JP2555333Y2 - Temporary fixing jig for anchoring pile head in SC pile - Google Patents

Temporary fixing jig for anchoring pile head in SC pile

Info

Publication number
JP2555333Y2
JP2555333Y2 JP8977091U JP8977091U JP2555333Y2 JP 2555333 Y2 JP2555333 Y2 JP 2555333Y2 JP 8977091 U JP8977091 U JP 8977091U JP 8977091 U JP8977091 U JP 8977091U JP 2555333 Y2 JP2555333 Y2 JP 2555333Y2
Authority
JP
Japan
Prior art keywords
pile
pile head
ring
temporary fixing
fixing jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8977091U
Other languages
Japanese (ja)
Other versions
JPH0540337U (en
Inventor
徹 倉内
雄一 大越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP8977091U priority Critical patent/JP2555333Y2/en
Publication of JPH0540337U publication Critical patent/JPH0540337U/en
Application granted granted Critical
Publication of JP2555333Y2 publication Critical patent/JP2555333Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案はSC杭の杭頭部に杭頭定
着鉄筋を溶着する際に同定着鉄筋を仮止め固定する治具
に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jig for temporarily fixing and fixing an identified reinforcing steel bar when welding a reinforcing steel bar to a pile head of an SC pile.

【0002】[0002]

【従来の技術】従来図4に示す如く杭頭鉄筋aをSC杭
bの杭頭部に溶接するのに際して、1本の鉄筋の重量が
重いため、1人では施工不可能で、前記鉄筋aを把持し
ている補助者が必要になる。
2. Description of the Related Art Conventionally, as shown in FIG. 4, when a pile head reinforcing rod a is welded to a pile head of an SC pile b, one reinforcing rod is heavy and cannot be constructed by one person. An assistant holding the device is required.

【0003】[0003]

【考案が解決しようとする課題】このように1本の杭頭
鉄筋の溶接に対して2人作業を行っていては、溶接工の
不足している現状では、工期の遅れにつながる惧れがあ
る。本考案は前記従来技術の有する問題点に鑑みて提案
されたもので、その目的とする処は、1人で杭頭定着鉄
筋の溶接作業ができ、作業性が向上され、施工精度が改
善されるSC杭における杭頭定着鉄筋仮固定治具を提供
する点にある。
[Problems to be solved by the present invention] When two people are working on welding of a single pile head reinforcing rod, there is a risk that the construction period will be delayed in the current situation where there is a shortage of welders. is there. The present invention has been proposed in view of the above-mentioned problems of the prior art, and the purpose thereof is to perform welding work of a pile head anchoring bar by itself, thereby improving workability and improving construction accuracy. Another object of the present invention is to provide a temporary fixing jig for fixing a pile head in an SC pile.

【0004】[0004]

【課題を解決するための手段】前記の目的を達成するた
め、本考案に係るSC杭における杭頭定着鉄筋仮固定治
具は、杭頭部外周に嵌合するリング状部材の内周面に、
所定間隔毎に有底半円筒状の垂直の鉄筋保持片を配設す
るとともに、前記リング状部材の上端縁より所定間隔毎
に水平の杭頭係止部片を突設して構成されている。
In order to achieve the above object, a temporary fixing jig for fixing a pile head in an SC pile according to the present invention is provided on an inner peripheral surface of a ring-shaped member fitted to an outer periphery of a pile head. ,
A vertical reinforcing bar holding piece having a bottomed semi-cylindrical shape is provided at predetermined intervals, and a horizontal pile head locking portion is projected from the upper edge of the ring-shaped member at predetermined intervals. .

【0005】[0005]

【作用】本考案に係るSC杭における杭頭定着仮固定治
具は前記したように、リング状部材の上端縁より所定間
隔毎に水平の杭頭係止部片が突設されているので、前記
リング状部材を杭頭部に嵌合すると、同杭頭係止部片が
杭頭部に係止し、本考案の杭頭定着固定治具が杭頭部に
セットされる。
As described above, since the pile head anchoring temporary fixing jig in the SC pile according to the present invention has horizontal pile head locking portions protruding at predetermined intervals from the upper edge of the ring-shaped member as described above, When the ring-shaped member is fitted to the pile head, the pile head locking portion is locked to the pile head, and the pile head fixing fixture of the present invention is set on the pile head.

【0006】次いで前記リング状部材の内周面に、所定
間隔毎に配設された、有底半円筒状の垂直の鉄筋保持片
内に、夫々杭頭定着鉄筋を嵌挿することによって、同各
鉄筋は杭頭部の所定位置に配筋される。この後、前記各
鉄筋を杭頭部に仮止め溶接したのち、前記治具を外し、
前記各鉄筋の本溶接を行なうものである。
[0006] Next, a pile head anchoring reinforcing bar is inserted into a bottomed semi-cylindrical vertical reinforcing bar holding piece disposed at predetermined intervals on the inner peripheral surface of the ring-shaped member. Each reinforcing bar is arranged at a predetermined position on the pile head. After this, after temporarily welding the respective reinforcing bars to the pile head, the jig is removed,
The main welding of each reinforcing bar is performed.

【0007】[0007]

【実施例】以下本考案を図示例について説明する。1,
1′は上下2段の平鋼製リング状部材で、夫々複数の分
割部片1a,1′aより構成され、各分割部片1a、
1′aは丁番2によって開閉自在に連結されている。更
にリング状部材1,1′の両端部には締付片3が取付け
られ、万力等によって締付けることによって前記各分割
部片1a,1′aによってリングが形成されるようにな
っている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1,
Reference numeral 1 'denotes an upper and lower two-stage flat steel ring-shaped member which is composed of a plurality of divided pieces 1a and 1'a, respectively.
1'a is connected by a hinge 2 so as to be openable and closable. Further, tightening pieces 3 are attached to both ends of the ring-shaped members 1 and 1 ', and a ring is formed by each of the divided pieces 1a and 1'a by tightening with a vice or the like.

【0008】前記上下リング状部材1,1′の内周面に
は、所定間隔毎に有底半円筒状の鉄筋保持片4が垂直に
溶着され、上部リング状部材1の上端縁より所定間隔毎
に、水平の杭頭係止部片5が、杭断面の直径方向に延び
るように片持状に溶着され、かくして杭頭定着鉄筋仮固
定治具Aが構成される。前記のように構成された杭頭定
着鉄筋仮固定治具AをSC杭Bの杭頭部に落し込むと、
上部リング状部材1に配設された杭頭係止部片5が杭頭
部に係止することによって、SC杭Bの杭頭部に前記杭
頭定着鉄筋仮固定治具Aがセットされる。 次いで同治
具Aにおける有底半円筒状の鉄筋保持片4に杭頭定着鉄
筋を挿入することによって、同鉄筋を所定位置に配筋
し、杭頭部に仮止め溶接したのち前記治具Aを外し、本
溶接を行なう。
A semi-cylindrical rebar holding piece 4 with a bottom is vertically welded to the inner peripheral surfaces of the upper and lower ring-shaped members 1 and 1 'at predetermined intervals, and is spaced apart from the upper edge of the upper ring-shaped member 1 by a predetermined distance. Each time, the horizontal pile head engaging portion piece 5 is welded in a cantilever manner so as to extend in the diameter direction of the pile cross section, thus forming the pile head fixing steel temporary fixing jig A. When the pile head anchoring reinforcing bar temporary fixing jig A configured as described above is dropped into the pile head of the SC pile B,
The pile head anchoring piece 5 disposed on the upper ring-shaped member 1 is locked to the pile head, whereby the pile head anchoring rebar temporary fixing jig A is set on the pile head of the SC pile B. . Next, by inserting a pile head fixing reinforcing bar into the bottomed semi-cylindrical reinforcing bar holding piece 4 of the jig A, the reinforcing bar is arranged at a predetermined position, and temporarily fixed to the pile head, and then the jig A is removed. Remove and perform main welding.

【0009】同治具Aの取外し時、前記リング状部材
1、1′を構成する部片分割1a、1′aが丁番2を介
して開閉自在に連結されていることによって、作業が簡
単に行なわれる。
When the jig A is detached, the work can be easily performed because the pieces 1a and 1'a constituting the ring-shaped members 1 and 1 'are openably and closably connected via the hinge 2. Done.

【0010】[0010]

【考案の効果】本考案に係るSC杭における杭頭定着鉄
筋仮固定治具は前記したようにリング状部材の上端縁よ
り所定間隔毎に水平の杭頭係止部片を突設したことによ
って、前記リング状部材をSC杭の杭頭部に嵌合したと
き、前記仮固定治具を所定位置にセットすることがで
き、しかるのち前記リング状部材の内周面に、杭頭定着
鉄筋が嵌入される有底半円筒状の垂直の鉄筋保持片が配
設されていることによって、前記定着鉄筋を所定位置に
保持することができ、SC杭における杭頭定着鉄筋の取
付作業が1人で行なわれるので、作業効率が向上し、工
程の遅れもなく、前記鉄筋のピッチも乱れがなく、施工
精度の向上が図られる。
[Effect of the Invention] The temporary fixing jig for the pile head anchoring in the SC pile according to the present invention is obtained by projecting the horizontal pile head locking pieces at predetermined intervals from the upper edge of the ring-shaped member as described above. When the ring-shaped member is fitted to the pile head of the SC pile, the temporary fixing jig can be set at a predetermined position. Thereafter, a pile-head anchoring bar is provided on the inner peripheral surface of the ring-shaped member. Since the bottomed semi-cylindrical vertical reinforcing bar holding piece to be inserted is provided, the anchoring reinforcing bar can be held at a predetermined position, and the installation work of the pile head anchoring bar in the SC pile can be performed by one person. As a result, the working efficiency is improved, the process is not delayed, the pitch of the rebar is not disturbed, and the construction accuracy is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案に係るSC杭における杭頭定着鉄筋仮固
定治具の一実施例を示す平面図である。
FIG. 1 is a plan view showing an embodiment of a temporary fixing jig for fixing a pile head in an SC pile according to the present invention.

【図2】図1の部分側面図である。FIG. 2 is a partial side view of FIG.

【図3】前記治具の使用状態を示す縦断面図である。FIG. 3 is a longitudinal sectional view showing a use state of the jig.

【図4】従来のSC杭に対する杭頭鉄筋の取付作業状況
を示す縦断面図である。
FIG. 4 is a vertical cross-sectional view showing a mounting state of a pile head reinforcing bar to a conventional SC pile.

【符号の説明】[Explanation of symbols]

1 リング状部材 1′ リング状部材 1a 分割部片 1′a 分割部片 2 丁番 3 締付片 4 鉄筋保持片 5 杭頭係止部片 A 杭頭定着鉄筋仮固定治具 B SC杭 DESCRIPTION OF SYMBOLS 1 Ring-shaped member 1 'Ring-shaped member 1a Divided piece 1'a Divided piece 2 Hinge 3 Tightening piece 4 Reinforcing bar holding piece 5 Pile head locking part piece A Pile head fixing steel temporary fixing jig B SC pile

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 杭頭部外周に嵌合するリング状部材の内
周面に、所定間隔毎に有底半円筒状の垂直の鉄筋保持片
を配設するとともに、前記リング状部材の上端縁より所
定間隔毎に水平の杭頭係止部片を突設してなることを特
徴とするSC杭における杭頭定着鉄筋仮固定治具。
1. A semi-cylindrical vertical reinforcing bar holding piece having a bottom is provided at predetermined intervals on an inner peripheral surface of a ring-shaped member fitted to an outer periphery of a pile head, and an upper edge of the ring-shaped member is provided. A temporary fixing jig for fixing a pile head in an SC pile, wherein a horizontal pile head locking portion is protruded at predetermined intervals.
JP8977091U 1991-10-31 1991-10-31 Temporary fixing jig for anchoring pile head in SC pile Expired - Lifetime JP2555333Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8977091U JP2555333Y2 (en) 1991-10-31 1991-10-31 Temporary fixing jig for anchoring pile head in SC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8977091U JP2555333Y2 (en) 1991-10-31 1991-10-31 Temporary fixing jig for anchoring pile head in SC pile

Publications (2)

Publication Number Publication Date
JPH0540337U JPH0540337U (en) 1993-06-01
JP2555333Y2 true JP2555333Y2 (en) 1997-11-19

Family

ID=13979926

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8977091U Expired - Lifetime JP2555333Y2 (en) 1991-10-31 1991-10-31 Temporary fixing jig for anchoring pile head in SC pile

Country Status (1)

Country Link
JP (1) JP2555333Y2 (en)

Also Published As

Publication number Publication date
JPH0540337U (en) 1993-06-01

Similar Documents

Publication Publication Date Title
JP2555333Y2 (en) Temporary fixing jig for anchoring pile head in SC pile
JPH02243873A (en) Connecting device for supporting pillar and stay
JPS6122088B2 (en)
JPH0428901Y2 (en)
JPH0810106Y2 (en) Mounting hardware and precast concrete board equipped with the mounting hardware
JPH0638955Y2 (en) Reinforcement ring temporary stop
JPH0612054Y2 (en) Concrete block for manhole
JP3000796U (en) Temporary fence
JP2530661Y2 (en) Mounting hardware for Pca curtain wall
JPS5841235Y2 (en) Anger bolt support device
JP3615083B2 (en) Steel pipe pile head connection method
JPH0711930Y2 (en) Formwork for concrete members
JP3649795B2 (en) 竪 Pipe centering jig
JP3239176B2 (en) Arrangement structure of box body
JPS5930131Y2 (en) Angle steel frame for assembling reinforcing bars
JPH08319624A (en) Execution method of anchor bolt
JP4004608B2 (en) How to make artificial reefs
JPS6022184Y2 (en) Connection fittings for mounting fences, etc.
JP3053847U (en) Rebar assembly equipment
JP3051080U (en) Foundation reinforcement device
JPH07166702A (en) Form for embedding anchor bolt
JPS5844452B2 (en) concrete segment noseizouhouhou
JPS6347250Y2 (en)
JPH0331166Y2 (en)
JPH04111804U (en) Steel beam pin joint structure