CN220481647U - Quick installation loading platform of large-scale jar body - Google Patents

Quick installation loading platform of large-scale jar body Download PDF

Info

Publication number
CN220481647U
CN220481647U CN202320432769.5U CN202320432769U CN220481647U CN 220481647 U CN220481647 U CN 220481647U CN 202320432769 U CN202320432769 U CN 202320432769U CN 220481647 U CN220481647 U CN 220481647U
Authority
CN
China
Prior art keywords
tank body
triangular
tops
slots
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320432769.5U
Other languages
Chinese (zh)
Inventor
李延生
吴威
郑文明
李学东
江哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN202320432769.5U priority Critical patent/CN220481647U/en
Application granted granted Critical
Publication of CN220481647U publication Critical patent/CN220481647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A rapid installation and loading platform for a large tank body comprises a tank body, wherein a plurality of groups of triangular brackets are arranged at intervals in the circumferential direction outside the tank body, upright posts are respectively arranged at the tops of the outer sides of the triangular brackets, slots are respectively arranged at the tops, the middle parts and the bottoms of the upright posts, U-shaped guardrails are respectively inserted into the slots at the tops and the middle parts of the adjacent two upright posts, skirting boards are respectively inserted into the slots at the bottoms of the adjacent two upright posts, and a pavement board is paved at the upper parts of the triangular brackets. The triangular bracket and the positioning steel pipe are detachably connected, so that the triangular bracket is convenient to install and detach, and the skirting board, the horse road board, the U-shaped guardrail and the dense mesh net are arranged, so that the overall stability and the safety of the platform are improved; the device can be used in a turnover way, the investment of personnel and materials in the platform erection process can be reduced, the installation efficiency of the tank body is improved, the installation period is shortened, and the safety risk is reduced.

Description

Quick installation loading platform of large-scale jar body
Technical Field
The utility model relates to the technical field of installation, in particular to a rapid installation and loading platform for a large tank body.
Background
The cementing material tank with the diameter of more than 800t is large, and a sheet type combined storage bin is adopted in many cases, and is generally formed by assembling more than 8 tank bodies; because the weight of the tank body of the sheet type combined storage bin is large, the tank body cannot be integrally hoisted once due to the limitation of field hoisting equipment, and the tank body is required to be hoisted for multiple times and assembled at a high place, so the erection of an operation platform is very important.
At present, a scaffold is mostly adopted to erect an operation platform to finish assembly operation. The scaffold is made of more materials, and the construction and the dismantling are time-consuming and labor-consuming, the construction period is long, and the input cost is high. Therefore, how to manufacture a large tank rapid mounting and loading platform capable of solving the problems in the prior art becomes a technical problem to be solved.
Disclosure of Invention
The utility model provides a rapid installation and loading platform for a large tank body based on the technical problems, so as to solve the problems in the background technology.
In view of this, the utility model provides a rapid installation and loading platform for a large tank, which comprises: the tank body, the external annular of tank upwards the interval be provided with multiunit tripod, the tripod outside top be provided with the stand respectively, top, middle part and the bottom of stand be provided with the slot respectively, adjacent two the stand top and middle part the slot in insert respectively and be equipped with U type guardrail, adjacent two the stand bottom the slot in insert respectively and be equipped with the baseboard, tripod upper portion laid the horse board.
Furthermore, a plurality of groups of positioning steel pipes are arranged at intervals in the circumferential direction outside the tank body, and the inner side of the triangular bracket is inserted into the positioning steel pipes.
Further, the pavement plate is arranged on the triangular bracket through iron wire binding.
Further, the outside of the upright post and the lower part of the triangular bracket are respectively provided with a dense mesh net.
Furthermore, the positioning steel pipe is made of ϕ steel pipes, and the positioning steel pipe is welded and arranged on the outer ring of the tank body.
Furthermore, the slot is made of a short steel pipe, the U-shaped guardrail is made of steel bars, and the triangular bracket is made of angle steel and steel pipes.
Compared with the prior art, the triangular bracket and the positioning steel pipe are detachably spliced, the mounting and dismounting are convenient, the skirting board, the horse road board, the U-shaped guardrail and the dense mesh net are arranged, the overall stability and the safety of the platform are improved, and the aerial butt joint operation platform on the tank body is realized;
the utility model can be installed on the ground, and is integrally hoisted with the tank body in an inserted manner, so that the investment of turnover materials and the manual investment are reduced to the greatest extent; the device can be used in a turnover way, the installation and the dismantling of the device are time-saving and labor-saving, the installation efficiency of the tank body is improved, the installation period is shortened, the cost investment is reduced, the safety risk is reduced, and the device has higher practicability.
Drawings
FIG. 1 shows a perspective view of the overall structure of the present utility model;
FIG. 2 shows a perspective view of the overall structure of the present utility model;
in the figure: 1A-frame, 2 skirting boards, 3 horse way boards, 4U-shaped guardrails, 5 tank bodies, 6 upright posts, 7 slots and 8 positioning steel pipes.
Detailed Description
In order that the above-recited objects, features and advantages of the present utility model will be more clearly understood, a more particular description of the utility model will be rendered by reference to the appended drawings and appended detailed description.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present utility model, however, the present utility model may be practiced in other ways than those described herein, and the scope of the utility model is therefore not limited by the following disclosure.
The technical scheme of the utility model is further described below with reference to fig. 1 and 2.
A first embodiment is shown in fig. 1 and 2: a rapid installation loading platform for a large tank 5, comprising: tank body 5, tank body 5 outer ring upwards the interval can dismantle and be provided with multiunit tripod 1, tripod 1 outside top be provided with stand 6 respectively, stand 6's top, middle part and bottom be provided with slot 7 respectively, adjacent two stand 6 top and middle part slot 7 in can dismantle respectively and insert and be equipped with the U type guardrail 4 that is used for stable structure, adjacent two stand 6 bottom slot 7 in can dismantle respectively and insert and be equipped with baseboard 2, tripod 1 upper portion can dismantle and laid the horse way board 3.
The tank body 5 is provided with a plurality of groups of positioning steel pipes 8 at intervals in the upper direction, and the inner side of the triangular bracket 1 is detachably inserted into the positioning steel pipes 8.
The pavement plate 3 is detachably arranged on the triangular bracket 1 through iron wire binding.
The outside of the upright post 6 and the lower part of the triangular bracket 1 are respectively detachably provided with a dense mesh net.
The positioning steel pipe 8 is made of ϕ steel pipes, and the positioning steel pipe 8 is welded on the outer ring of the tank body 5.
The slot 7 is made of a short steel pipe, the U-shaped guardrail 4 is made of steel bars, and the triangular bracket 1 is made of angle steel and a steel pipe.
The construction process comprises the following steps: 1. preparing construction, namely 2 electric welders, 2 electricians and 8 installers; angle steel L50 x 5, a 10mm steel plate, a DN32 steel pipe, a DN25 steel pipe, a DN20 steel pipe, a ϕ round steel, a ϕ screw thread steel, a 3mm pattern steel plate, a 50mm thick pavement slab 3, a dense mesh net, an iron wire and a safety warning board;
2. the implementation step is that blanking is carried out according to the specification and the size of drawing materials; welding a triangular bracket 1, manufacturing a U-shaped guardrail 4 and a skirting board 2 according to a drawing, and welding a positioning steel pipe 8 on a tank body 5; 3. and (3) a mounting platform: one side of the welded triangular bracket 1 is inserted into a positioning steel pipe 8 of the tank body 5, a U-shaped guardrail 4 and a skirting board 2 are installed, a pavement board 3 is paved and fixed firmly, a dense mesh net is bound, and a safety warning board is hung.
The triangular bracket 1 and the positioning steel pipe 8 are detachably connected, the installation and the detachment are convenient, and the skirting board 2, the pavement board 3, the U-shaped guardrail 4 and the dense mesh net are arranged, so that the overall stability and the safety of the platform are improved; the device can be used in a turnover way, the investment of personnel and materials in the platform erection can be reduced, the installation efficiency of the tank body 5 is improved, the installation period is shortened, and the safety risk is reduced.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The utility model provides a large-scale jar body installs loading platform fast, includes the jar body, its characterized in that: the tank body is provided with a plurality of groups of triangular supports at intervals in the circumferential direction, the tops of the outer sides of the triangular supports are respectively provided with an upright post, the tops, the middle parts and the bottoms of the upright posts are respectively provided with slots, two adjacent upright post tops and middle parts are respectively inserted with U-shaped guardrails, two adjacent upright post bottoms are respectively inserted with skirting boards in the slots, and the upper parts of the triangular supports are paved with pavement boards.
2. The large tank quick install landing as set forth in claim 1 wherein: the tank body is provided with a plurality of groups of positioning steel pipes at intervals in the circumferential direction, and the inner side of the triangular bracket is inserted into the positioning steel pipes.
3. The large tank quick install landing as set forth in claim 2 wherein: the pavement plate is arranged on the triangular bracket through iron wire binding.
4. A large tank quick install landing as claimed in claim 3 wherein: the outside of the upright post and the lower part of the triangular bracket are respectively provided with a dense mesh net.
5. The rapid installation platform of large cans as in claim 4 wherein: the positioning steel pipe is made of ϕ steel pipes, and is welded and arranged on the outer ring of the tank body.
6. The rapid installation platform of large cans as in claim 5 wherein: the slot is made of a short steel pipe, the U-shaped guardrail is made of steel bars, and the triangular bracket is made of angle steel and a steel pipe.
CN202320432769.5U 2023-03-09 2023-03-09 Quick installation loading platform of large-scale jar body Active CN220481647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320432769.5U CN220481647U (en) 2023-03-09 2023-03-09 Quick installation loading platform of large-scale jar body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320432769.5U CN220481647U (en) 2023-03-09 2023-03-09 Quick installation loading platform of large-scale jar body

Publications (1)

Publication Number Publication Date
CN220481647U true CN220481647U (en) 2024-02-13

Family

ID=89829059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320432769.5U Active CN220481647U (en) 2023-03-09 2023-03-09 Quick installation loading platform of large-scale jar body

Country Status (1)

Country Link
CN (1) CN220481647U (en)

Similar Documents

Publication Publication Date Title
US20160230365A1 (en) Tower support structure
CN210758420U (en) Device for pre-embedding and positioning main ribs of splicing surface
CN104746862A (en) Temporary installation operating platform on overhead equipment foundation and erecting method thereof
CN211143305U (en) Steel structure building
CN220481647U (en) Quick installation loading platform of large-scale jar body
JP3144708U (en) Reinforcing bar temporary fixing device
CN216828426U (en) Pile foundation steel reinforcement cage skeleton processing bed-jig of adjustable diameter
CN209874467U (en) A template support frame for construction of silo awl shell
CN212403274U (en) Tower crane attaches wall installation or demolishs operation platform
CN204728368U (en) Borehole wall formwork bracing system
CN208023970U (en) Construction discharging platform
CN209367700U (en) For building the tower crane device of concrete tower
CN216939082U (en) Jacket folding welding working platform
CN208046093U (en) Branch stake tool and emergency rescue device
CN214424160U (en) Umbrella stand type supporting device of mold for casting conical top of squat silo
CN216973126U (en) Bridge construction device
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN220247554U (en) Assembled adjustable hanging flower basket support
CN214785873U (en) Support high-altitude butt joint operation platform steel attached to steel column
CN217680774U (en) Encircling ladder cage for pier construction
CN219638485U (en) Integral lifting device for increasing floor layer height of existing concrete structure
CN216640293U (en) Assembled high altitude tubular column operation platform
CN217552271U (en) Novel indirect cooling tower expands wide platform installation frock
CN220596862U (en) Tower crane wall-attached operation platform capable of being recycled
CN219825624U (en) Semi-circular foundation bolt positioning bracket for foundation butt joint of large-scale tower equipment