CN2251595Y - Building construction external hanging rack - Google Patents
Building construction external hanging rack Download PDFInfo
- Publication number
- CN2251595Y CN2251595Y CN 96212000 CN96212000U CN2251595Y CN 2251595 Y CN2251595 Y CN 2251595Y CN 96212000 CN96212000 CN 96212000 CN 96212000 U CN96212000 U CN 96212000U CN 2251595 Y CN2251595 Y CN 2251595Y
- Authority
- CN
- China
- Prior art keywords
- job platform
- platform plate
- anchor clamps
- pylon
- convenient
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title abstract 2
- 238000010276 construction Methods 0.000 abstract description 8
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 241000282326 Felis catus Species 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000009628 steelmaking Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides a construction stores pylon, characterized by, the support frame is triangle-shaped, and two triangular supports that set up relatively support and set up on the cylinder of structure post anchor clamps below, and the top surface is connected with the operation platform board with bolt connection, sets up platform connection bridge plate between the operation platform board, and the periphery is equipped with the guardrail. The outer hanging frame has the advantages that a scaffold and an operation platform do not need to be supported on the ground around the column body, the outer hanging frame can be installed on the structural column body in advance on site, and then the column body is hoisted, so that manpower and material resources are saved; the split single-chip assembly is adopted, so that the split single-chip assembly is convenient to disassemble and store and is convenient to assemble on site. The structure is light and handy, convenient construction. The steel column outer hanging rack is suitable for building construction.
Description
The utility model belongs to the building operations scaffold, particularly a kind of building operations pylon that is used for structural column height idle job.
In steel work and reinforced concrete member lifting construction, it is higher often to run into the structure cylinder, and the situation that operation planar can not be in time, traditional practice is earlier with behind the cylinder hoisted in position, prop up scaffolding and arrive the operation plane, take out platform again, use for personnel operation, drop into great amount of manpower and material resources like this, and can not satisfy the requirement of construction speed.
The purpose of this utility model is, designs and produces a kind of building operations pylon, adopts split monolithic assembling form, but split deposit, on-site consolidation is convenient to accumulating, convenient construction.
Building operations pylon of the present utility model is made up of bracing frame, landing slab, it is characterized in that bracing frame is triangular in shape, and two triangular support brackets that are oppositely arranged are supported on the cylinder of structural column anchor clamps below, are provided with the connection pull bar between the triangular support bracket; The job platform plate is set on triangular support bracket, and end face is connected with bolt with the job platform plate, sets up platform between the job platform plate and connects bridge plate, and job platform plate periphery is provided with the guardrail jack, plugs the platform guardrail, and it is fixing to adopt jack to connect between the railing spare; The structural column anchor clamps are grooved, and the edge of a wing is provided with the job platform plate and connects jack, and two ends is provided with the cylinder lever connecting rod through hole.
Using method of the present utility model is to adopt aluminum alloy plate materials to make landing slab, thin-wall steel tube making guardrail, channel-section steel making structural column anchor clamps.Before at the scene structural column being lifted, anchor clamps or riveting component are connected with the structure cylinder, between two relative anchor clamps, connect pull bar; On anchor clamps, connect the job platform plate, set up platform and connect bridge plate; Triangular support bracket is installed, and is connected with bolt with the job platform plate; Connect pull bar between the triangular support bracket that is oppositely arranged.The auxiliary cat ladder of using is set,, carries out cylinder and connect construction operation for landing slab about the personnel.
The utility model has the advantages that, need not to prop up scaffolding around cylinder on ground, arrive the operation plane, take out platform again and carry out operation, can in advance pylon be installed at the scene on the structure cylinder, the hoisting structure post is saved human and material resources again; Adopt split monolithic assembling form,, its disintegration is deposited, during use, carry out assembly unit again in time spent not.Structure is light, convenient construction.Be applicable to the construction pylon of structure cylinder, particularly steel column.
Below in conjunction with drawings and Examples, the utility model will be further described:
Fig. 1 is the organigram of building operations pylon
Fig. 2 is the organigram of the structural column anchor clamps of building operations pylon
Fig. 3 is the assembling sequence figure of building operations pylon
As seen from the figure, building operations pylon of the present utility model is made up of bracing frame, landing slab, it is characterized in that, bracing frame 1 is triangular in shape, and two triangular support brackets that are oppositely arranged are supported on the cylinder of structural column anchor clamps 2 belows, is provided with between the triangular support bracket to connect pull bar 3; Job platform plate 4 is set on triangular support bracket, and end face is connected with bolt with the job platform plate, sets up platform between the job platform plate and connects bridge plate 5, and job platform plate periphery is provided with the guardrail jack, plugs platform guardrail 6, and it is fixing to adopt jack to connect between the railing spare; Structural column anchor clamps 2 are grooved, and the edge of a wing is provided with the job platform plate and connects jack 7, and two ends is provided with the through hole of cylinder lever connecting rod 8.
Claims (2)
1, a kind of building operations pylon is made up of bracing frame, landing slab, it is characterized in that bracing frame is triangular in shape, and two triangular support brackets that are oppositely arranged support to be arranged between structural column anchor clamps below, the triangular support bracket and are provided with the connection pull bar; The job platform plate is set on triangular support bracket, and end face adopts bolt to be connected with the job platform plate; Set up platform between the job platform plate and connect bridge plate, job platform plate periphery is provided with the guardrail jack, plugs the platform guardrail, and it is fixing to adopt jack to connect between the railing spare.
2, building operations pylon as claimed in claim 1 is characterized in that, the structural column anchor clamps are grooved, and the edge of a wing is provided with the job platform plate and connects jack, and two ends is provided with the cylinder lever connecting rod through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96212000 CN2251595Y (en) | 1996-05-23 | 1996-05-23 | Building construction external hanging rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 96212000 CN2251595Y (en) | 1996-05-23 | 1996-05-23 | Building construction external hanging rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2251595Y true CN2251595Y (en) | 1997-04-09 |
Family
ID=33894789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 96212000 Expired - Fee Related CN2251595Y (en) | 1996-05-23 | 1996-05-23 | Building construction external hanging rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2251595Y (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858139A (en) * | 2010-06-22 | 2010-10-13 | 中国核工业华兴建设有限公司 | Concrete casting platform |
CN103526918A (en) * | 2013-10-18 | 2014-01-22 | 中国建筑第八工程局有限公司 | Adjustable steel pipe operation platform |
CN104074346A (en) * | 2014-07-02 | 2014-10-01 | 吴江市明港道桥工程有限公司 | Suspended construction support frame |
CN104264955A (en) * | 2014-09-18 | 2015-01-07 | 中建三局第二建设工程有限责任公司 | Overhead movable L-shaped bottoming bracket operating platform |
CN104975707A (en) * | 2014-04-04 | 2015-10-14 | 吴庆豪 | Shed frame and triangular support frame body of shed frame |
CN106320369A (en) * | 2016-08-26 | 2017-01-11 | 中国化学工程第六建设有限公司 | Opposite-clamping type detachable movable platform for assembling stand column of pipe rack structure |
CN106522099A (en) * | 2016-11-10 | 2017-03-22 | 上海市基础工程集团有限公司 | Non-foundation simple steel platform structure for bridge shallow water area operation |
CN109629812A (en) * | 2017-10-09 | 2019-04-16 | 上海宝冶集团有限公司 | The fast assembling-disassembling method of super high-rise steel pipe column operating platform |
CN111519885A (en) * | 2020-03-27 | 2020-08-11 | 耀华建设管理有限公司 | Construction method of side wall type formwork support |
CN111591890A (en) * | 2020-04-15 | 2020-08-28 | 上海建工四建集团有限公司 | Hoisting and sizing traction platform for large-span frame structure prefabricated slab |
-
1996
- 1996-05-23 CN CN 96212000 patent/CN2251595Y/en not_active Expired - Fee Related
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101858139A (en) * | 2010-06-22 | 2010-10-13 | 中国核工业华兴建设有限公司 | Concrete casting platform |
CN103526918A (en) * | 2013-10-18 | 2014-01-22 | 中国建筑第八工程局有限公司 | Adjustable steel pipe operation platform |
CN110259089A (en) * | 2014-04-04 | 2019-09-20 | 吴庆豪 | Frame and its triangular support frame body |
CN104975707A (en) * | 2014-04-04 | 2015-10-14 | 吴庆豪 | Shed frame and triangular support frame body of shed frame |
CN104074346A (en) * | 2014-07-02 | 2014-10-01 | 吴江市明港道桥工程有限公司 | Suspended construction support frame |
CN104264955A (en) * | 2014-09-18 | 2015-01-07 | 中建三局第二建设工程有限责任公司 | Overhead movable L-shaped bottoming bracket operating platform |
CN106320369B (en) * | 2016-08-26 | 2019-06-18 | 中国化学工程第六建设有限公司 | Pipe rack column group is to the detachable movable platform of wafer type |
CN106320369A (en) * | 2016-08-26 | 2017-01-11 | 中国化学工程第六建设有限公司 | Opposite-clamping type detachable movable platform for assembling stand column of pipe rack structure |
CN106522099A (en) * | 2016-11-10 | 2017-03-22 | 上海市基础工程集团有限公司 | Non-foundation simple steel platform structure for bridge shallow water area operation |
CN106522099B (en) * | 2016-11-10 | 2021-05-28 | 上海市基础工程集团有限公司 | Foundation-free simple steel platform structure for operation in bridge shallow water area |
CN109629812A (en) * | 2017-10-09 | 2019-04-16 | 上海宝冶集团有限公司 | The fast assembling-disassembling method of super high-rise steel pipe column operating platform |
CN111519885A (en) * | 2020-03-27 | 2020-08-11 | 耀华建设管理有限公司 | Construction method of side wall type formwork support |
CN111519885B (en) * | 2020-03-27 | 2021-09-24 | 耀华建设管理有限公司 | Construction method of side wall type formwork support |
CN111591890A (en) * | 2020-04-15 | 2020-08-28 | 上海建工四建集团有限公司 | Hoisting and sizing traction platform for large-span frame structure prefabricated slab |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN2251595Y (en) | Building construction external hanging rack | |
CN106812328B (en) | The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer | |
CN103806645A (en) | Light intelligent hydraulic formwork climbing device with good wind and fire resistant performance | |
CN2255468Y (en) | External hanging basket for building construction | |
CN210767797U (en) | Connecting structure of prefabricated outer wall and external scaffold | |
CN101298796A (en) | Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN218149656U (en) | Operating platform in lighting well | |
CN109944164A (en) | Self-elevating hollow thin-wall pier roller die system and construction method thereof | |
CN111997345B (en) | Lifting scaffold hangs hoist system upside down | |
CN211775988U (en) | Steel construction high-rise tower high altitude protector | |
CN211895796U (en) | Core cylinder movable arm type tower crane installation climbing structure | |
CN213204913U (en) | Modular prefabricated staircase operation platform | |
CN210659227U (en) | Exterior wall formwork system free of external scaffold | |
CN113387281A (en) | Alternate conversion attachment system of externally attached tower crane and construction method | |
CN216921348U (en) | Super high-rise reinforced concrete core tube aluminum mould climbing frame | |
CN213115437U (en) | Wall-attached type operation platform module under overhanging roof | |
CN209114976U (en) | A kind of dismountable environment protection fence | |
CN111764623A (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method | |
CN114427290B (en) | Super high-rise reinforced concrete core tube aluminum mould climbing frame and construction method | |
CN111719689A (en) | Special fixing device for hoisting pipe truss structure system equipment | |
CN215519871U (en) | Combined elevator shaft operating frame | |
CN215101636U (en) | Tower crane high altitude adheres to conversion system | |
CN219118715U (en) | Elevator well safety protection and operation platform integrated device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |