EP2500514A2 - Procédé et dispositif de traitement d'extension dans le tunnel - Google Patents

Procédé et dispositif de traitement d'extension dans le tunnel Download PDF

Info

Publication number
EP2500514A2
EP2500514A2 EP12001082A EP12001082A EP2500514A2 EP 2500514 A2 EP2500514 A2 EP 2500514A2 EP 12001082 A EP12001082 A EP 12001082A EP 12001082 A EP12001082 A EP 12001082A EP 2500514 A2 EP2500514 A2 EP 2500514A2
Authority
EP
European Patent Office
Prior art keywords
chisel
cone
rock
housing
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12001082A
Other languages
German (de)
English (en)
Inventor
Gerhard Dipl.-Ing. Glatzle
Hilmar Dipl.-Ing. Fewson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baresel GmbH
GTA Maschinensysteme GmbH
Original Assignee
Baresel GmbH
GTA Maschinensysteme GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baresel GmbH, GTA Maschinensysteme GmbH filed Critical Baresel GmbH
Publication of EP2500514A2 publication Critical patent/EP2500514A2/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/18Mining picks; Holders therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level

Definitions

  • the invention relates to a method for rehabilitation and extension of existing tunnel profiles, in which after an optional disassembly of an inner shell of the tunnel to be rehabilitated in a further step, the outer rock is removed.
  • the invention relates to a chisel for equipping an automatic hammer used for rehabilitation and expansion of existing tunnel profiles for carrying out this method and a mobile enclosure with a stud and a lining for temporarily secured areas, especially for tunnel cross-sections which are not subject to traffic during the renovation of existing ones Tunnel profiles, in which the enclosure is designed as a supporting framework for receiving units serving for the propulsion.
  • the inventive method is particularly well suited for the rehabilitation of railway tunnels. Due to tunnel damage, changing operating conditions or newly imposed guidelines and standards, the need for refurbishment of existing tunnels is considerable. Of particular importance for the choice of a suitable construction measure for the rehabilitation, renewal or expansion of an existing tunnel are the expected levels of intervention in traffic, especially in railway operations. Interruptions or diversions should be avoided as strictly as possible. Especially with single-tracked or reduced during the construction of a track double-railed tunnels renovation work such as a profile widening with arched outbreaks and production of an inner shell so far only possible with complete blockage of the tunnel due to the cramped space. In practice it has become Tunnel expansion established a tool combination of hydraulic hammers and drills. The old vault and its back packing are mechanically broken.
  • this object is achieved in that the rock to be removed is first perforated in sections by means of a plurality of bores and that the rock is subsequently released and / or split off by a splitting action exerted on the bores via an automatic hammer equipped with a conically designed bit.
  • the old inner shell of the tunnel to be rehabilitated is removed.
  • This is usually z. B. made of natural stones or brick and is torn by means of hydraulic hammers.
  • the extension of the profile then takes place by removing the rock.
  • a partial perforation of the rock in the region to be removed takes place by producing a plurality of bores.
  • These are then used as a starting point for the targeted use of an automatic hammer.
  • a particularly accurate profile extension can be achieved by ensuring the separation of a largely exact amount of rock. All work can be carried out while the traffic is running without any blocking break or other obstruction, since the space required for the procedure is particularly low.
  • the use of the automatic hammers to loosen the rock is advantageously controlled so that slipping or flying rock does not interfere with railway operation through the tunnel-in-tunnel system.
  • the bit has a cone whose front end is smaller than the diameter of the borehole and whose rear end is larger than the diameter of the borehole.
  • the bit at the front end of the cone has a diameter of about 100 mm and / or at the rear end of the cone has a diameter of about 220 mm in order to achieve the effects mentioned.
  • the cone extends over a certain amount in the region of the front end of the chisel. It is envisaged in this context that the length of the cone is about 500 mm.
  • the bit is formed at its front end as a flat chisel or has such a flat chisel.
  • the object according to the invention is achieved in that the aggregate used is at least one automatic hammer, which is arranged to be movable on a carriage arranged on a console in the longitudinal direction and / or in the transverse direction.
  • Such housing serves on the one hand as protection of the remaining free for vehicles residual tunnel cross-section and on the other hand as a basis and support structure for various propulsion units serving such.
  • one or more automatic hammers are provided, which are movable on the housing. Serves for this purpose a carriage positioned on a console, to which this automatic hammer is assigned and which is arranged to be adjustable in the longitudinal direction and / or in the transverse direction.
  • a hammer proves to be particularly agile and flexible, because all workspaces are accessible and if possible over the entire length as the entire scope of the mobile housing.
  • an unlimited number of aggregates can be used in parallel in this way.
  • a plurality of consoles are arranged laterally and / or on the housing.
  • the enclosure has three such consoles, each with an automatic hammer, each one console side and a top of the housing arranged.
  • These brackets can be rigid or in turn movable.
  • At least one axis of rotation is provided between the console or the carriage and the multi-function arm.
  • the multi-function can be rotated together with this at its opposite end associated automatic hammer.
  • At least one pivot axis is provided between the console or the carriage and the multi-function arm.
  • the multi-function arm with hammer is pivoted in this way about an axis that is assigned to either the console or on this adjustable slide.
  • the invention is characterized in particular by the fact that a method and a device for the rehabilitation and extension of existing tunnel profiles are created, which allow in several ways new ways in the rehabilitation of tunnels.
  • Even rock of maximum hardness can be degraded in the process of the invention by way of splitting, without causing an impairment of the traffic in the tunnel.
  • the rock is then selectively dismantled by automatic hammers.
  • Such a hammer is equipped as a machining tool with a chisel as a splitting tool, which in turn has a cone to improve the wedge or gap effect.
  • a hammer in turn is according to the invention on a mobile housing, positioned on a so-called "tunnel in the tunnel and on a multi-function arm arbitrarily swivel and rotatable and additionally on a carriage in the longitudinal direction and / or in the transverse direction arbitrarily adjustable on the housing.
  • the battered multifunction arms for the hammers can thus be additionally adjusted in height on the protective housing. Furthermore, a pivoting of the attachment point for the multi-function can be done.
  • FIG. 1 shows the section of a mobile housing 1, consisting of a stud 3 and panels 4.
  • a mobile housing 1 On the mobile housing 1 is in this illustration next to the platform 21 a trained as an automatic hammer 5, laterally positioned on the housing 1 unit 2 can be seen.
  • the hammer 5 is assigned to a multi-function arm 9.
  • the latter is associated with the carriage 10, which in turn is arranged on the bracket 6 in the transverse direction to the longitudinal axis 24 movable.
  • the bracket 6 is in this embodiment of the invention in the direction of the longitudinal axis 24 on the Housing 1 adjustable.
  • a pivot axis 12 is located at the upper end 25 of the carriage 10. It thus takes place a pivoting of the attachment point of the multi-function arm 9 in order to represent its movements even shorter and more compact.
  • FIG. 2 the enclosure 1 is shown with a located on the console 6 in its lowest position carriage 10 so that the corresponding applies to the multifunction arm 9 together with automatic hammer 5 and chisel 15, so that the sole 5 can be reached via the hammer 5.
  • Cylinders 26, 27, 28 ensure the various adjustment possibilities of the carriage 10 or of the multifunction arm 9.
  • FIG. 3 shows an enclosure 1 with the panel 4 and a unit 2 arranged thereon in a rear position. More precisely, is located at the top 13 of the housing 1 a permanently installed here console 6. On this console 6, a carriage 10 is transverse to the longitudinal axis 24 of the housing 1 adjustable or movable.
  • the reference numerals 11 and 22 respectively denote the axes.
  • the unit is in the out FIG. 4 in a forward position.
  • the carriage 10 together with the unit 2 is moved accordingly in the longitudinal axis direction 24 to the front to edit the mountains 8.
  • FIG. 6 shows in addition the side view of a housing 3 with the arranged on the top 13 aggregate 2.
  • the carriage 10 in the longitudinal direction 24 of the housing 1 is movably positioned. Thanks to the Caribbeanspiels diverse cylinder 33, 34 and the rotation and pivoting possibilities about the axes 11, 22 and 35 can be achieved with the automatic hammer 5 and the chisel 15 almost any position and solved in accordance with rock or split off.
  • FIGS. 7 and 8 An alternative embodiment of this show the FIGS. 7 and 8 , There, a console 6 is positioned laterally on the housing 1. About the carriage 10, the unit 2 together with the drill arm 9 is maximally between the rear in position FIG. 7 rear and the front position in FIG. 8 traversable. Thus, positions are high up, as in FIG. 7 illustrated, or in the area of the sole, as in FIG. 8 shown, realizable.
  • FIG. 9 Subject of FIG. 9 is a chisel 15.
  • the chisel 15 is received with its rear end 29 of the automatic hammer, not shown here, including the constriction 31 is used.
  • the focus is here on the front end 30 of the chisel 15, where a cone 16 is located.
  • the cone 16 extends between its front end 17 and its rear end 18 evenly between the two diameters d1 and d2, preferably in a ratio of 1.0 / 2.2, in order to realize a favorable effect in the splitting of the rock.
  • At the tip 32 of the bit 15 is a striking bit 19 instead of a round tip to chisel away small bumps can.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)
EP12001082A 2011-03-15 2012-02-18 Procédé et dispositif de traitement d'extension dans le tunnel Withdrawn EP2500514A2 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102011014027A DE102011014027A1 (de) 2011-03-15 2011-03-15 Verfahren und Vorrichtung für Erweiterungsarbeiten im Tunnelbau

Publications (1)

Publication Number Publication Date
EP2500514A2 true EP2500514A2 (fr) 2012-09-19

Family

ID=45655103

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12001082A Withdrawn EP2500514A2 (fr) 2011-03-15 2012-02-18 Procédé et dispositif de traitement d'extension dans le tunnel

Country Status (2)

Country Link
EP (1) EP2500514A2 (fr)
DE (1) DE102011014027A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088853A (zh) * 2013-01-19 2013-05-08 安徽理工大学 一种矿用智能型气动巷道卧底装置
CN108397204A (zh) * 2018-02-11 2018-08-14 重庆工业职业技术学院 一种基于形状记忆合金修复已变形地铁盾构隧道的装置

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT3486428T (pt) * 2017-11-20 2022-10-25 Marti Technik Ag Dispositivo para alargar um túnel

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006044733B3 (de) 2006-09-20 2008-01-31 Gta Maschinensysteme Gmbh Mobile Einhausung mit Vortriebsaggregaten

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006044733B3 (de) 2006-09-20 2008-01-31 Gta Maschinensysteme Gmbh Mobile Einhausung mit Vortriebsaggregaten

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103088853A (zh) * 2013-01-19 2013-05-08 安徽理工大学 一种矿用智能型气动巷道卧底装置
CN103088853B (zh) * 2013-01-19 2015-11-25 安徽理工大学 一种矿用智能型气动巷道卧底装置
CN108397204A (zh) * 2018-02-11 2018-08-14 重庆工业职业技术学院 一种基于形状记忆合金修复已变形地铁盾构隧道的装置
CN108397204B (zh) * 2018-02-11 2019-04-12 重庆工业职业技术学院 一种基于形状记忆合金修复已变形地铁盾构隧道的装置

Also Published As

Publication number Publication date
DE102011014027A1 (de) 2012-09-20

Similar Documents

Publication Publication Date Title
EP0345650B1 (fr) Appareil de forage d'ancrage
EP2304179B1 (fr) Appareil de forage et de mise en place de boulons d'ancrage comprenant des glissières séparées
EP2703564B1 (fr) Cadre de guidage pour guider un dispositif de fraisage
DE102010027544A1 (de) Verfahren zur Herstellung der Bohrvorrichtungen vor allem für die Rohrschirmtechnik und Bohrvorrichtung
DE2726445A1 (de) Verfahren und vorrichtung zum konturgenauen maschinellen vortrieb von im querschnitt unterschiedlichen strecken des untertaegigen bergbaus
DE2621674B2 (de) Verfahren und Vorrichtung zum Vortrieb und Ausbau einer untertägigen Strecke sowie Streckenausbau zur Ausübung des Verfahrens
DE3108877A1 (de) Verfahren zum herstellen eines ankerausbaues, sowie vorrichtung zur durchfuehrung dieses verfahrens
EP2500514A2 (fr) Procédé et dispositif de traitement d'extension dans le tunnel
WO2002001045A1 (fr) Machine d'extraction ou de creusement pour l'extraction de roches
EP1711684B1 (fr) Procede pour extraire du grisou dans des zones de roche non directement influencees par l'exploitation miniere
DE19732532C2 (de) Verfahren und Vvorrichtung zum horizontalen Richtungsbohren
DE19649108B4 (de) Kurzfrontmaschine für den Untertagebergbau mit einer Führung für ein Bohrgerät zum Herstellen von Bohrlöchern für die Firstverankerung
EP1630299B1 (fr) Procedée de renforcement du fondations par injection
DE2909918A1 (de) Vorrichtung zum vortreiben und ausbauen einer untertaegigen strecke
DE19820483C1 (de) Verfahren und Vorrichtung zur Erstellung gesteuerter Hausanschlüsse
DE19608815C1 (de) Vorrichtung und Verfahren zur Herstellung einer Dichtsohle im Boden
DE10346583A1 (de) Bohr- und Ankersetzeinrichtung für eine Teilschnittmaschine
DE2938777A1 (de) Einrichtung zum vortrieb von grubenbauen in festem gestein
DE3425294C2 (de) Vorrichtung zum Auffahren von langgestreckten untertägigen Gewölben
DE19524389C1 (de) Vorrichtung zum Bohren von Löchern und/oder Schlitzen
DE1161524B (de) Verfahren und Vorrichtung zur Herstellung von Bohrschaechten und aehnlichen Bohrungen
DE3605112C2 (fr)
DE3003685A1 (de) Verfahren und vorrichtung zur hydromechanischen gewinnung im untertagebetrieb, insbesondere von steinkohle im teilsohlenpfeilerbruchbau
DE19529554C2 (de) Bohr- und/oder Injektionsvorrichtung
DE3114899A1 (de) Tunnelvortriebsmaschine und verfahren zur anwendung dieser maschine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20130725