JPH11292220A - Transportation control method and device for cargo in physical distribution system - Google Patents

Transportation control method and device for cargo in physical distribution system

Info

Publication number
JPH11292220A
JPH11292220A JP10269898A JP10269898A JPH11292220A JP H11292220 A JPH11292220 A JP H11292220A JP 10269898 A JP10269898 A JP 10269898A JP 10269898 A JP10269898 A JP 10269898A JP H11292220 A JPH11292220 A JP H11292220A
Authority
JP
Japan
Prior art keywords
branch
load
storage
inventory management
work instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10269898A
Other languages
Japanese (ja)
Other versions
JP4029465B2 (en
Inventor
Masahiro Yamaguchi
賢宏 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Automatic Loom Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Automatic Loom Works Ltd filed Critical Toyoda Automatic Loom Works Ltd
Priority to JP10269898A priority Critical patent/JP4029465B2/en
Publication of JPH11292220A publication Critical patent/JPH11292220A/en
Application granted granted Critical
Publication of JP4029465B2 publication Critical patent/JP4029465B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)
  • Control Of Conveyors (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce a useless stop time for cargoes at the entrance of a branch passage and to shorten a transportation cycle time in a physical distribution system transporting the cargoes by using cargo placements with storage positions in automatic warehouses set to be specified positions, respectively. SOLUTION: Cargoes are transported from a delivery-in station 1 to a plurality of automatic warehouses 2 via a main transportation passage 3 and branch passages 4a, 4b branching from the main transportation passage 3 and ranging to delivery-in areas in the automatic warehouses. The display of a storage position for a cargo placement 8 transported along the main transportation passage 3 is identified by a bar code reader 22 at a position upstream of a branch/straight switching means 12. In accordance with an output signal from the bar code reader 22, branch indication is output from a control computer 27 to the branch/straight switching means 12 and an delivery-in demand signal is output to an inventory management computer 26. The inventory management computer 26 is used to make delivery-in indication data for a stacker crane 6.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は搬送用移動体により
多数の収納部に対して荷の搬入、搬出を行う自動倉庫を
複数備え、荷の搬送を前記自動倉庫での保管位置がそれ
ぞれ異なる特定の収納部となるように設定された保管位
置の表示がなされた荷載置体を使用して行うとともに、
荷の搬送元から前記各自動倉庫への荷の搬送を主搬送経
路と、該主搬送経路から分岐され前記自動倉庫の入庫部
に至る各分岐経路とを介して行う物流システムにおける
荷の搬送制御方法及び荷の搬送制御装置に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention comprises a plurality of automatic warehouses for carrying in / out a load to / from a large number of storage units by means of a transfer movable body. Using a loading body with a storage position set to be a storage unit, and
Load transfer control in a logistics system in which a load is transferred from a load transfer source to each of the automatic warehouses through a main transfer route and each of the branch routes branched from the main transfer route and reaching a storage section of the automatic warehouse. The present invention relates to a method and a load transfer control device.

【0002】[0002]

【従来の技術】従来、この種の物流システムとして例え
ば図6に示すものがある。この物流システムでは、荷の
搬送元となるステーション(図示せず)と複数(2機の
み図示)の自動倉庫51とが主搬送経路52及び分岐経
路53により連絡されている。各自動倉庫51は左右両
側に設けられたラック54間の通路に沿って移動するス
タッカクレーン55を備え、スタッカクレーン55によ
ってラック54の各収納部56に対する荷Wの搬入、搬
出が行われる。
2. Description of the Related Art Conventionally, as this kind of distribution system, for example, there is one shown in FIG. In this physical distribution system, a station (not shown) serving as a load transfer source and a plurality of (only two units are shown) automatic warehouses 51 are connected by a main transfer route 52 and a branch route 53. Each automatic warehouse 51 includes a stacker crane 55 that moves along a passage between the racks 54 provided on the left and right sides, and the stacker crane 55 loads and unloads the load W to and from each storage section 56 of the rack 54.

【0003】主搬送経路52及び分岐経路53はコンベ
アで構成され、各分岐経路53と対応する位置にはスト
ッパ57が、各分岐経路53より上流側にはバーコード
リーダ58がそれぞれ配設されている。荷Wは主搬送経
路52上を図6の左側から右側へと搬送され、バーコー
ドリーダ58によって行き先の収納部56のアドレスが
読み取られる。そして、行き先が当該分岐経路53と対
応する自動倉庫51の収納部56であれば、ストッパ5
7が阻止位置に配置されて当該荷Wの直進が禁止され
る。そして、主搬送経路52から分岐経路53へ移載さ
れた後、分岐経路53の先端まで搬送され、昇降装置5
9で上昇された状態でスタッカクレーン55に移載さ
れ、所定の収納部56に搬入される。該当する収納部5
6のない荷Wは払い出しステーション60へ搬送され
る。
The main transport path 52 and the branch path 53 are constituted by conveyors. A stopper 57 is provided at a position corresponding to each branch path 53, and a bar code reader 58 is provided upstream of each branch path 53. I have. The load W is transported from the left side to the right side in FIG. 6 on the main transport path 52, and the address of the destination storage section 56 is read by the barcode reader 58. If the destination is the storage section 56 of the automatic warehouse 51 corresponding to the branch route 53, the stopper 5
7 is disposed at the blocking position, and the straight movement of the load W is prohibited. Then, after being transferred from the main transport route 52 to the branch route 53, it is transported to the tip of the branch route 53, and
In a state of being lifted at 9, it is transferred to a stacker crane 55 and carried into a predetermined storage section 56. Applicable storage unit 5
The load W without 6 is conveyed to the payout station 60.

【0004】各自動倉庫51の在庫管理は在庫管理コン
ピュータで行われる。また、主搬送経路52及び分岐経
路53を構成するコンベアのコントローラ及びスタッカ
クレーン55のコントローラは、制御コンピュータ(い
ずれも図示せず)の指令に基づいてコンベア及びスタッ
カクレーン55を制御する。制御コンピュータはバーコ
ードリーダ58の読み取り信号から、その荷Wが対応す
る分岐経路53への進入を必要とする荷Wか否かを判断
し、必要であればストッパ57に阻止位置への移動を指
令する。そして、制御コンピュータは在庫管理コンピュ
ータに入庫要求を行い、在庫管理コンピュータから作業
指示データを入力すると、その指示データに基づいて各
コントローラに制御指令を出力する。
[0004] Inventory management of each automatic warehouse 51 is performed by an inventory management computer. Further, the controller of the conveyor and the controller of the stacker crane 55 constituting the main transport path 52 and the branch path 53 control the conveyor and the stacker crane 55 based on instructions from a control computer (both not shown). The control computer determines from the read signal of the bar code reader 58 whether or not the load W needs to enter the corresponding branch path 53, and if necessary, causes the stopper 57 to move to the blocking position. Command. Then, the control computer issues a storage request to the inventory management computer, and when the work instruction data is input from the inventory management computer, the control computer outputs a control instruction to each controller based on the instruction data.

【0005】[0005]

【発明が解決しようとする課題】前記従来装置において
は、制御コンピュータは、在庫管理コンピュータからの
作業指示データ(作業指示信号)を入力した後、コンベ
ア及びスタッカクレーン55の駆動を制御する各コント
ローラに制御指令を出力する。従って、作業指示データ
がすぐに入力されない場合には、分岐経路53へ進入す
べき荷Wがストッパ57と係合した状態で、分岐経路5
3の入口で一定時間停止してしまい、後続の荷Wの直進
も阻止される。その結果、直進する荷Wの待ち時間が長
くなり、最終の分岐経路53で分岐される荷Wは、前記
待ち時間の累積により搬送時間が長くなるという問題が
ある。
In the above-mentioned conventional apparatus, the control computer inputs the work instruction data (work instruction signal) from the inventory management computer, and then sends the work instruction data to each controller for controlling the driving of the conveyor and the stacker crane 55. Outputs control commands. Therefore, when the work instruction data is not input immediately, the load W to enter the branch path 53 is engaged with the stopper 57 and the branch path 5
At the entrance of No. 3, it stops for a certain period of time, and the subsequent straight movement of the load W is also prevented. As a result, there is a problem that the waiting time of the load W going straight increases, and the load W branched off on the final branch path 53 becomes longer due to the accumulation of the waiting time.

【0006】特に自動倉庫51が多数設けられ、在庫管
理すべき収納部の数が数千から2万程度に及ぶ場合は、
制御コンピュータから在庫管理コンピュータに入庫要求
を出力してから、作業指示データを入力するまでに要す
る時間が長くなってこのような問題が生じ易い。また、
在庫管理対象が多いため、在庫管理コンピュータにおけ
る在庫更新処理の遅れが発生し、制御コンピュータから
入庫要求を出力した時点で在庫管理コンピュータが対象
収納部を入庫先に指定する引当て処理を行った時点では
引当て失敗となる場合がある。このとき一度の失敗で分
岐処理を行うのをやめて当該荷Wを払い出しステーショ
ンに搬送するのは、当該荷を再度搬送元に送り返して搬
送をやり直すことになり無駄が大きくなる。一方、引当
て処理が失敗した場合でも、在庫更新処理の遅れが解消
した段階で再試行(リトライ)をすると、引当てが成功
する確率が高い。しかし、分岐経路53の入口で再試行
(リトライ)を行うまでストッパ57により荷Wの移動
を阻止すると、前記と同様に後続の荷Wの直進も阻止さ
れる。前記問題がより大きくなる。
In particular, when a large number of automatic warehouses 51 are provided and the number of storage units to be managed in inventory ranges from several thousand to about 20,000,
The time required from the output of a storage request from the control computer to the inventory management computer to the input of work instruction data is lengthened, and such a problem is likely to occur. Also,
The inventory management computer delays the inventory update process in the inventory management computer because there are many inventory management targets, and the inventory management computer performs allocation processing to specify the target storage unit as the storage destination when the storage request is output from the control computer Then, the allocation may fail. At this time, stopping the branching process and transporting the load W to the payout station due to a single failure requires sending the load back to the transport source and redoing the transport, thereby increasing waste. On the other hand, even if the allocation processing has failed, if retry (retry) is performed at a stage where the delay of the inventory update processing has been resolved, the allocation is likely to succeed. However, if the movement of the load W is blocked by the stopper 57 until a retry (retry) is performed at the entrance of the branch route 53, the subsequent load W is also prevented from going straight as described above. The problem is even greater.

【0007】本発明は前記の問題点に鑑みてなされたも
のであって、その目的は自動倉庫での保管位置がそれぞ
れ異なる特定の位置に設定されるとともに、保管位置の
表示がなされた荷載置体を使用して荷の搬送を行い、分
岐経路の入口部における荷の無駄な停止時間を少なくし
て、搬送サイクルタイムを短縮することができる物流シ
ステムにおける荷の搬送制御方法及び搬送制御装置を提
供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and has as its object the purpose of setting a storage position in an automatic warehouse to a specific position different from each other and displaying a storage position. A transport control method and a transport control device for a logistics system capable of transporting a load using a body, reducing unnecessary stoppage time of the load at an entrance of a branch path, and shortening a transport cycle time. To provide.

【0008】[0008]

【課題を解決するための手段】前記の目的を達成するた
め、請求項1に記載の発明では、搬送用移動体により多
数の収納部に対して荷の搬入、搬出を行う自動倉庫を複
数備え、荷の搬送を前記自動倉庫での保管位置がそれぞ
れ異なる特定の収納部となるように設定された保管位置
の表示がなされた荷載置体を使用して行うとともに、荷
の搬送元から前記各自動倉庫への荷の搬送を主搬送経路
と、該主搬送経路から分岐され前記自動倉庫の入庫部に
至る各分岐経路とを介して行う物流システムにおいて、
前記主搬送経路の各分岐経路毎に分岐・直進切替手段
と、該分岐・直進切替手段より上流側の位置で前記主搬
送経路を搬送されてくる荷載置体の保管位置の表示を確
認する保管位置確認手段とを設け、該保管位置確認手段
で荷載置体の保管位置を確認に基づいて、当該分岐部の
分岐・直進切替手段への分岐又は直進の指示と、当該自
動倉庫の搬送用移動体の作業指示データの作成処理とを
並行して行う。
In order to achieve the above object, according to the first aspect of the present invention, there are provided a plurality of automatic warehouses for loading and unloading loads to and from a large number of storage units by a transfer movable body. The transport of the load is performed using the load-bearing body on which the storage position in the automatic warehouse is displayed so that the storage position is set to be a different specific storage unit. In a logistics system that transports a load to an automatic warehouse through a main transport route and each branch route that branches off from the main transport route and reaches a storage unit of the automatic warehouse,
Branching / straight-forward switching means for each branch path of the main transport path, and storage for confirming the display of the storage position of the load carried on the main transport path at a position upstream of the branch / straight switching means. A position confirming means, based on the storage position confirming means confirming the storage position of the loaded body, instructing the branching / straightening switching means of the branching part to branch or go straight, and moving the automatic warehouse for transportation. The process of creating the body work instruction data is performed in parallel.

【0009】請求項2に記載の発明では、搬送用移動体
により多数の収納部に対して荷の搬入、搬出を行う自動
倉庫を複数備え、荷の搬送を前記自動倉庫での保管位置
がそれぞれ異なる特定の収納部となるように設定された
保管位置の表示がなされた荷載置体を使用して行うとと
もに、荷の搬送元から前記各自動倉庫への荷の搬送を主
搬送経路と、該主搬送経路から分岐され前記自動倉庫の
入庫部に至る各分岐経路とを介して行う物流システムに
おいて、前記主搬送経路の各分岐経路と対応する位置に
それぞれ設けられた分岐・直進切替手段と、前記主搬送
経路の各分岐経路と対応する位置にそれぞれ設けられ、
前記各分岐・直進切替手段より上流側の位置で前記主搬
送経路を搬送されてくる前記荷載置体の保管位置の表示
を確認する保管位置確認手段と、荷の入出庫を要求する
要求信号に基づいて作業指示データを作成する在庫管理
コンピュータと、前記保管位置確認手段の確認信号に基
づいて、前記在庫管理コンピュータへの入庫要求信号
と、前記分岐・直進切替手段への分岐又は直進指令とを
並行して又はほぼ同時に出力し、在庫管理コンピュータ
からの作業指示データに基づいて前記搬送用移動体のコ
ントローラに作業指令を出力する制御コンピュータとを
備えた。
According to the second aspect of the present invention, a plurality of automatic warehouses are provided for loading and unloading loads to and from a large number of storage units by the transporting moving body. A load is displayed using the storage unit that is displayed as a storage position set to be a different specific storage unit, and the transfer of the load from the load transfer source to each of the automatic warehouses is performed by a main transfer path, and In a logistics system that branches off from the main transport route and passes through each branch route to the storage section of the automatic warehouse, a branch / straight switching unit provided at a position corresponding to each branch route of the main transport route, Each is provided at a position corresponding to each branch path of the main transport path,
Storage position confirmation means for confirming the display of the storage position of the load carried by the main transport path at a position upstream of each branching / straight switching means; and a request signal for requesting loading and unloading of the load. An inventory management computer that creates work instruction data based on the storage request, a storage request signal to the inventory management computer, and a branching / straightening command to the branching / straightening switching unit, based on a confirmation signal of the storage location checking unit. And a control computer for outputting work commands to the controller of the transporting moving body based on work instruction data from the inventory management computer in parallel or almost simultaneously.

【0010】請求項3に記載の発明では、請求項2に記
載の発明において、前記在庫管理コンピュータは、前記
制御コンピュータからの入庫要求信号に基づいて作業指
示データの作成処理を行う際に、一度失敗しても所定時
間内に所定の周期で作業指示データの作成処理の再試行
を行う再試行機能を備えている。
According to a third aspect of the present invention, in the second aspect of the present invention, the inventory management computer, when performing a process of creating work instruction data based on a storage request signal from the control computer, A retry function is provided for retrying the process for creating the work instruction data within a predetermined period at a predetermined cycle even if the operation fails.

【0011】請求項4に記載の発明では、請求項2又は
請求項3に記載の発明において、前記制御コンピュータ
は、前記搬送用移動体への作業指示データを前記在庫管
理コンピュータからの指令に基づかずに作業者の操作に
よって作成するための、作業指示データ作成手段を備え
ている。
According to a fourth aspect of the present invention, in the second or third aspect of the present invention, the control computer transmits work instruction data to the transporting moving body based on a command from the inventory management computer. Work instruction data creating means for creating the work instruction data without operator's operation.

【0012】請求項5に記載の発明では、請求項4に記
載の発明において、前記作業指示データ作成手段は、前
記制御コンピュータが前記在庫管理コンピュータからの
作業指示データ作成不能の信号を受信したときに作動可
能に構成されている。
According to a fifth aspect of the present invention, in the fourth aspect of the present invention, the work instruction data creating means receives the signal indicating that the work instruction data cannot be created from the inventory management computer. It is configured to be operable.

【0013】請求項1〜請求項5に記載の発明では、荷
の搬送は自動倉庫での保管位置がそれぞれ異なる特定の
収納部となるように設定された保管位置の表示がなされ
た荷載置体を使用して行われる。荷の搬送元から複数の
自動倉庫への荷の搬送が主搬送経路と、該主搬送経路か
ら分岐され前記自動倉庫の入庫部に至る各分岐経路とを
介して行われる。主搬送経路を搬送されてくる荷載置体
の保管位置の表示が、各分岐経路毎に設けられた分岐・
直進切替手段より上流側の位置で保管位置確認手段によ
って確認される。そして、保管位置確認手段による前記
保管位置の確認に基づいて、当該分岐部の分岐・直進切
替手段への分岐又は直進の指示と、当該自動倉庫の搬送
用移動体の作業指示データの作成処理とが並行して行わ
れる。
According to the first to fifth aspects of the present invention, the load is displayed on a storage position which is set so that the load is conveyed to a specific storage unit at a different storage position in the automatic warehouse. This is done using The transfer of a load from a load transfer source to a plurality of automatic warehouses is performed via a main transfer path and each branch path branched from the main transfer path and reaching a storage section of the automatic warehouse. The display of the storage position of the load carried on the main transport route is displayed on the branch /
It is confirmed by the storage position confirmation means at a position upstream of the straight-ahead switching means. Then, based on the confirmation of the storage position by the storage position confirmation means, an instruction of branching or going straight to the branching / straightening switching means of the branching section, and a process of creating work instruction data of the transporting moving body of the automatic warehouse. Are performed in parallel.

【0014】請求項2に記載の発明では、荷の入出庫の
要求信号に基づいて在庫管理コンピュータにより作業指
示データが作成される。前記保管位置確認手段の確認信
号に基づいて、制御コンピュータから在庫管理コンピュ
ータへの入庫要求信号と、前記分岐・直進切替手段への
分岐又は直進指示とが並行して又はほぼ同時に出力され
る。そして、在庫管理コンピュータからの作業指示デー
タが制御コンピュータに入力されると、制御コンピュー
タから搬送用移動体のコントローラに作業指令が出力さ
れる。
According to the second aspect of the present invention, the work instruction data is created by the inventory management computer based on the request signal for loading / unloading of goods. Based on the confirmation signal of the storage position confirmation means, a storage request signal from the control computer to the inventory management computer and a branch or straight ahead instruction to the branch / straight switching means are output in parallel or almost simultaneously. When the work instruction data from the inventory management computer is input to the control computer, a work instruction is output from the control computer to the controller of the transporting moving body.

【0015】請求項3に記載の発明では、請求項2に記
載の発明において、在庫管理コンピュータが、制御コン
ピュータからの入庫要求信号に基づいて作業指示データ
の作成処理を行う際に、一度失敗しても所定時間内に所
定の周期で作業指示データの作成処理が再試行される。
According to a third aspect of the present invention, in the second aspect of the present invention, when the inventory management computer performs a process of creating work instruction data based on a storage request signal from the control computer, it fails once. Even so, the process of creating the work instruction data is retried at a predetermined cycle within a predetermined time.

【0016】請求項4に記載の発明では、請求項2又は
請求項3に記載の発明において、前記制御コンピュータ
に装備された作業指示データ作成手段を作業者が操作す
ることにより、前記搬送用移動体への作業指示データが
前記在庫管理コンピュータからの指令に基づかずに作成
可能となる。
According to a fourth aspect of the present invention, in the second or third aspect of the present invention, the transfer operation is performed by an operator operating a work instruction data generating means provided in the control computer. Work instruction data for the body can be created without being based on a command from the inventory management computer.

【0017】請求項5に記載の発明では、請求項4に記
載の発明において、前記作業指示データ作成手段は前記
制御コンピュータが前記在庫管理コンピュータからの作
業指示データ作成不能の信号を受信したときに作動可能
となる。
According to a fifth aspect of the present invention, in the fourth aspect of the present invention, the work instruction data creating means receives a signal indicating that the work instruction data cannot be created from the inventory management computer. It is ready for operation.

【0018】[0018]

【発明の実施の形態】以下、本発明を具体化した一実施
の形態を図1〜図5に従って説明する。図1に示すよう
に、この物流システムでは、荷Wの搬送元としての搬入
ステーション1と複数(2機のみ図示)の自動倉庫2と
が主搬送経路3及び分岐経路4により連絡されている。
各自動倉庫2には複数の収納部5aを備えた一対のラッ
ク(枠組棚)5と、ラック5間の通路に沿って移動する
搬送用移動体としてのスタッカクレーン6とを備えてい
る。スタッカクレーン6は通路に敷設された走行用レー
ル7に沿って走行可能に配備され、スタッカクレーン6
によってラック5の各収納部5aに対する荷Wの搬入、
搬出が行われる。荷Wは荷載置体8(図2に図示)上に
載置された状態で搬送される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. As shown in FIG. 1, in this distribution system, a loading station 1 as a transport source of a load W and a plurality of (only two machines are shown) automatic warehouses 2 are connected by a main transport route 3 and a branch route 4.
Each automatic warehouse 2 is provided with a pair of racks (frame shelves) 5 each having a plurality of storage sections 5a, and a stacker crane 6 as a transfer movable body that moves along a passage between the racks 5. The stacker crane 6 is provided so as to be able to travel along a traveling rail 7 laid in a passage.
Loading of the load W into each storage section 5a of the rack 5 by
Unloading is performed. The load W is conveyed while being placed on the load carrying body 8 (shown in FIG. 2).

【0019】主搬送経路3は各自動倉庫2のスタッカク
レーン6の走行方向と直交する方向に延びるように配設
され、分岐経路4a,4bはスタッカクレーン6の走行
方向と平行に配設されている。主搬送経路3及び分岐経
路4a,4bはそれぞれコンベアで構成されている。こ
の実施の形態ではコンベアとしてローラコンベア9が使
用されている。図2及び図3に示すように、ローラコン
ベア9は、平行に立設されたフレーム10間に所定間隔
で平行に配設されたローラ11と、各ローラ11を回転
させるモータ(図示せず)とを備えている。ローラコン
ベア9は、荷載置体8を搬送する際に、積極駆動される
少なくとも1本のローラ11に荷載置体8が常に係合す
るように構成されている。また、主搬送経路3のローラ
コンベア9は、分岐経路4a,4bと対応する位置にお
いては、ローラ11の配置間隔が他の位置より広く設定
されている。なお、主搬送経路3の搬入ステーション1
と反対側の端部には、払い出しステーション3aが配設
されている。払い出しステーション3aは搬入ステーシ
ョン1から搬入された荷載置体8で該当する収納部5a
のない荷載置体8を一時載置しておく役割を果たす。
The main transport path 3 is disposed so as to extend in a direction perpendicular to the traveling direction of the stacker crane 6 in each automatic warehouse 2, and the branch paths 4 a and 4 b are disposed parallel to the traveling direction of the stacker crane 6. I have. The main transport path 3 and the branch paths 4a and 4b are each configured by a conveyor. In this embodiment, a roller conveyor 9 is used as a conveyor. As shown in FIGS. 2 and 3, the roller conveyor 9 includes rollers 11 arranged in parallel at predetermined intervals between frames 10 erected in parallel, and a motor (not shown) for rotating each roller 11. And The roller conveyor 9 is configured such that when transporting the load 8, the load 8 always engages with at least one roller 11 that is positively driven. In the roller conveyor 9 of the main transport path 3, at positions corresponding to the branch paths 4 a and 4 b, the arrangement interval of the rollers 11 is set wider than other positions. In addition, the loading station 1 of the main transport path 3
A payout station 3a is disposed at the end opposite to the end. The payout station 3a is a storage unit 5a corresponding to the loading body 8 carried in from the carry-in station 1.
It plays a role of temporarily placing the loading body 8 without any.

【0020】主搬送経路3の各分岐経路4a,4bと対
応する位置には、分岐・直進切替手段12がそれぞれ設
けられている。図3に示すように、分岐・直進切替手段
12はチェーンコンベアにより構成されている。チェー
ンコンベアは主搬送経路3の搬送方向と直交する平面内
でそれぞれ周回可能に構成された一対のチェーン13を
備えている。各チェーン13は、エアシリンダ14によ
り昇降作動されるほぼコ字状のブラケット15に支持さ
れたスプロケット(図示せず)間に、その上側走行部が
ローラ11と平行に延びる状態で周回可能に巻き掛けら
れている。対向する一組のスプロケットは回転軸16に
より一体回転可能に連結され、回転軸16はブラケット
15上に支持されたモータ17によりベルト伝動機構1
8を介して駆動される。モータ17はブラケット15が
上昇位置に配置されたことを検知する図示しないセンサ
の検知信号に基づいて駆動が開始され、ブラケット15
が下降位置(待機位置)に配置されると停止されるよう
になっている。
At a position corresponding to each of the branch paths 4a and 4b of the main transport path 3, a branch / straight traveling switching means 12 is provided. As shown in FIG. 3, the branching / straightening switching means 12 is constituted by a chain conveyor. The chain conveyor includes a pair of chains 13 configured to be able to go around in a plane orthogonal to the transport direction of the main transport path 3. Each chain 13 is rotatably wound around a sprocket (not shown) supported by a substantially U-shaped bracket 15 which is raised and lowered by an air cylinder 14 with its upper running portion extending in parallel with the roller 11. It is hung. A pair of opposing sprockets are connected by a rotating shaft 16 so as to be integrally rotatable. The rotating shaft 16 is connected to a belt transmission mechanism 1 by a motor 17 supported on a bracket 15.
8 is driven. The motor 17 starts to be driven based on a detection signal of a sensor (not shown) that detects that the bracket 15 is located at the raised position, and
Is stopped at the lower position (standby position).

【0021】各チェーン13はエアシリンダ14の作動
により、ブラケット15とともに作用位置と待機位置と
に配置される。各チェーン13は作用位置では上側走行
部がローラコンベア9の上面より上方に突出して、荷載
置体8をローラ11から持ち上げて分岐通路4a,4b
に送り出す作用を為し、待機位置では上側走行部がロー
ラコンベア9の上面より下方に配置されて荷載置体8と
係合不能となる。
Each of the chains 13 is arranged at the operation position and the standby position together with the bracket 15 by the operation of the air cylinder 14. In the operation position, the upper running portion of each chain 13 projects above the upper surface of the roller conveyor 9, lifts the load 8 from the roller 11, and lifts the branching passages 4a, 4b.
In the standby position, the upper traveling portion is disposed below the upper surface of the roller conveyor 9 and cannot be engaged with the load 8.

【0022】主搬送経路3の各分岐経路4a,4bと対
応する位置にはストッパ19が配設されている。図3に
示すように、ストッパ19は平板で構成されるととも
に、ローラ11の下方に配設されたエアシリンダ20の
ピストンロッドに固定されている。ストッパ19は、エ
アシリンダ20の作動により、ローラ11の間から荷載
置体8と係合可能な状態に突出する阻止位置と、荷載置
体8が上方を通過可能な待機位置とに配置可能に構成さ
れている。また、分岐・直進切替手段12と対応する位
置には、荷載置体8を検知可能なセンサSが配設されて
いる。
A stopper 19 is provided at a position corresponding to each of the branch routes 4a and 4b of the main transport route 3. As shown in FIG. 3, the stopper 19 is formed of a flat plate, and is fixed to a piston rod of an air cylinder 20 disposed below the roller 11. The stopper 19 can be arranged in a blocking position where the stopper 19 protrudes from the space between the rollers 11 so as to be able to engage with the loading body 8 and a standby position where the loading body 8 can pass upward by operation of the air cylinder 20. It is configured. A sensor S capable of detecting the load 8 is provided at a position corresponding to the branching / straight-forward switching means 12.

【0023】図2に示すように、荷搬送体8には自動倉
庫2での保管位置を表示する表示部としてのバーコード
21が取り付けられている。各荷載置体8は、自動倉庫
2での保管位置がそれぞれ異なる特定の収納部5aとな
るように設定されており、各バーコード21にはそれぞ
れ異なる収納部5aの番地が表示されている。番地の表
示方法としては、例えば自動倉庫2の別と、ラック5の
左右の別と、ラック5の連方向(長手方向)及び段方向
(上下方向)の位置を示すデータが表示される。主搬送
経路3には各分岐・直進切替手段12より上流側の所定
位置に主搬送経路3を搬送されて来る荷載置体8のバー
コード21を確認する保管位置確認手段としてのバーコ
ードリーダ22が配設されている。
As shown in FIG. 2, a bar code 21 is attached to the load carrier 8 as a display unit for displaying a storage position in the automatic warehouse 2. Each loading body 8 is set so that the storage position in the automatic warehouse 2 is a specific storage unit 5a different from each other, and each barcode 21 displays a different address of the storage unit 5a. As a display method of the address, for example, data indicating the position of the automatic warehouse 2, the position of the rack 5 on the left and right, and the position of the rack 5 in the continuous direction (longitudinal direction) and the step direction (vertical direction) are displayed. In the main transport path 3, a bar code reader 22 serving as a storage position confirming means for confirming the bar code 21 of the load 8 which is being transported along the main transport path 3 to a predetermined position upstream of each branching / straight-forward switching means 12. Are arranged.

【0024】図1に示すように、分岐経路4a,4bの
先端部には昇降装置23が配設されている。昇降装置2
3はエアシリンダ24によって昇降作動される一対の支
持板25を備えている。支持板25はエアシリンダ24
の作動により、ローラ11の間から荷載置体8と係合可
能な状態に突出する上昇位置と、荷載置体8が上方を通
過可能な待機位置とに配置可能に構成されている。支持
板25は待機位置が基準位置となり、昇降装置23の上
方に荷載置体8が配置されると、図示しないセンサの検
知信号に基づいてエアシリンダ24が作動される。そし
て、支持板25が上昇位置に配置され、荷載置体8がロ
ーラ11から上方に離れた位置に支承された状態に保持
される。この状態でスタッカクレーン6に装備された移
載装置(フォーク装置)が、荷Wを荷載置体8とともに
分岐経路4a上からスタッカクレーン6上に移載するよ
うになっている。
As shown in FIG. 1, an elevating device 23 is provided at the tip of each of the branch paths 4a and 4b. Lifting device 2
Reference numeral 3 denotes a pair of support plates 25 which are moved up and down by an air cylinder 24. The support plate 25 is an air cylinder 24
By the operation described above, it is configured to be able to be arranged at a raised position protruding from the space between the rollers 11 so as to be able to engage with the loading body 8 and a standby position at which the loading body 8 can pass above. The standby position of the support plate 25 becomes a reference position, and when the load 8 is disposed above the elevating device 23, the air cylinder 24 is operated based on a detection signal of a sensor (not shown). Then, the support plate 25 is arranged at the ascending position, and the loading body 8 is held in a state of being supported at a position away from the roller 11 upward. In this state, the transfer device (fork device) mounted on the stacker crane 6 transfers the load W together with the load 8 from the branch path 4a onto the stacker crane 6.

【0025】次に前記物流システムの電気的構成を図4
に従って説明する。在庫管理コンピュータ26は制御コ
ンピュータ27と接続されている。在庫管理コンピュー
タ26は各自動倉庫2の在庫を管理するとともに、荷の
入出庫を要求する要求信号に基づいて作業指示データを
作成する。また、在庫管理コンピュータ26は制御コン
ピュータ27からの入庫を要求する要求データに基づい
て、入庫先の収納部5aが空か否かを確認してその収納
部5aを入庫先に指定する引当て処理と、作業指示デー
タの作成を行う。
Next, the electrical configuration of the distribution system is shown in FIG.
It will be described according to. The inventory management computer 26 is connected to the control computer 27. The inventory management computer 26 manages the inventory of each automatic warehouse 2 and creates work instruction data based on a request signal for requesting loading and unloading of cargo. Further, the inventory management computer 26 checks whether or not the storage unit 5a at the storage destination is empty based on the request data from the control computer 27 requesting storage, and assigns the storage unit 5a to the storage destination. Then, work instruction data is created.

【0026】在庫管理コンピュータ26は、制御コンピ
ュータ27からの入庫要求信号に基づいて作業指示デー
タの作成処理を行う際に、一度失敗しても所定時間内に
所定の周期で作業指示データの作成処理の再試行を行う
再試行機能を備えている。即ち、従来装置と異なり、引
当て処理に一度失敗しても入庫要求信号を受けてから所
定時間内であれば成功するまで引当て処理を繰り返す。
The inventory management computer 26 performs the process of generating the work instruction data at a predetermined cycle within a predetermined time, even if it fails once, when performing the process of generating the work instruction data based on the storage request signal from the control computer 27. It has a retry function to retry. That is, unlike the conventional device, even if the allocation processing fails once, the allocation processing is repeated until the processing is successful within a predetermined time after the receipt request signal is received.

【0027】制御コンピュータ27はコンベア制御盤2
8及びクレーン制御盤29に接続されている。制御コン
ピュータ27は、CPU(中央処理装置)30と、読出
し専用メモリ(ROM)からなるプログラムメモリ31
と、読出し及び書替え可能なメモリ(RAM)からなる
作業用メモリ32とを備えている。CPU30はバーコ
ードリーダ22と、キーボードを備えた入力装置33
と、表示手段としてのディスプレイ34とに入出力イン
タフェース35を介してそれぞれ接続されている。ま
た、CPU30はコンベア制御盤28及びクレーン制御
盤29と入出力インタフェース35及びネットワークを
介してデータ信号の授受が可能となっている。
The control computer 27 is a conveyor control panel 2
8 and a crane control panel 29. The control computer 27 includes a CPU (central processing unit) 30 and a program memory 31 including a read-only memory (ROM).
And a working memory 32 comprising a readable and rewritable memory (RAM). The CPU 30 includes a barcode reader 22 and an input device 33 having a keyboard.
And a display 34 as a display means via an input / output interface 35. The CPU 30 can exchange data signals with the conveyor control panel 28 and the crane control panel 29 via the input / output interface 35 and the network.

【0028】CPU30はプログラムメモリ31に記憶
されたプログラムデータに従って動作し、各バーコード
リーダ22からの確認信号に基づいて、在庫管理コンピ
ュータ26への入庫要求信号と、分岐・直進切替手段1
2への分岐指示とを並行して出力する。分岐・直進切替
手段12への分岐指示はコンベア制御盤28へ出力され
る。また、制御コンピュータ27は在庫管理コンピュー
タ26から作業指示データ信号を入力すると、その作業
指示データ基づいてクレーン制御盤29に作業指令を出
力する。
The CPU 30 operates in accordance with the program data stored in the program memory 31 and, based on the confirmation signal from each bar code reader 22, a storage request signal to the inventory management computer 26 and the branch / straight-forward switching means 1
The instruction to branch to 2 is output in parallel. The branch instruction to the branch / straight-forward switching means 12 is output to the conveyor control panel 28. When the control computer 27 receives a work instruction data signal from the inventory management computer 26, it outputs a work instruction to the crane control panel 29 based on the work instruction data.

【0029】プログラムメモリ31には、スタッカクレ
ーン6への作業指示データを在庫管理コンピュータ26
からの指令に基づかずに、作業者の操作即ち入力装置3
3からの入力によって作成するための、作業指示データ
作成手段を構成するプログラムが記憶されている。この
作業指示データ作成用のプログラムは、CPU30が在
庫管理コンピュータ26からの作業指示データ作成不能
の信号を受信したときに作動可能に構成されている。
The program memory 31 stores work instruction data for the stacker crane 6 in the inventory management computer 26.
Operation based on the command from the operator, that is, the input device 3
A program constituting work instruction data creating means to be created by the input from 3 is stored. The program for creating work instruction data is configured to be operable when the CPU 30 receives a signal from the inventory management computer 26 that the work instruction data cannot be created.

【0030】コンベア制御盤28はエアシリンダ14へ
の圧縮空気の供給を制御する電磁切替弁36と、エアシ
リンダ20への圧縮空気の供給を制御する電磁切替弁3
7と、エアシリンダ24への圧縮空気の供給を制御する
電磁切替弁38とにそれぞれ接続されている。コンベア
制御盤28はローラ11を駆動する各モータ39に接続
されている。コンベア制御盤28は、制御コンピュータ
27の作業指示信号に基づいて主搬送経路3及び分岐経
路4a,4bの各ローラコンベア9、分岐・直進切替手
段12及び昇降装置23を制御する。
The conveyor control panel 28 includes an electromagnetic switching valve 36 for controlling the supply of compressed air to the air cylinder 14 and an electromagnetic switching valve 3 for controlling the supply of compressed air to the air cylinder 20.
7 and an electromagnetic switching valve 38 that controls the supply of compressed air to the air cylinder 24. The conveyor control panel 28 is connected to each motor 39 for driving the rollers 11. The conveyor control panel 28 controls the roller conveyor 9 of the main transport path 3 and the branch paths 4a and 4b, the branch / straight switching means 12, and the elevating device 23 based on a work instruction signal from the control computer 27.

【0031】次に前記のように構成された物流システム
の作用を説明する。このシステムでは荷Wの搬送は、自
動倉庫2での保管位置がそれぞれ異なる収納部5aとな
るように1対1で設定された荷載置体8を使用して行わ
れる。荷Wは荷載置体8とともに搬入ステーション1か
ら主搬送経路3上に搬入され、主搬送経路3上を下流
側、即ち図1及び図3の右側に向かって搬送される。チ
ェーン13、ストッパ19及び支持板25は、いずれも
初期状態では待機位置に配置されている。
Next, the operation of the distribution system configured as described above will be described. In this system, the transport of the load W is performed by using the load carriers 8 set one-to-one so that the storage positions in the automatic warehouse 2 are different storage units 5a. The load W is loaded from the loading station 1 together with the load 8 onto the main transport path 3, and is transported downstream on the main transport path 3, that is, toward the right side in FIGS. 1 and 3. The chain 13, the stopper 19 and the support plate 25 are all located at the standby position in the initial state.

【0032】主搬送経路3上を搬送されている荷載置体
8が、分岐部の上流側に配設されたバーコードリーダ2
2と対応する位置を通過する際に、当該荷載置体8のバ
ーコード21がバーコードリーダ22で読み取られる。
バーコードリーダ22は読み取ったバーコード21のデ
ータを制御コンピュータ27に出力する。
The loading body 8 being transported on the main transport path 3 is connected to a bar code reader 2 disposed upstream of the branching section.
When passing through the position corresponding to 2, the barcode 21 of the loading body 8 is read by the barcode reader 22.
The barcode reader 22 outputs the read data of the barcode 21 to the control computer 27.

【0033】制御コンピュータ27のCPU30はバー
コードリーダ22からの前記データを入力すると、当該
荷載置体8がその分岐部で分岐を必要とする荷載置体8
か否かを判断する。そして、分岐を必要としないと判断
した場合は、コンベア制御盤28に直進指示を行う。コ
ンベア制御盤28はCPU30から直進指示を受ける
と、エアシリンダ20用の電磁切替弁37に消磁指令を
出力する。ストッパ19は初期状態において待機位置に
あり、電磁切替弁37も消磁状態にある。従って、この
消磁指令は念のための指令である。そして、各分岐部毎
に配設されているストッパ19は待機位置に保持され、
荷載置体8は分岐部を直進する。
When the CPU 30 of the control computer 27 inputs the data from the bar code reader 22, the loading body 8 needs to be branched at its branching point.
It is determined whether or not. Then, when it is determined that the branch is not required, a straight-ahead instruction is given to the conveyor control panel 28. Upon receiving the straight-ahead instruction from the CPU 30, the conveyor control panel 28 outputs a demagnetization instruction to the electromagnetic switching valve 37 for the air cylinder 20. The stopper 19 is in a standby position in an initial state, and the electromagnetic switching valve 37 is also in a demagnetized state. Therefore, this demagnetization command is a command for security. Then, the stopper 19 provided for each branch portion is held at the standby position,
The loading body 8 goes straight on the branch.

【0034】一方、CPU30は前記データから、当該
荷載置体8と対応する収納部5aの番地が、その分岐経
路4aに連絡された自動倉庫2のものである場合は、分
岐を必要とすると判断する。そして、CPU30は、在
庫管理コンピュータ26への入庫要求信号と、コンベア
制御盤28への分岐指示とを並行して出力(送信)す
る。コンベア制御盤28はCPU30からの分岐指示に
基づいて、分岐・直進切替手段12を分岐状態に切り替
える。即ち、コンベア制御盤28から電磁切替弁37に
励磁指令が出力され、エアシリンダ20が作動されてス
トッパ19が阻止位置に配置される。
On the other hand, from the data, the CPU 30 determines that a branch is required if the address of the storage section 5a corresponding to the load 8 is that of the automatic warehouse 2 connected to the branch path 4a. I do. Then, the CPU 30 outputs (transmits) a storage request signal to the inventory management computer 26 and a branch instruction to the conveyor control panel 28 in parallel. The conveyor control panel 28 switches the branching / straight-forward switching means 12 to a branching state based on a branching instruction from the CPU 30. That is, an excitation command is output from the conveyor control panel 28 to the electromagnetic switching valve 37, the air cylinder 20 is operated, and the stopper 19 is located at the blocking position.

【0035】ストッパ19が阻止位置に配置された状態
でセンサSから検知信号が出力されると、その信号に基
づいて電磁切替弁36が励磁される。そして、エアシリ
ンダ14が作動されてチェーン13が作用位置に配置さ
れて荷載置体8がチェーン13に支承された状態とな
る。次にモータ17が駆動されてチェーン13が作動さ
れ、荷載置体8が分岐経路4a上に送り出される。その
結果、センサSからの荷載置体8の検知が信号が出力さ
れなくなる。センサSからの検知信号が出力されなくな
ると、両電磁切替弁36,37が消磁されてエアシリン
ダ14,20が作動され、チェーン13及びストッパ1
9が待機位置に配置される。従って、主搬送経路3の当
該分岐部と対応する位置を再び荷載置体8が通過可能に
なる。
When a detection signal is output from the sensor S in a state where the stopper 19 is located at the blocking position, the electromagnetic switching valve 36 is excited based on the signal. Then, the air cylinder 14 is operated, the chain 13 is arranged at the operation position, and the load 8 is supported by the chain 13. Next, the motor 17 is driven to operate the chain 13, and the load 8 is sent out onto the branch path 4a. As a result, the detection of the load 8 from the sensor S does not output a signal. When the detection signal from the sensor S is no longer output, the two electromagnetic switching valves 36 and 37 are demagnetized, the air cylinders 14 and 20 are operated, and the chain 13 and the stopper 1 are stopped.
9 is arranged at the standby position. Therefore, the loading body 8 can pass through the position corresponding to the branching portion of the main transport path 3 again.

【0036】分岐経路4a上に送り出された荷載置体8
が、分岐経路4aの先端まで搬送されると、昇降装置2
3のエアシリンダ24が作動されて荷載置体8が支持板
25に支承されてスタッカクレーン6の移載装置による
移載が可能な位置に保持された状態となる。
The loading body 8 sent out on the branch path 4a
Is transported to the tip of the branch path 4a,
The third air cylinder 24 is operated, and the loading body 8 is supported by the support plate 25, and is maintained at a position where the transfer can be performed by the transfer device of the stacker crane 6.

【0037】一方、CPU30からの入庫要求信号を入
力した在庫コンピュータ26は、入庫要求に対応する収
納部5aの荷の有無を判断し、当該収納部5aが空であ
ればその収納部5aを入庫先に指定する引当て処理と、
作業指示データの作成を行う。そして、在庫管理コンピ
ュータ26はその作業指示データをCPU30に送信す
る。
On the other hand, the inventory computer 26 which has received the storage request signal from the CPU 30 determines whether there is a load in the storage unit 5a corresponding to the storage request, and if the storage unit 5a is empty, stores the storage unit 5a in storage. Assignment processing specified first,
Create work instruction data. Then, the inventory management computer 26 transmits the work instruction data to the CPU 30.

【0038】CPU30は作業指示データを入力(受
信)すると、クレーン制御盤29に荷搬送体8の入庫先
を示す作業指令を出力する。そして、クレーン制御盤2
9はその作業指令に基づいて、スタッカクレーン6に入
庫作業を行わせるように制御信号を出力する。そして、
スタッカクレーン6は入庫作業を行うため、入庫部、即
ち分岐経路4aの先端の昇降装置23と対応する位置に
移動する。スタッカクレーン6が入庫部に到達したとき
に、既に昇降装置23により荷載置体8が上昇位置に配
置されていれば、直ちに荷の移載作業が行われる。荷載
置体8が上昇位置に配置されていなければその状態とな
るまで待機し、荷載置体8が上昇位置に配置されると直
ちに荷の移載作業が行われる。
When the CPU 30 inputs (receives) the work instruction data, it outputs a work instruction to the crane control panel 29 indicating the destination where the load carrier 8 is stored. And crane control panel 2
9 outputs a control signal based on the work command so that the stacker crane 6 performs a stocking work. And
The stacker crane 6 is moved to a position corresponding to the elevating device 23 at the tip of the branch path 4a in order to perform the loading operation. When the stacker crane 6 reaches the storage section, if the loading device 8 has already been placed at the ascending position by the elevating device 23, the load transfer operation is immediately performed. If the load 8 is not located at the raised position, the process waits until the state is reached, and the load is transferred immediately after the load 8 is placed at the raised position.

【0039】そして、スタッカクレーン6によって荷W
が荷載置体8とともに所定の収納部5aに収納されて入
庫作業が完了すると、クレーン制御盤29からCPU3
0に入庫完了信号が送信される。CPU30はそれを受
信すると、在庫管理コンピュータ26に入庫完了信号を
送信する。在庫管理コンピュータ26はCPU30から
入庫完了信号を受信すると、在庫更新処理を行う。
The load W is moved by the stacker crane 6.
Is stored in the predetermined storage section 5a together with the loading body 8 and the warehousing operation is completed.
A storage completion signal is transmitted to 0. Upon receiving the notification, the CPU 30 transmits a storage completion signal to the inventory management computer 26. When the inventory management computer 26 receives the storage completion signal from the CPU 30, the inventory management computer 26 performs an inventory update process.

【0040】即ち、この実施の形態では分岐指示が必要
な場合の搬送制御の際の在庫管理コンピュータ26、C
PU30、コンベア制御盤28及びクレーン制御盤29
間の信号の流れは図5に示すようになる。在庫管理すべ
き収納部5aの数が数千〜2万に及ぶ場合は、在庫管理
コンピュータ26が入庫要求信号を受信してから入庫指
示信号を送信するまでに時間がかかる。従来は、CPU
30は入庫指示信号を受信してからコンベア制御盤28
への分岐指示及びクレーン制御盤29への入庫指示を行
うため、後続の荷載置体8の無駄な停止時間(待ち時
間)が長くなる。
That is, in this embodiment, the inventory management computer 26, C
PU 30, conveyor control panel 28 and crane control panel 29
The signal flow between them is as shown in FIG. When the number of storage units 5a to be stock-managed ranges from several thousand to 20,000, it takes time from when the stock management computer 26 receives the stock request signal to when it sends the stock instruction signal. Conventionally, CPU
30 is the conveyor control panel 28 after receiving the receiving instruction signal.
Since the instruction to branch to and the instruction to enter the crane control panel 29 are issued, a wasteful stop time (waiting time) of the subsequent loading body 8 becomes longer.

【0041】一方、この実施の形態ではコンベア制御盤
28への分岐指示は、在庫管理コンピュータ26への入
庫要求信号の送信と並行して行われる。従って、分岐・
直進切替手段12は在庫管理コンピュータ26における
処理を待つことなく、分岐状態に切り替えられる。ま
た、バーコードリーダ22がバーコード21を読み取っ
た時点から、荷載置体8がストッパ19と係合可能な位
置に到達するまでの時間T1より、バーコードリーダ2
2の出力信号に基づいてCPU30が分岐を必要と判断
して、コンベア制御盤28が分岐指示を入力するまでの
時間T2の方が短い。そして、荷載置体8がストッパ1
9と係合すると、直ちに分岐・直進切替手段12が作動
されて、荷載置体8が分岐経路4a,4bに送り出され
る。
On the other hand, in this embodiment, the branch instruction to the conveyor control panel 28 is performed in parallel with the transmission of the storage request signal to the inventory management computer 26. Therefore, the branch
The straight-ahead switching means 12 is switched to the branch state without waiting for the processing in the inventory management computer 26. In addition, the barcode reader 2 starts reading from the time T1 when the barcode reader 22 reads the barcode 21 and reaches the position where the loading body 8 can engage with the stopper 19.
The time T2 until the CPU 30 determines that the branch is necessary based on the output signal of No. 2 and the conveyor control panel 28 inputs the branch instruction is shorter. And the loading body 8 is the stopper 1
As soon as it engages with 9, the branching / straightening switching means 12 is actuated, and the load 8 is sent out to the branch paths 4a, 4b.

【0042】また、正常な作動状態であれば、分岐・直
進切替手段12の作動が開始されてから、荷載置体8が
昇降装置23によって上昇位置に配置されるまでの時間
T3より、CPU30が入庫要求信号を送信してからク
レーン制御盤29がスタッカクレーン6に入庫指示を出
力するまでの時間T4の方が短い。従って、スタッカク
レーン6は荷載置体8が分岐経路4a,4bを移動中に
入庫部へ移動を開始でき、無駄な時間が少なくなるとと
もに、場合によっては荷載置体8が上昇位置に配置され
るとすぐに移載作業を開始できる。
In the normal operation state, the CPU 30 starts operating after the time T3 from the start of the operation of the branching / straightening switching means 12 to the placement of the load 8 in the ascending position by the elevating device 23. The time T4 from when the storage request signal is transmitted to when the crane control panel 29 outputs the storage instruction to the stacker crane 6 is shorter. Accordingly, the stacker crane 6 can start moving to the storage section while the load 8 is moving along the branch paths 4a and 4b, so that wasteful time is reduced, and in some cases, the load 8 is disposed at the raised position. Transfer work can be started immediately.

【0043】在庫管理コンピュータ26は、CPU30
からの入庫要求信号に基づいて作業指示データの作成処
理を行う際に、一度失敗しても所定時間内に所定の周期
で作業指示データの作成処理を再試行する。荷載置体8
毎に自動倉庫2における番地が別々に設定されているた
め、入庫要求信号に基づいて在庫管理コンピュータ26
が引当て処理を行う場合、正常であれば入庫先に荷Wが
あるはずはない。しかし、在庫管理数が多い場合には更
新処理の遅れで引当て処理が失敗する場合がある。従っ
て、所定時間後に再度行えば更新処理の遅れが解消して
引当てが可能になる。
The inventory management computer 26 has a CPU 30
When the process for creating the work instruction data is performed based on the storage request signal from the server, even if the process fails once, the process for creating the work instruction data is retried at a predetermined cycle within a predetermined time. Loading body 8
Since the addresses in the automatic warehouse 2 are set separately for each, the inventory management computer 26
Performs normal allocation processing, if there is no problem, there is no possibility that there is a load W at the storage destination. However, when the number of stock management is large, the allocation process may fail due to a delay in the update process. Therefore, if the processing is performed again after a predetermined time, the delay of the update processing is eliminated and the allocation becomes possible.

【0044】在庫管理コンピュータ26は再試行を所定
時間内に繰り返しても引当てができない場合は、CPU
30に作業指示データ作成不能の信号を送信する。CP
U30は作業指示データ作成不能の信号を入力すると、
ディスプレイ35にその旨の表示を行う。作業者は入力
装置33を操作して、ディスプレイ35に作業指示デー
タ入力画面を表示させるとともに、クレーン制御盤29
への作業指示データを入力する。このとき、ディスプレ
イ35に当該自動倉庫2の空の収納部5aの一部が表示
され、作業者はその中から仮入庫を行う収納部5aを選
択する。この入力操作により作業指示データが作成さ
れ、クレーン制御盤29に作業指示データが送信され
る。この作業指示データは仮に入庫するためのデータで
あり、正しい収納部5aが空いた段階で再度入庫をやり
直すことを前提としている。
If the inventory management computer 26 cannot reallocate even if the retry is repeated within a predetermined time,
A signal indicating that the work instruction data cannot be created is transmitted to 30. CP
When U30 inputs a signal indicating that work instruction data cannot be created,
A display to that effect is displayed on the display 35. The operator operates the input device 33 to display a work instruction data input screen on the display 35, and the crane control panel 29.
Enter the work instruction data to At this time, a part of the empty storage unit 5a of the automatic warehouse 2 is displayed on the display 35, and the operator selects the storage unit 5a to be temporarily stored from among them. The work instruction data is created by this input operation, and the work instruction data is transmitted to the crane control panel 29. This work instruction data is data for temporary storage, and is premised on re-entering the storage when the correct storage unit 5a is empty.

【0045】前記ディスプレイ35に表示された作業指
示データ入力画面で、入力装置33の操作によって作業
指示データの入力が可能になるのは、在庫管理コンピュ
ータ26からの作業指示データ作成不能(引当て失敗)
の信号を受信したときに限り、正常状態では入力装置3
3から作業指示データを入力することはできない。
On the work instruction data input screen displayed on the display 35, the operation instruction data can be input by operating the input device 33 because work instruction data cannot be created from the inventory management computer 26 (allocation failure). )
Input device 3 in the normal state only when the
3 cannot input work instruction data.

【0046】従って、この実施の形態では以下の効果を
有する。 (1) 荷載置体8が主搬送経路3から分岐経路4a,
4bへの分岐搬送を必要とする場合、在庫管理コンピュ
ータ26からの作業指示データの作成を待たずに分岐経
路4a,4bへの搬送(送り出し)が開始される。従っ
て、主搬送経路3を搬送されている後続の荷載置体8
の、分岐経路4a,4bの入口部における無駄な停止時
間が少なくなり、搬送サイクルタイムを短縮することが
できる。
Therefore, this embodiment has the following effects. (1) The loading body 8 is moved from the main transport path 3 to the branch path 4a,
When the branch transfer to the branch route 4b is required, the transfer (delivery) to the branch routes 4a and 4b is started without waiting for the creation of the work instruction data from the inventory management computer 26. Therefore, the subsequent loading body 8 being transported along the main transport path 3
However, unnecessary stoppage time at the entrances of the branch routes 4a and 4b is reduced, and the transport cycle time can be shortened.

【0047】(2) 分岐が必要な場合は、荷載置体8
がストッパ19と係合すると、直ちに分岐・直進切替手
段12が作動されて、荷載置体8が分岐経路4a,4b
に送り出される。従って、主搬送経路3を搬送されてい
る後続の荷載置体8の、分岐経路4a,4bの入口部に
おける無駄な停止時間がより少なくなる。
(2) When branching is required, the loading body 8
Immediately engages with the stopper 19, the branching / straight-forward switching means 12 is actuated, and the load 8 is moved to the branch paths 4a, 4b.
Will be sent to Therefore, the useless stop time of the subsequent loading body 8 being transported along the main transport path 3 at the entrances of the branch paths 4a and 4b is reduced.

【0048】(3) ストッパ19は常には荷載置体8
と係合不能な待機位置に配置されているため、分岐指示
より頻度の大きな直進指示のときにエアシリンダ20を
作動させる必要がない。従って、常には荷載置体8の通
過を阻止する阻止位置に配置しておき、直進指示のとき
に退避位置に配置させる構成に比較してエアシリンダ2
0の作動回数が少なくなり、省エネルギーや耐久性の点
で有利となる。
(3) The stopper 19 is always mounted on the load 8
It is not necessary to actuate the air cylinder 20 at the time of a straight-ahead instruction that is more frequent than the branch instruction. Therefore, the air cylinder 2 is always disposed at a blocking position for preventing the passage of the loading body 8 and is disposed at the retreat position when a straight-ahead instruction is given.
The number of times of operation is reduced, which is advantageous in terms of energy saving and durability.

【0049】(4) 正常な作動状態であれば、スタッ
カクレーン6は荷載置体8が分岐経路4a,4bを移動
している間に、クレーン制御盤29からの入庫指示に従
って入庫部への移動を開始する。従って、スタッカクレ
ーン6が荷Wの移載作業を開始するまでの無駄な時間が
少なくなるとともに、場合によっては荷載置体8が上昇
位置に配置されるとすぐに移載作業を開始できる。
(4) In the normal operation state, the stacker crane 6 moves to the storage section in accordance with the storage instruction from the crane control panel 29 while the load 8 is moving along the branch paths 4a and 4b. To start. Accordingly, wasteful time until the stacker crane 6 starts the transfer operation of the load W is reduced, and in some cases, the transfer operation can be started as soon as the load 8 is placed at the raised position.

【0050】(5) 在庫管理コンピュータ26が作業
指示データの作成処理を再試行しているときには、荷載
置体8は分岐経路4a,4b上にあるため、在庫管理コ
ンピュータ26の再試行が完了するのに時間がかかって
も、当該荷載置体8が後続の荷載置体8の搬送に支障を
来すことはない。従って、在庫管理コンピュータ26の
更新処理の遅れを考慮した所定時間、引当て処理を繰り
返すことにより、在庫管理コンピュータ26における更
新処理の遅れによる引当て処理の失敗が原因で、当該荷
載置体8の入庫指示ができなくなることが回避される。
(5) When the inventory management computer 26 is retrying the process for creating the work instruction data, the reloading of the inventory management computer 26 is completed because the load 8 is on the branch routes 4a and 4b. Even if it takes a long time, the load 8 does not hinder the conveyance of the subsequent load 8. Therefore, by repeatedly performing the allocation process for a predetermined time in consideration of the delay of the updating process of the inventory management computer 26, the allocation process of the loading object 8 is failed due to the failure of the allocation process due to the delay of the updating process in the inventory management computer 26. It is possible to prevent the entry instruction from being disabled.

【0051】(6) 在庫管理コンピュータ26から作
業指示信号が送信されない場合、制御コンピュータ27
でクレーン制御盤29への作業指示データを作成でき
る。従って、在庫管理コンピュータ26から引当て失敗
により作業指示信号が送信されない場合でも、当該荷載
置体8の仮入庫作業や出庫作業をスタッカクレーン6に
指示することができる。その結果、作業者が当該荷載置
体8を分岐経路4a,4bから離脱させる作業を行わな
くても、搬送作業を継続することができる。
(6) When the work instruction signal is not transmitted from the inventory management computer 26, the control computer 27
Thus, work instruction data for the crane control panel 29 can be created. Therefore, even when the work instruction signal is not transmitted from the inventory management computer 26 due to the allocation failure, the temporary loading operation and the unloading operation of the loader 8 can be instructed to the stacker crane 6. As a result, the transfer operation can be continued even if the worker does not perform the operation of detaching the loaded body 8 from the branch routes 4a and 4b.

【0052】(7) 在庫管理コンピュータ26からの
作業指示データ作成不能(引当て失敗)の信号を受信し
たときに限り、制御コンピュータ27による作業指示デ
ータの作成を可能にした。従って、自由に作業指示デー
タを作成可能とした場合に比較して、クレーン制御盤2
9に間違った作業指示信号が出力される虞が少なくな
る。
(7) The work instruction data can be created by the control computer 27 only when a signal indicating that the work instruction data cannot be created (assignment failure) is received from the inventory management computer 26. Therefore, compared to the case where work instruction data can be freely created, the crane control panel 2
9 is less likely to output an incorrect work instruction signal.

【0053】なお、実施の形態は前記に限定されるもの
ではなく、例えば、次のように具体化してもよい。 ○ 在庫管理コンピュータ26への入庫要求信号と、分
岐・直進切替手段への分岐又は直進指令とを並行して出
力する代わりに、ほぼ同時に、即ち何れか一方を先に出
力した後、他方をすぐに出力するようにしてもよい。こ
の場合も前記実施の形態とほぼ同様な効果が得られる。
The embodiment is not limited to the above, and may be embodied as follows, for example. Instead of outputting the warehousing request signal to the inventory management computer 26 and the branching / straightening switching means to the branching / straightening switching means in parallel, almost simultaneously, that is, one of them is output first, and then the other is immediately output. May be output. In this case, substantially the same effects as in the above embodiment can be obtained.

【0054】○ 制御コンピュータ27による作業指示
データの作成を自由に行うことが可能に構成してもよ
い。 ○ 在庫管理コンピュータ26からの作業指示データ作
成不能(引当て失敗)の信号を受信したときに、制御コ
ンピュータ27が自動的にクレーン制御盤29に当該荷
載置体8の出庫指示信号を出力する構成としてもよい。
引当て失敗の信号が出力された場合は、何らかの異常が
発生している虞が大きいので、仮入庫ではなく、当該荷
載置体8を直ちに出庫させて原因を調べる方がよい。ま
た、仮入庫を行うと、後続の荷載置体8の入庫位置と重
なる虞があり、結果的に搬送処理の遅れが大きくなる虞
がある。
The construction may be such that the work instruction data can be freely created by the control computer 27. A configuration in which the control computer 27 automatically outputs a loading instruction signal of the load 8 to the crane control panel 29 when receiving a signal indicating that work instruction data cannot be created (assignment failure) from the inventory management computer 26. It may be.
When the allocation failure signal is output, there is a high possibility that some abnormality has occurred. Therefore, it is better to immediately leave the loading unit 8 and check the cause instead of the temporary storage. Further, when the temporary storage is performed, there is a possibility that the storage position may overlap with the storage position of the subsequent loading body 8, and as a result, the delay of the transport process may be increased.

【0055】○ 在庫管理コンピュータ26と制御コン
ピュータ27とを一つにしてもよい。この場合、在庫管
理コンピュータ26と制御コンピュータ27との信号の
授受の時間が少なくなる。
The inventory management computer 26 and the control computer 27 may be integrated into one. In this case, the time for sending and receiving signals between the inventory management computer 26 and the control computer 27 is reduced.

【0056】○ 在庫管理コンピュータ26の再試行機
能や、制御コンピュータ27の作業指示データ作成機能
を省略してもよい。 ○ 主搬送経路3及び分岐経路4a,4bを構成するコ
ンベアとしてローラコンベア9にかえて、チェーンコン
ベアやベルトコンベアを使用してもよい。
The retry function of the inventory management computer 26 and the work instruction data creation function of the control computer 27 may be omitted. A chain conveyor or a belt conveyor may be used instead of the roller conveyor 9 as a conveyor that forms the main transport path 3 and the branch paths 4a and 4b.

【0057】○ 分岐・直進切替手段12としてチェー
ンコンベアに代えて、ストッパ19によって直進が阻止
された状態にある荷載置体8を、分岐経路4a,4b側
へ押し出す押出し装置を設けてもよい。例えば、主搬送
経路3を挟んで分岐経路4a,4bと対向する位置にエ
アシリンダを主搬送経路3と直交する方向に延びる状態
で水平に配設し、そのピストンロッドに荷載置体8と係
合可能な板を設ける。この場合、チェーンコンベアより
構成が簡単になる。
In place of the chain conveyor, an extruding device may be provided as the branching / straightening switching means 12, which pushes the loaded body 8 in a state where the straightening is blocked by the stopper 19, to the branching paths 4a, 4b. For example, an air cylinder is horizontally disposed at a position facing the branch routes 4a and 4b with the main transport path 3 interposed therebetween and extending in a direction orthogonal to the main transport path 3, and the piston rod is connected to the loading body 8 with the loading body 8. Provide a compatible plate. In this case, the configuration is simpler than that of the chain conveyor.

【0058】○ 分岐経路4a,4bを主搬送経路3か
らカーブ部分を介して接続される構成とし、切替レバー
で直進と分岐とを切り替える構成としてもよい。 ○ 自動倉庫2及びスタッカクレーン6として、荷Wを
フォークの上面で支持するタイプの移載装置を使用する
ものではなく、他のタイプの移載装置を使用するものに
適用してもよい。
The branch paths 4a and 4b may be connected from the main transport path 3 via a curved portion, and may be switched between straight traveling and branching by a switching lever. As the automatic warehouse 2 and the stacker crane 6, a transfer device of a type that supports the load W on the upper surface of the fork may not be used, but may be one that uses another type of transfer device.

【0059】○ 主搬送経路3への荷Wの搬送元を一箇
所とせずに、複数箇所としてもよい。前記実施の形態か
ら把握できる請求項記載以外の発明について、以下にそ
の効果とともに記載する。
The transport source of the load W to the main transport path 3 may be a plurality of locations instead of a single location. Inventions other than those described in the claims that can be grasped from the embodiment will be described below together with their effects.

【0060】(1) 請求項2又は請求項3に記載の発
明において、前記制御コンピュータは、前記搬送用移動
体への作業指示データの作成不能の信号を入力したとき
に、前記搬送用移動体に出庫作業指示を出力するように
構成されている。この場合、仮入庫を行った収納部5a
が、後続の荷載置体の入庫位置と重なることがなく、搬
送処理の遅れが大きくなるという虞がない。また、仮入
庫を行う場合に比較して制御も簡単になる。
(1) In the invention according to claim 2 or 3, when the control computer inputs a signal indicating that work instruction data cannot be created to the transfer movable body, Is configured to output an outgoing work instruction. In this case, the storage unit 5a in which the temporary storage was performed
However, it does not overlap with the loading position of the succeeding loading body, and there is no possibility that the delay of the transport process is increased. In addition, control is simplified as compared with the case of performing temporary storage.

【0061】(2) 請求項2に記載の発明において、
前記各分岐・直進切替手段は常には前記荷載置体の直進
を許容する状態に保持され、前記保管位置確認手段の確
認信号に基づいて、分岐を必要とする荷載置体が来たと
きに分岐させる状態に切り替えられるように構成されて
いる。この場合、分岐させる状態を基準位置として、直
進が必要なときに直進させる状態に切り替えられるよう
にした構成に比較して、分岐・直進切替手段の作動回数
が少なくなり、省エネルギーや耐久性の点で有利とな
る。
(2) In the invention described in claim 2,
Each of the branching / straight-forward switching means is always kept in a state in which the loading body is allowed to go straight, and based on a confirmation signal of the storage position confirmation means, when a loading body requiring branching arrives, the branching is performed. It is configured to be able to switch to a state in which In this case, the number of operations of the branch / straight switching means is reduced as compared with a configuration in which the branching state is set as a reference position and the state is switched to the straight traveling state when straight traveling is required, and energy saving and durability are reduced. Is advantageous.

【0062】[0062]

【発明の効果】以上詳述したように請求項1〜請求項5
に記載の発明によれば、在庫管理コンピュータからの作
業指示データの作成を待たずに分岐経路への搬送が開始
される。従って、主搬送経路を搬送されている後続の荷
載置体の、分岐経路の入口部における無駄な停止時間が
少なくなり、搬送サイクルタイムを短縮することができ
る。
As described in detail above, claims 1 to 5 are provided.
According to the invention described in (1), the transfer to the branch route is started without waiting for the creation of the work instruction data from the inventory management computer. Therefore, the useless stop time of the subsequent load carried on the main transport path at the entrance of the branch path is reduced, and the transport cycle time can be shortened.

【0063】請求項3に記載の発明によれば、在庫管理
コンピュータにおける更新処理の遅れによる引当て処理
の失敗が原因で、当該荷載置体の入庫指示ができなくな
ることが回避され、しかも後続の荷載置体の搬送に支障
を来すことはない。
According to the third aspect of the present invention, it is possible to prevent the storage management computer from being unable to issue a loading instruction due to a failure in the allocation process due to a delay in the updating process, and to prevent the subsequent loading instruction from being performed. There is no hindrance to the transport of the load.

【0064】請求項4に記載の発明によれば、在庫管理
コンピュータから作業指示信号が送信されない場合で
も、当該荷載置体の仮入庫作業や出庫作業を搬送用移動
体に指示することができ、作業者が当該荷載置体を分岐
経路から離脱させる作業を行わなくても、搬送作業を継
続することができる。
According to the fourth aspect of the present invention, even when a work instruction signal is not transmitted from the inventory management computer, it is possible to instruct the transfer moving body to temporarily enter or leave the loaded body, The transfer operation can be continued even if the worker does not perform the operation of detaching the load from the branch path.

【0065】請求項5に記載の発明によれば、制御コン
ピュータにより自由に作業指示データを作成可能とした
場合に比較して、コントローラに間違った作業指示信号
が出力される虞が少なくなる。
According to the fifth aspect of the present invention, there is less possibility that an erroneous work instruction signal is output to the controller as compared with a case where work instruction data can be freely created by the control computer.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 一実施の形態の物流システムを示す一部省略
模式構成図。
FIG. 1 is a partially omitted schematic configuration diagram showing a distribution system according to an embodiment.

【図2】 荷載置体、ローラコンベア等の関係を示す模
式斜視図。
FIG. 2 is a schematic perspective view showing a relationship between a loading body, a roller conveyor, and the like.

【図3】 分岐部付近の概略平面図。FIG. 3 is a schematic plan view near a branch portion.

【図4】 電気的構成を示すブロック図。FIG. 4 is a block diagram showing an electrical configuration.

【図5】 作用を説明する模式図。FIG. 5 is a schematic diagram illustrating an operation.

【図6】 従来の物流システムを示す一部省略模式構成
図。
FIG. 6 is a partially omitted schematic configuration diagram showing a conventional distribution system.

【符号の説明】 1…荷の搬送元としての搬入ステーション、2a,2b
…自動倉庫、3…主搬送経路、4a,4b…分岐経路、
5a…収納部、6…搬送用移動体としてのスタッカクレ
ーン、8…荷載置体、9…ローラコンベア、12…分岐
・直進切替手段、21…表示部としてのバーコード、2
2a,22b…保管位置確認手段としてのバーコードリ
ーダ、26…在庫管理コンピュータ、27…制御コンピ
ュータ、29…コントローラとしてのクレーン制御盤、
30…制御コンピュータ及び作業指示データ作成手段を
構成するCPU、31…作業指示データ作成手段を構成
するプログラムメモリ。
[Explanation of Signs] 1 .... Loading station as load source, 2a, 2b
... Automatic warehouse, 3 ... Main transport route, 4a, 4b ... Branch route,
5a: storage unit, 6: stacker crane as a moving body for transport, 8: loading body, 9: roller conveyor, 12: branching / straight running switching means, 21: bar code as a display unit, 2
2a, 22b: bar code reader as storage position confirmation means; 26, inventory management computer; 27, control computer; 29, crane control panel as controller;
30: CPU constituting the control computer and the work instruction data creating means, 31 ... Program memory constituting the work instruction data creating means.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 搬送用移動体により多数の収納部に対し
て荷の搬入、搬出を行う自動倉庫を複数備え、荷の搬送
を前記自動倉庫での保管位置がそれぞれ異なる特定の収
納部となるように設定された保管位置の表示がなされた
荷載置体を使用して行うとともに、荷の搬送元から前記
各自動倉庫への荷の搬送を主搬送経路と、該主搬送経路
から分岐され前記自動倉庫の入庫部に至る各分岐経路と
を介して行う物流システムにおいて、 前記主搬送経路の各分岐経路毎に分岐・直進切替手段
と、該分岐・直進切替手段より上流側の位置で前記主搬
送経路を搬送されてくる荷載置体の保管位置の表示を確
認する保管位置確認手段とを設け、該保管位置確認手段
による荷載置体の保管位置の確認に基づいて、当該分岐
部の分岐・直進切替手段への分岐又は直進の指示と、当
該自動倉庫の搬送用移動体の作業指示データの作成処理
とを並行して行う物流システムにおける荷の搬送制御方
法。
1. A plurality of automatic warehouses for loading and unloading loads to and from a large number of storage units by a transporting moving body, wherein the loads are transported to specific storage units at different storage positions in the automatic warehouses. A load is carried out using the display of the storage position set as described above, and the transfer of the load from the load transfer source to each of the automatic warehouses is performed by the main transfer route and the main transfer route. In a logistics system performed through each branch route to an entrance of an automatic warehouse, a branch / straight switching unit is provided for each branch route of the main transport route, and the main / branch switching unit is located at a position upstream of the branch / straight switching unit. Storage position confirmation means for confirming the display of the storage position of the loaded body conveyed along the transport path, and based on the confirmation of the storage location of the loaded body by the storage position confirmation means, Branch to straight-line switching means or Indication of proceed, load conveyance control method in distribution system concurrently performing the process of creating work instruction data of the conveying movement of the automated warehouse.
【請求項2】 搬送用移動体により多数の収納部に対し
て荷の搬入、搬出を行う自動倉庫を複数備え、荷の搬送
を前記自動倉庫での保管位置がそれぞれ異なる特定の収
納部となるように設定された保管位置の表示がなされた
荷載置体を使用して行うとともに、荷の搬送元から前記
各自動倉庫への荷の搬送を主搬送経路と、該主搬送経路
から分岐され前記自動倉庫の入庫部に至る各分岐経路と
を介して行う物流システムにおいて、 前記主搬送経路の各分岐経路と対応する位置にそれぞれ
設けられた分岐・直進切替手段と、 前記主搬送経路の各分岐経路と対応する位置にそれぞれ
設けられ、前記各分岐・直進切替手段より上流側の位置
で前記主搬送経路を搬送されてくる前記荷載置体の保管
位置の表示を確認する保管位置確認手段と、 荷の入出庫を要求する要求信号に基づいて作業指示デー
タを作成する在庫管理コンピュータと、 前記保管位置確認手段の確認信号に基づいて、前記在庫
管理コンピュータへの入庫要求信号と、前記分岐・直進
切替手段への分岐又は直進指令とを並行して又はほぼ同
時に出力し、在庫管理コンピュータからの作業指示デー
タに基づいて前記搬送用移動体のコントローラに作業指
令を出力する制御コンピュータとを備えた物流システム
における荷の搬送制御装置。
2. A plurality of automatic warehouses for loading and unloading loads to and from a large number of storage units by a transporting moving body, and the loads are transported to specific storage units at different storage positions in the automatic warehouses. A load is carried out using the display of the storage position set as described above, and the transfer of the load from the load transfer source to each of the automatic warehouses is performed by the main transfer route and the main transfer route. In a logistics system performed through each branch route to an entrance of an automatic warehouse, a branch / straight switching unit provided at a position corresponding to each branch route of the main transport route, and each branch of the main transport route. A storage position confirmation unit provided at a position corresponding to the route, and a storage position confirmation unit for confirming a display of a storage position of the loaded body that is conveyed along the main conveyance path at a position upstream of each branching / straight switching unit; Loading and unloading of goods An inventory management computer that creates work instruction data based on a request signal requesting the storage position confirmation means, and a storage request signal to the inventory management computer based on a confirmation signal of the storage position confirmation means; And a control computer that outputs a branch or straight-ahead command in parallel or almost at the same time and outputs a work command to a controller of the transporting moving body based on work command data from an inventory management computer. Transfer control device.
【請求項3】 前記在庫管理コンピュータは、前記制御
コンピュータからの入庫要求信号に基づいて作業指示デ
ータの作成処理を行う際に、一度失敗しても所定時間内
に所定の周期で作業指示データの作成処理の再試行を行
う再試行機能を備えている請求項2に記載の物流システ
ムにおける荷の搬送制御装置。
3. The inventory management computer, when performing a process of creating work instruction data based on a storage request signal from the control computer, even if it fails once, at a predetermined period within a predetermined time period. The load transfer control device according to claim 2, further comprising a retry function for retrying the creation process.
【請求項4】 前記制御コンピュータは、前記搬送用移
動体への作業指示データを前記在庫管理コンピュータか
らの指令に基づかずにオペレータの操作によって作成す
るための、作業指示データ作成手段を備えている請求項
2又は請求項3に記載の物流システムにおける荷の搬送
制御装置。
4. The control computer includes a work instruction data creating unit for creating work instruction data for the transporting moving body by an operation of an operator without being based on a command from the inventory management computer. A transport control device for a load in the physical distribution system according to claim 2 or 3.
【請求項5】 前記作業指示データ作成手段は、前記制
御コンピュータが前記在庫管理コンピュータからの作業
指示データ作成不能の信号を受信したときに作動可能に
構成されている請求項4に記載の物流システムにおける
荷の搬送制御装置。
5. The physical distribution system according to claim 4, wherein said work instruction data creating means is operable when said control computer receives a signal from said inventory management computer that said work instruction data cannot be created. Transport control device in the factory.
JP10269898A 1998-04-14 1998-04-14 Load transport control method and transport control device in distribution system Expired - Lifetime JP4029465B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10269898A JP4029465B2 (en) 1998-04-14 1998-04-14 Load transport control method and transport control device in distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10269898A JP4029465B2 (en) 1998-04-14 1998-04-14 Load transport control method and transport control device in distribution system

Publications (2)

Publication Number Publication Date
JPH11292220A true JPH11292220A (en) 1999-10-26
JP4029465B2 JP4029465B2 (en) 2008-01-09

Family

ID=14334488

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10269898A Expired - Lifetime JP4029465B2 (en) 1998-04-14 1998-04-14 Load transport control method and transport control device in distribution system

Country Status (1)

Country Link
JP (1) JP4029465B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002068426A (en) * 2000-09-01 2002-03-08 Toppan Forms Co Ltd Material carrying method and automatic warehouse system
CN106219126A (en) * 2016-07-22 2016-12-14 鄢永军 A kind of fully-automatic intelligent delivery system
CN107128654A (en) * 2017-05-26 2017-09-05 广东溢达纺织有限公司 Finished product yardage roll automatic stacking system
CN107380990A (en) * 2017-06-30 2017-11-24 钟颖凯 A kind of intelligent storage sorting station and its method for sorting
CN109502276A (en) * 2018-10-15 2019-03-22 宁波吉利汽车研究开发有限公司 Feed process, device and intelligent terminal
CN112009974A (en) * 2019-05-29 2020-12-01 德国邮政股份公司 Method for monitoring and/or maintaining a conveyor system and conveyor system
WO2023246435A1 (en) * 2022-06-22 2023-12-28 深圳市海柔创新科技有限公司 Warehousing system, warehoused goods handling method and system, and storage medium

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002068426A (en) * 2000-09-01 2002-03-08 Toppan Forms Co Ltd Material carrying method and automatic warehouse system
CN106219126A (en) * 2016-07-22 2016-12-14 鄢永军 A kind of fully-automatic intelligent delivery system
CN107128654A (en) * 2017-05-26 2017-09-05 广东溢达纺织有限公司 Finished product yardage roll automatic stacking system
CN107380990A (en) * 2017-06-30 2017-11-24 钟颖凯 A kind of intelligent storage sorting station and its method for sorting
CN107380990B (en) * 2017-06-30 2018-12-25 钟颖凯 A kind of intelligent storage sorting station and its method for sorting
CN109502276A (en) * 2018-10-15 2019-03-22 宁波吉利汽车研究开发有限公司 Feed process, device and intelligent terminal
CN112009974A (en) * 2019-05-29 2020-12-01 德国邮政股份公司 Method for monitoring and/or maintaining a conveyor system and conveyor system
WO2023246435A1 (en) * 2022-06-22 2023-12-28 深圳市海柔创新科技有限公司 Warehousing system, warehoused goods handling method and system, and storage medium

Also Published As

Publication number Publication date
JP4029465B2 (en) 2008-01-09

Similar Documents

Publication Publication Date Title
JP4029465B2 (en) Load transport control method and transport control device in distribution system
KR100684157B1 (en) Transportation system
JP2003292116A (en) Carrying system
JP3941216B2 (en) Entry / exit control method and entry / exit control device of distribution system
JP2010222082A (en) Method for shipping and warehousing cargo
JPH09156762A (en) Identification code reading device in automated warehouse
JP2000095304A (en) Article storage facility
JP2743310B2 (en) Selection control device for traveling conveyance device
JP2000095327A (en) Carrying equipment
JPH09255114A (en) Conveyance route setting method and device in physical distribution system
JP2006232437A (en) Conveying method for article and article conveying system
JP4011308B2 (en) Warehouse management system
JP3795318B2 (en) Work transfer equipment
CN113697341A (en) Material distribution method and device, computer equipment and storage medium
JP2001301946A (en) Conveyer
JP3864556B2 (en) Delivery management device
JP2007022699A (en) Storage and retrieval system
JP2000289811A (en) Automatic carrying system
JPS61273402A (en) Delivery system in storehouse
JPS5815256B2 (en) I can't wait to see what I can do at work.
JP2022133834A (en) Conveyance system
JP2001048318A (en) Inventory method of automated storage and retrieval system
JP4045449B2 (en) Conveyor system
JP2000293232A (en) Automatic transport system
JPH0920404A (en) Cargo warehousing control device in automatic warehouse

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040318

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061114

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071008

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101026

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111026

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121026

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121026

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131026

Year of fee payment: 6

EXPY Cancellation because of completion of term