JPH04209206A - Establishment of anchor foundation pile - Google Patents

Establishment of anchor foundation pile

Info

Publication number
JPH04209206A
JPH04209206A JP34021290A JP34021290A JPH04209206A JP H04209206 A JPH04209206 A JP H04209206A JP 34021290 A JP34021290 A JP 34021290A JP 34021290 A JP34021290 A JP 34021290A JP H04209206 A JPH04209206 A JP H04209206A
Authority
JP
Japan
Prior art keywords
auger
steel pipe
blade
auger rod
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP34021290A
Other languages
Japanese (ja)
Other versions
JPH0781270B2 (en
Inventor
Ryukichi Ishibashi
石橋 龍吉
Shigeki Terasaki
滋樹 寺崎
Hatsuichi Torisaki
鳥崎 肇一
Masatoshi Yasutake
安武 正俊
Mitsugi Otsuki
貢 大槻
Shinichi Hibino
日比野 信一
Shuji Kami
周史 上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JUTAKU TOSHI SEIBI KODAN
TENOTSUKUSU KK
Kubota Corp
Nippon Steel Corp
Tenox Corp
Original Assignee
JUTAKU TOSHI SEIBI KODAN
TENOTSUKUSU KK
Kubota Corp
Nippon Steel Corp
Tenox Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JUTAKU TOSHI SEIBI KODAN, TENOTSUKUSU KK, Kubota Corp, Nippon Steel Corp, Tenox Corp filed Critical JUTAKU TOSHI SEIBI KODAN
Priority to JP2340212A priority Critical patent/JPH0781270B2/en
Publication of JPH04209206A publication Critical patent/JPH04209206A/en
Publication of JPH0781270B2 publication Critical patent/JPH0781270B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To make unable to disturb or loosen the original ground by loading a common rotation preventive wing having a diameter larger than an excavation diameter to the upper step of an excavation wing so that it is capable of rotating against an auger rod, crushing a clod of earth with the common rotation preventive wing to excavate and, at the same time, settling a steel pipe while injecting a solidifiable material. CONSTITUTION:While rotating an auger 1 and a steel pipe pile 4 in the opposite direction each other or in the same direction and, at the same time, a solidifiable material is discharged from a discharge port 25 on the front end of an auger rod 21 to excavate a hole with an excavation wing 23. After that, the ground excavated with the excavation wing 23 is crushed with a common rotation preventive wing 3. A clod of earth is mixed with a solidifiable material discharged from the discharge port 25 while stirring it with a stirring wing 23. In addition, the steel pipe pile 4 is settled under such a condition. According to the constitution, the original ground is not disturbed or loosened, so that very powerful vertical bearing power and drawing resistance force can be generated in one pile.

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、建設関係の基礎工事に適用されるアンカー基
礎杭の造成方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for constructing anchor foundation piles applied to construction-related foundation work.

[従来の技術] 従来、基礎杭の造成工法には、種々の工法が存在する。[Conventional technology] Conventionally, there are various methods for constructing foundation piles.

例えば、下記の通りである。For example, as follows.

(11アースアンカーによる工法は、ワイヤーロープ等
の引張り材を地盤中に挿入して、グラウト等により固着
することにより引き抜き力に対応する基礎工法である。
(11) The earth anchor construction method is a foundation construction method that responds to pull-out forces by inserting a tensile material such as a wire rope into the ground and fixing it with grout or the like.

(2)既製杭(既製コンクリート杭、鋼管杭)による工
法は、杭打機で地盤中に既製杭を打込むものと、−旦地
盤にプレボーリングし、その孔にセメントモルタル等の
固化液を所定量注入した後既製杭を沈設し、既製杭と孔
内壁間を固化液で固めるものとがある。
(2) Construction methods using ready-made piles (ready-made concrete piles, steel pipe piles) include driving the ready-made piles into the ground with a pile driver, and - pre-boring the ground and filling the holes with a solidifying liquid such as cement mortar. In some cases, a prefabricated pile is placed after a predetermined amount is injected, and the space between the prefabricated pile and the inner wall of the hole is solidified with a solidifying liquid.

(3)場所打ち杭による工法は、地盤を掘削して排土し
、その孔に鉄筋かごを入れ、これにコンクリートを流し
込んだものが一般的である。
(3) The general method of construction using cast-in-place piles is to excavate the ground, remove the soil, insert a reinforcing cage into the hole, and pour concrete into it.

[発明が解決しようとする課題] 構造物が大型化、高層化すると地震時に基礎杭には大き
な押し込み力と引き抜き力が交互に作用するようになる
。本発明はこの大きな押し込み力と引き抜き力に耐え、
かつ上部工と確実に応力伝達できる基礎杭を提供する。
[Problems to be Solved by the Invention] As structures become larger and taller, large pushing forces and pulling forces alternately act on foundation piles during an earthquake. The present invention can withstand this large pushing force and pulling force,
The present invention also provides a foundation pile that can reliably transmit stress to the superstructure.

しかしながら、前記従来の工法には、いずれも次のよう
な欠点がある。
However, all of the conventional construction methods have the following drawbacks.

前記(1)のアースアンカーによる工法については、ア
ースアンカーは引き抜き力には耐えるが押し込み力には
ほとんど無抵抗である。
Regarding the construction method using the earth anchor (1) above, the earth anchor can withstand pull-out force, but has almost no resistance to push-in force.

前記(2)の既製コンクリート杭による工法については
、既製コンクリート抗は押し込み力には比較的強いが、
引き抜き力には弱く、かつ引き抜き力に対して上部工と
確実に応力伝達できる接続方法もない。
Regarding the construction method using prefabricated concrete piles (2) above, prefabricated concrete piles are relatively strong against pushing force, but
It is weak against pull-out force, and there is no connection method that can reliably transmit stress to the superstructure against pull-out force.

また、鋼管杭による工法については、鋼管杭は材料自体
は引っ張り力に対して強いが、鋼管と地盤との付着力が
小さく、かつ自重も小さいため引き抜きに対する抵抗力
が弱い。
Regarding construction methods using steel pipe piles, although the material of steel pipe piles itself is strong against tensile forces, the strength of adhesion between the steel pipe and the ground is small, and the pile's own weight is also small, so it has low resistance to pulling out.

また、地盤との付着カケ向上させるためにブレポーリン
グ工法による杭周固定液を用いたとしても従来のプレポ
ーリング工法では地盤を弛めるため引き抜き力の向上は
望めない。よしんば地盤を緩めずに施工できたとしても
鋼管と杭周固定液との付着力は比較的小さい。
Further, even if a pile circumferential fixing solution is used by the pre-poling method to improve the adhesion to the ground, the conventional pre-poling method loosens the ground and cannot be expected to improve the pulling force. Even if construction could be done without loosening the Yoshiba ground, the adhesion force between the steel pipe and the pile circumferential fixing fluid is relatively small.

前記(3)の場所打ち杭による工法については、場所打
ち杭はそれ自体は押し込み力にも引き抜き力にも強く、
かつ引き抜き力に対して上部工と確実に応力伝達できる
接続方法も確立されている。
Regarding the construction method using cast-in-place piles in (3) above, cast-in-place piles themselves are strong against pushing force and pulling force;
A connection method has also been established that can reliably transmit stress to the superstructure against pull-out force.

しかしながら、場所打ち杭はその施工方法のため泥水や
残土等が大量に発生するため、今や社会問題になってお
り市街地での施工は実質的に困難である。
However, because cast-in-place piles generate large amounts of muddy water and residual soil due to their construction method, they have become a social problem and are practically difficult to construct in urban areas.

本発明は上述した従来の欠点を解決するために成された
ものである。
The present invention has been made to solve the above-mentioned conventional drawbacks.

[課題を解決するだめの手段] 本発明は上記目的を達成するため、オーガーはオーガー
ロッドの途中に少なくとも1個のスタビライザが回転自
在に遊嵌され、前記オーガーロッドの先端に掘削翼が、
その上段に攪拌翼及び共回り防止翼が配設され、前記掘
削翼と攪拌翼とはそれぞれオーガーロッドに固着された
支持部材に枢軸により枢着され、前記共回り防止翼は支
持部材を介してオーガーロッドに回転自在に遊嵌される
と共に、支持部材に枢軸により枢着され、前記掘削翼、
攪拌翼及び共回り防止翼はそれぞれ支持部材に枢軸とシ
ャーピンにより拡開状態に保持されており、前記オーガ
ーを地上で準備し、別途に準備した外周面リブ付きの鋼
管杭下端より前記掘削翼、攪拌翼及び共回り防止翼を先
行させた状態でオーガーロッドを前記鋼管坑内に挿入す
る工程と、オーガーロッドと鋼管杭上端をそれぞれ作業
機に把持させ、オーガーと鋼管杭をそれぞれ」回転させ
つつ、同時にオーガー先端からスラリー状の固化材を吐
出し、地盤の所定深度まで給進する工程と、次に、オー
ガーロッドと鋼管杭の給進を停止し、固化材の注入を、
それまでに注入した固化材よりも固化後の圧縮強度が大
きなスラリー状固化材に切り替え削孔底部の根固め部を
その固化材で充満する工程と、次に、鋼管杭を固定した
状態でオーガー軸を引揚げて前記シャーピンを剪断し、
共回り防止翼、攪拌翼及び掘削翼を鋼管坑内に縮閉する
工程と、次に、鋼管杭を回転させながら前記根固め部内
に挿入する工程と、その後、前記オーガーを引揚げる工
程とより成ることを特徴とするアンカー基礎杭の造成方
法と、 オーガーはオーガーロッドの途中に少なくとも1個のス
タビライザが回転自在に遊嵌され、前記オーガーロッド
の先端に掘削翼が、その上段に攪拌翼及び共回り防止翼
が配設され、前記掘削翼と攪拌翼とはそれぞれオーガー
ロッドに固着された支持部材に枢軸により枢着され、前
記共回り防止翼は支持部材を介してオーガーロッドに回
転自在に遊嵌されると共に、支持部材に枢軸により枢着
され、前記掘削翼、攪拌翼及び共回り防止翼はそれぞれ
支持部材に枢軸とシャーピンにより拡開状態に保持され
ており、前記オーガーを地上で準備し、別途に準備した
外周面リブ付きの鋼管杭下端より前記掘削翼、攪拌翼及
び共回り防止翼を先行させた状態でオーガーロッドを前
記鋼管坑内に挿入する工程と、オーガーロッドと鋼管杭
上端をそれぞれ作業機に把持させ、オーガーと鋼管杭を
それぞれ回転させつつ、同時にオーガー先端からスラリ
ー状の固化材を吐出し、削孔底部の根固め部の距離だけ
浅い地盤の深度まで給進する工程と、次に、固化材の注
入を、それまでに注入した固化材よりも固化後の圧縮強
度が大きなスラリー状固化材に切り替え、前記根固め部
の距離だけ固化材を注入しつつ所定深度まで削孔する工
程と、次に、鋼管杭を固定した状態でオーガー軸を引揚
げて前記シャーピンを剪断し、共回り防止翼、攪拌翼及
び掘削翼を鋼管坑内に縮閉する工程と、次に、鋼管杭を
回転させながら前記根固め部内に挿入する工程と、その
後、前記オーガーを引揚げる工程とより成ることを特徴
とするアンカー基礎杭の造成方法と、 前記鋼管杭にはその内周面の下部に固化材との付着力向
上のための少なくとも1個以上のリング状の突起が固設
されていることを特徴とするアンカー基礎杭の造成方法
である。
[Means for Solving the Problems] In order to achieve the above object, the present invention has an auger in which at least one stabilizer is rotatably fitted in the middle of an auger rod, and a digging wing is provided at the tip of the auger rod.
A stirring blade and a co-rotation prevention blade are disposed on the upper stage, and the excavation blade and the stirring blade are each pivoted to a support member fixed to an auger rod, and the co-rotation prevention blade is attached to a support member fixed to the auger rod. The excavation wing is rotatably loosely fitted to the auger rod and is pivotally connected to the support member,
The stirring blades and the co-rotation prevention blades are each held in an expanded state by a support member with a pivot and a shear pin, and the auger is prepared on the ground, and the excavation blades, Inserting the auger rod into the steel pipe shaft with the stirring blade and the co-rotation prevention blade in advance, and having the auger rod and the upper end of the steel pipe pile each gripped by a working machine, and rotating the auger and the steel pipe pile respectively, At the same time, a slurry-like solidification material is discharged from the tip of the auger and fed to a predetermined depth in the ground.Next, the feeding of the auger rod and steel pipe pile is stopped, and the solidification material is injected.
The process of switching to a slurry solidified material that has a higher compressive strength after solidification than the previously injected solidified material and filling the hardening section at the bottom of the drilled hole with the solidified material, and then the auger with the steel pipe pile fixed. pulling up the shaft and shearing the shear pin;
It consists of the steps of contracting and closing the co-rotation prevention blades, stirring blades, and excavation blades in the steel pipe mine, then inserting the steel pipe pile into the foot protection part while rotating, and then lifting the auger. A method for constructing an anchor foundation pile, characterized in that the auger has at least one stabilizer rotatably fitted in the middle of the auger rod, a digging blade is provided at the tip of the auger rod, and a stirring blade is provided at the upper stage of the auger rod. Anti-rotation blades are provided, and the excavation blade and stirring blade are each pivoted to a support member fixed to the auger rod, and the anti-rotation blade is rotatably attached to the auger rod via the support member. At the same time, the auger is mounted on the support member by a pivot, and the digging blade, stirring blade, and co-rotation prevention blade are each held in an expanded state by the support member by the pivot and shear pin, and the auger is prepared on the ground. , a step of inserting the auger rod into the steel pipe shaft with the excavation blade, stirring blade, and co-rotation prevention blade leading from the bottom end of the steel pipe pile with external ribs prepared separately, and inserting the auger rod and the top end of the steel pipe pile. A process in which the auger and steel pipe pile are each gripped by a working machine and rotated, while at the same time a slurry-like solidified material is discharged from the tip of the auger and fed to a shallow ground depth by the distance of the foot hardening section at the bottom of the drilled hole. Next, the injection of the solidifying material is changed to a slurry-like solidifying material that has a higher compressive strength after hardening than the previously injected solidifying material, and the solidifying material is injected by the distance of the foot hardening section while cutting to a predetermined depth. a step of drilling a hole; next, with the steel pipe pile fixed, the auger shaft is pulled up to shear the shear pin; a co-rotation prevention blade, a stirring blade and a drilling blade are contracted and closed in the steel pipe mine; A method for constructing an anchor foundation pile, comprising the steps of inserting a steel pipe pile into the foot protection part while rotating it, and then pulling up the auger; This is a method for constructing an anchor foundation pile, characterized in that at least one ring-shaped protrusion is fixed to the lower part to improve adhesion to the solidifying material.

[作 用] 掘削翼の上段には掘削径より大きな径の共回り防止翼が
オーガーロッドに対して回転自在に装着されているので
掘削翼で掘削されて生じた土塊は静止した共回り防止翼
に当って破砕される。
[Function] A co-rotation prevention blade with a diameter larger than the excavation diameter is attached to the upper stage of the excavation blade so that it can rotate freely with respect to the auger rod, so the soil mass excavated by the excavation blade is removed by the stationary co-rotation prevention blade. It will be crushed by hitting it.

また、地盤を掘削・攪拌しつつ固化材を注入し、同時に
鋼管を押し込むので、固化材が固化しない内に鋼管が沈
設される。
Furthermore, the solidifying material is injected while the ground is being excavated and stirred, and the steel pipe is pushed in at the same time, so the steel pipe is deposited before the solidifying material has solidified.

鋼管杭の外周面にはリブが設けてあり、孔の内壁との間
には固化材と土壌の固化物が充填されているので、鋼管
杭は引き抜き、押し込みに対し摩擦抵抗力が大である。
Steel pipe piles have ribs on their outer circumferential surface, and the space between them and the inner wall of the hole is filled with solidified material and solidified soil, so steel pipe piles have high frictional resistance when pulled out or pushed in. .

さらに、鋼管杭の下端内周面に設けられたリング状の突
起は鋼管内の前記固化物と鋼管との付着力を増大させる
Furthermore, the ring-shaped protrusion provided on the inner circumferential surface of the lower end of the steel pipe pile increases the adhesive force between the solidified material inside the steel pipe and the steel pipe.

[実施例コ 以下添付図に基づいて本発明の一実施例を詳細に説明す
る。
[Example 1] An example of the present invention will be described in detail below based on the attached drawings.

第1図〜第6図は本発明のアンカー基礎杭の造成方法の
施工順序を示す図、第7図は本発明の施工に使用するオ
ーガーの正面図である。
1 to 6 are diagrams showing the construction order of the anchor foundation pile construction method of the present invention, and FIG. 7 is a front view of an auger used in the construction of the present invention.

第7図において、1はオーガーでこのオーガー1はオー
ガー軸21と、この途中に遊嵌されたスタビライザ22
と、軸先端に装着された掘削翼23と、この上段に支持
部材24cを介して固着された攪拌翼24と、さらにこ
の上段に支持部材3Cを介して回転自在に遊嵌された共
回り防止翼3とから構成されている。
In FIG. 7, 1 is an auger, and this auger 1 has an auger shaft 21 and a stabilizer 22 loosely fitted in the middle of the auger shaft 21.
, the excavating blade 23 attached to the tip of the shaft, the stirring blade 24 fixed to this upper stage via a support member 24c, and the co-rotation prevention blade rotatably fitted loosely to this upper stage via a support member 3C. It is composed of wings 3.

掘削翼23にはビット23aが固着され、攪拌翼24の
外径は掘削翼23の外径と路間−である。
A bit 23a is fixed to the excavating blade 23, and the outer diameter of the agitating blade 24 is equal to the outer diameter of the excavating blade 23 and the distance between the tracks.

共回り防止翼3の外径は掘削翼23より大径に形成され
、掘削中は掘削翼23で掘削された削孔壁から外側の原
地盤中に食い込むので、掘削翼2”3と攪拌翼24とが
回転しても共回り防止翼3は回転しないようになってい
る。
The outer diameter of the co-rotation prevention blade 3 is formed to be larger than that of the excavation blade 23, and during excavation, it bites into the original ground outside from the borehole wall excavated by the excavation blade 23, so that the excavation blade 2"3 and the stirring blade 24 rotates, the co-rotation prevention blade 3 does not rotate.

第7図では攪拌翼24の上段に共回り防止翼3が設けら
れているが、攪拌翼24と共回り防止翼3の位置を入れ
替えても良い。
In FIG. 7, the co-rotation prevention blade 3 is provided at the upper stage of the stirring blade 24, but the positions of the stirring blade 24 and the co-rotation prevention blade 3 may be interchanged.

前記共回り防止翼は、掘削翼23で掘削されて生じた大
きな土塊を破砕するもので、掘削翼23や攪拌翼24と
共に回転している大きな土塊が回転していない共回り防
止翼に当り、掘削翼23や攪拌翼24との間で剪断され
て破砕され、固化材と地盤との均一な混線を可能にする
The co-rotation prevention blade is for crushing a large lump of soil that is excavated by the excavation blade 23, and the large clod that is rotating together with the excavation blade 23 and stirring blade 24 hits the non-rotating co-rotation prevention blade, It is sheared and crushed between the excavation blades 23 and stirring blades 24, allowing uniform mixing of the solidified material and the ground.

23b、24a、3aは、それぞれ掘削翼23、攪拌翼
24.共回り防止翼3を枢支するボルトで、支持部材2
3d、24c、3cに枢着されている。
23b, 24a, and 3a are the digging blade 23 and the stirring blade 24. The support member 2 is a bolt that pivotally supports the co-rotation prevention wing 3.
It is pivotally connected to 3d, 24c, and 3c.

前記掘削翼23.攪拌翼24及び共回り防止翼3は前記
ボルト23b、24a、3aで下方向回動自在に枢支さ
れると共に5シャーピン23C124b、3bで下方向
に回動じないように規制されている。
Said digging wing 23. The stirring blade 24 and the co-rotation prevention blade 3 are pivotally supported by the bolts 23b, 24a, and 3a so as to be freely rotatable downward, and are restricted from rotating downward by five shear pins 23C124b and 3b.

22はスタビライザでオーガーロッド21の途中に複数
組遊嵌されており、挿通すべき鋼管杭(第1図〜第6図
の符号4)の内側に摺接するようになっている。スタビ
ライザ22は掘削中の鋼管杭の芯振れを防止すると共に
オーガロッド21の屈曲を防止するものである。
A plurality of stabilizers 22 are loosely fitted in the middle of the auger rod 21, and are adapted to come into sliding contact with the inside of a steel pipe pile (reference numeral 4 in FIGS. 1 to 6) to be inserted. The stabilizer 22 prevents the steel pipe pile from swinging out during excavation and also prevents the auger rod 21 from bending.

25はセメントミルク等の固化材の吐出口である。25 is a discharge port for solidifying material such as cement milk.

以下に、施工順序について説明する。The construction order will be explained below.

先ず、地上で第1図で示すように拡開状態のオーガー1
を鋼管杭4にセットする。
First, the auger 1 is opened on the ground as shown in Figure 1.
Set it on the steel pipe pile 4.

鋼管杭4は外周面リブ付のスパイラル鋼管で下端の内周
には丸棒のリングが2本(1本以上あれば良い)溶接さ
れて突起4a、4aを形成しており掘削翼23.攪拌翼
24及び共回り防止翼3を鋼管杭4下端から先行させた
状態でオーガーロッド21が鋼管杭4内に挿通される。
The steel pipe pile 4 is a spiral steel pipe with ribs on the outer circumferential surface, and two round bar rings (one or more is sufficient) are welded to the inner periphery of the lower end to form protrusions 4a, 4a, and the excavation wings 23. The auger rod 21 is inserted into the steel pipe pile 4 with the stirring blade 24 and the co-rotation prevention blade 3 leading from the lower end of the steel pipe pile 4.

次に、図示しない作業機でオーガーロッド21と鋼管杭
4のそれぞれの上端を把持し、第2図に示すようにオー
ガー1と鋼管杭4をそれぞれ互に逆方向または同一方向
に回転させつつ、同時にオーガーロッド21先端の吐出
口25からスラリー状の固化材を吐出し、地盤中を掘削
翼23で削孔する。
Next, the upper ends of the auger rod 21 and the steel pipe pile 4 are held by a working machine (not shown), and as shown in FIG. 2, while rotating the auger 1 and the steel pipe pile 4 in opposite directions or in the same direction, At the same time, a solidified material in the form of slurry is discharged from the discharge port 25 at the tip of the auger rod 21, and a hole is drilled in the ground with the drilling blade 23.

掘削翼23で掘削された地盤の土塊は共回り防止翼3で
破砕され、攪拌翼24で攪拌されつつ、吐出口25から
吐出する固化材と混合される。
The soil clod excavated by the excavation blades 23 is crushed by the co-rotation prevention blades 3, and is mixed with the solidification material discharged from the discharge port 25 while being stirred by the stirring blades 24.

第2図に示すように鋼管杭4の1本分が給進されたら、
次に第3図に示すように鋼管杭4及びオーガーロッド2
1をそれぞれ1本縫足す。
When one steel pipe pile 4 is fed as shown in Figure 2,
Next, as shown in Fig. 3, the steel pipe pile 4 and the auger rod 2
Add one stitch each.

次に、第4図に示すように継足した1本分を固化材を注
入しつつ削孔し、図示しないが引続き鋼管杭4を順次継
足して所定深度まで固化材を注入しつつ削孔する。
Next, as shown in Fig. 4, a hole is drilled for the added one pile while injecting solidifying material, and although not shown, the steel pipe piles 4 are successively added and the hole is drilled while injecting solidifying material to a predetermined depth. do.

所定深度まで掘削翼23先端が到達した時点でオーガー
ロッド21と鋼管杭4の給進を停止し、固化後の圧縮強
度がそれまで注入した固化材より大きいスラリー状固化
材に切り替えて削孔底部5をその固化材で充満して根固
め部5を形成する。
When the tip of the drilling blade 23 reaches a predetermined depth, the feeding of the auger rod 21 and the steel pipe pile 4 is stopped, and the solidified material is switched to a slurry solidified material whose compressive strength after solidification is higher than that of the solidified material injected up to that point, and the bottom of the drilled hole is poured. 5 is filled with the solidifying material to form the root hardening section 5.

この場合オーガー1は給進しないが回転させた方が良い
。この工程を根固め工程と称す。
In this case, auger 1 is not fed, but it is better to rotate it. This process is called the root hardening process.

前記根固め工程の代わりに、第4図に示された所定深度
よりも削孔底部の根固め部5の距離だけ浅い地盤の深度
まで削孔した後、それまで注入した固化材よりも固化後
の圧縮強度が大きな固化材に切り替え、前記削孔底部の
根固め部5の距離だけ固化材を注入しつつ所定深度まで
削孔することもできる。
Instead of the above-mentioned foot hardening process, after drilling the hole to a depth of the ground that is shallower than the predetermined depth shown in FIG. It is also possible to switch to a solidifying material with a high compressive strength and drill the hole to a predetermined depth while injecting the solidifying material by the distance of the hardening section 5 at the bottom of the hole.

なお、この場合、所定深度よりも削孔底部の根固め部5
の距離だけ浅い地盤の深度まで削孔した後、それまで注
入した固化材よりも固化後の圧縮強度が大きな固化材に
切り替え、オーガー1を削孔底部の根固め部の距離(以
下根固め距離と称す)だけ固化材を注入しつつ回転・給
進して所定深度まで到達し、次に固化材は注入せずオー
ガーロッド21を回転させつつ根固め距離だけオーガー
ロッド21を上下させて再攪拌を行うこともできる。
In addition, in this case, the root hardening part 5 at the bottom of the drilled hole is lower than the predetermined depth.
After drilling a hole to a shallow ground depth by a distance of The auger rod 21 is rotated and the auger rod 21 is rotated without injecting the solidification material (referred to as ``3''), and then the auger rod 21 is moved up and down by the distance of the root hardening, and the agitation is re-stirred. You can also do

次に、第5図に示すように鋼管杭4を反力にして(m管
杭4上端にかぶせた図示しない作業機のキャップを油圧
ジヤツキで矢印6方向に押えて鋼管杭4が上昇しないよ
うにして)オーガーロッド21を引揚げる。この場合、
共回り防止翼3.攪拌翼24.掘削翼23が順次鋼管杭
4の下端に当ってシャーピン3b、24b、23cが順
次剪断されるので、共回り防止翼3.攪拌翼24及び掘
削翼23は下方に折り畳まれて鋼管杭4内を上昇する。
Next, as shown in Fig. 5, the steel pipe pile 4 is used as a reaction force (m). ) Pull up the auger rod 21. in this case,
Co-rotation prevention wing 3. Stirring blade 24. Since the excavating blades 23 successively hit the lower ends of the steel pipe piles 4 and the shear pins 3b, 24b, and 23c are sequentially sheared, the co-rotation prevention blades 3. The stirring blades 24 and the digging blades 23 are folded downward and ascend within the steel pipe pile 4.

この場合、鋼管杭4下端内面の突起4a(この実施例の
場合は丸棒2本)に折り畳まれた共回り防止翼3.攪拌
翼24及び掘削翼23は当らないような寸法に形成され
ている。
In this case, co-rotation prevention wings 3. The stirring blades 24 and the excavating blades 23 are dimensioned so that they do not touch each other.

次に、第6図に示すように鋼管杭4を回転させながら給
進し、固化後の圧縮強度が大きな固化材が注入された根
固め部5内に挿入する。
Next, as shown in FIG. 6, the steel pipe pile 4 is rotated and advanced, and inserted into the foot protection part 5 into which a solidification material having a high compressive strength after solidification is injected.

次にオーガー1を地上へ引き揚げる。Next, lift Auger 1 to the ground.

なお、第5図に示すように、共回り防止翼3゜攪拌翼2
4及び掘削翼23を縮閉した後、引続きオーガー1を地
上に引き揚げ、次に第6図に示すように鋼管杭4を削孔
底へ沈設しても良い。
In addition, as shown in FIG. 5, the co-rotation prevention blade 3
After contracting and closing the auger 4 and the excavation blades 23, the auger 1 may be subsequently raised to the ground, and then the steel pipe pile 4 may be sunk to the bottom of the excavation hole as shown in FIG.

[発明の効果] 本発明のアンカー基礎杭の造成方法は下記のような効果
を奏する。
[Effects of the Invention] The anchor foundation pile construction method of the present invention has the following effects.

■掘削土を積極的に排出せず、削孔内を固化材と地盤と
の混合物で満たすため、原地盤を乱したり、弛めたする
ことがない。したがって、1本の杭に極めて大きな鉛直
支持力と引き抜き抵抗力が発生する ■芯材として鋼管を使用するので上部工との接続が確実
である。
■Since excavated soil is not actively discharged and the inside of the borehole is filled with a mixture of solidification material and ground, the original ground is not disturbed or loosened. Therefore, a single pile generates an extremely large vertical support force and pull-out resistance force. ■Since a steel pipe is used as the core material, the connection with the superstructure is reliable.

■泥土、残土の発生量が非常に少ない。■The amount of mud and residual soil generated is extremely small.

従って、地震時に基礎杭に大きな押し込み力と引き抜き
力が交互に作用しても耐えることができ、かつ上部工と
確実に応力伝達ができるので構造物の大型化、高層化に
適応することができる。
Therefore, it can withstand even if large pushing and pulling forces are applied alternately to the foundation pile during an earthquake, and since stress can be reliably transmitted to the superstructure, it can be adapted to larger and higher-rise structures. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第6図は本発明のアンカー基礎杭の造成方法の
施工順序を示す図、第7図は本発明の施工に使用するオ
ーガーの正面図である。 ■・・・オーガー、21・・・オーガーロッド、22・
・・スタビライザ、23・・・掘削翼、24・・・攪拌
翼、 23d、24c、3cm支持部材、 25・・・吐出口、3・・・共回り防止翼、4・・・鋼
管杭、4a・・・突起、5・・・根固め部、6・・・矢
印。
1 to 6 are diagrams showing the construction order of the anchor foundation pile construction method of the present invention, and FIG. 7 is a front view of an auger used in the construction of the present invention. ■... Auger, 21... Auger rod, 22...
... Stabilizer, 23... Excavation blade, 24... Stirring blade, 23d, 24c, 3cm support member, 25... Discharge port, 3... Co-rotation prevention blade, 4... Steel pipe pile, 4a ...Protrusion, 5... Root hardening part, 6... Arrow.

Claims (1)

【特許請求の範囲】[Claims] (1)下記工程より成るアンカー基礎杭の造成方法。 (A)オーガーはオーガーロッドの途中に少なくとも1
個のスタビライザが回転自在に遊嵌され、前記オーガー
ロッドの先端に掘削翼が、その上段に攪拌翼及び共回り
防止翼が配設され、前記掘削翼と攪拌翼とはそれぞれオ
ーガーロッドに固着された支持部材に枢軸により枢着さ
れ、前記共回り防止翼は支持部材を介してオーガーロッ
ドに回転自在に遊嵌されると共に、支持部材に枢軸によ
り枢着され、前記掘削翼、攪拌翼及び共回り防止翼はそ
れぞれ支持部材に枢軸とシャーピンにより拡開状態に保
持されており、前記オーガーを地上で準備し、別途に準
備した外周面リブ付きの鋼管杭下端より前記掘削翼、攪
拌翼及び共回り防止翼を先行させた状態でオーガーロッ
ドを前記鋼管坑内に挿入する工程 (B)オーガーロッドと鋼管杭上端をそれぞれ作業機に
把持させ、オーガーと鋼管杭をそれぞれ回転させつつ、
同時にオーガー先端からスラリー状の固化材を吐出し、
地盤の所定深度まで給進する工程 (C)次に、オーガーロッドと鋼管杭の給進を停止し、
固化材の注入を、それまでに注入した固化材よりも固化
後の圧縮強度が大きなスラリー状固化材に切り替え削孔
底部の根固め部をその固化材で充満する工程 (D)次に、鋼管抗を固定した状態でオーガー軸を引揚
げて前記シャーピンを剪断し、共回り防止翼、攪拌翼及
び掘削翼を鋼管坑内に縮閉する工程 (E)次に、鋼管杭を回転させながら前記根固め部内に
挿入する工程 (F)その後、前記オーガーを引揚げる工程(2)下記
工程より成るアンカー基礎杭の造成方法。 (A)オーガーはオーガーロッドの途中に少なくとも1
個のスタビライザが回転自在に遊嵌され、前記オーガー
ロッドの先端に掘削翼が、その上段に攪拌翼及び共回り
防止翼が配設され、前記掘削翼と攪拌翼とはそれぞれオ
ーガーロッドに固着された支持部材に枢軸により枢着さ
れ、前記共回り防止翼は支持部材を介してオーガーロッ
ドに回転自在に遊嵌されると共に、支持部材に枢軸によ
り枢着され、前記掘削翼、攪拌翼及び共回り防止翼はそ
れぞれ支持部材に枢軸とシャーピンにより拡開状態に保
持されており、前記オーガーを地上で準備し、別途に準
備した外周面リブ付きの鋼管杭下端より前記掘削翼、攪
拌翼及び共回り防止翼を先行させた状態でオーガーロッ
ドを前記鋼管坑内に挿入する工程 (B)オーガーロッドと鋼管杭上端をそれぞれ作業機に
把持させ、オーガーと鋼管杭をそれぞれ回転させつつ、
同時にオーガー先端からスラリー状の固化材を吐出し、
削孔底部の根固め部の距離だけ浅い地盤の深度まで給進
する工程(C)次に、固化材の注入を、それまでに注入
した固化材よりも固化後の圧縮強度が大きなスラリー状
固化材に切り替え、前記根固め部の距離だけ固化材を注
入しつつ所定深度まで削孔する工程 (D)次に、鋼管杭を固定した状態でオーガー軸を引揚
げて前記シャーピンを剪断し、共回り防止翼、攪拌翼及
び掘削翼を鋼管坑内に縮閉する工程 (E)次に、鋼管杭を回転させながら前記根固め部内に
挿入する工程 (F)その後、前記オーガーを引揚げる工程(3)前記
鋼管杭にはその内周面の下部に固化材との付着力向上の
ための少なくとも1個以上のリング状の突起が固設され
ていることを特徴とする請求項(1)または請求項(2
)に記載のアンカー基礎杭の造成方法。
(1) A method for constructing anchor foundation piles consisting of the following steps. (A) There should be at least one auger in the middle of the auger rod.
A number of stabilizers are rotatably fitted loosely into the auger rod, and a digging blade is provided at the tip of the auger rod, and a stirring blade and a co-rotation prevention blade are provided on the upper stage thereof, and the digging blade and the stirring blade are each fixed to the auger rod. The co-rotation prevention blade is rotatably fitted loosely to the auger rod via the support member, and is pivotally connected to the support member by a pivot, and the co-rotation prevention blade is rotatably fitted to the auger rod via the support member, and the co-rotation prevention blade is rotatably fitted to the auger rod via the support member. The anti-rotation blades are each held in an expanded state by a support member with a pivot and a shear pin, and the auger is prepared on the ground, and the excavation blade, stirring blade and common Step (B) of inserting the auger rod into the steel pipe mine with the anti-rotation wing in advance; (B) the auger rod and the upper end of the steel pipe pile are each held by a working machine, and while rotating the auger and the steel pipe pile, respectively;
At the same time, a slurry solidified material is discharged from the auger tip,
Step of feeding to a predetermined depth in the ground (C) Next, stop feeding the auger rod and steel pipe pile,
Step (D) of changing the injection of solidification material to a slurry solidification material that has a higher compressive strength after solidification than the solidification material injected up to that point and filling the hardening section at the bottom of the drilled hole with the solidification material (D) Next, the steel pipe is Step (E) of pulling up the auger shaft with the shaft fixed, shearing the shear pin, and contracting and closing the co-rotation prevention blade, stirring blade, and excavation blade in the steel pipe mine (E) Next, while rotating the steel pipe pile, the shear pin is sheared. A method for constructing an anchor foundation pile comprising the following steps: (F) inserting the auger into the solidified portion; and (2) lifting the auger. (A) There should be at least one auger in the middle of the auger rod.
A number of stabilizers are rotatably fitted loosely into the auger rod, and a digging blade is provided at the tip of the auger rod, and a stirring blade and a co-rotation prevention blade are provided on the upper stage thereof, and the digging blade and the stirring blade are each fixed to the auger rod. The co-rotation prevention blade is rotatably fitted loosely to the auger rod via the support member, and is pivotally connected to the support member by a pivot, and the co-rotation prevention blade is rotatably fitted to the auger rod via the support member, and the co-rotation prevention blade is rotatably fitted to the auger rod via the support member. The anti-rotation blades are each held in an expanded state by a support member with a pivot and a shear pin, and the auger is prepared on the ground, and the excavation blade, stirring blade and common Step (B) of inserting the auger rod into the steel pipe mine with the anti-rotation wing in advance; (B) the auger rod and the upper end of the steel pipe pile are each held by a working machine, and while rotating the auger and the steel pipe pile, respectively;
At the same time, a slurry solidified material is discharged from the auger tip,
(C) Next, the solidification material is injected into a slurry form that has a higher compressive strength after solidification than the solidification material injected so far. (D) Next, with the steel pipe pile fixed, the auger shaft is pulled up and the shear pin is sheared, and the shear pin is sheared with the steel pipe pile fixed. Step (E) of contracting and closing the anti-rotation blades, stirring blades, and excavation blades into the steel pipe mine (F) Next, the step (F) of inserting the steel pipe pile into the foot protection section while rotating (F) The step of lifting the auger (3) ) Claim (1) or claim 1, wherein the steel pipe pile has at least one ring-shaped projection fixed to the lower part of the inner circumferential surface thereof to improve adhesion to the solidifying material. term (2
) method for constructing anchor foundation piles.
JP2340212A 1990-11-30 1990-11-30 Anchor foundation pile construction method Expired - Fee Related JPH0781270B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2340212A JPH0781270B2 (en) 1990-11-30 1990-11-30 Anchor foundation pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2340212A JPH0781270B2 (en) 1990-11-30 1990-11-30 Anchor foundation pile construction method

Publications (2)

Publication Number Publication Date
JPH04209206A true JPH04209206A (en) 1992-07-30
JPH0781270B2 JPH0781270B2 (en) 1995-08-30

Family

ID=18334772

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2340212A Expired - Fee Related JPH0781270B2 (en) 1990-11-30 1990-11-30 Anchor foundation pile construction method

Country Status (1)

Country Link
JP (1) JPH0781270B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5829374A (en) * 1981-08-13 1983-02-21 Takashi Take Reducing method for higher harmonic of six-phase rectifier
JPS58185826A (en) * 1982-04-23 1983-10-29 Tenotsukusu:Kk Construction of foundation pile
JPS6130090A (en) * 1984-07-20 1986-02-12 Nec Corp Semiconductor laser
JPS6346545U (en) * 1986-09-16 1988-03-29
JPS6448926A (en) * 1987-08-17 1989-02-23 Nippon Kokan Kk Construction of pile
JPH02140323A (en) * 1988-11-19 1990-05-30 Nippon Steel Corp Formation of soil cement synthetic pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5829374A (en) * 1981-08-13 1983-02-21 Takashi Take Reducing method for higher harmonic of six-phase rectifier
JPS58185826A (en) * 1982-04-23 1983-10-29 Tenotsukusu:Kk Construction of foundation pile
JPS6130090A (en) * 1984-07-20 1986-02-12 Nec Corp Semiconductor laser
JPS6346545U (en) * 1986-09-16 1988-03-29
JPS6448926A (en) * 1987-08-17 1989-02-23 Nippon Kokan Kk Construction of pile
JPH02140323A (en) * 1988-11-19 1990-05-30 Nippon Steel Corp Formation of soil cement synthetic pile

Also Published As

Publication number Publication date
JPH0781270B2 (en) 1995-08-30

Similar Documents

Publication Publication Date Title
JP5265500B2 (en) Pile digging method, foundation pile structure
CN106088064B (en) A kind of construction method of the axle cement mixing pile drilling tool of hard stratum precrushing three
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JPH04289319A (en) Method and apparatus for forming soil cement composite pile
JP3960372B2 (en) Foundation pile structure
JP2004270440A (en) Construction method for foundation pile, and prefabricated pile
JP2920436B2 (en) Auger for mid-digging soil cement composite pile
JPH02289718A (en) Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill
CN205894066U (en) Hard stratum is broken triaxial cement stirring stake drilling tool in advance
JP2005282063A (en) Composite field preparation pile, its construction method and device for preparing composite field preparation pile
JP2000144727A (en) Construction method of footing pile
JPH04209206A (en) Establishment of anchor foundation pile
JP2002294704A (en) Center deviation preventing device for precast pile and center deviation preventing work method for precast pile
JP4887460B1 (en) Ground compaction device
JP2004308411A (en) Existing concrete pile foundation having large diameter and method for burying existing pile
JP2001200539A (en) Center deviation preventing device for hollow pipe pile, and center deviation preventing work method for hollow pipe pile
JP4197074B2 (en) Embedded pile construction equipment
JPH03257215A (en) Pile constructing method
JP4688214B2 (en) Concrete foundation method
JPH0470422A (en) Open caisson method
JP4188286B2 (en) Ground improvement method
JP4006838B2 (en) Drilling and stirring method and equipment
JPS6321796B2 (en)
JPS6131246B2 (en)
JPH0627405B2 (en) Ready-made pile burying method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080830

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080830

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090830

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100830

Year of fee payment: 15

LAPS Cancellation because of no payment of annual fees