장착된 천공장비의 수직도 역시 조절할 수 있게 되어 작업의 품질이 향상된다.In addition, since the crane equipment cannot adjust the verticality of the drilling, the quality of work is reduced. The drain construction equipment has the function of adjusting the verticality of the paper drain board, so that the verticality of the installed drilling equipment can also be adjusted. The quality of work is improved.

이하에서 본 발명의 실시예를 도시한 첨부도면을 통해 더욱 상세히 설명하기로 한다.Hereinafter will be described in more detail with reference to the accompanying drawings showing an embodiment of the present invention.

본 발명은 연약지반 개량시공을 위한 시공 장비 및 이를 이용한 시공방법에 관한 것으로, 연약지반을 천공하는 천공기를 드레인 시공 장비에 탈, 장착 가능하게 구성하여 필요에 따라 지반을 천공하거나 드레인 보드를 압입할 수 있고, 더욱이 드레인 시공 장비의 장점을 이용하여 지반을 천공하는 수직도를 조절할 수 있게 하여 연약지반 개량 시공의 품질을 향상시키고자 한다.The present invention relates to a construction equipment for the construction of improved soft ground and a construction method using the same, and to be able to remove and install the drilling machine for drilling the soft ground in the drain construction equipment to drill the ground or press the drain board as needed In addition, by using the advantages of the drain construction equipment can be adjusted to the vertical degree of drilling the ground to improve the quality of the soft ground improved construction.

이를 위해 본 발명은 도 2에서와 같이 사용자의 조작에 의해 운행되는 본체(10)와; 상기 본체(10)에 구비되어 페이퍼 드레인 보드를 가이드하는 레일(20)과; 상기 레일(20)의 페이퍼 드레인 보드를 승강시키는 와어어(30) 및; 상기 와이어(30)를 권취하는 와이어드럼(40)을 포함하는 페이퍼 드레인 시공 장비에 있어서, 상기 레일(20)의 전방에 장, 탈착되는 천공장치(60)를 포함한다.To this end, the present invention is the main body 10 which is operated by the user's operation as shown in FIG. A rail 20 provided in the main body 10 to guide the paper drain board; A wire (30) for elevating the paper drain board of the rail (20); In the paper drain construction equipment including a wire drum 40 to wind the wire 30, the front of the rail 20 includes a punching device 60, which is mounted and detached.

본체(10)는 도 2에서와 같이 무한궤도를 이용하여 이동가능하고, 그 양측으로 천공 또는 드레인 보드 압입 시공 시에 본체(10)의 유동을 최소화하기 위한 보 조 지지대를 다수 포함한다.The main body 10 is movable using an endless track as shown in FIG. 2, and includes a plurality of auxiliary supports for minimizing the flow of the main body 10 at the time of punching or drain board press-fitting on both sides thereof.

레일(20)은 드레인 보드 또는 천공장치(60)의 천공파일의 길이에 따라 적정의 길이로 실시되며, 평시에는 수평으로 뉘어진 채 이동을 할 수 있고, 작업시에는 본체(10)에 설치된 다수의 유압장치를 통해 지면으로부터 수직이 되게 세워진다.The rail 20 is appropriately lengthened according to the length of the drill file of the drain board or the punching device 60, and can be moved while being horizontally laid in normal times, and a plurality of rails are installed in the main body 10 during the work. It is erected vertically from the ground by means of hydraulics.

상기 레일(20)에는 와이어드럼(40)에서 연장되는 와이어(30)가 연결되어, 이 와이어(30)가 당겨지거나 풀리면서 그 전방에 설치되는 드레인 케이싱(70) 또는 천공장치(60)가 승하강된다.A wire 30 extending from the wire drum 40 is connected to the rail 20 so that the drain casing 70 or the drilling device 60 installed in front of the wire 30 is pulled or unrolled. Descends.

와이어(30)는 보통 두꺼운 강선으로 이루어져 무거운 천공장치(60)는 물론 드레인 케이싱(70)을 승하강시키는 과정에서 끊어지지 않도록 하고, 더욱이 드레인 케이싱(70)을 압입하기 위해서도 와이어(30)가 사용된다.The wire 30 is usually made of a thick steel wire so as not to be broken in the process of lifting and lowering the drain casing 70 as well as the heavy drilling device 60, and the wire 30 is also used to press-fit the drain casing 70. do.

이러한 와이어(30)를 권취시키는 와이어드럼(40)은 통상 본체(10) 상부에 설치되는 것이나, 본 발명에서는 레일(20)의 중간부에 위치시키고, 레일(20)의 상하단에 활차(도르레)를 설치한 것으로 실시된다.The wire drum 40 wound around the wire 30 is usually installed on the main body 10, but in the present invention, the wire drum 40 is positioned at the middle of the rail 20, and pulleys (pulls) are provided at the upper and lower ends of the rail 20. It is carried out by installing.

상기 천공장치(60)는 소음과 진동을 최소화하기 위해 유압식 해머를 사용할 수 있는데, 이러한 예로서 도 6에서와 같이 상기 천공장치(60)는 유압에 의해서 승하강되는 해머(61)와; 상기 해머(61)를 가이드하는 실린더(62) 및; 상기 실린더(62)의 상하측 각각에 유체가 공급 및 배출되는 유압라인(63)을 포함한다.The drilling device 60 may use a hydraulic hammer to minimize noise and vibration. For example, as shown in FIG. 6, the drilling device 60 includes a hammer 61 which is lifted and lowered by hydraulic pressure; A cylinder (62) for guiding the hammer (61); And a hydraulic line 63 for supplying and discharging fluid to each of the upper and lower sides of the cylinder 62.

상기 실린더(62)의 상하면에는 각각 상, 하판(65, 66)이 더 설치되고, 상기 상, 하판(65, 66)의 양단이 서로 맞닿게 연장되고, 각각의 끝단에 완충실린더(67)를 더 구비하여 실시된다. Upper and lower plates 65 and 66 are further provided on the upper and lower surfaces of the cylinder 62, respectively, and both ends of the upper and lower plates 65 and 66 extend to abut each other, and a buffer cylinder 67 is formed at each end thereof. It is further provided.

이는 내부해머(61)가 승하강되면서 천공파일이 압입 또는 인발되도록 충격을 가하게 되는데, 이 충격이 드레인 시공 장비로 전달되는 것을 최소화하기 위해 천공파일로 전달되는 충격을 제외한 다른 부분의 충격은 최소화하기 위한 구성이다.This imparts an impact so that the drill file is press-in or pulled out while the inner hammer 61 is raised and lowered. To minimize the impact of the impact to other parts except the impact transmitted to the drill file to minimize the impact to the drain construction equipment. It is for the configuration.

여기에 어큐뮬레이터(64)를 더 구비하여 실시될 수 있는데, 상기 어큐뮬레이터(64)는 발생하는 충격을 유압 또는 공기로 흡수하여 소음과 진동을 억제하는 구성으로 이러한 어큐뮬레이터(64)는 통상적으로 사용되는 것이므로, 이에 대한 상세한 설명은 생략하기로 한다.In addition, the accumulator 64 may be implemented, and the accumulator 64 absorbs shock generated by hydraulic pressure or air to suppress noise and vibration, and thus the accumulator 64 is commonly used. Detailed description thereof will be omitted.

천공장치(60)를 탈, 장착하여 사용되기 위해서는 상기 레일(20)의 양측면에 별도의 가이드 역할을 하는 탈착부(50)를 더 구비하는데, 이러한 탈착부(50)는 상하로 길이를 갖게 형성되어 장착된 천공장치(60)가 탈착부(50)를 따라 승하강되면서 가이드 된다.In order to be used by removing and mounting the punching device 60, a detachable part 50 serving as a separate guide role is further provided on both sides of the rail 20. Such detachable part 50 is formed to have a length vertically. The mounted drilling device 60 is guided while being raised and lowered along the detachable portion 50.

상기와 같이 드레인 시공 장비에 탈, 장착 가능하게 천공기(60)를 구성하여 이를 필요에 따라 탈, 장착하면서 연약지반 개량 시공을 하는데, 이하에서는 본 발명의 드레인 시공 장비를 이용한 연약지반 개량 시공방법에 대하여 설명하기로 한다.As described above, the boring machine 60 is configured to be detachable from and mounted on the drain construction equipment, and the soft ground improvement construction is performed by removing and installing the boring machine 60 as necessary. This will be described.

먼저, 도 3에서와 같이 개량 시공이 필요한 연약지반의 표층을 분석하여 연약지반 내에 견고한 층이 존재하는지를 판단하게 되는데(S100), 이때 견고한층(단단한 지반)은 보통 외부로 노출된 상부층에 형성되는 경우가 많다.First, by analyzing the surface layer of the soft ground that needs to be improved construction as shown in Figure 3 to determine whether there is a solid layer in the soft ground (S100), wherein the solid layer (hard ground) is usually formed on the upper layer exposed to the outside There are many cases.

따라서 상부층을 제외한 내부의 지반은 연약한 지반이더라도 그 상부층은 드레인 시공 장비의 드레인 케이싱이 쉽게 압입될 수 없기 때문에 지반을 천공기를 사용하여 먼저 천공할 필요가 있다.Therefore, even if the ground in the interior except the upper layer is a soft ground, since the drain casing of the drain construction equipment can not be easily pressed in the upper layer, it is necessary to first drill the ground using a perforator.

이때 본 발명은 통상적으로 사용되는 크레인을 이용한 천공장비를 사용하지 않고 드레인 시공 장비의 전방에 천공장치(60)를 장착하여 천공장비로서의 기능을 수행토록 한다(S200).At this time, the present invention is equipped with a drilling device 60 in front of the drain construction equipment without using a drilling equipment using a conventionally used crane to perform a function as a drilling equipment (S200).

이처럼 천공장치(60)를 드레인 시공 장비에 장착하여 시공하게 되면 별도의 크레인 장비를 사용하지 않아도 되며, 이러한 크레인은 통상 드레인 시공 장비에 비하여 그 크기와 무게가 더 나가기 때문에 이 장비가 연약지반 내로 이동하는 과정에서 발생하는 지반 함몰 등의 문제를 해소할 수 있으며, 더욱이 크레인의 이동이 가능하도록 상부층을 단단하게 개량하는 상부층 개량시공을 생략할 수 있다.As such, when the drilling device 60 is mounted on the drain construction equipment, it is not necessary to use a separate crane equipment, and since the crane has a larger size and weight than the drain construction equipment, the equipment is moved into the soft ground. Problems such as ground depressions generated in the process can be solved, and the upper layer improvement construction for hardly improving the upper layer to allow the movement of the crane can be omitted.

상기 단계에서 드레인 시공 장비에 천공장치(60)를 장착한 다음, 드레인 시공 장비를 천공이 필요한 위치로 이동하고, 레일(20)이 지면으로부터 수직이 되도록 세워 설치하게 된다. 이때 세워지는 레일(20)을 지면으로부터 수직이 되게 설치하는 것은 천공장치(60)가 레일(20)에 설치되기 때문에 레일(20)이 수직으로 세워 지면 천공장치(60) 또한 지면으로부터 수직으로 세워지는 것이 되고, 이로 인해 지반을 수직으로 천공할 수 있어 드레인 보드를 수직으로 압입하여 시공할 수 있게 된다(S300).After mounting the drilling device 60 to the drain construction equipment in the above step, the drain construction equipment is moved to the position that needs to be drilled, and the rail 20 is installed so that it is perpendicular to the ground. In this case, the rail 20 to be installed vertically from the ground is installed because the punching device 60 is installed on the rail 20, so that the rail 20 is vertically mounted, and the drilling device 60 is also perpendicular to the ground. As a result, the ground can be vertically drilled and the drain board can be vertically press-fitted to be installed (S300).

통상의 드레인 시공 장비에는 레일(20)을 수직으로 세울 수 있도록 그 수직도를 가늠할 수 있도록 구성되기 때문에 상술한 수직도 조절방법에 대한 상세한 설명은 생략하기로 한다.Since the conventional drain construction equipment is configured to measure the verticality of the rail 20 to stand vertically, detailed description of the above-described verticality adjusting method will be omitted.

천공장치(60)가 수직으로 세워지면 도 4에서와 같이 천공장치(60)를 작동하여 천공장치(60)에 장착된 천공파일을 지반 내로 압입하면서 천공작업을 실시하고(S400), 적정의 깊이로 천공이 완료되면 압입된 천공파일을 제거한 다음 천공장치(60)를 탈거하여 레일(20) 전방에 드레인 케이싱(70)을 재장착한다.When the drilling device 60 is set up vertically, as shown in FIG. 4, the drilling device 60 is operated to press the drilling file attached to the drilling device 60 into the ground and perform the drilling operation (S400). After drilling is completed, remove the press-fitted drilling file, and then remove the drilling device 60 and refit the drain casing 70 in front of the rail 20.

상기 과정에서 드레인 케이싱(70)이 레일(20) 전방에 설치되면 도 5에서와 같이 드레인 케이싱(70)을 천공된 홀에 맞춰 지반 내로 압입하면서 연약지반 개량시공을 실시한다(S500).When the drain casing 70 is installed in front of the rail 20 in the above process, as shown in FIG. 5, the drain casing 70 is press-fitted into the ground in accordance with the perforated hole, and the soft ground improvement construction is performed (S500).

이와 같은 시공방법을 통해 연약지반을 개량하기 위해 천공작업과 드레인 보드 압입 작업은 하나의 시공 장비로 할 수 있고, 이 때문에 시공에 소요되는 시간을 대폭 단축할 수 있으며, 무거운 크레인 장비를 사용하지 않아도 되어 천공장비 투입을 위한 지반강화 작업을 생략할 수 있다.In order to improve the soft ground through this construction method, drilling work and drain board press-in work can be done with one construction equipment, which can greatly shorten the time required for construction and eliminate the need for heavy crane equipment. Therefore, it is possible to omit the ground strengthening work for drilling equipment input.

도 1은 종래의 페이퍼 드레인 시공 장비의 예를 보인 사시도,1 is a perspective view showing an example of a conventional paper drain construction equipment,

도 2는 본 발명에 따른 천공장비가 부착된 페이퍼 드레인 시공장비의 예를 보인 구성도,Figure 2 is a block diagram showing an example of the paper drain construction equipment is attached to the drilling equipment according to the present invention,

도 3은 본 발명에 따른 천공장비가 부착된 페이퍼 드레인 시공장비를 이용한 시공방법의 예를 보인 순서도,Figure 3 is a flow chart showing an example of a construction method using a paper drain construction equipment equipped with a drilling equipment according to the present invention,

도 4는 본 발명에 따른 천공장비의 사용 예를 보인 측면도,Figure 4 is a side view showing an example of the use of the drilling equipment according to the present invention,

도 5는 본 발명에 따른 드레인 시공장비에 드레인 케이싱을 장착한 예를 보인 측면도,Figure 5 is a side view showing an example of mounting the drain casing in the drain construction equipment according to the present invention,

도 6은 본 발명에 따른 천공장치의 예를 보인 단면도이다.6 is a cross-sectional view showing an example of the drilling device according to the present invention.

[도면의 주요부분에 대한 부호의 설명][Explanation of symbols on the main parts of the drawings]

10: 본체 20: 레일10: main body 20: rail

30: 와이어 40: 와이어드럼30: wire 40: wire drum

50: 탈착부 60: 천공장치50: removable part 60: punching device

61: 해머 62: 실린더61: hammer 62: cylinder

63: 유압라인 64: 어큐뮬레이터63: hydraulic line 64: accumulator

65: 상판 66: 하판65: top plate 66: bottom plate

67: 완충실린더 70: 드레인 케이싱67: buffer cylinder 70: drain casing

Claims (5)

사용자의 조작에 의해 운행되는 본체(10)와; 상기 본체(10)에 구비되어 페이퍼 드레인 보드를 가이드하는 레일(20)과; 상기 레일(20)의 페이퍼 드레인 보드를 승강시키는 와어어(30) 및; 상기 와이어(30)를 권취하는 와이어드럼(40)을 포함하는 페이퍼 드레인 시공 장비에 있어서,A main body 10 driven by a user's operation; A rail 20 provided in the main body 10 to guide the paper drain board; A wire (30) for elevating the paper drain board of the rail (20); In the paper drain construction equipment comprising a wire drum 40 winding the wire 30, 상기 레일(20)의 양측면에 설치되며 레일(20)을 따라 길이를 갖는 탈착부(50)와; 상기 탈착부(50)에 장, 탈착되며 천공파일을 압입 또는 인발하기 위해 사용되는 천공장치(60)를 포함하되;A detachable part 50 installed on both sides of the rail 20 and having a length along the rail 20; It includes a punching device 60 is mounted on the detachable portion 50, detachable and used to press or draw a punched file; 상기 천공장치(60)는 유압에 의해서 승하강되는 해머(61)와; 상기 해머(61)를 가이드하는 실린더(62) 및; 상기 실린더(62)의 상하측 각각에 유체가 공급 및 배출되는 유압라인(63)과 어큐뮬레이터(64)를 포함하는 유압식 천공장비이고;The drilling device 60 and the hammer (61) which is raised and lowered by hydraulic pressure; A cylinder (62) for guiding the hammer (61); Hydraulic drilling equipment including an accumulator (64) and a hydraulic line (63) for supplying and discharging fluid to the upper and lower sides of the cylinder (62); 상기 유압식 천공장비의 실린더(62)의 상하면에 각각 상, 하판(65, 66)을 구비하고, 상기 상, 하판(65, 66)의 양단을 연결하는 완충실린더(67)를 포함한 것을 특징으로 하는 천공장비가 부착된 페이퍼 드레인 시공 장비.The upper and lower plates 65 and 66 are provided on the upper and lower surfaces of the cylinder 62 of the hydraulic drilling equipment, respectively, and include a buffer cylinder 67 connecting both ends of the upper and lower plates 65 and 66. Paper drain installation equipment with perforation equipment. 삭제delete 삭제delete 삭제delete 연약지반을 개량하는 시공방법에 있어서,In the construction method to improve the soft ground, 연약지반 사이에 견고한 층이 내재되어 있는지를 판단하는 지반 표층 분석단계(S100)와;A ground surface analysis step (S100) of determining whether a solid layer is embedded between the soft grounds; 드레인 시공 장비의 전방에 천공장치(60)를 장착하는 천공장비 설치단계(S200)와;Drilling equipment installation step (S200) for mounting the drilling device 60 in front of the drain construction equipment; 본체(10)에서 레일(20)을 세워 천공장치(60)를 지면에 수직으로 세우는 수직도 조절 단계(S300)와;A vertical degree adjusting step (S300) of setting up the rails 20 in the main body 10 and setting the drilling device 60 perpendicular to the ground; 천공장치(60)의 수직도를 조절한 다음, 천공장치를 작동시켜 천공파일을 지반 내의 적정 깊이로 압입하는 지반천공단계(S400) 및;After adjusting the vertical degree of the drilling device 60, the ground drilling step (S400) for pressing the drilling file to the appropriate depth in the ground by operating the mill factory; 천공 완료 후, 천공장치(60)를 탈거하고 레일(20)에 페이퍼 드레인 보드를 설치하여 드레인 보드를 지반 내에 압입하는 보드 압입단계(S500)로 이루어지는 것을 특징으로 하는 천공장비가 부착된 페이퍼 드레인 시공 장비를 이용한 시공방법.After the completion of the drilling, remove the punching device 60 and install the paper drain board on the rail 20, the paper drain construction with a punching equipment characterized in that the press-in step (S500) for press-in the drain board into the ground Construction method using equipment.
KR1020090093836A 2009-10-01 2009-10-01 A paper board drain machine and the used method KR100971564B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090093836A KR100971564B1 (en) 2009-10-01 2009-10-01 A paper board drain machine and the used method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090093836A KR100971564B1 (en) 2009-10-01 2009-10-01 A paper board drain machine and the used method

Publications (1)

Publication Number Publication Date
KR100971564B1 true KR100971564B1 (en) 2010-07-20

Family

ID=42645871

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090093836A KR100971564B1 (en) 2009-10-01 2009-10-01 A paper board drain machine and the used method

Country Status (1)

Country Link
KR (1) KR100971564B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200221445Y1 (en) * 2000-10-19 2001-04-16 광진중공업주식회사 Oil pressure pile hammer
KR100311864B1 (en) * 1997-01-17 2001-12-28 호소미 키요시 Suspension system
KR20020021445A (en) * 2000-09-15 2002-03-21 김덕중 A complex dimming circuit
KR100623198B1 (en) * 2004-03-03 2006-09-18 삼성물산 주식회사 Installer of Drain Board
KR100650435B1 (en) * 2006-09-04 2006-11-30 (주)수림건설 Plastic board drain apparatus multi-drain casing with improvement soft ground

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100311864B1 (en) * 1997-01-17 2001-12-28 호소미 키요시 Suspension system
KR20020021445A (en) * 2000-09-15 2002-03-21 김덕중 A complex dimming circuit
KR200221445Y1 (en) * 2000-10-19 2001-04-16 광진중공업주식회사 Oil pressure pile hammer
KR100623198B1 (en) * 2004-03-03 2006-09-18 삼성물산 주식회사 Installer of Drain Board
KR100650435B1 (en) * 2006-09-04 2006-11-30 (주)수림건설 Plastic board drain apparatus multi-drain casing with improvement soft ground

Similar Documents

Publication Publication Date Title
CN103669351B (en) Full-stroke hole-leading hydraulic static pile driver
CN108978644B (en) Energy-saving and environment-friendly construction method for cast-in-situ bored pile
KR101904230B1 (en) Pile driving equipment with counter weight and pile driving method using the same
KR100971564B1 (en) A paper board drain machine and the used method
KR102637552B1 (en) File construction apparatus capable of simultaneous achievement of hole-boring and vibrating
CN112459064B (en) Full casing cast-in-situ bored pile casing correcting device and construction method
CN115404880A (en) Supporting pile construction process
CN211948416U (en) Immersed tube pile extruding machine
JP5378066B2 (en) Mountain fastening method
KR200398533Y1 (en) Pile for using construction
KR101882192B1 (en) Multi punching device for grouting method to road subsided by weak ground
KR20120125727A (en) Boring equipment
KR20120126704A (en) Construction method of screw file
US5465666A (en) Method for changing railway sleepers and equipment for applying the method
CN104594353B (en) Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device
KR101176515B1 (en) Blast hole Down-drilling Device for Backhoe
JP3760365B2 (en) Core material erection device
CN115198797B (en) Underground communication channel construction method combining three-side surrounding pipe curtain method and open cut
KR100837182B1 (en) Pile construction method for drilling and piling at a time without rotating a pile
CN212272017U (en) Double-drill-rod full-sleeve type long spiral drilling pile machine
CN213390295U (en) Building equipment for foundation building
CN215367204U (en) Vibroflotation gravel pile machine
KR102230279B1 (en) A device preventing scattering of dust and noise for an auger drilling machine
CN206635761U (en) Dam repairs automatic bar planting dabbing system
KR100795446B1 (en) A excavating apparatus for improving week-ground

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130718

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee