EP1674657A1 - Method of building a tunnel - Google Patents

Method of building a tunnel Download PDF

Info

Publication number
EP1674657A1
EP1674657A1 EP04106796A EP04106796A EP1674657A1 EP 1674657 A1 EP1674657 A1 EP 1674657A1 EP 04106796 A EP04106796 A EP 04106796A EP 04106796 A EP04106796 A EP 04106796A EP 1674657 A1 EP1674657 A1 EP 1674657A1
Authority
EP
European Patent Office
Prior art keywords
beams
arch
tunnel
shaped structure
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP04106796A
Other languages
German (de)
French (fr)
Inventor
Hendrik Jan Spoelstra
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Strukton Infratechnieken BV
Original Assignee
Strukton Infratechnieken BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Strukton Infratechnieken BV filed Critical Strukton Infratechnieken BV
Priority to EP04106796A priority Critical patent/EP1674657A1/en
Publication of EP1674657A1 publication Critical patent/EP1674657A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E21B7/201Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members
    • E21D11/388Sealing means positioned between adjacent lining members having longitudinal cavities communicating with the exterior on the outer side of the lining elements

Definitions

  • the invention relates to a method of building a tunnel comprising an arch-shaped structure as well as to such tunnel.
  • a particular application of the invention is to build the tunnel or underpass without causing surface disruption.
  • One example thereof is to build a bicycle underpass below an existing rail track or highway without stopping the use and operation thereof.
  • the invention provides a method according to claim 1.
  • the method according to the invention is quite simple and may be used to build both short tunnels and longer tunnels in which a plurality of beams is driven into the ground aligned with each up to a desired length.
  • the arch-shaped structure is formed by driving the elongate beams into the ground in a side-by-side relationship and during or after the creation of the arch-shaped structure, the soil below the arch is excavated in order to form the tunnel opening. If the beams are positioned with respect to each other such that a watertight seal is formed between them, there is no necessity to finish the beams on the inner side of the tunnel but the arch can be used right away. This makes the method according to the invention very simple.
  • the floor and the foundation can be provided in different ways, depending on the underlying soil and the structure under which the tunnel should be made.
  • the elongate beams are driven into the ground while the ground is removed in front of the beams, for example by means of an auger which can be used if the beams are hollow.
  • the auger is inserted through the lumen in the beams and is moved with each beam in order to remove the soil in front of the beam and discharge it through the lumen in the beam.
  • the beam is inserted into the ground by a combination of pressing or jacking and drilling. Due to the small cross section of the building elements (i.e. beams) and due to the manner of driving in the building elements, the soil disruption is kept to a minimum.
  • the invention also includes a tunnel comprising a plurality of elongate beams positioned side by side in a watertight manner to create an arch-shaped structure forming the roof of the tunnel, a foundation connected to the arch-shaped structure and a floor.
  • a tunnel is simple in structure and is easy to build into the ground. The soil and the structures above the tunnel to be excavated are not disrupted so that for example a road above the tunnel can remain in operation during building of the tunnel. If the subsoil is such that no foundation is required, the floor and arch-shaped structure can be supported directly on the subsoil.
  • Figs. 1, 3 and 5 are longitudinal sectional views of three different embodiments of a tunnel according to the invention.
  • Figs. 2, 4 and 6 are front views of the tunnel embodiments of Figs. 1, 3 and 5.
  • Fig. 7 is an enlarged scale front view of an elongate beam for forming the arch-shaped structure in the tunnel according to Figs. 1-6.
  • Figs. 8-10 show, on an even larger scale, three embodiments of possible seals between two adjacent beams in the arch-shaped structure.
  • Figs. 11 and 12 illustrate two stages in the operation of driving the elongate beams of the arch-shaped structure into the ground.
  • Figs. 13 and 14 illustrate in a front view a manner of forming the arch-shaped structure by means of the elongate beams.
  • Figs. 15 - 19 illustrate several stages in providing a floor and foundation in the embodiment of the tunnel according to Figs. 3 and 4.
  • Fig. 20 is a sectional view according to the line XX-XX in Fig. 19.
  • FIG. 1 - 6 show several embodiments of a tunnel or underpass.
  • the tunnel is used to underpass a traffic road or railroad which is built on a bank, so that the tunnel to be excavated is made at ground level. It should be understood, however, that the tunnel and the methods of building one could also be used underground.
  • the tunnel includes as main part an arch-shaped structure 1 which is formed of elongate beams 2.
  • These beams 2 are of a substantially rectangular shape, but include an arc shape such that the arch will be formed automatically if the beams 2 are in abutting relationship.
  • they are provided with a tong-and-groove system, wherein one side of each beam is provided with a tongue 3, whereas the opposite side is provided with a groove 4 in which the tongue 3 of the next beam 2 fits.
  • the other two sides of the beam 2 are slightly curved, so that when the beams 2 have been fitted to each other there is formed a smooth surface on the inner side of the arch-shaped structure 1.
  • the beams 2 are hollow and have a lumen 5 extending in longitudinal direction through the whole length of each beam 2. The function and advantages thereof will be described later on.
  • the tunnel may further include a floor 6 and a foundation 7.
  • the foundation 7 is positioned at the ends of the tunnel and in this case laterally and longitudinally outside the arch-shaped structure 1.
  • the foundation 7 comprises in this embodiment foundation piles 8 and supporting heads 9 resting on the piles 8.
  • the transverse supporting heads 9 support the ends of an arch-shaped end beam 10 created around the ends of the elongate beams 2 and being fixed thereto.
  • This end beams 10 may also support or be connected to a further superstructure 11 provided on the bank B.
  • pre-tensioning elements such as cables or rods through the lumen 5 in the beams 2, which are stretched and fixed outside the beams 2, for example to the end beams 10. These pre-tensioning elements will increase the strength of the arch-shaped structure 1.
  • the floor 6 is part of the foundation and for this purpose, the floor 6 is fixed on its lateral sides 2 at least to the lower beams 2 of the arch-shaped structure 1 and is supported on foundation piles 12.
  • the floor 6 may be made of prefabricated elements or may be cast in situ. The method of building this embodiment of the tunnel according to the invention will be explained later on with reference to Figs. 15 - 19.
  • Figs. 5 and 6 show an embodiment of the tunnel according to the invention, in which the underground or subsoil functions as the foundation of the tunnel.
  • the underground consists of non-settling material, such as rock or sand.
  • the floor 6 and the arch-shaped structure 1 are formed directly on the underground or subsoil.
  • Figs. 7 - 10 show the cross-sectional shape of the elongate beams 2 in more detail. If the arch shape of the structure 1 has a constant curvature, all beams 2 may have the same cross section, but in principle it is possible to create an arch which has different curvatures along its cross-section and in that case beams 2 with different cross sections will be used along the length of the arch.
  • Figs. 8 - 10 show three embodiments of a seal between adjacent beams 2 in order to obtain water tightness of the arch-shaped structure 1. In that case, no finishing or sealing layers are necessary on the inside or outside of the arch-shaped structure.
  • a porous tube or hose 13 for example made of coconut fibre material, is provided between the tongue 3 and groove 4 of the adjacent beams 2 and preferably this tube or hose 13 is accommodated partly in a small notch 14 in the tongue 3 of the beams 2.
  • the tube 13 is introduced simultaneously with one of the adjacent beams 2.
  • a sealing fluid such as grout or the like, is injected into the tube 13 and this fluid fills the tube 13 but will also leave the tube through the pores in order to fill the space between the adjacent beams 2. In this way there is created a watertight seal between the beams 2 in the arch-shaped structure 1.
  • Fig. 9 shows the second embodiment wherein a solid rubber seal 15 is positioned under tension between the tongue 3 and groove 4 of adjacent beams 2 in order to create a watertight seal.
  • Fig. 10 shows a third embodiment which is a combination of the embodiments of Figs. 8 and 9.
  • a rubber seal 15 is provided in a notch 14 in the tongue 3 of one of the beams 2 and this rubber seal 15 may be filled in order to either create pressure from the inside to close off the space between the adjacent beams 2 or to be enable the rubber seal to accommodate movements and forces between the adjacent beams 2.
  • the arch-shaped structure 1 is created by subsequently driving a plurality of elongate beams 2 substantially horizontally into the ground, in this case into the ground forming a bank B, in a side-by-side relationship.
  • a driving apparatus 16 In order to drive each beam 2 into the ground, a driving apparatus 16 is used which uses a combination of drilling and pressing or jacking to drive the beams 2 into the ground.
  • a pilot rod 17 In order to guide the beams 2 through the ground, a pilot rod 17 is driven into the ground by means of the driving apparatus 16. Said pilot rod 17 has a small diameter and has a pointed tip in order to cut through the ground easily. This piloting operation is illustrated in Fig. 11.
  • Fig. 12 shows the next step in the driving operation and in this step, the beams 2 are driven into the ground guided around the pilot rod 17.
  • a ground drill or auger 18 which is hollow so as to be guided around the pilot rod 17 and which is introduced in the ground together with the beam.
  • the auger 18 is inserted into the beam 2 through the lumen 5 therein and this auger 18 projects slightly from the driving end of the beam 2 so as to remove the ground in front of the beam 2 and to discharge this ground or soil through the lumen 5 to a position behind the beam 2.
  • the beam 2 is introduced into the ground by a combination of drilling and pressing as this beam 2 is forced into the ground by pressure exerted by the driving apparatus 16.
  • a plurality of beams 2 are driven into the ground in alignment with each other such that the combined length of the aligned beams 2 corresponds with the desired length of the arch-shaped structure. Different lengths of the beams 2 may be used or the end beams 2 can be cut off at the desired length if the length of the arch-shaped structure 1 varies along the arch.
  • the creation of the arch-shaped structure 1 is started with a centre beam 2' which does no have a tongue 3 and groove 4 at opposite sides, but has a groove 4 on opposite sides.
  • the cross section of the tunnel is symmetrical with the tongues 3 of the beams 2 being directed to the centre of the arch on both sides of the centre beam 2'.
  • the halves of the arch-shaped structure 1 are created one after the other.
  • other ways of creating the arch are conceivable.
  • Figs. 15 - 19 illustrate a method of excavating the tunnel and providing the floor and foundation of the tunnel, in particular in the embodiments according to Figs. 3 and 4.
  • Fig. 15 shows the situation after the arch-shaped structure 1 has been created. Then the soil within the arch-shaped structure 1 is removed in a segment S on one end of the arch-shaped structure 1.
  • a floor 6 is created in this excavated segment S and in case the floor 6 is founded, foundation piles 12 are first driven into the soil before the floor 6 is provided thereon. If the floor 6 is finished in this first segment S, the next segment S is excavated as is illustrated in Fig. 17. This next segment S is neighbouring the first segment S. As is illustrated in Fig. 18, the floor 6 and the foundation 7 are then provided in this second segment S. This operation is continued until all of the soil within the arch-shaped structure 1 has been excavated and the floor 7 has been provided at the bottom of this excavated tunnel.
  • the tunnel is of greater length or if loads on the arch-shaped structure 1 are relatively high, it is possible to form one or more cambered trusses 19 at one or more positions between the ends of the arch-shaped structure 1 to improve the strength of this structure.
  • This truss 19 is shown in Figs. 19 and 20.
  • the invention provides a method with which a tunnel can be built in a simple and quick manner without disturbing the soil above it.
  • the cross-sectional shape of the arch may be varied, and more resemble a rounded rectangle.
  • the vertical support for beams by the adjacent beam will be less in the centre of the tunnel, so it is desirable then to provide a supporting arch.
  • the beams are driven into the ground subsequently, but it is also conceivable that more than one beam is inserted at a time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a method of building a tunnel comprising an arched structure (1). The method includes the step of driving elongate beams (2) substantially horizontally into the ground in a side-by-side relationship so as to create an arch-shaped structure of beams. The beams (2) are placed side by side in a watertight manner, and preferably a seal (13; 15) is inserted together with the beams. The ground below the arch-shaped structure is excavated and a floor (6) is provided to define the bottom of the tunnel. The floor may be founded. The invention also includes such tunnel.

Description

  • The invention relates to a method of building a tunnel comprising an arch-shaped structure as well as to such tunnel.
  • A particular application of the invention is to build the tunnel or underpass without causing surface disruption. One example thereof is to build a bicycle underpass below an existing rail track or highway without stopping the use and operation thereof.
  • A problem with conventional tunnelling techniques is that for safety reasons a depth of soil of approximately 2 to 3 times the diameter of the tunnel to be excavated is required above said tunnel. This makes conventional techniques impractical. Therefore a number of new methods have been developed. One example thereof is disclosed in US 6,406,220 B1 relating to an arched support structure. According to the disclosed method of building such structure, a series of supporting units is positioned in the soil and during excavating, arched sections are pushed one after another into the excavated area thereby sliding in a track formed in the supporting units.
  • It is an object of the present invention to provide a novel method of building a tunnel.
  • For this purpose the invention provides a method according to claim 1.
  • The method according to the invention is quite simple and may be used to build both short tunnels and longer tunnels in which a plurality of beams is driven into the ground aligned with each up to a desired length. The arch-shaped structure is formed by driving the elongate beams into the ground in a side-by-side relationship and during or after the creation of the arch-shaped structure, the soil below the arch is excavated in order to form the tunnel opening. If the beams are positioned with respect to each other such that a watertight seal is formed between them, there is no necessity to finish the beams on the inner side of the tunnel but the arch can be used right away. This makes the method according to the invention very simple.
  • The floor and the foundation can be provided in different ways, depending on the underlying soil and the structure under which the tunnel should be made. Preferably, the elongate beams are driven into the ground while the ground is removed in front of the beams, for example by means of an auger which can be used if the beams are hollow. In that case the auger is inserted through the lumen in the beams and is moved with each beam in order to remove the soil in front of the beam and discharge it through the lumen in the beam. In this manner, the beam is inserted into the ground by a combination of pressing or jacking and drilling. Due to the small cross section of the building elements (i.e. beams) and due to the manner of driving in the building elements, the soil disruption is kept to a minimum.
  • The invention also includes a tunnel comprising a plurality of elongate beams positioned side by side in a watertight manner to create an arch-shaped structure forming the roof of the tunnel, a foundation connected to the arch-shaped structure and a floor. Such tunnel is simple in structure and is easy to build into the ground. The soil and the structures above the tunnel to be excavated are not disrupted so that for example a road above the tunnel can remain in operation during building of the tunnel. If the subsoil is such that no foundation is required, the floor and arch-shaped structure can be supported directly on the subsoil.
  • Further details and advantages of the invention will become apparent from the following description with reference to the drawings showing embodiments of the present invention.
  • Figs. 1, 3 and 5 are longitudinal sectional views of three different embodiments of a tunnel according to the invention.
  • Figs. 2, 4 and 6 are front views of the tunnel embodiments of Figs. 1, 3 and 5.
  • Fig. 7 is an enlarged scale front view of an elongate beam for forming the arch-shaped structure in the tunnel according to Figs. 1-6.
  • Figs. 8-10 show, on an even larger scale, three embodiments of possible seals between two adjacent beams in the arch-shaped structure.
  • Figs. 11 and 12 illustrate two stages in the operation of driving the elongate beams of the arch-shaped structure into the ground.
  • Figs. 13 and 14 illustrate in a front view a manner of forming the arch-shaped structure by means of the elongate beams.
  • Figs. 15 - 19 illustrate several stages in providing a floor and foundation in the embodiment of the tunnel according to Figs. 3 and 4.
  • Fig. 20 is a sectional view according to the line XX-XX in Fig. 19.
  • The drawings and in first instance Figs. 1 - 6 show several embodiments of a tunnel or underpass. In the embodiments shown, the tunnel is used to underpass a traffic road or railroad which is built on a bank, so that the tunnel to be excavated is made at ground level. It should be understood, however, that the tunnel and the methods of building one could also be used underground.
  • In all three embodiments, the tunnel includes as main part an arch-shaped structure 1 which is formed of elongate beams 2. These beams 2 are of a substantially rectangular shape, but include an arc shape such that the arch will be formed automatically if the beams 2 are in abutting relationship. To position the beams 2 with respect to each other, they are provided with a tong-and-groove system, wherein one side of each beam is provided with a tongue 3, whereas the opposite side is provided with a groove 4 in which the tongue 3 of the next beam 2 fits. The other two sides of the beam 2 are slightly curved, so that when the beams 2 have been fitted to each other there is formed a smooth surface on the inner side of the arch-shaped structure 1. The beams 2 are hollow and have a lumen 5 extending in longitudinal direction through the whole length of each beam 2. The function and advantages thereof will be described later on.
  • The tunnel may further include a floor 6 and a foundation 7. In the embodiments of Figs. 1 and 2, the foundation 7 is positioned at the ends of the tunnel and in this case laterally and longitudinally outside the arch-shaped structure 1. The foundation 7 comprises in this embodiment foundation piles 8 and supporting heads 9 resting on the piles 8. In the embodiment shown, the transverse supporting heads 9 support the ends of an arch-shaped end beam 10 created around the ends of the elongate beams 2 and being fixed thereto. This end beams 10 may also support or be connected to a further superstructure 11 provided on the bank B. In this embodiment, there may be provided pre-tensioning elements, such as cables or rods through the lumen 5 in the beams 2, which are stretched and fixed outside the beams 2, for example to the end beams 10. These pre-tensioning elements will increase the strength of the arch-shaped structure 1.
  • In the embodiment of Figs. 3 and 4, the floor 6 is part of the foundation and for this purpose, the floor 6 is fixed on its lateral sides 2 at least to the lower beams 2 of the arch-shaped structure 1 and is supported on foundation piles 12. The floor 6 may be made of prefabricated elements or may be cast in situ. The method of building this embodiment of the tunnel according to the invention will be explained later on with reference to Figs. 15 - 19.
  • Figs. 5 and 6 show an embodiment of the tunnel according to the invention, in which the underground or subsoil functions as the foundation of the tunnel. Such embodiment is possible for example if the underground consists of non-settling material, such as rock or sand. In these embodiments, the floor 6 and the arch-shaped structure 1 are formed directly on the underground or subsoil.
  • Figs. 7 - 10 show the cross-sectional shape of the elongate beams 2 in more detail. If the arch shape of the structure 1 has a constant curvature, all beams 2 may have the same cross section, but in principle it is possible to create an arch which has different curvatures along its cross-section and in that case beams 2 with different cross sections will be used along the length of the arch.
  • Figs. 8 - 10 show three embodiments of a seal between adjacent beams 2 in order to obtain water tightness of the arch-shaped structure 1. In that case, no finishing or sealing layers are necessary on the inside or outside of the arch-shaped structure.
  • In the embodiment of Fig. 8, a porous tube or hose 13, for example made of coconut fibre material, is provided between the tongue 3 and groove 4 of the adjacent beams 2 and preferably this tube or hose 13 is accommodated partly in a small notch 14 in the tongue 3 of the beams 2. Preferably, the tube 13 is introduced simultaneously with one of the adjacent beams 2.
    After creation of the arch-shaped structure 1, a sealing fluid, such as grout or the like, is injected into the tube 13 and this fluid fills the tube 13 but will also leave the tube through the pores in order to fill the space between the adjacent beams 2. In this way there is created a watertight seal between the beams 2 in the arch-shaped structure 1.
  • Fig. 9 shows the second embodiment wherein a solid rubber seal 15 is positioned under tension between the tongue 3 and groove 4 of adjacent beams 2 in order to create a watertight seal.
  • Fig. 10 shows a third embodiment which is a combination of the embodiments of Figs. 8 and 9. In this third embodiment a rubber seal 15 is provided in a notch 14 in the tongue 3 of one of the beams 2 and this rubber seal 15 may be filled in order to either create pressure from the inside to close off the space between the adjacent beams 2 or to be enable the rubber seal to accommodate movements and forces between the adjacent beams 2.
  • A method of building a tunnel including an arch-shaped structure 1 will now be elucidated, in first instance with reference to Figs. 11 - 14.
  • The arch-shaped structure 1 is created by subsequently driving a plurality of elongate beams 2 substantially horizontally into the ground, in this case into the ground forming a bank B, in a side-by-side relationship. In order to drive each beam 2 into the ground, a driving apparatus 16 is used which uses a combination of drilling and pressing or jacking to drive the beams 2 into the ground. In order to guide the beams 2 through the ground, a pilot rod 17 is driven into the ground by means of the driving apparatus 16. Said pilot rod 17 has a small diameter and has a pointed tip in order to cut through the ground easily. This piloting operation is illustrated in Fig. 11.
  • Fig. 12 shows the next step in the driving operation and in this step, the beams 2 are driven into the ground guided around the pilot rod 17. In order to facilitate the insertion of the elongate beams 2 into the ground use is made of a ground drill or auger 18 which is hollow so as to be guided around the pilot rod 17 and which is introduced in the ground together with the beam. For this purpose, the auger 18 is inserted into the beam 2 through the lumen 5 therein and this auger 18 projects slightly from the driving end of the beam 2 so as to remove the ground in front of the beam 2 and to discharge this ground or soil through the lumen 5 to a position behind the beam 2. As a result, the beam 2 is introduced into the ground by a combination of drilling and pressing as this beam 2 is forced into the ground by pressure exerted by the driving apparatus 16. As is shown in Fig. 12, a plurality of beams 2 are driven into the ground in alignment with each other such that the combined length of the aligned beams 2 corresponds with the desired length of the arch-shaped structure. Different lengths of the beams 2 may be used or the end beams 2 can be cut off at the desired length if the length of the arch-shaped structure 1 varies along the arch.
  • As is illustrated in Figs. 13 and 14, the creation of the arch-shaped structure 1 is started with a centre beam 2' which does no have a tongue 3 and groove 4 at opposite sides, but has a groove 4 on opposite sides. In this way, the cross section of the tunnel is symmetrical with the tongues 3 of the beams 2 being directed to the centre of the arch on both sides of the centre beam 2'. The halves of the arch-shaped structure 1 are created one after the other. Of course, other ways of creating the arch are conceivable.
  • Figs. 15 - 19 illustrate a method of excavating the tunnel and providing the floor and foundation of the tunnel, in particular in the embodiments according to Figs. 3 and 4.
  • Fig. 15 shows the situation after the arch-shaped structure 1 has been created. Then the soil within the arch-shaped structure 1 is removed in a segment S on one end of the arch-shaped structure 1.
  • In fig. 16, a floor 6 is created in this excavated segment S and in case the floor 6 is founded, foundation piles 12 are first driven into the soil before the floor 6 is provided thereon. If the floor 6 is finished in this first segment S, the next segment S is excavated as is illustrated in Fig. 17. This next segment S is neighbouring the first segment S. As is illustrated in Fig. 18, the floor 6 and the foundation 7 are then provided in this second segment S. This operation is continued until all of the soil within the arch-shaped structure 1 has been excavated and the floor 7 has been provided at the bottom of this excavated tunnel. If the tunnel is of greater length or if loads on the arch-shaped structure 1 are relatively high, it is possible to form one or more cambered trusses 19 at one or more positions between the ends of the arch-shaped structure 1 to improve the strength of this structure. This truss 19 is shown in Figs. 19 and 20.
  • It is clear from the foregoing description that the invention provides a method with which a tunnel can be built in a simple and quick manner without disturbing the soil above it.
  • The invention is not limited to the embodiments described above and shown in the drawings which can be varied in different manners within the scope of the appended claims. For example, the cross-sectional shape of the arch may be varied, and more resemble a rounded rectangle. In such arrangement, the vertical support for beams by the adjacent beam will be less in the centre of the tunnel, so it is desirable then to provide a supporting arch. Preferably, the beams are driven into the ground subsequently, but it is also conceivable that more than one beam is inserted at a time.

Claims (12)

  1. A method of building a tunnel comprising an arched structure (1), including, in a desired order, the steps of:
    driving elongate beams (2) substantially horizontally into the ground in a side-by-side relationship so as to create an arch-shaped structure of beams,
    excavating the ground below the arch-shaped structure, and
    providing a floor (6) to define the bottom of the tunnel.
  2. The method of claim 1, wherein the elongate beams (2) are driven into the ground while the ground is removed in front of the beams.
  3. The method of claim 2, wherein the elongate beams (2) are hollow, and a ground drill (18) is inserted through the hollow in the beams and is moved with the beams in order to remove the ground in front of the beams and discharge it through the hollow beams.
  4. The method of claim 1 for building a long tunnel, wherein a plurality of beams (2) is driven into the ground aligned with each other.
  5. The method of any one of the preceding claims, including the step of creating a foundation (7) and connecting it to the arch-shaped structure (1).
  6. The method of claim 5, wherein the foundation (7) is provided under the floor (6) and wherein, preferably, the soil under the arch-shaped structure (1) is excavated in longitudinal direction segment (S) by segment (S), and the foundation and floor are built in one of the segments and fixed to the arched-shaped structure before the next segment is excavated, and wherein preferably one or more trusses are formed at one or more positions between the ends of the arch-shaped structure (1).
  7. The method of any of the preceding claims, wherein the foundation (7) is built at the ends of the arch-shaped structure below the lower beams (2), and wherein an end beam (10) may be added supporting a structure (11) on top of the tunnel, while pretension cables may be stretched through the hollow beams and fixed to the end beams (10).
  8. The method of any of the preceding claims, wherein the beams (2) are placed side by side in a watertight manner, preferably a seal (13; 15) is inserted together with the beams, for example a porous tube (13) is accommodated in a hollow space (14) between two adjacent beams and a sealing substance, such as grout, is pressed into the porous tube after installation of the beams.
  9. A tunnel comprising a plurality of elongate beams (2) positioned side by side in a watertight manner to create an arch-shaped structure (1) forming the roof of the tunnel, a foundation (7), if required, connected to the arch shaped structure, and a floor (6).
  10. The tunnel of claim 9, comprising a seal (13; 15) between the adjacent beams (2), the seal including at least one of a rubber seal (15), a sealant filled rubber seal (15) and a porous tube (13) filled with a sealant such as grout.
  11. The tunnel of claim 9 or 10, wherein the beams (2) are hollow, and may have pretension elements extending through the hollows.
  12. The tunnel of any of claims 9 - 11, wherein the foundation (7) is a (pile) foundation (12) built under the floor (6) of the tunnel which is fixed to the arch-shaped structure (1), or a (pile) foundation (8) built under the ends of the arch-shaped structure (1) and supporting the lower beams (2).
EP04106796A 2004-12-21 2004-12-21 Method of building a tunnel Withdrawn EP1674657A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP04106796A EP1674657A1 (en) 2004-12-21 2004-12-21 Method of building a tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP04106796A EP1674657A1 (en) 2004-12-21 2004-12-21 Method of building a tunnel

Publications (1)

Publication Number Publication Date
EP1674657A1 true EP1674657A1 (en) 2006-06-28

Family

ID=34930100

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04106796A Withdrawn EP1674657A1 (en) 2004-12-21 2004-12-21 Method of building a tunnel

Country Status (1)

Country Link
EP (1) EP1674657A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864959B (en) * 2009-04-17 2013-06-12 中铁工程设计咨询集团有限公司 Method for tunneling construction of main structure of underground station
JP2016141946A (en) * 2015-01-30 2016-08-08 株式会社大林組 Guide member for guiding pile, and tunnel ground support method
JP2017082550A (en) * 2015-10-30 2017-05-18 大成建設株式会社 Construction method of underground structure, underground structure and joint structure
CN107288642A (en) * 2017-06-20 2017-10-24 北京市政建设集团有限责任公司 PBA construction technologies

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1289550A (en) * 1969-12-30 1972-09-20
DE2250635A1 (en) * 1972-10-16 1974-04-25 Nishimatsu Constr Co Ltd PROCEDURE FOR BUILDING A TUNNEL
US4009579A (en) * 1975-12-08 1977-03-01 Patzner Delbert M Method for constructing a tunnel or underpass
US4139320A (en) * 1976-08-20 1979-02-13 Japanese National Railways Process for excavating and constructing tunnel and excavating device
JPS5458919A (en) * 1977-10-19 1979-05-12 Japan National Railway Method of constructing tunnel under roadway
JPH03156094A (en) * 1989-11-13 1991-07-04 Higashi Nippon Riyokaku Tetsudo Kk Under-roadbed traverse round section structure and its construction
JPH11247275A (en) * 1998-02-27 1999-09-14 Mitsubishi Rayon Co Ltd Water stop material
JP2000337093A (en) * 1999-05-26 2000-12-05 Nihon Samicon Kk Arched hollow structure
JP2001123791A (en) * 1999-10-28 2001-05-08 Shin Gijutsu Koei Kk Excavator and excavating method
JP2003176698A (en) * 2001-12-11 2003-06-27 Hayakawa Rubber Co Ltd Construction method for repairing tunnel structure, and tunnel structure
JP2004011341A (en) * 2002-06-10 2004-01-15 Nippon Grease Nipple Kk Hose for injecting chemical

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1289550A (en) * 1969-12-30 1972-09-20
DE2250635A1 (en) * 1972-10-16 1974-04-25 Nishimatsu Constr Co Ltd PROCEDURE FOR BUILDING A TUNNEL
US4009579A (en) * 1975-12-08 1977-03-01 Patzner Delbert M Method for constructing a tunnel or underpass
US4139320A (en) * 1976-08-20 1979-02-13 Japanese National Railways Process for excavating and constructing tunnel and excavating device
JPS5458919A (en) * 1977-10-19 1979-05-12 Japan National Railway Method of constructing tunnel under roadway
JPH03156094A (en) * 1989-11-13 1991-07-04 Higashi Nippon Riyokaku Tetsudo Kk Under-roadbed traverse round section structure and its construction
JPH11247275A (en) * 1998-02-27 1999-09-14 Mitsubishi Rayon Co Ltd Water stop material
JP2000337093A (en) * 1999-05-26 2000-12-05 Nihon Samicon Kk Arched hollow structure
JP2001123791A (en) * 1999-10-28 2001-05-08 Shin Gijutsu Koei Kk Excavator and excavating method
JP2003176698A (en) * 2001-12-11 2003-06-27 Hayakawa Rubber Co Ltd Construction method for repairing tunnel structure, and tunnel structure
JP2004011341A (en) * 2002-06-10 2004-01-15 Nippon Grease Nipple Kk Hose for injecting chemical

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 015, no. 386 (M - 1163) 30 September 1991 (1991-09-30) *
PATENT ABSTRACTS OF JAPAN vol. 1999, no. 14 22 December 1999 (1999-12-22) *
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 15 6 April 2001 (2001-04-06) *
PATENT ABSTRACTS OF JAPAN vol. 2000, no. 22 9 March 2001 (2001-03-09) *
PATENT ABSTRACTS OF JAPAN vol. 2003, no. 10 8 October 2003 (2003-10-08) *
PATENT ABSTRACTS OF JAPAN vol. 2003, no. 12 5 December 2003 (2003-12-05) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864959B (en) * 2009-04-17 2013-06-12 中铁工程设计咨询集团有限公司 Method for tunneling construction of main structure of underground station
JP2016141946A (en) * 2015-01-30 2016-08-08 株式会社大林組 Guide member for guiding pile, and tunnel ground support method
JP2017082550A (en) * 2015-10-30 2017-05-18 大成建設株式会社 Construction method of underground structure, underground structure and joint structure
CN107288642A (en) * 2017-06-20 2017-10-24 北京市政建设集团有限责任公司 PBA construction technologies

Similar Documents

Publication Publication Date Title
CN107849917B (en) Tunnel construction method using advance support and lag support and device suitable for same
JP5103516B2 (en) Pre-support tunnel construction method for large section tunnel
CN109209397B (en) Pass through that high angle is inverse to rush rich water richness sand tomography method for tunnel construction
CN109555540B (en) Tunnel type prestressed pipe curtain structure and construction method
KR100936471B1 (en) A circular structure supported by the segment with A drainage structure and method constructing the shield tunnel
CN110374633A (en) The Portal Section Construction method of Tunnel Passing loose media
CN109944593B (en) Reinforcing method for shield tunnel to penetrate existing building
KR101716573B1 (en) The Construction Method of linear curve-shaped non-excavation tunnel with using Forepoling Board and ground reinforcement
KR101244257B1 (en) Method for digging tunnel
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
KR20170061060A (en) Tunnel construction method by using pre-support and post-support, and suitable device therefor
JP4317322B2 (en) Arch support structure
CN109931077B (en) Support system for tunnel repair and construction method thereof
KR100800028B1 (en) Method for constructing a tunnel using front jacking construction method
CN101153494A (en) Underground Beam-Pile Frame Structure for Slope Reinforcement
JP4296549B2 (en) Underground support structure, its construction method and tunnel construction method
EP1674657A1 (en) Method of building a tunnel
DE4412880A1 (en) Process for digging underground cavity
KR100626820B1 (en) Shallow overbuden tunnel construction method
CN110424459A (en) It is a kind of not influence the current underpass construction technology of existing road
US5871307A (en) Pre-cast concrete panel wall
EP1426495A2 (en) Method and device for the construction of a tunnel or a trench
KR101523948B1 (en) Construction method of underground structure under the established building
JP2697762B2 (en) Tunnel structure and construction method
KR102222354B1 (en) The Pressed Frame Type Underground Tunnel Structure

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

17P Request for examination filed

Effective date: 20061222

17Q First examination report despatched

Effective date: 20070123

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20080904