JP6988618B2 - Power generation system and control method of power generation system - Google Patents

Power generation system and control method of power generation system Download PDF

Info

Publication number
JP6988618B2
JP6988618B2 JP2018053456A JP2018053456A JP6988618B2 JP 6988618 B2 JP6988618 B2 JP 6988618B2 JP 2018053456 A JP2018053456 A JP 2018053456A JP 2018053456 A JP2018053456 A JP 2018053456A JP 6988618 B2 JP6988618 B2 JP 6988618B2
Authority
JP
Japan
Prior art keywords
generator
power generation
power
generated
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018053456A
Other languages
Japanese (ja)
Other versions
JP2019165598A (en
Inventor
浩二 山口
武弘 軸丸
達郎 山田
美沙子 矢野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2018053456A priority Critical patent/JP6988618B2/en
Publication of JP2019165598A publication Critical patent/JP2019165598A/en
Application granted granted Critical
Publication of JP6988618B2 publication Critical patent/JP6988618B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Description

本発明は、発電システムに関する。 The present invention relates to a power generation system.

例えば、再生可能エネルギーにより交流電力を発電する発電機と、その発電機で発電した交流電力を直流電力に変換して電源装置や電力系統に供給するインバータと、を備えた発電システムが知られている(例えば、特許文献1)。 For example, a power generation system equipped with a generator that generates AC power from renewable energy and an inverter that converts the AC power generated by the generator into DC power and supplies it to a power supply device or a power system is known. (For example, Patent Document 1).

特開2017−163659号公報Japanese Unexamined Patent Publication No. 2017-163659

ところで、再生可能エネルギーは天候などの自然状況に左右される不安定なエネルギーである。そのため、再生可能エネルギーが変動した場合には、発電機での損失やインバータでの損失が変動することになり、その結果発電システム全体で発生する損失が変動する。したがって、発電システム全体で発生する損失が増加して、発電効率が低下する場合がある。 By the way, renewable energy is unstable energy that depends on natural conditions such as weather. Therefore, when the renewable energy fluctuates, the loss in the generator and the loss in the inverter fluctuate, and as a result, the loss generated in the entire power generation system fluctuates. Therefore, the loss generated in the entire power generation system may increase and the power generation efficiency may decrease.

本発明は、このような事情に鑑みてなされたもので、その目的は、発電システムで発生する損失を低減することである。 The present invention has been made in view of such circumstances, and an object of the present invention is to reduce the loss generated in a power generation system.

本発明の一態様は、発電機と、前記発電機で発電された発電電力を直流に変換する電力変換装置と、を備えた発電システムであって、前記電力変換装置を構成するスイッチング素子のスイッチング周波数を変化させながら、前記発電機で発生する損失と前記電力変換装置で発生する損失とを含む合計損失が最小となるように前記スイッチング素子に対してスイッチング制御を行う制御部を備えることを特徴とする発電システムである。 One aspect of the present invention is a power generation system including a generator and a power conversion device for converting the generated power generated by the generator into DC, and switching of switching elements constituting the power conversion device. It is characterized by including a control unit that performs switching control for the switching element so that the total loss including the loss generated by the generator and the loss generated by the power conversion device is minimized while changing the frequency. It is a power generation system.

本発明の一態様は、上述の発電システムであって、前記制御部は、前記電力変換装置により変換された発電電力が最大となるように前記スイッチング素子に対してスイッチング制御を行う。 One aspect of the present invention is the above-mentioned power generation system, in which the control unit performs switching control on the switching element so that the generated power converted by the power conversion device is maximized.

本発明の一態様は、上述の発電システムであって、前記制御部は、前記発電機の出力が目標値に追従するように前記発電機の出力をフィードバック制御し、前記スイッチング周波数の制御周波数は、負荷変動時におけるフィードバック制御の共振周波数よりも小さく、かつ、前記発電機の回転数変動の周波数より大きい。 One aspect of the present invention is the power generation system described above, wherein the control unit feedback-controls the output of the generator so that the output of the generator follows a target value, and the control frequency of the switching frequency is set. It is smaller than the resonance frequency of the feedback control at the time of load fluctuation and larger than the frequency of the rotation speed fluctuation of the generator.

本発明の一態様は、上述の発電システムであって、前記スイッチング素子の温度を測定する第1の温度センサを更に備え、前記制御部は、前記第1の温度センサにより測定された温度が第1の閾値以上になった場合には、強制的にスイッチング周波数を低減させる。 One aspect of the present invention is the power generation system described above, further comprising a first temperature sensor for measuring the temperature of the switching element, and the control unit has a temperature measured by the first temperature sensor. When the temperature exceeds the threshold value of 1, the switching frequency is forcibly reduced.

本発明の一態様は、上述の発電システムであって、前記発電機の温度を測定する第2の温度センサを更に備え、前記制御部は、前記第2の温度センサにより測定された温度が第2の閾値以上になった場合には、強制的にスイッチング周波数を増加させる。 One aspect of the present invention is the power generation system described above, further comprising a second temperature sensor for measuring the temperature of the generator, and the control unit has a temperature measured by the second temperature sensor. When the temperature exceeds the threshold value of 2, the switching frequency is forcibly increased.

以上説明したように、本発明によれば、発電システムで発生する損失を低減することができる。 As described above, according to the present invention, it is possible to reduce the loss generated in the power generation system.

本発明の一実施形態に係る発電電力変換器を備えた発電システムAの概略構成の一例を示す図である。It is a figure which shows an example of the schematic structure of the power generation system A provided with the power generation power converter which concerns on one Embodiment of this invention. 本発明の一実施形態に係る発電機損失P、インバータ損失PIV、及び合計損失Pのスイッチング周波数fsに対する傾向の一例を示す図である。It illustrates an embodiment in accordance with the generator losses P G, inverter loss P IV, and an example of a trend for the switching frequency fs of the total losses P S of the present invention. 本発明の一実施形態に係る応答角周波数ωSWを説明する図である。It is a figure explaining the response angular frequency ω SW which concerns on one Embodiment of this invention. 本発明の一実施形態に係る最小損失点追従制御のフロー図である。It is a flow diagram of the minimum loss point follow-up control which concerns on one Embodiment of this invention. 本発明の一実施形態に係る最小損失点追従制御の変形例を示すフロー図である。It is a flow diagram which shows the modification of the minimum loss point follow-up control which concerns on one Embodiment of this invention.

以下、本発明の一実施形態に係る発電電力変換器を、図面を用いて説明する。 Hereinafter, the power generation power converter according to the embodiment of the present invention will be described with reference to the drawings.

図1は、本発明の一実施形態に係る発電電力変換器を備えた発電システムAの概略構成の一例を示す図である。図1に示すように、発電システムAは、電源装置1、発電機2、及び発電電力変換器3を備える。 FIG. 1 is a diagram showing an example of a schematic configuration of a power generation system A including a power generation power converter according to an embodiment of the present invention. As shown in FIG. 1, the power generation system A includes a power supply device 1, a generator 2, and a power generation power converter 3.

電源装置1は、直流電源であって、例えば、ニッケル水素電池やリチウムイオン電池といった二次電池を用いることができる。また、電源装置1は、二次電池の代わりに、電気二重層キャパシタ(コンデンサ)を用いることもできる。さらに、電源装置1は、交流電源からの出力を直流に整流する装置であってもよい。 The power supply device 1 is a DC power supply, and for example, a secondary battery such as a nickel hydrogen battery or a lithium ion battery can be used. Further, the power supply device 1 may use an electric double layer capacitor (capacitor) instead of the secondary battery. Further, the power supply device 1 may be a device that rectifies the output from the AC power supply to direct current.

発電機2は、再生可能エネルギーや蒸気タービン等により駆動されることで電力(以下、「発電電力」という。)を発電する発電機である。本実施形態では発電機2は、三相(U、V、W)の交流発電機である。具体的には、発電機2は、永久磁石を有するロータと、三相(U、V、W)それぞれに対応するコイルLu、Lv、Lwがロータの回転方向に順に巻装されているステータとを備えている。そして、各相のコイルLu、Lv、Lwのそれぞれは、発電電力変換器3に接続されている。 The generator 2 is a generator that generates electric power (hereinafter referred to as "generated electric power") by being driven by renewable energy, a steam turbine, or the like. In this embodiment, the generator 2 is a three-phase (U, V, W) alternator. Specifically, the generator 2 includes a rotor having a permanent magnet and a stator in which coils Lu, Lv, and Lw corresponding to each of the three phases (U, V, W) are wound in order in the rotation direction of the rotor. It is equipped with. Each of the coils Lu, Lv, and Lw of each phase is connected to the power generation power converter 3.

発電電力変換器3は、発電機2で発電した交流の発電電力を直流に変換して電源装置1に供給する。以下に、本発明の一実施形態に係る発電電力変換器3の構成について、具体的に説明する。 The power generation power converter 3 converts the generated power of the alternating current generated by the generator 2 into direct current and supplies it to the power supply device 1. Hereinafter, the configuration of the power generation power converter 3 according to the embodiment of the present invention will be specifically described.

発電電力変換器3は、インバータ4及びインバータ制御部5を備える。なお、インバータ4は、本発明の「電力変換装置」の一例である。 The power generation converter 3 includes an inverter 4 and an inverter control unit 5. The inverter 4 is an example of the "power conversion device" of the present invention.

インバータ4は、発電機2で発電した交流の発電電力を直流に変換する。そして、インバータ4は、直流に変換した発電電力を電源装置1に供給する。 The inverter 4 converts the generated power of the alternating current generated by the generator 2 into direct current. Then, the inverter 4 supplies the generated power converted to direct current to the power supply device 1.

具体的には、インバータ4は、出力端子N1、基準端子N2、及び入力端子N3〜N5を備える。 Specifically, the inverter 4 includes an output terminal N1, a reference terminal N2, and input terminals N3 to N5.

出力端子N1は、接続線L1を介して電源装置1の正極端子に接続されている。基準端子N2は、接続線L2を介して電源装置1の負極端子に接続されている。また、入力端子N3には、コイルLuが接続されている。入力端子N4には、コイルLvが接続されている。入力端子N5には、コイルLwが接続されている。
したがって、インバータ4は、入力端子N3〜N5に入力した交流の発電電力を直流に変換して出力端子N1から電源装置1に出力する。
The output terminal N1 is connected to the positive electrode terminal of the power supply device 1 via the connection line L1. The reference terminal N2 is connected to the negative electrode terminal of the power supply device 1 via the connection line L2. Further, a coil Lu is connected to the input terminal N3. A coil Lv is connected to the input terminal N4. A coil Lw is connected to the input terminal N5.
Therefore, the inverter 4 converts the alternating current generated power input to the input terminals N3 to N5 into direct current and outputs it from the output terminal N1 to the power supply device 1.

以下に、インバータ4の構成について、具体的に説明する。 The configuration of the inverter 4 will be specifically described below.

インバータ4は、複数のスイッチング素子SWを有し、このスイッチング素子のオン状態とオフ状態とがインバータ制御部5によりスイッチング制御されることで発電機2からの交流の発電電力を直流に変換して電源装置1に出力する。これにより、電源装置1に発電電力が充電される。なお、本実施形態では、6つのスイッチング素子SW1〜SW6がFET(Field Effective Transistor)である場合について説明するが、これに限定されず、例えば、IGBT(Insulated gate bipolar transistor)、及びBJT(bipolar junction transistor)であってもよい。また、インバータ4は、スイッチング素子SWの個数には特に限定されない。 The inverter 4 has a plurality of switching elements SW, and the ON state and the OFF state of the switching elements are switched and controlled by the inverter control unit 5, so that the AC generated power from the generator 2 is converted into direct current. Output to power supply 1. As a result, the power generation device 1 is charged with the generated power. In this embodiment, a case where the six switching elements SW1 to SW6 are FETs (Field Effective Transistors) will be described, but the present invention is not limited to this, and for example, an IGBT (Insulated gate bipolar transistor) and a BJT (bipolar junction) are described. It may be a transistor). Further, the inverter 4 is not particularly limited in the number of switching elements SW.

具体的には、直列に接続されたスイッチング素子SW1,SW2と、直列に接続されたスイッチング素子SW3,SW4と、直列に接続されたスイッチング素子SW5,SW6とは、出力端子N1と、基準端子N2との間に並列に接続されている。 Specifically, the switching elements SW1 and SW2 connected in series, the switching elements SW3 and SW4 connected in series, and the switching elements SW5 and SW6 connected in series are the output terminal N1 and the reference terminal N2. It is connected in parallel with.

スイッチング素子SW1のドレイン端子は、出力端子N1に接続されている。スイッチング素子SW2のソース端子は、基準端子N2に接続されている。スイッチング素子SW1のソース端子と、スイッチング素子SW2のドレイン端子との接続点(入力端子N3)は、コイルLuの一端に接続されている。 The drain terminal of the switching element SW1 is connected to the output terminal N1. The source terminal of the switching element SW2 is connected to the reference terminal N2. The connection point (input terminal N3) between the source terminal of the switching element SW1 and the drain terminal of the switching element SW2 is connected to one end of the coil Lu.

スイッチング素子SW3のドレイン端子は、スイッチング素子SW1のドレイン端子に接続されている。スイッチング素子SW4のソース端子は、基準端子N2に接続されている。スイッチング素子SW3のソース端子と、スイッチング素子SW4のドレイン端子との接続点(入力端子N4)は、コイルLvの一端に接続されている。 The drain terminal of the switching element SW3 is connected to the drain terminal of the switching element SW1. The source terminal of the switching element SW4 is connected to the reference terminal N2. The connection point (input terminal N4) between the source terminal of the switching element SW3 and the drain terminal of the switching element SW4 is connected to one end of the coil Lv.

スイッチング素子SW5のドレイン端子は、スイッチング素子SW1のドレイン端子に接続されている。スイッチング素子SW6のソース端子は、基準端子N2に接続されている。スイッチング素子SW5のソース端子と、スイッチング素子SW6のドレイン端子との接続点(入力端子N5)は、コイルLwの一端に接続されている。 The drain terminal of the switching element SW5 is connected to the drain terminal of the switching element SW1. The source terminal of the switching element SW6 is connected to the reference terminal N2. The connection point (input terminal N5) between the source terminal of the switching element SW5 and the drain terminal of the switching element SW6 is connected to one end of the coil Lw.

また、各スイッチング素子SW1〜SW6のゲート端子は、インバータ制御部5に接続されている。 Further, the gate terminals of the switching elements SW1 to SW6 are connected to the inverter control unit 5.

インバータ制御部5は、インバータ4の駆動を制御する。具体的には、インバータ制御部5は、スイッチング素子SW1〜SW6をスイッチング制御する。以下に、インバータ制御部5の構成について、具体的に説明する。 The inverter control unit 5 controls the drive of the inverter 4. Specifically, the inverter control unit 5 switches and controls the switching elements SW1 to SW6. The configuration of the inverter control unit 5 will be specifically described below.

インバータ制御部5は、電流検出部6、電圧検出部7、及び制御部8を備える。 The inverter control unit 5 includes a current detection unit 6, a voltage detection unit 7, and a control unit 8.

電流検出部6は、インバータ4の出力端子N1から電源装置1に出力する出力電流Ioutを検出する。例えば、電流検出部6は、接続線L1に設けられ、接続センサL1に流れる電流を検出することで、出力電流Ioutを検出する。そして、電流検出部6は、検出した出力電流Ioutを制御部8に出力する。 The current detection unit 6 detects the output current Iout output from the output terminal N1 of the inverter 4 to the power supply device 1. For example, the current detection unit 6 is provided on the connection line L1 and detects the output current Iout by detecting the current flowing through the connection sensor L1. Then, the current detection unit 6 outputs the detected output current Iout to the control unit 8.

この電流検出部6は、出力電流Ioutを検出する構成であれば特に限定されないが、例えば、トランスを備えたカレントトランス(CT)やホール素子を備えた電流センサである。また、電流検出部6は、接続線L1に直列に接続されたシャント抵抗の両端の電圧から出力電流Ioutを検出してもよい。 The current detection unit 6 is not particularly limited as long as it is configured to detect the output current Iout, but is, for example, a current transformer (CT) including a transformer or a current sensor including a Hall element. Further, the current detection unit 6 may detect the output current Iout from the voltage across the shunt resistor connected in series with the connection line L1.

電圧検出部7は、インバータ4から電源装置1に出力される出力電圧Voutを検出する。例えば、電圧検出部7は、出力端子N1と基準端子N2との間の電位差を検出することで、出力電圧Voutを検出する。なお、電圧検出部7は、インバータ4から出力される出力電圧Voutをそのまま読み取るのではなく、例えば、抵抗分圧回路で出力電圧Voutを抵抗分圧した電圧(以下、「分圧電圧」という。)を読み取ってもよい。この場合には、電圧検出部7は、読み取った分圧電圧から、抵抗分圧回路の分圧比に基づいて出力電圧Voutを算出する。 The voltage detection unit 7 detects the output voltage Vout output from the inverter 4 to the power supply device 1. For example, the voltage detection unit 7 detects the output voltage Vout by detecting the potential difference between the output terminal N1 and the reference terminal N2. The voltage detection unit 7 does not read the output voltage Vout output from the inverter 4 as it is, but for example, the voltage obtained by dividing the output voltage Vout by a resistance voltage divider circuit (hereinafter referred to as "voltage divider voltage"). ) May be read. In this case, the voltage detection unit 7 calculates the output voltage Vout from the read voltage dividing voltage based on the voltage dividing ratio of the resistance voltage dividing circuit.

電圧検出部7は、検出した出力電圧Voutを制御部8に出力する。なお、上述したように、出力端子N1が電源装置1の正極端子に、基準端子N2が電源装置1の負極端子に接続されているため、出力電圧Voutは電源装置1の出力電圧に相当する。 The voltage detection unit 7 outputs the detected output voltage Vout to the control unit 8. As described above, since the output terminal N1 is connected to the positive electrode terminal of the power supply device 1 and the reference terminal N2 is connected to the negative electrode terminal of the power supply device 1, the output voltage Vout corresponds to the output voltage of the power supply device 1.

制御部8は、スイッチング素子SW1〜SW6を任意のスイッチング周波数fswでスイッチング制御する。例えば、制御部8は、スイッチング素子SW1〜SW6のゲート端子に制御信号を出力することで、スイッチング素子SW1〜SW6をオン状態又はオフ状態に制御するスイッチング制御を行う。この制御信号は、例えば、PWM(パルス幅変調)信号である。 The control unit 8 switches and controls the switching elements SW1 to SW6 at an arbitrary switching frequency fsw. For example, the control unit 8 performs switching control for controlling the switching elements SW1 to SW6 in an on state or an off state by outputting a control signal to the gate terminal of the switching elements SW1 to SW6. This control signal is, for example, a PWM (Pulse Width Modulation) signal.

具体的には、制御部8は、発電機2の出力が目標値に追従するようにPWM信号のディーティ比を設定することで発電機2の出力をフィードバック制御する。ここで、発電機2の出力とは、発電機2から出力される電流(発電電流)でもよいし、発電機2から出力される電圧(発電電圧)でもよい。 Specifically, the control unit 8 feedback-controls the output of the generator 2 by setting the detail ratio of the PWM signal so that the output of the generator 2 follows the target value. Here, the output of the generator 2 may be a current output from the generator 2 (generated current) or a voltage output from the generator 2 (generated voltage).

また、制御部8は、インバータ4のスイッチング周波数fswを、上記フィードバック制御の制御系(以下、「第1の制御系」という。)とは異なる第2の制御系で設定する。なお、上記スイッチング周波数fswは、制御信号の周波数に相当する。
ここで、本実施形態に係る特徴の一つは、インバータ4のスイッチング周波数fswを固定せずに変化させながら、発電機2で発生する損失(以下、「発電機損失」という。)Pとインバータ4で発生する損失(以下、「インバータ損失」という。)PIVとを合計した損失(以下、「合計損失」という。)Pが最小となるスイッチング周波数fsw(以下、「fswmin」という。)を常に探索する最小損失点追従制御を行うことである。
Further, the control unit 8 sets the switching frequency fsw of the inverter 4 with a second control system different from the feedback control control system (hereinafter, referred to as “first control system”). The switching frequency fsw corresponds to the frequency of the control signal.
Here, one feature of the present embodiment, while changing without fixing the switching frequency fsw of the inverter 4, loss generated by the generator 2 (hereinafter, referred to as "generator loss".) And P G loss generated in the inverter 4 (hereinafter, "inverter loss" hereinafter.) in a loss which is the sum of the P IV (hereinafter, referred to as "total loss".) P S is the minimum switching frequency fsw (hereinafter, "fsw min" It is to perform the minimum loss point tracking control that constantly searches for.).

換言すれば、最小損失点追従制御とは、発電機2が駆動している状態において、合計損失Pが最小となるように、スイッチング周波数fsw(例えば、制御信号の周波数)をパラメータとして変化させながら合計損失Pが最小となるようにインバータ4をスイッチング制御することである。 In other words, a minimum loss point tracking control, in a state where the generator 2 is driven, so that the total loss P S is minimized, changing the switching frequency fsw (e.g., frequency control signal) as a parameter total loss P S is to switching control of the inverter 4 so as to minimize while.

以下に、合計損失Pについて、図2を用いて説明する。図2は、本発明の一実施形態に係る発電機損失P、インバータ損失PIV、及び合計損失Pのスイッチング周波数fsに対する傾向の一例を示す図である。 Hereinafter, the total loss P S, is described with reference to FIG. Figure 2 is a diagram illustrating an embodiment in accordance with the generator losses P G, inverter loss P IV, and an example of a trend for the switching frequency fs of the total losses P S of the present invention.

本発明者らは、スイッチング周波数fswが高くなるにつれて、発電機損失Pが減少する傾向にあるともにインバータ損失PIVが増加する傾向にあることを発見した。これは、図2に示すように、縦軸を損失、横軸をスイッチング周波数fswとしたグラフにおいて、発電機損失P及びインバータ損失PIVをプロットした場合には、スイッチング周波数fswの所定範囲内において、損失Pが最小となるポイント(以下、「最小損失点」という。)が存在する。すなわち、合計損失Pには、スイッチング周波数fswの所定範囲内において、必ず最小損失点が存在することになる。したがって、制御部8は、再生可能エネルギーや蒸気タービンの駆動が変動することで発電機2の回転数が変動した場合でも、スイッチング周波数fswを変化させながら常に最小損失点のスイッチング周波数fswminを探索してスイッチング制御することで、合計損失Pを低減することができる。 The present inventors have discovered that there as the switching frequency fsw increases, are both prone to inverter loss P IV increases tend to generator losses P G is reduced. This is because, as shown in FIG. 2, the loss on the vertical axis, the horizontal axis in graph switching frequency fsw, when plotting the generator losses P G and the inverter loss P IV is within a predetermined range of the switching frequency fsw in the point where the loss P S is minimized (hereinafter, referred to as "minimum loss point".) exists. That is, the total losses P S is within a predetermined range of the switching frequency fsw, so that always there is a minimum loss point. Therefore, the control unit 8 always searches for the switching frequency fsw min of the minimum loss point while changing the switching frequency fsw even when the rotation speed of the generator 2 fluctuates due to the fluctuation of the renewable energy or the drive of the steam turbine. by to switching control, it is possible to reduce the total loss P S.

ここで、発電機2の回転数が一定である場合には、スイッチング周波数fswに対する合計損失Pの傾向とインバータ4から出力される発電電力Poutの傾向とは、互いに反対の傾向を示す。すなわち、発電機2の回転数が一定である場合には、合計損失Pが最小となるスイッチング周波数fSWと、発電電力Poutが最大となるスイッチング周波数fSWとが、同一の周波数となる。したがって、本実施形態に係る制御部8は、最小損失点追従制御において、発電機2の駆動時にインバータ4のスイッチング周波数fSWを変化させながら、発電電力Poutが最大となるようにスイッチング素子SW1〜SW6のスイッチング制御を行う。 Here, when the rotation speed of the generator 2 is constant, the tendency of the generated power Pout output from the tendency of the inverter 4 of the total losses P S to the switching frequency fsw, a tendency opposite to each other. That is, when the rotation speed of the generator 2 is constant, the switching frequency f SW of total losses P S is minimized, and the switching frequency f SW of generated power Pout becomes maximum, the same frequency. Therefore, in the minimum loss point tracking control, the control unit 8 according to the present embodiment changes the switching frequency f SW of the inverter 4 when the generator 2 is driven, and the switching elements SW1 to maximize the generated power Pout. SW6 switching control is performed.

なお、発電機2の回転数が変動すると最小損失点も変動するため、図3に示すように、最小損失点追従制御においてスイッチング周波数fswを変化させる制御系(第2の制御系)の応答角周波数ωSWは、想定される発電機2の回転数変動の周波数ωよりも大きい値に設定される。この第2の制御系の応答角周波数ωSWとは、スイッチング周波数fswを制御する周波数(スイッチング周波数fswの制御周波数)である。なお、想定される発電機2の回転数変動の周波数ωは、想定される発電機2の回転数変動の最大周波数であることが望ましい。
さらに、応答角周波数ωSWが発電機2の回転数変動時における上記第1の制御系の共振角周波数ωr(>ω)より大きいと、スイッチング周波数fswが共振などの過渡状態(不安定状態)に追従してしまう可能性がある。
Since the minimum loss point also changes when the rotation speed of the generator 2 fluctuates, the response angle of the control system (second control system) that changes the switching frequency fsw in the minimum loss point tracking control as shown in FIG. The frequency ω SW is set to a value larger than the frequency ω L of the assumed rotation speed fluctuation of the generator 2. The response angular frequency ω SW of the second control system is a frequency for controlling the switching frequency fsw (control frequency of the switching frequency fsw). It is desirable that the frequency ω L of the assumed rotation speed fluctuation of the generator 2 is the maximum frequency of the assumed rotation speed fluctuation of the generator 2.
Further, when the response angular frequency ω SW is larger than the resonance angular frequency ωr (> ω L ) of the first control system when the rotation speed of the generator 2 fluctuates, the switching frequency fsw is in a transient state (unstable state) such as resonance. ) May be followed.

したがって、応答角周波数ωSWは、上記共振角周波数ωrよりも小さい値に設定される。例えば、応答角周波数ωSWは、以下の条件(1)になるように設定される。
ω<<ωSW<<ωr…(1)
Therefore, the response angle frequency ω SW is set to a value smaller than the resonance angle frequency ωr. For example, the response angular frequency ω SW is set so as to satisfy the following condition (1).
ω L << ω SW << ωr ... (1)

次に、本発明の一実施形態に係る最小損失点追従制御の動作の流れについて、図4を用いて説明する。図4は、本発明の一実施形態に係る最小損失点追従制御のフロー図である。 Next, the flow of the operation of the minimum loss point tracking control according to the embodiment of the present invention will be described with reference to FIG. FIG. 4 is a flow chart of minimum loss point tracking control according to an embodiment of the present invention.

まず、制御部8は、スイッチング周波数fswを予め設定された初期値fsw0に設定した制御信号をスイッチング素子SW1〜SW6に出力することで、インバータ4を駆動する。これにより、スイッチング周波数fsw=初期値fsw0でスイッチング制御されたインバータ4は、発電機2で発電された交流の発電電力を直流に変換して、当該直流の発電電力Poutを電源装置1に供給する(ステップS101)。なお、初期値fsw0は、例えば、シミュレーションから得られた基準値や設計値、試験的に得られた基準値である。 First, the control unit 8 drives the inverter 4 by outputting a control signal whose switching frequency fsw is set to a preset initial value fsw0 to the switching elements SW1 to SW6. As a result, the inverter 4 whose switching is controlled at the switching frequency fsw = initial value fsw0 converts the AC generated power generated by the generator 2 into DC and supplies the DC generated power Pout to the power supply device 1. (Step S101). The initial value fsw0 is, for example, a reference value obtained from a simulation, a design value, or a reference value obtained on a trial basis.

次に、制御部8は、発電機2が駆動している状態において、現在のスイッチング周波数fswに、微小周波数Δfsw×増減フラグFを加える。ここで、微小周波数Δfswは、予め設定されており、最小損失点追従制御においてスイッチング周波数fswを変化させる変化量である。増減フラグFは、最小損失点追従制御においてスイッチング周波数fswを変化させる場合に、当該スイッチング周波数fswを増加させるのか、又は減少させるのかを決定するものである。例えば、増減フラグFが「+1」ならばスイッチング周波数fswを増加させ、増減フラグFが「−1」ならばスイッチング周波数fswを減少させる。なお、増減フラグFの初期値は、ステップS101において設定され、本実施形態では初期値として「+1」に設定する。ただし、増減フラグFの初期値は、「−1」でもよい。 Next, the control unit 8 adds a minute frequency Δfsw × increase / decrease flag F to the current switching frequency fsw while the generator 2 is being driven. Here, the minute frequency Δfsw is preset and is a change amount that changes the switching frequency fsw in the minimum loss point tracking control. The increase / decrease flag F determines whether to increase or decrease the switching frequency fsw when the switching frequency fsw is changed in the minimum loss point tracking control. For example, if the increase / decrease flag F is "+1", the switching frequency fsw is increased, and if the increase / decrease flag F is "-1", the switching frequency fsw is decreased. The initial value of the increase / decrease flag F is set in step S101, and is set to "+1" as the initial value in the present embodiment. However, the initial value of the increase / decrease flag F may be "-1".

電流検出部6は、インバータ4から電源装置1に出力される出力電流Ioutを検出し、その検出した出力電流Ioutを制御部8に出力する。また、電圧検出部7は、インバータ4から電源装置1に出力される出力電圧Voutを検出し、その検出した出力電圧Voutを制御部8に出力する(ステップS103)。 The current detection unit 6 detects the output current Iout output from the inverter 4 to the power supply device 1, and outputs the detected output current Iout to the control unit 8. Further, the voltage detection unit 7 detects the output voltage Vout output from the inverter 4 to the power supply device 1, and outputs the detected output voltage Vout to the control unit 8 (step S103).

制御部8は、電流検出部6から取得した出力電流Ioutと、電圧検出部7から取得した出力電圧Voutとを乗算することで、現在の発電電力Pout(=Iout×Vout)を算出する(ステップS104)。 The control unit 8 calculates the current power generation power Pout (= Iout × Vout) by multiplying the output current Iout acquired from the current detection unit 6 and the output voltage Vout acquired from the voltage detection unit 7 (step). S104).

制御部8は、現在の発電電力Poutを算出すると、その算出した現在の発電電力Poutと、前回算出した発電電力Poutとを比較する(ステップS104)。なお、説明が煩雑になることを防ぐため、前回算出した発電電力Poutを発電電力Prefと表記する。なお、発電電力Prefの初期値は、ステップS101において設定され、本実施形態では「0」に設定される。 When the control unit 8 calculates the current power generation power Pout, the control unit 8 compares the calculated current power generation power Pout with the previously calculated power generation power Pout (step S104). In order to prevent the explanation from becoming complicated, the power generation power Pout calculated last time is referred to as the power generation power Ref. The initial value of the generated power Pref is set in step S101, and is set to "0" in this embodiment.

制御部8は、現在の発電電力Poutと前回の発電電力Prefとを比較し、現在の発電電力Poutが、前回の発電電力Prefより大きい場合(Pout>Pref)には、増減フラグFの符号は変更しない。そして、制御部8は、現在の発電電力Poutを前回の発電電力Prefとして設定して(ステップS107)、ステップS102の処理に戻る。 The control unit 8 compares the current power generation power Pout with the previous power generation power Pref, and when the current power generation power Pout is larger than the previous power generation power Pref (Pout> Pref), the sign of the increase / decrease flag F is Not going to change. Then, the control unit 8 sets the current generated power Pout as the previous generated power Pref (step S107), and returns to the process of step S102.

一方、制御部8は、現在の発電電力Poutと前回の発電電力Prefとを比較し、現在の発電電力Poutが、前回の発電電力Pref以下である場合(Pout≦Pref)には、増減フラグFの符号を反転させる(ステップS106)。そして、制御部8は、現在の発電電力Poutを前回の発電電力Prefとして設定して(ステップS107)、ステップS102の処理に戻る。 On the other hand, the control unit 8 compares the current power generation power Pout with the previous power generation power Pref, and when the current power generation power Pout is equal to or less than the previous power generation power Pref (Pout ≦ Pref), the increase / decrease flag F Invert the sign of (step S106). Then, the control unit 8 sets the current generated power Pout as the previous generated power Pref (step S107), and returns to the process of step S102.

このように、制御部8は、ステップS102〜ステップS107を繰り返すことで、スイッチング周波数fswをパラメータとして、前回のスイッチング周波数fswから微小周波数Δfswだけ増加又は減少させながら発電電力Poutが前回の値よりも大きくなるようにインバータ4をスイッチング制御する。これにより、制御部8は、スイッチング周波数fswを増加又は減少させながら最小損失点を探索することが可能となる。その結果、発電システムAは、発電機2の回転数、発電機2やスイッチング素子SW1〜SW6の温度、発電機2の発電電圧、発電機2やスイッチング素子SW1〜SW6の個体ばらつき等によらず、最小損失で発電機2の運転を継続することができる。
さらに、発電システムAは、発電機2の回転数に変動があった場合でも、最小損失に維持し、常に高い発電効率に維持することができる。
In this way, by repeating steps S102 to S107, the control unit 8 increases or decreases the generated power Pout by a minute frequency Δfsw from the previous switching frequency fsw with the switching frequency fsw as a parameter, and the generated power Pout is higher than the previous value. The inverter 4 is switched and controlled so as to be large. This enables the control unit 8 to search for the minimum loss point while increasing or decreasing the switching frequency fsw. As a result, the power generation system A does not depend on the rotation speed of the generator 2, the temperature of the generator 2 and the switching elements SW1 to SW6, the power generation voltage of the generator 2, the individual variation of the generator 2 and the switching elements SW1 to SW6, and the like. , The operation of the generator 2 can be continued with the minimum loss.
Further, the power generation system A can maintain the minimum loss and always maintain high power generation efficiency even if the rotation speed of the generator 2 fluctuates.

以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。 Although the embodiments of the present invention have been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and includes designs and the like within a range that does not deviate from the gist of the present invention.

(変形例1)
上記実施形態において、最小損失点追従制御において、変更するスイッチング周波数fswの範囲に制限を設けてもよい。例えば、制御部8は、最小損失点追従制御におけるスイッチング周波数fswを、最小値fswMIN(最小限度値)と最大値fswMAX(最大限度値)との間の範囲(fswMIN≦fsw≦fswMAX)内において変更してもよい。
(Modification 1)
In the above embodiment, the range of the switching frequency fsw to be changed may be limited in the minimum loss point tracking control. For example, the control unit 8 sets the switching frequency fsw in the minimum loss point tracking control in the range between the minimum value fsw MIN (minimum value) and the maximum value fsw MAX (maximum value) (fsw MIN ≤ fsw ≤ fsw MAX). ) May be changed.

(変形例2)
上記実施形態において、制御部8は、最小損失点追従制御の開始時において、ステップS101の処理で初期条件を設定した後に、スイッチング周波数fsw(初期値fsw0)に微小周波数Δfsw×増減フラグFを足してから(ステップS102)、出力電流Iout及び出力電圧Voutの取得(ステップS103)、発電電力Poutの演算(ステップS104)を行ったが、本発明はこれに限定されない。例えば、制御部8は、最小損失点追従制御の開始時においては、ステップS101の処理を行った後に、ステップS102の処理を行わずに、ステップS103,S104の処理を実行してもよい。この場合には、制御部8は、ステップS107の処理を行った後に、ステップS102の処理を行うことになる。
(Modification 2)
In the above embodiment, the control unit 8 adds the minute frequency Δfsw × increase / decrease flag F to the switching frequency fsw (initial value fsw0) after setting the initial conditions in the process of step S101 at the start of the minimum loss point tracking control. After that (step S102), acquisition of the output current Iout and the output voltage Vout (step S103), and calculation of the generated power Pout (step S104) were performed, but the present invention is not limited thereto. For example, at the start of the minimum loss point tracking control, the control unit 8 may execute the processing of steps S103 and S104 without performing the processing of step S102 after performing the processing of step S101. In this case, the control unit 8 performs the process of step S102 after the process of step S107.

具体的には、図5に示すように、まず、制御部8は、初期条件を設定する。すなわち、制御部8は、スイッチ101の処理と同様に、スイッチング周波数fswを予め設定された初期値fsw0に設定した制御信号をスイッチング素子SW1〜SW6に出力することで、インバータ4を駆動する。さらに、制御部8は、前回の発電電力Prefを初期値「0」に、増減フラグFを初期値「+1」に設定する(ステップS201)。 Specifically, as shown in FIG. 5, the control unit 8 first sets the initial conditions. That is, the control unit 8 drives the inverter 4 by outputting the control signal whose switching frequency fsw is set to the preset initial value fsw0 to the switching elements SW1 to SW6, as in the processing of the switch 101. Further, the control unit 8 sets the previous generated power Pref to the initial value “0” and the increase / decrease flag F to the initial value “+1” (step S201).

初期条件が設定された後、電流検出部6は、インバータ4から電源装置1に出力される出力電流Ioutを検出し、その検出した出力電流Ioutを制御部8に出力する。また、電圧検出部7は、インバータ4から電源装置1に出力される出力電圧Voutを検出し、その検出した出力電圧Voutを制御部8に出力する(ステップS202)。 After the initial conditions are set, the current detection unit 6 detects the output current Iout output from the inverter 4 to the power supply device 1, and outputs the detected output current Iout to the control unit 8. Further, the voltage detection unit 7 detects the output voltage Vout output from the inverter 4 to the power supply device 1, and outputs the detected output voltage Vout to the control unit 8 (step S202).

制御部8は、電流検出部6から取得した出力電流Ioutと、電圧検出部7から取得した出力電圧Voutとを乗算することで、発電電力Pout(=Iout×Vout)を算出する(ステップS203)。 The control unit 8 calculates the generated power Pout (= Iout × Vout) by multiplying the output current Iout acquired from the current detection unit 6 and the output voltage Vout acquired from the voltage detection unit 7 (step S203). ..

制御部8は、現在の発電電力Poutを算出すると、その算出した現在の発電電力Poutと、前回算出した発電電力Prefとを比較し(ステップS204)、現在の発電電力Poutが、前回の発電電力Prefより大きい場合(Pout>Pref)には、増減フラグFの符号は変更しない。そして、制御部8は、現在の発電電力Poutを前回の発電電力Prefとして設定する(ステップS206)。一方、制御部8は、現在の発電電力Poutと前回の発電電力Prefとを比較し、現在の発電電力Poutが、前回の発電電力Pref以下である場合(Pout≦Pref)には、増減フラグFの符号を反転させる(ステップS205)。そして、制御部8は、現在の発電電力Poutを前回の発電電力Prefとして設定する(ステップS206)。その後、制御部8は、現在のスイッチング周波数fswに、微小周波数Δfsw×増減フラグFを加えて(ステップS207)、ステップS202の処理に戻る。 When the control unit 8 calculates the current power generation power Pout, the calculated current power generation power Pout is compared with the previously calculated power generation power Pref (step S204), and the current power generation power Pout is the previous power generation power. If it is larger than Pref (Pout> Pref), the sign of the increase / decrease flag F is not changed. Then, the control unit 8 sets the current generated power Pout as the previous generated power Def (step S206). On the other hand, the control unit 8 compares the current power generation power Pout with the previous power generation power Pref, and when the current power generation power Pout is equal to or less than the previous power generation power Pref (Pout ≦ Pref), the increase / decrease flag F Invert the sign of (step S205). Then, the control unit 8 sets the current generated power Pout as the previous generated power Def (step S206). After that, the control unit 8 adds a minute frequency Δfsw × increase / decrease flag F to the current switching frequency fsw (step S207), and returns to the process of step S202.

(変形例3)
上記実施形態において、発電システムAは、スイッチング素子SW1〜SW6の温度Tswを測定する第1の温度センサを備えてもよい。そして、制御部8は、最小損失点追従制御において、上記第1の温度センサで測定された温度Tswが予め設定された第1の閾値Tth1以上になった場合には、当該温度Tswが第1の閾値Tth1未満になるまで強制的にスイッチング周波数fswを低減させてもよい。例えば、制御部8は、最小損失点追従制御を行っていても、温度Tswが第1の閾値Tth1以上になった場合には、割り込み処理として強制的にスイッチング周波数fswを低減させてもよい。これにより、スイッチング素子SW1〜SW6による損失(インバータ損失)が低減され、制御部8は、スイッチング素子SW1〜SW6が発熱により故障することを防止することができる。なお、強制的にスイッチング周波数fswを低減させる方法として、例えば、増減フラグFの符号を強制的に反転させる方法がある。
(Modification 3)
In the above embodiment, the power generation system A may include a first temperature sensor that measures the temperature Tsw of the switching elements SW1 to SW6. Then, in the minimum loss point tracking control, when the temperature Tsw measured by the first temperature sensor becomes equal to or higher than the preset first threshold value Tth1, the control unit 8 sets the temperature Tsw to the first. The switching frequency fsw may be forcibly reduced until it becomes less than the threshold value Tth1 of. For example, the control unit 8 may forcibly reduce the switching frequency fsw as an interrupt process when the temperature Tsw becomes equal to or higher than the first threshold value Tth1 even if the minimum loss point tracking control is performed. As a result, the loss (inverter loss) due to the switching elements SW1 to SW6 is reduced, and the control unit 8 can prevent the switching elements SW1 to SW6 from failing due to heat generation. As a method for forcibly reducing the switching frequency fsw, for example, there is a method for forcibly inverting the sign of the increase / decrease flag F.

(変形例4)
上記実施形態において、発電システムAは、発電機2の温度Tを測定する第2の温度センサを備えてもよい。この発電機2の温度Tとは、例えば、コイルLu、Lv、Lwの各温度である。そして、制御部8は、最小損失点追従制御において、上記第2の温度センサで測定された温度Tが予め設定された第2の閾値Tth2以上になった場合には、当該温度Tが第2の閾値Tth2未満になるまで強制的にスイッチング周波数fswを増加させてもよい。例えば、制御部8は、最小損失点追従制御を行っていても、温度Tが第2の閾値Tth2以上になった場合には、割り込み処理として強制的にスイッチング周波数fswを増加させてもよい。これにより、発電機損失が低減され、制御部8は、コイルLu、Lv、Lwの発熱により発電機2が故障することを防止することができる。なお、強制的にスイッチング周波数fswを増加させる方法として、例えば、増減フラグFの符号を強制的に反転させる方法がある。
(Modification example 4)
In the above embodiment, the power generation system A may include a second temperature sensor that measures the temperature TG of the generator 2. The temperature TG of the generator 2 is, for example, the temperature of each of the coils Lu, Lv, and Lw. Then, in the minimum loss point tracking control, when the temperature TG measured by the second temperature sensor becomes equal to or higher than the preset second threshold value Tth2 , the control unit 8 sets the temperature TG. The switching frequency fsw may be forcibly increased until it becomes less than the second threshold value Tth2. For example, the control unit 8 may forcibly increase the switching frequency fsw as interrupt processing when the temperature TG becomes equal to or higher than the second threshold value Tth2 even if the minimum loss point tracking control is performed. .. As a result, the generator loss is reduced, and the control unit 8 can prevent the generator 2 from failing due to the heat generated by the coils Lu, Lv, and Lw. As a method for forcibly increasing the switching frequency fsw, for example, there is a method for forcibly inverting the sign of the increase / decrease flag F.

(変形例5)
上記実施形態において、発電システムAは、上記第1の温度センサと上記第2の温度センサとの双方を備えてもよい。そして、制御部8は、温度Tswが第1の閾値Tth1以上となり、かつ、温度Tが第2の閾値Tth2以上となった場合には、発電機2の出力(例えば、発電電流)が低減するように制御する。例えば、制御部8は、発電機2の出力の目標値を下げる。これにより、インバータ損失と発電機損失との双方が低減され、スイッチング素子SW1〜SW6と発電機2との発熱による故障を防止することができる。
(Modification 5)
In the above embodiment, the power generation system A may include both the first temperature sensor and the second temperature sensor. Then, when the temperature Tsw becomes the first threshold value Tth1 or more and the temperature TG becomes the second threshold value Tth2 or more, the control unit 8 reduces the output (for example, the power generation current) of the generator 2. Control to do. For example, the control unit 8 lowers the target value of the output of the generator 2. As a result, both the inverter loss and the generator loss are reduced, and it is possible to prevent a failure due to heat generation between the switching elements SW1 to SW6 and the generator 2.

(変形例6)
上記実施形態では、制御部8は、電流検出部6で検出された出力電流Ioutと電圧検出部7で検出された出力電圧Voutとを乗算することで発電電力Poutを取得したが、本発明はこれに限定されない。すなわち、制御部8は、発電電力Poutを取得できればよく、その取得方法には特に限定されない。例えば、制御部8は、接続線L1に設けられた電力センサにより発電電力Poutを取得してもよい。また、制御部8は、発電機2の発電電流やインバータ4の変換効率等から発電電力Poutを算出することで、当該発電電力Poutを取得してもよい。
(Modification 6)
In the above embodiment, the control unit 8 acquires the generated power Pout by multiplying the output current Iout detected by the current detection unit 6 and the output voltage Vout detected by the voltage detection unit 7. Not limited to this. That is, the control unit 8 only needs to be able to acquire the generated power Pout, and the acquisition method is not particularly limited. For example, the control unit 8 may acquire the generated power Pout by the power sensor provided on the connection line L1. Further, the control unit 8 may acquire the generated power Pout by calculating the generated power Pout from the generated current of the generator 2, the conversion efficiency of the inverter 4, and the like.

(変形例7)
上記実施形態では、インバータ4から出力される発電電力Poutが電源装置1に供給される場合について説明したが、本発明はこれに限定されない。すなわち、インバータ4から出力される発電電力Poutが負荷に供給されればよく、その負荷の種類には特に限定されない。例えば、発電システムAは、インバータ4から出力される発電電力Poutを交流に変換する変換装置をさらに備え、当該変換装置により交流に変換された発電電力を電力系統等の負荷に供給してもよい。
(Modification 7)
In the above embodiment, the case where the generated power Pout output from the inverter 4 is supplied to the power supply device 1 has been described, but the present invention is not limited to this. That is, the generated power Pout output from the inverter 4 may be supplied to the load, and the type of the load is not particularly limited. For example, the power generation system A may further include a conversion device that converts the generated power Pout output from the inverter 4 into alternating current, and supply the generated power converted to alternating current by the conversion device to a load such as a power system. ..

上述したように、本発明者は、スイッチング周波数fswが高くなるにつれて、発電機損失Pが減少する傾向にあるともにインバータ損失PIVが増加する傾向にあることを発見し、合計損失Pにはスイッチング周波数fswをパラメータとする最小損失点が存在することを見出した。本実施形態に係る発電電力変換器3は、このような知見に基づいてなされたものであって、インバータ4を構成するスイッチング素子SW1〜SW6のスイッチング周波数を変化させながら、発電機損失Pとインバータ損失PIVとを含む合計損失Pが最小となるようにスイッチング素子SW1〜SW6をスイッチング制御する制御部8を備える。 As described above, the present inventors, as the switching frequency fsw increases, the generator losses P G are both inverter loss P IV in tends to decrease discovered that tends to increase, the total losses P S Found that there is a minimum loss point with the switching frequency fsw as a parameter. Generated power converter 3 according to the present embodiment, which has been made based on these findings, while changing the switching frequency of the switching element SW1~SW6 constituting the inverter 4, a generator loss P G a control unit 8 that the total losses P S including the inverter loss P IV is switching control of the switching element SW1~SW6 to minimize.

このような構成によれば、発電機2の回転数変動が発生した場合であっても、合計損失Pを常に最小損失となるように維持することができる。そのため、発電機2の回転数変動により発電システムAで発生する損失を低減することができる。 According to such a configuration, even when the engine speed fluctuation of the generator 2 is generated, it is possible to maintain the total losses P S to always minimized losses. Therefore, it is possible to reduce the loss generated in the power generation system A due to the fluctuation of the rotation speed of the generator 2.

より具体的には、制御部8は、インバータ4により直流に変換された発電電力Poutが最大となるようにスイッチング素子SW1〜SW6をスイッチング制御する。 More specifically, the control unit 8 switches and controls the switching elements SW1 to SW6 so that the generated power Pout converted to direct current by the inverter 4 is maximized.

また、制御部8は、発電機2の出力をフィードバック制御する構成を備えてもよい。そして、スイッチング周波数fswの制御周波数は、負荷変動時におけるフィードバック制御の共振周波数よりも小さく、かつ、発電機2の回転数変動の周波数よりも大きい値に設定されてもよい。 Further, the control unit 8 may be provided with a configuration in which the output of the generator 2 is feedback-controlled. The control frequency of the switching frequency fsw may be set to a value smaller than the resonance frequency of the feedback control at the time of load fluctuation and larger than the frequency of the rotation speed fluctuation of the generator 2.

このような構成によれば、最小損失点追従制御において設定されるスイッチング周波数fswは、共振などの過渡状態には追従せずに、発電機2の回転数変動には十分に応答して追従できる。 According to such a configuration, the switching frequency fsw set in the minimum loss point tracking control can sufficiently respond and follow the fluctuation of the rotation speed of the generator 2 without following the transient state such as resonance. ..

また、発電システムAは、スイッチング素子SW1〜SW6の温度Tswを測定する第1の温度センサを更に備えてもよい。そして、制御部8は、第1の温度センサにより測定された温度Tswが第1の閾値Tth1以上になった場合には、強制的にスイッチング周波数fswを低減させてもよい。 Further, the power generation system A may further include a first temperature sensor for measuring the temperature Tsw of the switching elements SW1 to SW6. Then, the control unit 8 may forcibly reduce the switching frequency fsw when the temperature Tsw measured by the first temperature sensor becomes equal to or higher than the first threshold value Tth1.

このような構成によれば、インバータ損失が低減され、スイッチング素子SW1〜SW6が発熱により故障することを防止することができる。 According to such a configuration, the inverter loss is reduced, and it is possible to prevent the switching elements SW1 to SW6 from failing due to heat generation.

また、発電システムAは、発電機2の温度を測定する第2の温度センサを更に備えてもよい。そして、制御部8は、第2の温度センサにより測定された温度Tが第2の閾値Tth2以上になった場合には、強制的にスイッチング周波数fswを増加させてもよい。 Further, the power generation system A may further include a second temperature sensor for measuring the temperature of the generator 2. Then, the control unit 8 may forcibly increase the switching frequency fsw when the temperature TG measured by the second temperature sensor becomes equal to or higher than the second threshold value Tth2.

このような構成によれば、発電機損失が低減され、コイルLu、Lv、Lwの発熱により発電機2が故障することを防止することができる。 According to such a configuration, the generator loss is reduced, and it is possible to prevent the generator 2 from failing due to the heat generated by the coils Lu, Lv, and Lw.

A 発電システム
1 電源装置
2 発電機
3 発電電力変換器
4 インバータ
5 インバータ制御部
6 電流検出部
7 電圧検出部
8 制御部
A Power generation system 1 Power supply device 2 Generator 3 Power generation power converter 4 Inverter 5 Inverter control unit 6 Current detection unit 7 Voltage detection unit 8 Control unit

Claims (7)

発電機と、前記発電機で発電された発電電力を直流に変換する電力変換装置と、を備えた発電システムであって、
前記電力変換装置を構成するスイッチング素子のスイッチング周波数を変化させながら、前記発電機で発生する損失と前記電力変換装置で発生する損失とを含む合計損失が最小となるように前記スイッチング素子に対して継続的にスイッチング周波数が変動するよう追従制御を行う制御部を備えることを特徴とする発電システム。
A power generation system including a generator and a power conversion device that converts the generated power generated by the generator into DC.
While changing the switching frequency of the switching element constituting the power conversion device, the total loss including the loss generated by the generator and the loss generated by the power conversion device is minimized with respect to the switching element. A power generation system characterized by having a control unit that performs follow-up control so that the switching frequency fluctuates continuously.
前記制御部は、前記電力変換装置により変換された発電電力が最大となるように前記スイッチング素子に対してスイッチング制御を行うことを特徴とする請求項1に記載の発電システム。 The power generation system according to claim 1, wherein the control unit performs switching control on the switching element so that the generated power converted by the power conversion device is maximized. 前記制御部は、前記発電機の出力が目標値に追従するように前記発電機の出力をフィードバック制御し、
前記スイッチング周波数の制御周波数は、負荷変動時における前記フィードバック制御の共振周波数よりも小さく、かつ、前記発電機の回転数変動の周波数よりも大きいことを特徴とする請求項1又は2に記載の発電システム。
The control unit feedback-controls the output of the generator so that the output of the generator follows the target value.
The power generation according to claim 1 or 2, wherein the control frequency of the switching frequency is smaller than the resonance frequency of the feedback control at the time of load fluctuation and larger than the frequency of the rotation speed fluctuation of the generator. system.
前記スイッチング素子の温度を測定する第1の温度センサを更に備え、
前記制御部は、前記第1の温度センサにより測定された温度が第1の閾値以上になった場合には、強制的にスイッチング周波数を低減させることを特徴とする請求項1から3のいずれか一項に記載の発電システム。
A first temperature sensor for measuring the temperature of the switching element is further provided.
One of claims 1 to 3, wherein the control unit forcibly reduces the switching frequency when the temperature measured by the first temperature sensor becomes equal to or higher than the first threshold value. The power generation system described in paragraph 1.
前記発電機の温度を測定する第2の温度センサを更に備え、
前記制御部は、前記第2の温度センサにより測定された温度が第2の閾値以上になった場合には、強制的にスイッチング周波数を増加させることを特徴とする請求項1から3のいずれか一項に記載の発電システム。
Further equipped with a second temperature sensor for measuring the temperature of the generator,
Any of claims 1 to 3, wherein the control unit forcibly increases the switching frequency when the temperature measured by the second temperature sensor becomes equal to or higher than the second threshold value. The power generation system described in paragraph 1.
発電機と、前記発電機で発電された発電電力を変換するスイッチング素子を含む電力変換装置と、を含む発電システムの制御方法であって、A method for controlling a power generation system including a generator and a power conversion device including a switching element for converting the generated power generated by the generator.
参照値を取得するステップと、The step to get the reference value and
前記発電機で発生する損失と前記電力変換装置で発生する損失の合計である合計損失に対応する比較値を取得するステップと、A step of acquiring a comparison value corresponding to a total loss, which is the sum of the loss generated by the generator and the loss generated by the power converter.
前記参照値と前記比較値とを比較するステップと、A step of comparing the reference value with the comparison value,
前記参照値と前記比較値との比較結果に応じて、前記スイッチング素子のスイッチング周波数を増加又は減少させるステップと、A step of increasing or decreasing the switching frequency of the switching element according to the comparison result between the reference value and the comparison value, and
前記参照値を、前記比較値に更新するステップとWith the step of updating the reference value to the comparison value
を含む、発電システムの制御方法。How to control the power generation system, including.
前記比較値は、前記電力変換装置により変換された発電電力である、請求項6に記載の発電システムの制御方法。The control method for a power generation system according to claim 6, wherein the comparison value is the generated power converted by the power conversion device.
JP2018053456A 2018-03-20 2018-03-20 Power generation system and control method of power generation system Active JP6988618B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018053456A JP6988618B2 (en) 2018-03-20 2018-03-20 Power generation system and control method of power generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018053456A JP6988618B2 (en) 2018-03-20 2018-03-20 Power generation system and control method of power generation system

Publications (2)

Publication Number Publication Date
JP2019165598A JP2019165598A (en) 2019-09-26
JP6988618B2 true JP6988618B2 (en) 2022-01-05

Family

ID=68065108

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018053456A Active JP6988618B2 (en) 2018-03-20 2018-03-20 Power generation system and control method of power generation system

Country Status (1)

Country Link
JP (1) JP6988618B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3684871B2 (en) * 1998-10-27 2005-08-17 トヨタ自動車株式会社 Temperature protection control device for power converter
JP4042308B2 (en) * 2000-07-05 2008-02-06 株式会社デンソー Rotating electric machine for vehicles
JP2007282298A (en) * 2006-04-03 2007-10-25 Nissan Motor Co Ltd Motor controller
JP5156304B2 (en) * 2007-09-10 2013-03-06 東洋電装株式会社 Inverter generator control device
JP4605274B2 (en) * 2008-08-27 2011-01-05 トヨタ自動車株式会社 vehicle
JP2015089235A (en) * 2013-10-30 2015-05-07 株式会社Ihi Power conversion device

Also Published As

Publication number Publication date
JP2019165598A (en) 2019-09-26

Similar Documents

Publication Publication Date Title
JP4457692B2 (en) Maximum power tracking control method and power conversion device
US6384579B2 (en) Capacitor charging method and charging apparatus
JP5320144B2 (en) Solar cell maximum output power tracking control device
US8154236B2 (en) Electric power conversion circuit, and control device for multiphase electric rotary machine
Mishra et al. An efficient control scheme of self-reliant solar-powered water pumping system using a three-level DC–DC converter
US11329592B2 (en) Motor control device
JP2005269843A (en) Parallel operation device
JP7040188B2 (en) Motor system
JP6197690B2 (en) Motor control system
JP6988618B2 (en) Power generation system and control method of power generation system
JP6634992B2 (en) Induction motor control device
JP2017070056A (en) Inverter driving device
JP7500716B2 (en) DC Power Distribution System
US11456685B2 (en) Motor control device
JP7167786B2 (en) power generation system
JP2019161927A (en) Power conversion equipment and dynamo-electric machine system
JP7211179B2 (en) motor system
JP6154216B2 (en) Control circuit for inverter circuit, inverter device provided with this control circuit, induction heating device provided with this inverter device, and control method
CN113271052A (en) Pulse inverter with variable speed-dependent switching frequency
JP6522227B2 (en) Converter circuit, inverter circuit and power converter for air conditioner
JP6441880B2 (en) Inverter
JP2004266921A (en) Ac power supply system
WO2019026729A1 (en) Power supply device, driving device, control method, and program
JPH10127046A (en) Control circuit for step-up converter
Guan et al. A High Step-Down Partial Power Processing Switched-Capacitor Converter for Wide Input Voltage Range Medium Voltage DC Applications

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201109

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210721

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210727

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210924

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211102

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211115

R151 Written notification of patent or utility model registration

Ref document number: 6988618

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151