JP3086183B2 - Multi-axis excavator with detachable guide and underground wall construction method using it - Google Patents

Multi-axis excavator with detachable guide and underground wall construction method using it

Info

Publication number
JP3086183B2
JP3086183B2 JP08297931A JP29793196A JP3086183B2 JP 3086183 B2 JP3086183 B2 JP 3086183B2 JP 08297931 A JP08297931 A JP 08297931A JP 29793196 A JP29793196 A JP 29793196A JP 3086183 B2 JP3086183 B2 JP 3086183B2
Authority
JP
Japan
Prior art keywords
excavator
excavation
guide device
mixed
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08297931A
Other languages
Japanese (ja)
Other versions
JPH10266194A (en
Inventor
國藤光弘
Original Assignee
國藤 光弘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 國藤 光弘 filed Critical 國藤 光弘
Priority to JP08297931A priority Critical patent/JP3086183B2/en
Publication of JPH10266194A publication Critical patent/JPH10266194A/en
Application granted granted Critical
Publication of JP3086183B2 publication Critical patent/JP3086183B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、連続固結剤混合土地中
壁を作成するための多軸掘削機において、その多軸掘削
機の両外側に着脱自在な案内装置を設け、この案内装置
自体にも案内孔周囲の土砂を高圧噴射流体により掘壊
し、該掘壊土砂及び噴射流体と既に打設した未硬化固結
用液との混合攪拌が可能な機能を持たせた多軸掘削機
と、さらに、該掘削機を用いた新規な連続固結剤混合土
地中壁の造成工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a multi-screw excavator for forming a continuous cement-mixed ground wall, wherein detachable guide devices are provided on both outer sides of the multi-screw excavator. A multi-shaft excavator which has a function of digging the earth and sand around the guide hole with a high-pressure jetting fluid and mixing and stirring the excavated soil and the jetting fluid with the uncured consolidation liquid. Further, the present invention relates to a novel method of constructing a middle ground wall mixed with continuous binder using the excavator.

【0002】[0002]

【従来の技術】従来から、多軸掘削機の両外側掘削軸自
体を案内手段として利用する多軸掘削機およびこれを用
いた連続固結剤混合土地中壁の造成工法が知られてい
る。また同様に、多軸掘削機の一方外側に案内手段を装
着したもの及びこれにより連続地中壁を造成する工法も
知られている。
2. Description of the Related Art Conventionally, there has been known a multi-shaft excavator using both outer excavating shafts of the multi-shaft excavator itself as guide means, and a method of constructing a continuous cement-mixed middle ground using the same. Similarly, there is also known a method in which a guide means is mounted on one outer side of a multi-screw excavator and a method for forming a continuous underground wall by using the same.

【0003】次に、この様な地中壁工法および掘削装置
の公知例を説明する。図10は三軸掘削機を用いたSM
W工法の概略説明図である。すなわち、図に示すごとき
3本の掘削ドリル軸02を有するアースオーガ01を用
いて、先ずM1〜M3の柱列部分を掘削すると共に、セ
メントミルク等の混合液を掘削土砂と現位置にて混合し
てソイルセメント柱列を作成する。次いで同様にM1〜
M3の柱列の延長線上にM4〜M6の柱列部分を掘削
し、ソイルセメント柱列を作成する。その後、3本の掘
削ドリル軸02の内、左外側の軸は上記M3の柱孔に、
右外側の軸はM4の柱孔に夫々挿通することにより、こ
れらの既掘削孔をガイドとして利用して、中央部の掘削
ドリルによりM7部を掘削すると同時にソイルセメント
柱列を作成するものである。
Next, known examples of such an underground wall construction method and an excavator will be described. FIG. 10 shows SM using a triaxial excavator.
It is a schematic explanatory view of the W construction method. That is, using an earth auger 01 having three drilling drill shafts 02 as shown in the figure, first, the column sections of M1 to M3 are drilled, and a mixed liquid such as cement milk is mixed with the excavated soil at the present position. To create a soil cement column. Then, similarly,
Excavation of the M4 to M6 column sections on the extension of the M3 column row to create a soil cement column. After that, of the three drilling drill shafts 02, the left outer shaft is in the M3 column hole,
The shaft on the right outside is inserted into the M4 column hole to use these already drilled holes as a guide to drill the M7 part with the central drill and to create a soil cement column at the same time. .

【0004】従ってこの工法によれば、例えば3本の掘
削ドリルを有する多軸アースオーガ01を三回使用する
ことによりM1〜M7のソイルセメント柱列壁の構築が
可能となるものであるが、これは上述のごとく、3軸の
両端をガイドとして利用するために三回目の掘削が安定
して行えることと、例えばM3、M4の掘削孔の多少の
ズレも両外側端の掘削ドリルにより修正(ズレ部分の土
砂を同様に掘削しつつソイルセメント柱を構成)しなが
ら、中央部のソイルセメント柱M7を造成することがで
き、全体として安定した確実な柱列地中壁を構築するこ
とが可能である。しかしながら、上記の工法において
は、施工速度(同一掘削機の利用回数に対する地中壁の
形成速度)が極めて遅いという欠点があった。
Therefore, according to this construction method, it is possible to construct M1-M7 soil cement column walls by using, for example, a multi-axis earth auger 01 having three drilling drills three times. This is because, as described above, the third excavation can be performed stably because both ends of the three axes are used as guides, and for example, slight misalignment of the M3 and M4 excavation holes is corrected by the excavation drills on both outer ends ( The soil cement column M7 in the center can be created while the soil cement column is constructed while excavating the gaps and soils in the same manner, and a stable and reliable columnar underground wall can be constructed as a whole. It is. However, the above construction method has a drawback that the construction speed (the formation speed of the underground wall with respect to the number of uses of the same excavator) is extremely low.

【0005】これに対して、図11に示す工法も従来よ
り知られている。この工法によると、3本の掘削軸を有
するオーガ01の外側に1本の軸03と、この軸の先端
部にガイドスキー04を取り付けた装置を使用してい
る。そして、前段で掘削しソイルセメント柱列を作成し
た最外端の柱孔内に、該ガイドスキー04を挿入案内す
ることにより、他の3本の掘削軸02をより有効に活用
して掘削進度を速めようとするものである。
On the other hand, a construction method shown in FIG. 11 is conventionally known. According to this method, a device is used in which one shaft 03 is mounted outside an auger 01 having three excavation shafts, and a guide ski 04 is mounted on the tip of the shaft. Then, the guide ski 04 is inserted and guided in the outermost column hole in which the soil cement column was excavated in the previous stage, so that the other three excavation shafts 02 can be more effectively used to make excavation progress. Is to speed up.

【0006】しかしながら、この工法におけるガイドス
キー04は図11(A)、(B)から明らかなごとく、
断面がほぼ半月に近い形状の柱体04をその掘削軸列の
一方側の端部のみに設け、これを既に打設されたソイル
センメント柱列孔の1本に挿入するため、ガイドスキー
により掘削軸列の一方に大きな抵抗が加わると共に、ガ
イドスキーを持たない側の掘削軸はガイドスキー取付軸
03を中心として自由に振れることができ、さらにオー
ガ全体の掘削抵抗によりガイドスキーを挿通する既設の
柱列孔方向にも偏寄する傾向が生じる欠点がある。ま
た、ガイドスキー取付用の軸を特別に必要としている。
However, the guide ski 04 in this method is apparent from FIGS. 11A and 11B,
A column 04 having a cross section almost half a month is provided only at one end of the excavation shaft row, and this is inserted into one of the already installed soil center column row holes by a guide ski. A large resistance is applied to one of the excavation shaft rows, and the excavation shaft on the side having no guide ski can swing freely around the guide ski mounting shaft 03, and furthermore, the existing auger through which the guide ski is inserted by the excavation resistance of the entire auger. However, there is a drawback in that there is also a tendency to be deviated in the column row direction. In addition, a guide ski mounting shaft is specially required.

【0007】上記の様な偏寄傾向は、図12に示すごと
きその他の従来例の場合は特に顕著である。即ち、図1
2(A)におけるガイド板06を有する掘削軸05が挿
入案内される掘削孔M2は、既に掘削およびソイルセメ
ントの打設がなされており、さらにその隣の既打設の掘
削孔M1とも連通しているため、オーガ全体が地中壁形
成方向でより抵抗の少ない隣接の掘削孔方向に偏寄する
傾向が強く、結果として垂直な掘削が不可能となる等の
欠点を有するものである。
The above tendency of deviation is particularly remarkable in the case of other conventional examples as shown in FIG. That is, FIG.
The excavation hole M2 into which the excavation shaft 05 having the guide plate 06 in 2 (A) is inserted and guided is already excavated and cast with soil cement, and further communicates with the already-excavated excavation hole M1 adjacent thereto. Therefore, the entire auger has a strong tendency to deviate in the direction of the formation of the underground wall toward an adjacent excavation hole having less resistance, and as a result, there is a drawback that vertical excavation becomes impossible.

【0008】そこで、上記のごとき従来公知の工法にお
ける種々の欠点を解消するため、図13乃至図15に示
すごとき掘削機及び地中壁工法が考えられる。すなわ
ち、図13、図14に示すごとき例えば3本の掘削軸0
2を有するオ−ガ01の両外端の掘削軸外側に夫々補助
掘削手段07を設け、この様なオ−ガ01により図15
に示す施工順序に従って、・・・の順に掘削し、
かつ固結剤を混合して固結剤混合土地中壁を造成するも
のである。
Therefore, in order to solve the various drawbacks in the above-mentioned conventionally known construction methods, an excavator and an underground wall construction method as shown in FIGS. That is, for example, as shown in FIGS.
Auxiliary excavation means 07 are provided on both outer ends of the auger 01 having the two excavation shafts, respectively.
In accordance with the construction order shown in
In addition, the binder is mixed to form the inner wall of the land where the binder is mixed.

【0009】この場合の掘削機は上記図13、図14の
説明のごとく、従来公知の多軸掘削機の外側に例えば平
面視円弧状の補助掘削手段07を設けるものである。そ
して、該補助掘削手段である円弧状部材の夫々の両下端
部により、例えば図15に示すように、の掘削時に
おいて、の掘削時の掘削方向ズレによって生ずる未
掘削部分09を、該補助掘削手段07により掘壊連結し
て、連続した固結剤混合土地中壁を造成しょうとするも
のである。
As shown in FIGS. 13 and 14, the excavator in this case is provided with, for example, an auxiliary excavating means 07 having an arc shape in plan view outside the conventionally known multi-axis excavator. Then, as shown in FIG. 15, for example, as shown in FIG. 15, an unexcavated portion 09 caused by a deviation in the excavation direction during excavation is removed by the auxiliary excavation means. It is intended to construct a continuous inner wall of the cement-mixed land by excavating and connecting by means 07.

【0010】しかしながらこの様な掘削機においては、
例えば先行掘削壁孔、と後行掘削孔による未掘削
部分(非連続部分)を、補助掘削手段07である円弧状
鉄板により切断する状態で掘進するために、掘進の抵抗
が非常に大きくなり、その分オ−ガ自体の駆動機構を大
型化せざるを得ず、非経済的であるばかりか掘進速度、
すなわち施工速度も低下してしまう問題点がある。更
に、同図ののごとく後行掘削孔が先行掘削孔、
から完全に外れた場合、補助掘削手段の挿入自体が困難
になる場合も発生する。
However, in such an excavator,
For example, in order to excavate the non-excavated portion (discontinuous portion) of the leading excavation wall hole and the following excavation hole by cutting it with the arc-shaped iron plate as the auxiliary excavation means 07, the resistance of excavation becomes extremely large, The drive mechanism of the auger itself must be enlarged accordingly, which is not only uneconomical, but also
That is, there is a problem that the construction speed is reduced. Further, as shown in FIG.
In some cases, it is difficult to insert the auxiliary excavation means itself.

【0011】[0011]

【発明が解決しようとする課題】本発明は、上記のごと
き従来工法の欠点を解消し、掘削孔の垂直度を保ちなが
ら、ソイルセメント地中壁の構築速度の早い地中壁造成
工法を提供するものである。また、そのための多軸掘削
機の構造をより簡素化するとともに、掘削抵抗を低減
し、しかも先行掘削孔において多少の傾斜が生じた場合
にも、多軸掘削軸の両外側に着脱自在に設けた案内手段
自体に簡単な砕土手段を施すことにより、ズレの生じた
ソイルセメント柱孔間を簡単に、新しく作成されるソイ
ルセメント成生部により混合連結することで、完全な連
結地中壁を構成することができる工法およびそのための
装置を提供するものである。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned drawbacks of the conventional method and provides an underground wall construction method in which the construction speed of the soil cement underground wall is high while maintaining the verticality of the excavation hole. Is what you do. In addition, the structure of the multi-axis excavator for this purpose is further simplified, the excavation resistance is reduced, and even if a slight inclination occurs in the preceding excavation hole, it is detachably provided on both outer sides of the multi-axis excavation shaft. By applying a simple soil breaking means to the guide means itself, the gap between the soil cement pillar holes is easily mixed and connected by the newly created soil cement forming part, so that the complete connected underground wall is An object of the present invention is to provide a construction method that can be configured and a device therefor.

【0012】[0012]

【課題を解決するための手段】本発明に係る掘削機は3
本以上の多軸掘削機と、その両外側端軸に装着する着脱
自在な案内装置とからなる案内装置付多軸掘削機であっ
て、該案内装置は多軸掘削機により削孔される孔の円径
よりやや小さい径の円筒部と該円筒部の外周側にその一
部が切欠された縦切欠孔を持ち、同内周側には掘削軸の
揚土スクリュー等との干渉を避ける円弧状縦凹溝を有す
ることを特徴とする。また、本発明に係る地中壁造成工
法は、3本以上の多軸掘削機にて、地表から土中に平面
視数珠繋ぎ状の連続した固結剤混合土地中壁を造成する
に際し、多軸掘削機にて一次数珠繋ぎ状固結剤混合土地
中壁を形成し、次いで一次数珠繋ぎ状固結剤混合土地中
壁の水平延長線上に或る間隔を隔てて二次数珠繋ぎ状固
結剤混合土壁を形成し、一次及び二次数珠繋ぎ状壁の未
硬化の状態の時に一次及び二次数珠繋ぎ状壁の相対する
側の端部の丸孔を案内孔として、多軸掘削機の両端軸の
外側に着脱自由な上記案内装置を装備した上記案内装置
付多軸掘削機にて、両側の案内装置各々を一次、二次の
案内孔に挿入案内し、堀り残し部位に三次数珠繋ぎ状固
結剤混合土地中壁を形成することにより、連続した固結
剤混合土地中壁を造成することを特徴とする工法であ
る。
The excavator according to the present invention has three excavators.
A multi-screw excavator with a guide device comprising at least one multi-screw excavator and detachable guide devices attached to both outer end shafts, wherein the guide device is a hole drilled by the multi-screw excavator. It has a cylindrical part with a diameter slightly smaller than the diameter of the circle and a vertical notch hole with a part cut out on the outer peripheral side of the cylindrical part, and on the inner peripheral side it avoids interference with the excavating shaft lifting screw etc. It has an arc-shaped vertical groove. In addition, the underground wall construction method according to the present invention is a multi-axial excavator with three or more multi-axial excavators, when constructing a continuous cement-mixed land intermediate wall in a rosary-like shape in a plan view from the surface to the soil, using a multi-axial excavator. Using an excavator, form a primary rosary-like binder-mixed land inner wall, and then, at a certain interval on the horizontal extension of the primary rosary-like binder-mixed land inner wall, at a certain interval, make a secondary rosary-like binder-mixed soil wall When the primary and secondary beads are in an uncured state, the round holes at the opposite ends of the primary and secondary beads are used as guide holes, outside the shafts at both ends of the multi-screw excavator. The above guide device equipped with the above detachable guide device
With a multi-shaft excavator , the guide devices on both sides are inserted and guided into the primary and secondary guide holes, and a tertiary rosary-like binder-mixed land middle wall is formed in the remaining part of the excavation, so that continuous solidification is achieved. This method is characterized by the construction of the inner wall of the binder mixed land.

【0013】[0013]

【作用】多軸掘削機を用いて先行エレメントの掘削及び
ソイルセメントの混合攪拌を行い、次いで案内装置を装
着して後行エレメントの掘削及びソイルセメントの打設
と、先行エレメントとの連結を行う。その場合、先行エ
レメントの掘削時のズレは案内装置に設けた高圧流体噴
射ノズルからの流体による掘壊攪拌により修正連結を同
時に行う。
Using a multi-axis excavator, excavation of the preceding element and mixing and agitation of the soil cement are performed, and then a guide device is mounted to excavate the succeeding element, place the soil cement, and connect with the preceding element. . In this case, the displacement at the time of excavation of the preceding element is simultaneously corrected and connected by excavation and stirring by the fluid from the high-pressure fluid injection nozzle provided in the guide device.

【0014】[0014]

【実施の形態】本発明の装置に関する一実施例を図面に
より説明する。先ず、図1乃至図6により本発明に係る
新規な案内装置付多軸掘削機について説明する。図1、
図2は、本発明の特徴的構造を有する案内装置が取付け
可能である一般的な多軸掘削機10の概略を示してい
る。即ち、普通の多軸掘削機はアースオーガマシンの下
に多軸装置11を有し、3本以上の掘削軸12は夫々混
練翼、揚土スクリュー等13および掘削ヘッド14を持
つとともに、夫々の掘削ヘッド14の適宜位置にはセメ
ントミルク等の固結用液の注出口(図省略)が設けられ
ている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the apparatus of the present invention will be described with reference to the drawings. First, a novel multi-shaft excavator with a guide device according to the present invention will be described with reference to FIGS. Figure 1,
FIG. 2 schematically shows a general multi-axis excavator 10 to which a guide device having the characteristic structure of the present invention can be attached. That is, an ordinary multi-shaft excavator has a multi-shaft device 11 below an earth auger machine, and three or more digging shafts 12 each have a kneading wing, a lifting screw 13 and the like, and a digging head 14. At an appropriate position of the excavating head 14, an outlet (not shown) for a consolidation liquid such as cement milk is provided.

【0015】図3(A)、(B)、(C)は上記公知
の、3軸式掘削軸12に本発明の1つの特徴である案内
装置20を取付けた状態を示している。3本の掘削軸は
夫々揚土スクリュー、混練翼等13を有し、各軸12は
連結バンド15で互いに一直線上に連結固定されてい
る。案内装置20は、必要に応じて新たな連結バンドを
追加することにより、上記3本の掘削軸の両側外方に連
結される。例えば3本の掘削軸のうち、その中間の掘削
軸の先端とほぼ同位置に両側案内装置の先端部が位置す
るごとく(図3A参照)夫々の案内装置20を、外側掘
削軸12の外方に、既存の掘削軸連結装置15を介して
ボルト16等により装着する。
FIGS. 3A, 3B, and 3C show a state in which a guide device 20, which is one feature of the present invention, is attached to the above-mentioned known three-axis excavating shaft 12. FIG. Each of the three excavating shafts has a lifting screw, a kneading blade 13 and the like, and the respective shafts 12 are connected and fixed to each other in a straight line by a connecting band 15. The guide device 20 is connected to both outer sides of the three excavation shafts by adding a new connection band as needed. For example, each of the guide devices 20 is moved outwardly of the outer excavation shaft 12 so that the tip of the two-side guide device is located at substantially the same position as the tip of the intermediate excavation shaft among the three excavation shafts (see FIG. 3A). Then, it is mounted with bolts 16 or the like via the existing excavation shaft connecting device 15.

【0016】図3及至図5に示すごとく、案内装置20
は概ね筒状であり、その断面は円周22の一部、例えば
40゜〜100゜の範囲を切り欠いた形状で、図示のご
とく外側軸の両外方に装着した場合、該案内装置の切欠
縦孔が掘削軸列の外方に向くように固定されている。ま
た、案内装置の断面内方には、円周22の一部に円弧状
凹溝23を有し、この円弧の寸法はその半径が、取り付
けるべき掘削軸のビットあるいはスクリュー等の外径の
軌跡の半径よりやや大きくされている。
As shown in FIG. 3 to FIG.
Is generally cylindrical, and its cross section has a shape in which a part of the circumference 22, for example, a range of 40 ° to 100 ° is cut out, and when mounted on both outer sides of the outer shaft as shown in FIG. The notched vertical hole is fixed so as to face outward of the excavation shaft train. Also, inside the cross section of the guide device, there is an arc-shaped concave groove 23 in a part of the circumference 22. The radius of this arc is the locus of the outer diameter of the bit or screw of the excavation shaft to be attached. Is slightly larger than the radius.

【0017】従って、図3のごとく案内装置20を連結
装置により装着固定した場合に、オーガのスクリュー等
と干渉することがない。更に、外方の切欠縦孔24と内
方の円弧状凹溝23により区切られる2つの円周部22
はその外径が、掘削ビットあるいはスクリューの外径よ
り例えば約40mm程度小さい外径とすることができる。
即ち、例えば一般的SMWに使用するスクリューの外径
が600mmのものにあっては、案内装置20の円周部2
2の外径を約560mmとすることができる。案内装置2
0全体としては、筒状体21の一部内方が円弧状23に
窪み、一部外方を切り欠いた24形状とされている。
Accordingly, when the guide device 20 is mounted and fixed by the connecting device as shown in FIG. 3, it does not interfere with the auger screw or the like. Furthermore, two circumferential portions 22 separated by an outer notched vertical hole 24 and an inner arc-shaped concave groove 23.
May have an outer diameter that is about 40 mm smaller than the outer diameter of the drill bit or screw.
That is, for example, in the case of a screw having an outer diameter of 600 mm used for a general SMW, the circumferential portion 2
2 can have an outer diameter of about 560 mm. Guiding device 2
As a whole, the cylindrical body 21 has a 24 shape in which a part inside of the cylindrical body 21 is depressed into an arc shape 23 and a part outside is cut off.

【0018】図4は案内装置20の上端付近の取付構造
を、図5は同じく下端付近の取付け構造を示したもので
あって、従来公知の多軸オーガの掘削軸連結装置におけ
る外側位置の固定ボルト用穴(連結バンド15に設けた
ボルト穴)を用い、該案内装置20の内側円弧状凹溝2
3の、上下端近く又はその他適宜位置に設けた固定用ブ
ラケット25に穿設したボルト穴を介し、普通のボル
ト、ナット16により固定可能である。従って、図3に
示すごとく案内装置20の上下部を既存のSMW掘削機
の軸連結バンドの他に別途敷設して接続固定する場合に
は、該案内装置の縦長さは例えば約4.5mとすること
ができる(この場合壁長の浅い工事)が、もちろんこの
長さに限定されるものではなく深い工事用としては案内
装置の全長を例えば約6.75mとした場合、上下を既
存の連結バンド15により、中間部を別途設けたバンド
により接続固定することができる。要は、案内装置を該
装置の内側円弧状凹溝23に設けたブラケット25を介
して、掘削軸連結用バンドとボルト、ナット16により
簡単に着脱できることである。
FIG. 4 shows a mounting structure in the vicinity of the upper end of the guide device 20, and FIG. 5 shows a mounting structure in the vicinity of the lower end thereof. Using a bolt hole (a bolt hole provided in the connection band 15), the inner circular concave groove 2 of the guide device 20 is used.
3, can be fixed with ordinary bolts and nuts 16 through bolt holes formed in fixing brackets 25 provided near the upper and lower ends or at other appropriate positions. Therefore, as shown in FIG. 3, when the upper and lower portions of the guide device 20 are separately laid and fixed in addition to the shaft connecting band of the existing SMW excavator, the vertical length of the guide device is, for example, about 4.5 m. (In this case, a work with a shallow wall), but is not limited to this length. For a deep work, if the total length of the guide device is, for example, about 6.75 m, the existing connection between the upper and lower parts is made. The band 15 allows the intermediate portion to be connected and fixed by a band provided separately. The point is that the guide device can be easily attached / detached by the excavation shaft connecting band, the bolt, and the nut 16 via the bracket 25 provided in the inner arc-shaped concave groove 23 of the device.

【0019】案内装置20の外方切欠縦孔24は、該案
内装置円筒内に進入する未硬化ソイルセメントの、掘削
施工中の固結を防止するためにも有用である。すなわ
ち、既に打設された左右の案内用柱孔に案内装置20を
挿通案内しながら堀残し部に、全掘削軸の稼働によりソ
イルセメント柱を打設する型式の本発明の掘削機におい
ては、掘削機の作動中における案内装置の横振動に伴っ
て円筒内に進入した未硬化ソイルセメントも激しく振動
され、固液分離状態を呈することにより、ソイルセメン
トが固化するおそれがある。この案内装置20は上記の
ごとき縦孔24により案内装置内のソイルセメントを、
それに連なる既設柱列の未硬化ソイルセメントと振動に
より混合攪拌することにより、容易に上記の問題を解決
することができる点が重要である。
Outer notched vertical holes 24 in guide device 20 are also useful to prevent uncured soil cement entering the guide device cylinder from consolidating during excavation. That is, in the excavator of the present invention of a type in which a soil cement column is driven by operating all the excavation shafts in the remaining moat while guiding the guide device 20 into the left and right guiding column holes already guided, The uncured soil cement that has entered the cylinder along with the lateral vibration of the guide device during the operation of the excavator is also violently vibrated and exhibits a solid-liquid separation state, so that the soil cement may be solidified. The guide device 20 uses the vertical hole 24 as described above to remove soil cement in the guide device.
It is important that the above-mentioned problem can be easily solved by mixing and stirring the uncured soil cement of the existing pillar row connected thereto with vibration.

【0020】案内装置20の他の特徴は、その内方先端
部に高圧噴射ノズル30(詳細は図6に示す)を有し、
必要に応じて噴出流体用配管32に連結されるパイプ3
1と結合されている。そして、一般にパイプ31および
噴射ノズル35は、上記案内装置20の円周部22内面
と弧状凹溝23内面との連続部近傍に一対設けられるが
(図5参照)、その数を限定されるものではない。さら
に、案内装置の外方切欠縦孔24は、これにより切欠部
が振動時に開閉作動するのを防止するために、上下端及
び適宜中間位置を開き幅固定用バンド26で固定してい
る。
Another feature of the guide device 20 is that it has a high-pressure injection nozzle 30 (shown in detail in FIG. 6) at its inner tip.
A pipe 3 connected to the jetting fluid pipe 32 if necessary
It is connected to 1. Generally, a pair of the pipe 31 and the injection nozzle 35 are provided near a continuous portion between the inner surface of the circumferential portion 22 and the inner surface of the arc-shaped concave groove 23 of the guide device 20 (see FIG. 5), but the number is limited. is not. Further, in order to prevent the cutout portion from opening and closing when vibrating, the outer cutout vertical hole 24 of the guide device is opened at the upper and lower ends and at an appropriate intermediate position, and is fixed by the width fixing band 26.

【0021】図6は、高圧噴射ノズル30の詳細を示し
ている。案内装置20の内側に配置されるパイプ31の
先端には先端ノズルケース33が固定され、さらにその
端部にはシール材34を介して先端ノズル35が装着さ
れる。ここで、先端ノズルは例えばセラミック又は超鋼
により作成された穴径1.5mm〜3mmのものが利用でき
る。また、パイプ31部は例えば最大圧力100〜40
0kg/cm2 の噴流体に耐える高圧用鋼管を使用する。こ
のようにして、噴射ノズル30からエアー又は高圧の固
化剤ミルクを噴出することができる。
FIG. 6 shows the details of the high-pressure injection nozzle 30. A tip nozzle case 33 is fixed to a tip of a pipe 31 disposed inside the guide device 20, and a tip nozzle 35 is attached to an end of the pipe 31 via a seal member 34. Here, a tip nozzle having a hole diameter of 1.5 mm to 3 mm made of, for example, ceramic or super steel can be used. The pipe 31 has a maximum pressure of 100 to 40, for example.
A high-pressure steel pipe that can withstand a jet of 0 kg / cm 2 is used. In this manner, air or high-pressure solidifying milk can be ejected from the ejection nozzle 30.

【0022】噴射ノズル30からの噴出流体として、非
自硬性を有しセメントとの化学変化に依り硬化性を発揮
するスラリーである、例えばスラグミルクを利用するこ
とが有利である。すなわち、第1にスラグミルクを用い
て未掘削部分の土砂を掘壊し、既打設のソイルセメント
柱土と混合した場合に、既打設部のソイルセメント柱部
分のセメントミルクの混合比を大きく変化させることが
なく、SMWの強度特性を安定させることができる。第
2に、スラグミルクはセメントミルク等の固化剤ミルク
に比べて流動性にすぐれ、穴径の非常に小さい噴射ノズ
ルの使用後の保守、管理が極めて容易となることであ
る。
It is advantageous to use, as the fluid ejected from the ejection nozzle 30, a slurry, for example, slag milk, which is non-self-hardening and exhibits a hardening property due to a chemical change with cement. That is, first, when the unsanded portion of earth and sand is excavated using slag milk and mixed with the already installed soil cement column soil, the mixing ratio of the cement milk of the already installed portion of the soil cement column portion is increased. Without changing, the strength characteristics of the SMW can be stabilized. Second, slag milk has better fluidity than solidifying milk such as cement milk, and makes maintenance and management after use of the injection nozzle having a very small hole diameter extremely easy.

【0023】次いで、本発明に係る地中壁工法における
掘削および地中壁構成手順について説明する。図7の
(A)に示すごとく従来例においては、例えば3軸掘削
機を用いて、の先行エレメント(ソイルセメント柱
列孔)を掘削すると同時にセメントミルク等の固化剤を
注入攪拌し、続いて該エレメント、のソイルセメン
トが未硬化のうちに、先行エレメント、の隣り合う
内側のソイルセメント柱孔M3とM1に3軸掘削機の両
外側の掘削軸を挿入し、両柱孔M3、M1を案内として
中心部の1本の掘削軸により堀残し部M4を掘削すると
ともに、同様にセメントミルク等の固化剤を注入攪拌す
るものである。
Next, an excavation and an underground wall construction procedure in the underground wall method according to the present invention will be described. As shown in FIG. 7A, in the conventional example, a preceding element (soil cement column hole) is excavated using, for example, a triaxial excavator, and at the same time, a solidifying agent such as cement milk is injected and stirred. While the soil cement of the element is uncured, the outer drilling shafts of the triaxial excavator are inserted into the inner soil cement pillar holes M3 and M1 adjacent to the preceding element, and both pillar holes M3 and M1 are inserted. As a guide, the excavation part M4 is excavated by one central excavation shaft, and a solidifying agent such as cement milk is similarly injected and stirred.

【0024】これに対し、本発明においては図7の
(B)に示すごとく、例えば先行エレメント、、
およびはそれぞれの間隔を各エレメントのピッチすな
わち、多軸掘削機の掘削ピッチにほぼ等しいものとして
掘削打設し、その後ソイルセメントが未硬化のうちに、
前記掘削機の多軸掘削軸12の両外側に案内装置20を
装着した状態で、例えば後行エレメントの場合、先行
エレメント、の相隣り合う内方端のセメントソイル
柱孔M3、M1に両案内装置を挿通案内させながら、例
えば3本の掘削軸全てを駆動させて掘削し、かつ固結剤
を注入混合させる。続いて同様に、後行エレメント、
の構築作業を行うことにより全エレメントを連結し、
連続した地中壁を構成するものである。この場合、上記
従来例によるときは、後行エレメントにより掘削連結で
きる壁長は掘削軸1本分であるのに対し、本発明によれ
ば多軸の掘削軸を全て作動させることができ、地中壁の
構成速度を極めて早くすることができる。この工法にお
いては、先行エレメントにおけるソイルセメントが未硬
化なうちに後行エレメントの掘削工程を完了する範囲に
おいて、先行、後行エレメントの数及び案内装置の着脱
は自由である。
On the other hand, in the present invention, as shown in FIG.
And excavate and set each interval to be approximately equal to the pitch of each element, that is, the excavation pitch of the multi-axis excavator, and then, while the soil cement is uncured,
In a state where the guide device 20 is mounted on both outer sides of the multi-axis excavating shaft 12 of the excavator, for example, in the case of a succeeding element, both guides are provided in cement soil column holes M3 and M1 at adjacent inner ends of the preceding element. For example, all three excavating shafts are driven to excavate while the apparatus is being guided for insertion, and the consolidating agent is injected and mixed. Then, similarly, the following element,
By connecting all the elements by performing the construction work of
It constitutes a continuous underground wall. In this case, according to the above-described conventional example, the wall length that can be excavated and connected by the following element is the length of one excavation shaft, whereas according to the present invention, all multi-axial excavation shafts can be operated, The construction speed of the middle wall can be extremely increased. In this method, the number of leading and trailing elements and the attachment / detachment of the guide device are free as long as the excavation step of the trailing element is completed while the soil cement in the leading element is not yet set.

【0025】図8は、本発明に係る案内装置付き多軸掘
削機と単軸オーガを併用した地中壁工法の他の実施例を
示している。先ず、単軸掘削機を用いて先行削孔M1、
M2、M3、M4を施工する。この場合も単軸掘削機は
上記多軸掘削機の場合と同様に、掘削と同時にセメント
ミルク等の固結剤を注入攪拌し、未硬化状態のソイルセ
メント柱孔を作成するが、各先行削孔M1〜M4の間隔
は、次に施工する案内装置付き多軸掘削機の、例えば3
軸の場合3軸分の幅と等しくする。従って、例えば3軸
型掘削機の各軸間ピッチが450mmの場合、その両側に
案内装置20を装備した状態での案内装置間のピッチと
等しい幅で、先行削孔を単軸機によりピッチ1800mm
として行うものである。そして、先の実施例と同様に、
該M1、M2の先行削孔におけるソイルセメントが未硬
化状態において、両案内装置を挿通案内しながら、エレ
メントを施工するものである。エレメント、につ
いても同様である。
FIG. 8 shows another embodiment of the underground wall construction method using a multi-axis excavator with a guide device and a single-axis auger according to the present invention. First, using a single-screw excavator, the pre-drilling M1,
M2, M3 and M4 are constructed. In this case as well, the single-screw excavator injects and agitates a consolidating agent such as cement milk at the same time as excavation to create an unhardened soil cement column hole, as in the case of the multi-screw excavator. The interval between the holes M1 to M4 is, for example, 3
In the case of a shaft, the width is equal to the width of three axes. Therefore, for example, when the pitch between the axes of a three-axis type excavator is 450 mm, the pre-drilling is performed with a pitch of 1800 mm by a single-axis drill with a width equal to the pitch between the guide devices in a state where the guide devices 20 are provided on both sides thereof.
It is done as. And, like the previous example,
When the soil cement in the pre-drilling of the M1 and M2 is in an unhardened state, the element is constructed while inserting and guiding the two guiding devices. The same applies to the element.

【0026】図9には、図7(B)のごとき施行法を用
いた場合の、先行エレメント、間に生じた傾斜ズレ
を案内装置内に装着した高圧噴射ノズルからの流体によ
り掘壊混合しながら、後行エレメントを施工する状態を
示している。仮に先行エレメント、が相対的に傾斜
して図示S1、S2のごとくズレを生じた場合、後行エ
レメントは破線(図中下方)のごとく形成されるこ
とになる。従って、後行エレメントの施工時には、両
側に設けられた案内装置20の一方または両方が先行エ
レメントの案内孔M3、M1から外れ、例えば未掘削部
分に掛かる場合も発生する。この場合、上記案内装置2
0内先端に装備された噴射ノズル30からスラグミルク
等の非自硬性を有し、セメントとの化学変化に依り硬化
性を発揮するスラリーを高圧で噴射することにより、未
掘削部分S1、S2の土砂を掘壊混合し、先行エレメン
ト、の端部と後行エレメントとを通常の施工状態
と同様に連結混合し、連続した地中壁を形成するもので
ある。
FIG. 9 shows a case where the preceding element and the inclined displacement generated between the preceding element and the enforcing method as shown in FIG. 7B are excavated and mixed by the fluid from the high-pressure injection nozzle mounted in the guide device. While the subsequent element is being constructed. If the preceding element is relatively inclined and shifts as shown in S1 and S2 in the figure, the succeeding element is formed as shown by a broken line (lower in the figure). Therefore, when the succeeding element is constructed, one or both of the guide devices 20 provided on both sides may be disengaged from the guide holes M3 and M1 of the preceding element, and may, for example, hang over unexcavated portions. In this case, the guiding device 2
By injecting a non-hardened slurry such as slag milk or the like, which has non-self-hardening properties such as slag milk, and exerts a hardening property due to a chemical change with cement, at a high pressure from an injection nozzle 30 provided at the inner end of the inner portion 0, the unexcavated portions S1, S2 The earth and sand are crushed and mixed, and the end of the preceding element and the following element are connected and mixed in the same manner as in a normal construction state to form a continuous underground wall.

【0027】すなわち、図中の破線部は先行エレメン
トによる、の破線部は先行エレメントによる、
の破線部は後行エレメントによる、又斜線部S1及び
S2は案内装置20内に設けられた高圧流体噴射装置3
0の高圧噴射流体による掘壊混合範囲を夫々示すもので
ある。
That is, the broken line portion in the drawing is based on the preceding element, and the broken line portion is based on the preceding element.
The dashed lines indicate the following elements, and the hatched portions S1 and S2 indicate the high-pressure fluid injection device 3 provided in the guide device 20.
It shows the range of digging and mixing by the high-pressure jet fluid of 0 respectively.

【0028】[0028]

【効果】本発明に係る着脱自在な案内装置付多軸掘削機
によれば、一台の多軸掘削機を用いてその掘削軸の全て
を固結剤混合土地中壁の造成に使用することができるの
で、地中壁造成速度が非常に速いことであり、さらに案
内装置を着脱することのみによって一台の多軸掘削機を
使用して固結剤混合土地中壁造成の全工程を施工するこ
とができる。また、案内装置に装備された高圧ノズルの
利用により一次、二次掘削による混合土地中壁用柱孔の
鉛直ズレを簡単に修正しながら、完全な混合土連続地中
壁を造成することができる。したがって、全体的にも混
合土地中壁の造成速度を非常に速くすることができる。
本発明の工法によれば、三次数珠繋ぎ状固結剤混合土地
中壁の作成時に多軸掘削機が水平方向にズレることな
く、かつ、一次、二次数珠繋ぎ状固結剤混合土地中壁の
多少のズレも簡単に修正しながら迅速、確実に混合土地
中壁を連続造成することができる。
According to the multi-axis excavator with a detachable guide device according to the present invention, all of the excavation axes can be used for forming the inner wall of the land mixed with the binder using one multi-axis excavator. The construction speed of the underground wall is very high, and the entire process of building the underground wall with the binder mixed using only one multi-screw excavator is required only by attaching and detaching the guide device. can do. In addition, by using the high-pressure nozzle installed in the guide device, it is possible to create a complete mixed soil continuous ground wall while easily correcting the vertical displacement of the column hole for the mixed land middle wall due to primary and secondary excavation. . Therefore, it is possible to greatly increase the formation speed of the mixed land middle wall as a whole.
According to the method of the present invention, the multi-axis excavator does not shift in the horizontal direction during the creation of the tertiary rosary-like binding agent mixed land inner wall, and the primary and secondary rosary-like binder-like binding agent mixed land inner walls are somewhat The gap can be easily corrected, and the mixed land wall can be continuously and reliably created.

【図面の簡単な説明】[Brief description of the drawings]

【図1】一般的多軸掘削機の外観図である。FIG. 1 is an external view of a general multi-axis excavator.

【図2】3軸式掘削機の掘削軸部概略図である。FIG. 2 is a schematic view of an excavation shaft part of a three-axis excavator.

【図3】案内装置を装着した掘削軸下部の正面図、平面
図および側面図である。
FIG. 3 is a front view, a plan view, and a side view of a lower part of an excavation shaft equipped with a guide device.

【図4】案内装置の上端部および装着部の概略図であ
る。
FIG. 4 is a schematic view of an upper end portion and a mounting portion of the guide device.

【図5】案内装置の下端部および装着部の概略図であ
る。
FIG. 5 is a schematic view of a lower end portion and a mounting portion of the guide device.

【図6】高圧ノズルの観念図である。FIG. 6 is a conceptual diagram of a high-pressure nozzle.

【図7】多軸掘削機による従来公知の数珠繋ぎ状固結剤
混合土地中壁造成工法および本発明による造成工法の造
成工程説明図である
FIG. 7 is an explanatory view of a construction process of a conventionally known method of constructing a middle wall of a mixed rosary-like binder mixed land by a multi-axis excavator and a construction method according to the present invention.

【図8】本発明の他の造成工法による混合土地中壁の造
成工程説明図である。
FIG. 8 is an explanatory view of a step of forming a middle wall of mixed land by another forming method according to the present invention.

【図9】三次数珠繋ぎ状固結剤混合土地中壁造成時にお
ける、案内装置に設けた高圧ノズルによるズレの修正工
程説明観念図である。
FIG. 9 is a conceptual diagram for explaining a process of correcting a displacement by a high-pressure nozzle provided in a guide device during the formation of a middle wall of a land mixed with a tertiary rosary-like binder.

【図10】3軸掘削機を用いた従来工法による混合土地
中壁の造成工程説明観念図である。
FIG. 10 is a conceptual diagram illustrating a process of forming a middle wall of mixed land by a conventional method using a three-axis excavator.

【図11】従来公知のガイドスキーを有する3軸掘削機
による混合土地中壁の造成工程説明図である。
FIG. 11 is an explanatory view of a process of forming a middle wall of mixed land by a conventionally known three-axis excavator having a guide ski.

【図12】従来公知の他のガイド付き掘削による混合土
地中壁の造成工程説明図である。
FIG. 12 is an explanatory view of a step of forming a middle wall of mixed land by another conventionally known guided excavation.

【図13】改良案の1つである掘削機による掘削状況を
説明する概念図である。
FIG. 13 is a conceptual diagram illustrating a state of excavation by an excavator, which is one of improvements.

【図14】図13の掘削機における補助掘削機を含む掘
削軸部の断面図である。
FIG. 14 is a cross-sectional view of an excavation shaft portion including an auxiliary excavator in the excavator of FIG.

【図15】図13に示す改良案の掘削機による混合土地
中壁の造成工程説明図である。
FIG. 15 is an explanatory view of a step of forming a middle wall of mixed land by the excavator according to the improved plan shown in FIG. 13;

【符号の説明】[Explanation of symbols]

10 多軸掘削機 12 掘削軸 15 連結バンド 20 案内装置 21 筒状体 22 円周部 23 内側円弧状凹溝 24 外方切欠縦孔 25 固定用ブラケット 26 開き幅固定用バンド 30 高圧噴射ノズル M1〜M7 掘削孔 S1、S2 傾斜未掘削部 DESCRIPTION OF SYMBOLS 10 Multi-axis excavator 12 Excavation axis 15 Connecting band 20 Guiding device 21 Cylindrical body 22 Circumferential part 23 Inner arc-shaped concave groove 24 Outer notch vertical hole 25 Fixing bracket 26 Opening width fixing band 30 High pressure injection nozzle M1 M7 Drilling holes S1, S2 Inclined unexcavated part

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 3本以上の多軸掘削機とその両外側端軸
に装着する着脱自在な案内装置とからなる案内装置付多
軸掘削機であって、該案内装置は多軸掘削機により削孔
される孔の円径より小さい径の円筒部と該円筒部の外周
側にその一部が切欠された縦切欠孔を持ち、同内周側に
は掘削軸との干渉を避ける円弧状縦凹溝を有することを
特徴とする着脱自在な案内装置付多軸掘削機。
1. A multi-screw excavator with a guide device comprising at least three multi-screw excavators and detachable guide devices mounted on both outer end shafts thereof, wherein the guide device is a multi-screw excavator. It has a cylindrical part with a diameter smaller than the diameter of the hole to be drilled and a vertical notch with a part cut out on the outer peripheral side of the cylindrical part, and an arcuate shape on the inner peripheral side that avoids interference with the excavation axis A multi-shaft excavator with a detachable guide device, characterized by having a longitudinal groove.
【請求項2】 案内装置の内側下部に複数の高圧流体噴
射用ノズルを垂直方向に備えていることを特徴とする請
求項1に記載の案内装置付多軸掘削機。
2. The multi-spindle excavator with a guide device according to claim 1, wherein a plurality of high-pressure fluid injection nozzles are provided vertically below the inside of the guide device.
【請求項3】 3本以上の多軸掘削機により地表から土
中に平面視数珠繋ぎ状の連続した固結剤混合土地中壁を
造成するに際し、多軸掘削機にて一次数珠繋ぎ状固結剤
混合土地中壁を形成し、次いで一次数珠繋ぎ状固結剤混
合土地中壁の水平延長線上に或る間隔を隔てて二次数珠
繋ぎ状固結剤混合土壁を形成し、一次及び二次数珠繋ぎ
状壁の未硬化の状態の時に一次及び二次数珠繋ぎ状壁の
相対する側の端部の丸孔を案内孔として、多軸掘削機に
より削孔される孔の円径より小さい径の円筒部と該円筒
部の外周側にその一部が切欠された縦切欠孔を持ち、同
内周側には掘削軸との干渉を避ける円弧状縦凹溝を有す
る案内装置を装備した案内装置付多軸掘削機により、両
側の案内装置各々を一次二次の案内孔に挿入案内し、堀
り残し部位に三次数珠繋ぎ状固結剤混合土地中壁を形成
して連続した固結剤混合土地中壁を造成する工法。
3. A three- or more-axle excavator for forming a continuous bead-like solid binder mixed from the surface of the ground into the ground in a plan view, and a first-order bead-like binder with a multi-axial excavator. Forming a mixed ground mid-wall, then forming a secondary rosary bridging binder mixed earth wall at a certain interval on the horizontal extension line of the primary rosary bridging binder, forming the primary and secondary rosary bridging When the wall is in an uncured state, the round holes at the opposite ends of the primary and secondary beads are used as guide holes for the multi-screw excavator.
A cylindrical portion having a diameter smaller than the circular diameter of the hole to be drilled;
Has a notch on the outer periphery of the part,
There is an arc-shaped longitudinal groove on the inner circumference to avoid interference with the excavation axis
The guide devices on both sides are inserted and guided in the primary and secondary guide holes by a multi-screw excavator equipped with a guide device equipped with a guide device, and a tertiary rosary-linked solid binder mixed land inner wall is formed in the remaining part of the excavation. A method of building a continuous cement-mixed ground wall.
【請求項4】 案内装置各々の下端に設けた高圧流体噴
射ノズルから下方に向けて流体を噴射しながら、三次数
珠繋ぎ状固結剤混合土壁を形成することを特徴とする請
求項3に記載の工法。
4. The tertiary bead-like binder mixed soil wall is formed while ejecting fluid downward from a high-pressure fluid ejection nozzle provided at a lower end of each of the guide devices. Method of construction.
【請求項5】 高圧流体噴射ノズルから噴射される流体
が、非自硬性を有しセメントとの化学変化に依り硬化性
を発揮するスラリーである請求項4に記載の工法。
5. The method according to claim 4, wherein the fluid ejected from the high-pressure fluid ejection nozzle is a slurry having non-self-hardening properties and exhibiting hardening properties due to a chemical change with cement.
【請求項6】 1軸掘削機と、1軸掘削機により削孔さ
れる孔の円径より小さい径の円筒部と該円筒部の外周側
にその一部が切欠された縦切欠孔を持ち、同内周側には
掘削軸との干渉を避ける円弧状縦凹溝を有する案内装置
を装備した3本以上の多軸掘削機とを並用し、1軸掘削
機により互いに水平延長線上で或る間隔を隔てて複数本
の固結剤混合土柱を形成し、続いて該固結剤混合土が未
硬化の状態の時に、上記複数本の隣り合う混合土柱孔に
上記多軸掘削機の両側案内装置を挿入案内し、掘り残し
部位に数珠繋ぎ状固結混合土地中壁を形成することを特
徴とする連続した固結剤混合土地中壁を造成する工法。
6. A single-screw excavator, and drilled by the single-screw excavator.
Cylindrical part having a diameter smaller than the diameter of the hole to be bored and the outer peripheral side of the cylindrical part
It has a vertical notch with a part cut out, and on the inner peripheral side
Using three or more multi-axis excavators equipped with a guide device having an arc-shaped vertical concave groove to avoid interference with the excavation axis, using a single-axis excavator to make a certain interval on the horizontal extension line Forming a plurality of binder mixed soil columns separated from each other, and subsequently, when the binder mixed soil is in an uncured state, guide both sides of the multi-axis excavator to the plurality of adjacent mixed soil pillar holes. A method of constructing a continuous solid-filled mixed ground inner wall, which comprises inserting and guiding the device and forming a rosary-like solidified mixed mixed land inner wall at a remaining part of the excavation.
JP08297931A 1996-10-22 1996-10-22 Multi-axis excavator with detachable guide and underground wall construction method using it Expired - Fee Related JP3086183B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08297931A JP3086183B2 (en) 1996-10-22 1996-10-22 Multi-axis excavator with detachable guide and underground wall construction method using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08297931A JP3086183B2 (en) 1996-10-22 1996-10-22 Multi-axis excavator with detachable guide and underground wall construction method using it

Publications (2)

Publication Number Publication Date
JPH10266194A JPH10266194A (en) 1998-10-06
JP3086183B2 true JP3086183B2 (en) 2000-09-11

Family

ID=17852952

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08297931A Expired - Fee Related JP3086183B2 (en) 1996-10-22 1996-10-22 Multi-axis excavator with detachable guide and underground wall construction method using it

Country Status (1)

Country Link
JP (1) JP3086183B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2809559B2 (en) * 1992-07-17 1998-10-08 ケミカルグラウト株式会社 Multi-axis drilling rig
JPH0718677A (en) * 1993-07-01 1995-01-20 Kengi Kaihatsu Kk Pillar line type underground continuous wall construction method
JP2698768B2 (en) * 1995-03-08 1998-01-19 成幸工業株式会社 Method of forming underground continuous wall

Also Published As

Publication number Publication date
JPH10266194A (en) 1998-10-06

Similar Documents

Publication Publication Date Title
US4212565A (en) Method and apparatus for forming a continuous row of cast-in-place piles to form a wall
US6485234B2 (en) Apparatus and method for making cylindrical columns
JP3086183B2 (en) Multi-axis excavator with detachable guide and underground wall construction method using it
JP4550792B2 (en) Construction method of underground wall
JP4242251B2 (en) Open-ended steel pipe pile for rotary press-in and rotary press-in method for open-ended steel pipe pile
JP4115091B2 (en) Construction method of rotary press-fit steel pipe pile
KR100645893B1 (en) Agitating device for improving ground
JP3931298B2 (en) Hollow pipe pile core misalignment prevention device and hollow pipe pile core misalignment prevention construction method
JPS6351515A (en) Excavator for ground improvement
JPH0860976A (en) Method for constructing fore pile and drilling device for use therein
JPH0313622A (en) Pile driving method by pilot pile and pilot pile
JP3868176B2 (en) Soil-stabilized steel pipe for ground stabilization and ground stabilization method using this steel pipe
JP2645322B2 (en) Construction method of soil cement composite pile
JP3224435B2 (en) Construction method of underground continuous wall
JP3395958B2 (en) Earth pressure reduction type double auger for ground improvement
JP2585137B2 (en) Ground improvement method using solidified columns and drilling equipment for ground improvement
JP2009249903A (en) Construction method for establishing subterranean solidified body and apparatus for establishing solidified body using the same
JP2920470B2 (en) Earth pressure reduction type ground improvement method
JP2000104246A (en) Constructing method of erath retaining wall and tree- axle auger excavator used for its method
JP2000290995A (en) Method for constructing underground wall through ground improvement and device for use therein
JPH0868047A (en) Method for forming soil hardened body
JPH018587Y2 (en)
JP4643234B2 (en) Wall building apparatus and method around pipe
JP3058135U (en) Continuous underground wall construction equipment
JPH0347366B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees