JP2010133159A - Heave preventive pile - Google Patents

Heave preventive pile Download PDF

Info

Publication number
JP2010133159A
JP2010133159A JP2008310463A JP2008310463A JP2010133159A JP 2010133159 A JP2010133159 A JP 2010133159A JP 2008310463 A JP2008310463 A JP 2008310463A JP 2008310463 A JP2008310463 A JP 2008310463A JP 2010133159 A JP2010133159 A JP 2010133159A
Authority
JP
Japan
Prior art keywords
ground
pile
layer
permeable layer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008310463A
Other languages
Japanese (ja)
Other versions
JP4910217B2 (en
Inventor
Kaoru Kobayashi
林 薫 小
Kazuya Mizukoshi
越 和 弥 水
Toshiro Abo
保 寿 郎 阿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP2008310463A priority Critical patent/JP4910217B2/en
Publication of JP2010133159A publication Critical patent/JP2010133159A/en
Application granted granted Critical
Publication of JP4910217B2 publication Critical patent/JP4910217B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a heave preventive pile capable of preventing a heave even in the ground of a water nonpermeable layer (water difficultly permeable layer) with a soft drilled bottom face, and having structure excellent in economically. <P>SOLUTION: A hole is drilled using a stable liquid from a ground surface to the confined aquifer ground 2, a drilled hole diameter is expanded in the water nonpermeable layer (water difficultly permeable layer) ground 1 positioned at an upper side of the confined aquifer ground 2, or ranging from the water nonpermeable layer (water difficultly permeable layer) ground 1 to the confined aquifer ground 2 in a lower portion thereof, concrete or mortal is injected in stead of stable liquid, a pile is formed to include top-like expansion parts 10b, 10c with a steel pile material 8 inserted therein, positioned and hardened in the center of the drilled hole from a ground surface to a drilled hole bottom, and the heave in the drilled bottom face caused by uplift pressure from the confined aquifer ground is restrained by a frictional force between a pile outer circumferential face of the expansion part and the water nonpermeable layer (water difficultly permeable layer) ground 1, and a shearing reaction of the upper soil of the expansion part. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、盤ぶくれ防止のために打設される杭の地中形状、構造に関する。   The present invention relates to an underground shape and a structure of a pile placed for preventing padding.

被圧地下水位が高い地盤での掘削工事において、掘削底面の安定性確保、すなわち盤ぶくれ及びボイリング対策が大きな課題となっていた。   In excavation work on ground with high pressure groundwater level, securing the bottom of the excavation, that is, countermeasures for blistering and boiling have been a major issue.

図3は、従来の中間杭を用いた掘削における盤ぶくれの模式図で、(a)は平面図、(b)は断面図である。図に示すように、従来は、土留め壁4、5の先端が掘削底面Aの下方の不透水層(難透水層)地盤1に到達させて建造物構築領域を囲繞し、所用間隔で中間杭9を不透水層(難透水層)地盤1まで打ち込んで掘削を行っていた。掘削の進行に伴い、被圧滞水層地盤2の揚圧力U(矢印)により不透水層(難透水層)地盤1が盤ぶくれを起こし、掘削底面Aと共に中間杭9、地上の覆工板11までを押し上げる事故を生じていた。   FIGS. 3A and 3B are schematic views of a board bulge in excavation using a conventional intermediate pile, where FIG. 3A is a plan view and FIG. 3B is a cross-sectional view. As shown in the figure, conventionally, the ends of the retaining walls 4, 5 reach the impermeable layer (hardly permeable layer) ground 1 below the bottom surface A of the excavation to surround the building construction region, and are intermediate at a desired interval. Excavation was performed by driving the pile 9 to the impermeable layer (hardly permeable layer) ground 1. As the excavation progresses, the impervious layer (hardly permeable layer) ground 1 is bulged by the lifting pressure U (arrow) of the unconfined aquifer ground 2, and the intermediate pile 9 and the ground lining are excavated together with the excavated bottom surface A. There was an accident of pushing up to the plate 11.

このような問題を解決するため、特許文献1は、前記中間杭9を鋼製杭材の周囲にモルタルまたはコンクリートを一体化した盤ぶくれ防止杭とし、不透水層(難透水層)地盤1を貫通すると共に被圧滞水層地盤2の所要深さまで貫入させ、周辺地盤との摩擦力により掘削底面Aの不透水層(難透水層)地盤1が盤ぶくれを防止する発明であった。   In order to solve such a problem, Patent Document 1 discloses that the intermediate pile 9 is a padding prevention pile in which mortar or concrete is integrated around a steel pile material, and an impermeable layer (non-permeable layer) ground 1 is used. The impermeable layer (hardly permeable layer) ground 1 on the bottom surface A of the excavation is prevented by the frictional force with the surrounding ground and penetrating to the required depth of the confined aquifer ground 2. .

しかしながら、この工法では、不透水層(難透水層)地盤1の強度が比較的大きく、盤ぶくれ防止杭と地盤間の周面摩擦が所要の大きさを得られる場合でないと実施できない欠点があった。   However, in this construction method, there is a disadvantage that the strength of the impermeable layer (hardly permeable layer) ground 1 is relatively large and the peripheral friction between the padding prevention pile and the ground can be obtained only when the required magnitude is obtained. there were.

特許文献2は、掘削底面Aに当たる不透水層(難透水層)地盤1の部分に所定厚さの改良固結地盤体を造成し、その上で改良固結地盤体を貫通し被圧滞水層地盤2まで貫通する対策杭を打設し、被圧滞水層地盤3の強度が小さい場合でも盤ぶくれを防止する発明であった。   In Patent Document 2, an improved consolidated ground body having a predetermined thickness is formed in a portion of an impermeable layer (hardly permeable layer) ground 1 that hits the bottom surface A of excavation, and then the improved consolidated ground body is penetrated to form unconfined groundwater. The invention was an invention in which a countermeasure pile penetrating to the layer ground 2 was laid to prevent the padding even when the strength of the confined water layer ground 3 was small.

しかしながら、この工法では掘削底面の地盤を全面改良しなければならず、コストが嵩むため、経済性から採用が極めて難しい問題があった。   However, in this method, the ground on the bottom of the excavation has to be entirely improved, and the cost is high.

特開平11−181806号公報(第2、3頁、第1図)Japanese Patent Laid-Open No. 11-181806 (pages 2, 3 and 1) 特開2003−171949号公報(第2、3頁、第1図)Japanese Patent Laid-Open No. 2003-171949 (pages 2, 3 and 1)

前記の問題を解決するため、本発明は掘削底面が軟弱な不透水層(難透水層)地盤であっても盤ぶくれを防止することができ、且つ経済性に優れた構造の盤ぶくれ防止杭を提供することを課題とする。   In order to solve the above-mentioned problems, the present invention can prevent board bulge even in an impermeable layer (hard permeable layer) ground whose excavation bottom is soft and has a structure with excellent economical efficiency. It is an object to provide a prevention pile.

本発明の盤ぶくれ防止杭は、土留め壁で囲繞された地下建築物の構築領域内に所定の間隔で打設される地中杭であって、
地表面から被圧滞水層地盤の所要深さまで貫入する長さで、被圧滞水層地盤の上方に位置する不透水層(難透水層)地盤部分又は不透水層(難透水層)地盤部分から下方の被圧滞水層地盤部分まで、柱状に地盤改良を行い地中杭と一体に形成した拡張部とし、
該拡張部の杭外周面と不透水層(難透水層)地盤部との摩擦力及び拡張部の支圧抵抗により、被圧滞水層からの揚圧力による掘削底面の盤ぶくれを抑えることを特徴とする。
The board pile prevention pile of the present invention is an underground pile placed at a predetermined interval in a construction area of an underground building surrounded by a retaining wall,
Impermeable layer (impervious layer) or part of impervious layer (impervious layer) located above the confined aquifer layer with a length that penetrates from the ground surface to the required depth of the confined aquifer layer From the part to the lower unconfined aquifer ground part, it is an extension part formed integrally with the underground pile by improving the ground in a columnar shape,
Suppression of the bottom surface of the excavation bottom due to the lifting pressure from the confined aquifer is suppressed by the frictional force between the outer peripheral surface of the pile and the impermeable layer (hardly permeable layer) ground and the bearing resistance of the expansion. It is characterized by.

また、前記拡張部は、地質強度に応じた所望の盤ぶくれ抵抗力となるように、不透水層(難透水層)地盤部分又は不透水層(難透水層)地盤部分から下方の杭径及び杭軸方向の長さを設定することを特徴とする。   Moreover, the said extension part is a pile diameter below from an impermeable layer (non-permeable layer) ground part or an impermeable layer (non-permeable layer) ground part so that it may become the desired board bulge resistance force according to geological strength. And the length of a pile axial direction is set, It is characterized by the above-mentioned.

本発明の盤ぶくれ防止杭は、不透水層(難透水層)地盤部分または不透水層(難透水層)地盤部分から下方の被圧滞水層地盤部分に拡張部を備えることから、被圧滞水層地盤からの揚圧力に対抗する所定の周面摩擦力を確保することができる。   The padding prevention pile according to the present invention includes an extended portion in the unconfined aquifer layer ground portion below the impermeable layer (hardly permeable layer) ground portion or the impermeable layer (hardly permeable layer) ground portion. A predetermined peripheral frictional force that opposes the lifting pressure from the stagnant water layer ground can be secured.

このため、従来の改良固結地盤体の施工に比較して経済性に優れ、さらに従来の盤ぶくれ防止杭に較べ杭の打設本数を減らすことができる。   For this reason, compared with the construction of the conventional improved consolidated ground body, it is excellent in economic efficiency, and the number of piles to be piled can be reduced as compared with the conventional padding prevention pile.

また、拡張部杭、拡張部杭長およびその強度を適用地盤の地質構成に合わせて自由に設計・施工することができるため、適用範囲を拡大することができる。   Moreover, since an extension part pile, the extension part pile length, and its intensity | strength can be freely designed and constructed according to the geological structure of an application ground, an application range can be expanded.

以下、本発明の盤ぶくれ防止杭の実施の形態を図に基いて説明する。 DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of a board pile prevention pile according to the present invention will be described with reference to the drawings.

図1は、本発明の盤ぶくれ防止杭の形態を示し、(a)は第1の形態、(b)は第2の形態、(c)は第3の形態を示す断面図である。   FIG. 1 is a cross-sectional view showing a form of a board pile prevention pile according to the present invention, wherein (a) is a first form, (b) is a second form, and (c) is a third form.

図1に示す実施の形態において、地表面20の地下は互層地盤となっており、不透水層(難透水層)地盤1の下に砂質土などの被圧滞水層地盤2が位置している場合を示す。   In the embodiment shown in FIG. 1, the underground of the ground surface 20 is an alternating layer ground, and a confined aquifer layer ground 2 such as sandy soil is located under an impermeable layer (hardly permeable layer) ground 1. Indicates the case.

4、5は地下建築物構築領域を囲繞するために被圧滞水層地盤2まで根入れされた土留め壁である。図では、切梁6で土留め壁4、5を支保しながら掘削底面Aまで構築領域の掘削をした状態を示している。   Reference numerals 4 and 5 are earth retaining walls rooted to the submerged aquifer ground 2 in order to surround the underground building construction area. In the figure, the construction area is excavated to the excavation bottom surface A while supporting the retaining walls 4 and 5 with the cut beam 6.

図1(a)に示す本発明の盤ぶくれ防止杭10は、地表面20から被圧滞水層地盤2まで安定液を用いて削孔し、不透水層(難透水層)地盤1部分から下方の被圧滞水層地盤2までの削孔径を拡張し、安定液と置き換えてコンクリートまたはモルタルを注入し柱状に地盤改良を行い、削孔の中心に鋼製杭材8を地表から削孔低まで挿入建て込み硬化させ、地中杭と一体に形成した拡張部10b、10cを不透水層(難透水層)地盤1及び被圧滞水層地盤2に形成したものである。   1 (a) is a drilling prevention pile 10 according to the present invention, which is drilled from the ground surface 20 to the unconfined aquifer ground 2 with a stabilizing liquid, and a non-permeable layer (hardly permeable layer) ground 1 portion. The diameter of the drilling hole from the bottom to the unconfined aquifer ground 2 is expanded and replaced with a stabilizing liquid, concrete or mortar is injected to improve the ground in a columnar shape, and the steel pile material 8 is cut from the ground surface at the center of the drilling hole. The expanded portions 10b and 10c formed by being inserted and built and hardened to the hole low and formed integrally with the underground pile are formed in the impermeable layer (hardly permeable layer) ground 1 and the unconfined water layer ground 2.

本発明の拡張部は拡張されていないコンクリート・モルタル杭10a部分の3〜4倍の径(最大3000mm)とする。尚、この実施の形態では、不透水層(難透水層)地盤1部分から下方の被圧滞水層地盤2まで連続して拡張部10b、10cを形成したが、拡張部10bと間隔を空けて拡張部10cを杭底近傍のみに設けても良い。   The expansion part of the present invention has a diameter (maximum 3000 mm) 3 to 4 times that of the unexpanded concrete / mortar pile 10a. In this embodiment, the extended portions 10b and 10c are formed continuously from the impermeable layer (hardly permeable layer) 1 portion to the lower confined water layer ground 2 but are spaced apart from the expanded portion 10b. The extended portion 10c may be provided only in the vicinity of the pile bottom.

図1(b)の実施の形態は、地表面20から被圧滞水層地盤2まで安定液を用いて削孔し、不透水層(難透水層)地盤1部分のみ削孔径を拡張し、安定液と置き換えてコンクリートまたはモルタルを注入し柱状に地盤改良を行い、削孔の中心に鋼製杭材8を地表から削孔低まで挿入建て込み硬化させ、地中杭と一体に形成した拡張部10bを不透水層(難透水層)地盤1に形成したものである。   In the embodiment of FIG. 1 (b), a hole is drilled from the ground surface 20 to the confined aquifer ground 2 using a stabilizing liquid, and the diameter of the hole is expanded only in the impermeable layer (hardly permeable layer) ground 1 part. Replacement with stabilizing liquid, concrete or mortar is injected to improve the ground in a columnar shape, steel pile material 8 is inserted into the center of the drilling hole from the ground surface to the drilling hole, hardened, and formed integrally with the underground pile The part 10 b is formed on the impermeable layer (hardly permeable layer) ground 1.

すなわち、被圧滞水層地盤2に貫入している部分は、通常の削孔径のコンクリート・モルタル杭10aとしたものである。このため被圧滞水層地盤2への貫入長を図1(a)に示した第1の実施の形態より長くしている。   That is, the portion penetrating into the confined aquifer ground 2 is a concrete / mortar pile 10a having a normal drilling diameter. For this reason, the penetration length to the unconfined aquifer ground 2 is made longer than that of the first embodiment shown in FIG.

図1(c)の実施の形態は、第1の実施の形態と同様に、拡張部10b、10cを不透水層(難透水層)地盤1及び被圧滞水層地盤2に形成しているが、被圧滞水層地盤2に形成された拡張部10cの径を不透水層(難透水層)地盤1の拡張部10bよりさらに大きくし、被圧滞水層地盤2における周辺地盤との周面摩擦力を高めたものである。この例では、盤ぶくれ防止杭10の長さが図1(a)、(b)に対し短く、被圧滞水層地盤2への貫入長も短くすることができる。   In the embodiment shown in FIG. 1 (c), the extended portions 10b and 10c are formed in the impermeable layer (hardly permeable layer) ground 1 and the confined water layer ground 2 as in the first embodiment. However, the diameter of the expanded portion 10c formed in the unconfined aquifer ground 2 is made larger than the expanded portion 10b of the impermeable layer (hardly permeable layer) ground 1, The peripheral frictional force is increased. In this example, the length of the padding prevention pile 10 is shorter than that in FIGS. 1A and 1B, and the penetration length into the unconfined aquifer ground 2 can also be shortened.

図1において、盤ぶくれ防止杭10は1本のみ図示しているが、実際は建築物構築領域の面積に対応して所定間隔ごとに打設される。(図2参照)   In FIG. 1, only one padding prevention pile 10 is illustrated, but actually, it is driven at predetermined intervals corresponding to the area of the building construction area. (See Figure 2)

図1において、符号11は盤ぶくれ防止杭10を中間杭として仮設された覆工板、aは掘削空間である。図において掘削空間aに露出した盤ぶくれ防止杭10のコンクリート・モルタル杭10aは、周囲のコンクリート又はモルタルが剥がされ鋼製杭材8が露出された状態を示している。   In FIG. 1, the code | symbol 11 is the lining board temporarily installed by using the board swell prevention pile 10 as an intermediate pile, and a is excavation space. In the figure, the concrete mortar pile 10a of the padding prevention pile 10 exposed in the excavation space a shows a state in which the surrounding concrete or mortar is peeled off and the steel pile material 8 is exposed.

図2は、本発明の盤ぶくれ防止杭を用いた掘削工事の実施例を示し、(a)は建築物構築領域の平面図、(b)は建築物構築領域の断面図である。   2A and 2B show an example of excavation work using the pile prevention pile according to the present invention. FIG. 2A is a plan view of a building construction area, and FIG. 2B is a cross-sectional view of the building construction area.

図2(a)に示すように、建築物構築領域は鋼矢板などの土留め壁4、5が掘削底面より深い地中位置まで根入れされ周辺地盤と区画し、建築物構築領域の面積に応じて所定間隔で本発明の盤ぶくれ防止杭10が打設される。   As shown in FIG. 2 (a), the building construction area has a retaining wall 4 and 5 such as steel sheet piles that are deeper than the bottom of the excavation, and is separated from the surrounding ground. Accordingly, the board staking prevention pile 10 of the present invention is driven at predetermined intervals.

図に示すように、盤ぶくれ防止杭10は、中心にH型鋼の鋼製杭材8が挿入され、周囲にコンクリート又はモルタルが充填固化されており、掘削底面までは通常の中間杭と同様の杭径に形成されたコンクリート・モルタル杭10aとなっているが、掘削底面の不透水層(難透水層)地盤1部分又はその下の被圧滞水層地盤2部分は、その3〜4倍の径に拡張された拡張部10b、10cに形成されている。   As shown in the figure, the padding prevention pile 10 has a steel pile material 8 of H-shaped steel inserted in the center, filled with concrete or mortar around, and is the same as a normal intermediate pile up to the bottom of excavation. Although it is a concrete mortar pile 10a formed to a pile diameter of 1 mm, the impermeable layer (hardly permeable layer) ground 1 part at the bottom of excavation or the unconfined aquifer ground 2 part below it is 3-4 It is formed in the expansion parts 10b and 10c expanded to double the diameter.

これらの拡張部10b、10cは、背景技術の項で説明した不透水層(難透水層)地盤1の全面に設けられた改良固結地盤体(背景技術の項参照)に対比すると、柱状の改良固結地盤体に該当すると共に、杭の周辺摩擦力により杭周辺の不透水層(難透水層)地盤1を被圧滞水層地盤2からの揚圧力に対抗させるアンカーの役割を果たす。   These extended portions 10b and 10c are columnar when compared with the improved consolidated ground body (refer to the background art section) provided on the entire surface of the impermeable layer (non-permeable layer) ground 1 described in the background art section. It corresponds to the improved consolidated ground body, and plays the role of an anchor that opposes the impermeable layer (hardly permeable layer) ground 1 around the pile against the lifting pressure from the confined aquifer layer ground 2 by the frictional force around the pile.

図2(b)は、(a)の断面図で、山留め壁4、5に腹起こし6bを介して切梁6で支保工しながら掘削底面Aまで掘削した状態を示す。   FIG. 2B is a cross-sectional view of FIG. 2A, showing a state where excavation is performed up to the excavation bottom surface A while supporting on the cut beams 6 via the ridges 6 b on the retaining walls 4 and 5.

この実施例では、不透水層(難透水層)地盤1及び被圧滞水層地盤2に貫入された盤ぶくれ防止杭10は、拡張部10b、10cが形成されて、被圧滞水層地盤2からの揚圧力(上向きの矢印)に対抗する不透水層(難透水層)地盤1と拡張部10bの杭の周囲の周面摩擦力C1が盤ぶくれを抑止している。   In this embodiment, the padding prevention pile 10 penetrating into the impermeable layer (hardly permeable layer) ground 1 and the confined aquifer layer ground 2 is formed with expanded portions 10b and 10c, and the confined condensate layer. The impervious layer (hardly permeable layer) ground 1 that opposes the lifting pressure from the ground 2 (upward arrow) and the peripheral frictional force C1 around the pile of the extended portion 10b suppress the board bulge.

拡張部10b、10cの杭の径は、公知の拡径用の掘削ドリルを用いて最大3000mmとすることができる。   The diameter of the piles of the extended portions 10b and 10c can be set to a maximum of 3000 mm using a known drill for expanding the diameter.

尚、現場の地盤状況が悪く、盤ぶくれ防止杭10が図2(a)に示した所定間隔の打設のみでは効果が足りない(揚圧力に対抗できない)と判断される場合は、所定間隔を少なくして杭の本数を増加させ、或いは拡張部10b、10cが互いに重なり一体化するようにして効果を確保する。   It should be noted that if it is determined that the ground condition at the site is bad and the padding prevention pile 10 is not effective (cannot resist lifting pressure) only by driving at a predetermined interval shown in FIG. The effect is ensured by decreasing the interval to increase the number of piles or by extending and integrating the extended portions 10b and 10c.

本発明の盤ぶくれ防止杭の形態を示し、(a)は第1の形態、(b)は第2の形態、(c)は第3の形態を示す断面図である。The form of the boarding prevention pile of this invention is shown, (a) is a 1st form, (b) is a 2nd form, (c) is sectional drawing which shows a 3rd form. 本発明の盤ぶくれ防止杭を用いた掘削工事の実施例を示し、(a)は建築物構築領域の平面図、(b)は建築物構築領域の断面図である。The Example of the excavation construction using the board prevention pile of this invention is shown, (a) is a top view of a building construction area | region, (b) is sectional drawing of a building construction area | region. 従来の中間杭を用いた掘削における盤ぶくれの模式図で、(a)は平面図、(b)は断面図である。It is a schematic diagram of the board bulge in the excavation using the conventional intermediate pile, (a) is a top view, (b) is sectional drawing.

符号の説明Explanation of symbols

1 不透水層(難透水層)地盤
2、3 被圧滞水層地盤
土留め壁
6 切梁
6b 腹起こし
8 鋼製杭材(H型鋼)
9 中間杭
10 盤ぶくれ防止杭
10a コンクリート・モルタル杭
10b 拡張部
10c 拡張部
11 覆工板
20 地表面
1 Impermeable layer (hardly permeable layer) ground 2, 3 Confined water layer ground retaining wall 6 Cut beam 6b Raised 8 Steel pile material (H-shaped steel)
9 Intermediate pile 10 Overflow prevention pile 10a Concrete / mortar pile 10b Expansion section 10c Expansion section 11 Backing plate 20 Ground surface

Claims (2)

土留め壁で囲繞された地下建築物の構築領域内に所定の間隔で打設される地中杭であって、
地表面から被圧滞水層地盤の所要深さまで貫入する長さで、被圧滞水層地盤の上方に位置する不透水層(難透水層)地盤部分又は不透水層(難透水層)地盤部分から下方の被圧滞水層地盤部分まで、柱状に地盤改良を行い地中杭と一体に形成した拡張部とし、
該拡張部の杭外周面と不透水層(難透水層)地盤部との摩擦力及び拡張部の支圧抵抗により、被圧滞水層からの揚圧力による掘削底面の盤ぶくれを抑えることを特徴とする盤ぶくれ防止杭。
An underground pile placed at predetermined intervals in the construction area of an underground building surrounded by a retaining wall,
Impermeable layer (impervious layer) or part of impervious layer (impervious layer) located above the confined aquifer layer with a length that penetrates from the ground surface to the required depth of the confined aquifer layer From the part to the lower unconfined aquifer ground part, it is an extension part formed integrally with the underground pile by improving the ground in a columnar shape,
Suppression of the bottom surface of the excavation bottom due to the lifting pressure from the confined aquifer is suppressed by the frictional force between the outer peripheral surface of the pile and the impermeable layer (hardly permeable layer) ground and the bearing resistance of the expansion. Pile prevention pile characterized by.
前記拡張部は、地質強度に応じた所望の盤ぶくれ抵抗力となるように、不透水層(難透水層)地盤部分又は不透水層(難透水層)地盤部分から下方の杭径及び杭軸方向の長さを設定することを特徴とする請求項1記載の盤ぶくれ防止杭。
The extension part has a pile diameter and a pile below the impermeable layer (non-permeable layer) or the impermeable layer (non-permeable layer) ground part so as to have a desired bulge resistance according to the geological strength. 2. The board pile prevention pile according to claim 1, wherein an axial length is set.
JP2008310463A 2008-12-05 2008-12-05 Bump prevention pile Active JP4910217B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008310463A JP4910217B2 (en) 2008-12-05 2008-12-05 Bump prevention pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008310463A JP4910217B2 (en) 2008-12-05 2008-12-05 Bump prevention pile

Publications (2)

Publication Number Publication Date
JP2010133159A true JP2010133159A (en) 2010-06-17
JP4910217B2 JP4910217B2 (en) 2012-04-04

Family

ID=42344691

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008310463A Active JP4910217B2 (en) 2008-12-05 2008-12-05 Bump prevention pile

Country Status (1)

Country Link
JP (1) JP4910217B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014114600A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
JP2014114601A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
JP2019199692A (en) * 2018-05-14 2019-11-21 鹿島建設株式会社 Ground improvement structure and excavating method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181806A (en) * 1997-12-19 1999-07-06 Japan Railway Constr Pub Corp Heaving preventing method and construction of underground building
JP2003171949A (en) * 2001-12-04 2003-06-20 Tobishima Corp Excavating bottom surface-stabilizing construction method and underground building construction method
JP2006022623A (en) * 2004-07-09 2006-01-26 Kubota Corp Soil cement composite pile and its construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11181806A (en) * 1997-12-19 1999-07-06 Japan Railway Constr Pub Corp Heaving preventing method and construction of underground building
JP2003171949A (en) * 2001-12-04 2003-06-20 Tobishima Corp Excavating bottom surface-stabilizing construction method and underground building construction method
JP2006022623A (en) * 2004-07-09 2006-01-26 Kubota Corp Soil cement composite pile and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014114600A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
JP2014114601A (en) * 2012-12-10 2014-06-26 Kajima Corp Foundation pile construction method
JP2019199692A (en) * 2018-05-14 2019-11-21 鹿島建設株式会社 Ground improvement structure and excavating method
JP7017980B2 (en) 2018-05-14 2022-02-09 鹿島建設株式会社 Ground improvement structure and excavation method

Also Published As

Publication number Publication date
JP4910217B2 (en) 2012-04-04

Similar Documents

Publication Publication Date Title
JP2019199692A (en) Ground improvement structure and excavating method
JP3789127B1 (en) Seismic structure
JP4910217B2 (en) Bump prevention pile
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
JP4275437B2 (en) Structure for suppressing buoyancy of structures
KR100360462B1 (en) Method to construct a structure on soft soil and the structure thereof
JP5848038B2 (en) Overhead deterrent structure
JP2007046343A (en) Liquefaction preventive construction method of ground just under existing building
JP2005282130A (en) Ground excavation method
JPH03281826A (en) Excavation method in cohesive soil ground
KR100411662B1 (en) Construction Method of Prestressed spun High strength Concrete Pile
JP2010222914A (en) Underground structure using steel sheet pile with frictional projection and method of constructing the same
KR100683118B1 (en) Steel pile having drilling blade and reinforcing blade
KR20160006273A (en) Apparatus for Supporting Marine Structure
JP4336828B2 (en) Substructure
JP4529631B2 (en) Underground structure and construction method of underground structure
JP5190044B2 (en) Foundation structure
KR20060100821A (en) Construction method of a stone wall for reinforcement
JPH0684619B2 (en) Root cutting method
JP6679287B2 (en) Liquefaction countermeasure construction method for underground structures
JP3780191B2 (en) Building construction method
JP2020066875A (en) Foundation pile, foundation structure, structural body, and installation method of foundation pile
JP2009102951A (en) Substructure
JP2000160557A (en) Landslide protection construction method
Takuma Mitigation of sinkhole with press-in Piles

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100312

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110614

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110802

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111227

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111228

R150 Certificate of patent or registration of utility model

Ref document number: 4910217

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150127

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350