CN220301591U - Curtain wall construction convenient to installation - Google Patents

Curtain wall construction convenient to installation Download PDF

Info

Publication number
CN220301591U
CN220301591U CN202321986972.3U CN202321986972U CN220301591U CN 220301591 U CN220301591 U CN 220301591U CN 202321986972 U CN202321986972 U CN 202321986972U CN 220301591 U CN220301591 U CN 220301591U
Authority
CN
China
Prior art keywords
connecting portion
curtain wall
fixedly connected
wall construction
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321986972.3U
Other languages
Chinese (zh)
Inventor
吕志
邓永平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongzhu Creation Tianjin Construction Engineering Co ltd
Original Assignee
Zhongzhu Creation Tianjin Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongzhu Creation Tianjin Construction Engineering Co ltd filed Critical Zhongzhu Creation Tianjin Construction Engineering Co ltd
Priority to CN202321986972.3U priority Critical patent/CN220301591U/en
Application granted granted Critical
Publication of CN220301591U publication Critical patent/CN220301591U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The application provides a curtain wall construction convenient to installation, include: the first main body is provided with a first plane, and a first connecting piece is fixedly connected to the first plane; the second connecting piece is clamped with the first connecting piece; the second main bodies are provided with second planes, the second planes are parallel to the first planes, the second main bodies are provided with first connecting ends and second connecting ends which are perpendicular to the second planes, and the first connecting ends of one second main body are fixedly connected with the second connecting pieces, and the second connecting ends of the other second main body are fixedly connected with the first connecting pieces. This curtain wall construction convenient to installation can improve installation effectiveness, saves time and cost of labor.

Description

Curtain wall construction convenient to installation
Technical Field
The application relates to the technical field of curtain wall structures, in particular to a curtain wall structure convenient to install.
Background
The aluminum plate curtain wall adopts high-quality high-strength aluminum alloy plate. The structure mainly comprises an embedded plate, a panel, keels and corner brackets. The corner connector can be directly formed by bending and stamping the panel, and can also be formed by riveting the corner connector on the small side of the panel. The keel is connected with the electric welding screw behind the plate surface to form a firm whole. However, when connecting aluminum plate and fossil fragments, need two staff cooperation to accomplish, an staff hand aluminum plate, fix a position aluminum plate, and another staff carries out electric welding screw connection fossil fragments and face, and this mounting means installation effectiveness is low, waste time and cost of labor.
Disclosure of Invention
In view of the above-described drawbacks or deficiencies of the prior art, it is desirable to provide a curtain wall construction that is easy to install, comprising:
the first main body is provided with a first plane, and a first connecting piece is fixedly connected to the first plane;
the second connecting piece is clamped with the first connecting piece;
the second main bodies are provided with second planes, the second planes are parallel to the first planes, the second main bodies are provided with first connecting ends and second connecting ends which are perpendicular to the second planes, and the first connecting ends of one second main body are fixedly connected with the second connecting pieces, and the second connecting ends of the other second main body are fixedly connected with the first connecting pieces.
According to the technical scheme provided by the embodiment of the application, the second connecting piece comprises:
the first connecting part is vertical to the second plane and fixedly connected with the first connecting end;
the second connecting portion is perpendicular to the first connecting portion, a first clamping groove extending vertically is formed in the first end of the second connecting portion, and the opening of the first clamping groove faces downwards.
According to the technical scheme provided by the embodiment of the application, the first connecting piece comprises:
the third connecting part is parallel to the first plane and fixedly connected with the first plane;
the fourth connecting part is vertical to the third connecting part, a first clamping part is connected to the fourth connecting part, the first clamping part is vertical to the fourth connecting part, and the first clamping part is clamped with the first clamping groove;
the fifth connecting portion is perpendicular to the third connecting portion, the fifth connecting portion is fixedly connected with the second connecting end, a second clamping groove extending vertically is formed in the fifth connecting portion, an opening of the second clamping groove faces upwards, and the second clamping groove is clamped with the second end of the second connecting portion.
According to the technical scheme provided by the embodiment of the application, one end of the fifth connecting part, which is far away from the third connecting part, is connected with a sixth connecting part, and the sixth connecting part is parallel to the third connecting part and is attached to the first main body.
According to the technical scheme provided by the embodiment of the application, in two adjacent second main bodies, a first space is formed between the first connecting end of one second main body and the second connecting end of the other second main body, and weather-resistant glue is filled in the first space.
According to the technical scheme provided by the embodiment of the application, the first connecting part is fixedly connected with the first connecting end through a pull rivet.
According to the technical scheme provided by the embodiment of the application, the third connecting part is fixedly connected with the first plane through the first screw.
According to the technical scheme provided by the embodiment of the application, the fifth connecting part is fixedly connected with the second connecting end through a second screw.
According to the technical scheme provided by the embodiment of the application, the first main body is made of steel.
According to the technical scheme provided by the embodiment of the application, the second main body is made of aluminum.
The beneficial effects are as follows: the curtain wall structure convenient to install comprises a first main body, wherein the first main body is provided with a first plane, and a first connecting piece is fixedly connected to the first plane; the second connecting piece is clamped with the first connecting piece; the second main bodies are provided with second planes, the second planes are parallel to the first planes, the second main bodies are provided with first connecting ends and second connecting ends which are perpendicular to the second planes, and the first connecting ends of one second main body are fixedly connected with the second connecting pieces, and the second connecting ends of the other second main body are fixedly connected with the first connecting pieces. Therefore, when the curtain wall structure is installed, only one worker is required to fixedly connect the first connecting end of one second main body with the second connecting piece, then fixedly connect the first connecting piece on the first plane of the first main body, then fixedly connect the first connecting piece with the second connecting piece, finally fixedly connect the second connecting end of the other second main body with the first connecting piece, a plurality of second main bodies are connected with the first main body according to the installation of the process, the installation of the curtain wall structure is completed, the process is completed by only one worker, the installation is completed without the joint of two workers, and therefore, the installation efficiency is improved, and the time and the labor cost are saved.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the detailed description of non-limiting embodiments, made with reference to the following drawings, in which:
FIG. 1 is a schematic view of a curtain wall construction for easy installation;
fig. 2 is an enlarged schematic view of the structure at a in fig. 1.
In the figure: 1. a first body; 2. a first connector; 21. a third connecting portion; 22. a fourth connecting portion; 23. a first clamping part; 24. a fifth connecting portion; 25. a second clamping groove; 26. a sixth connecting portion; 3. a second body; 31. a first connection end; 32. a second connection end; 4. a second connector; 41. a first connection portion; 42. a second connecting portion; 43. a first clamping groove; 5. weather-resistant glue; 6. and (5) pulling the rivet.
Detailed Description
The present application is described in further detail below with reference to the drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the utility model and are not limiting of the utility model. It should be noted that, for convenience of description, only the portions related to the utility model are shown in the drawings.
It should be noted that, in the case of no conflict, the embodiments and features in the embodiments may be combined with each other. The present application will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1-2, a curtain wall construction for easy installation, comprising:
the first main body 1 is provided with a first plane, and a first connecting piece 2 is fixedly connected to the first plane;
the second connecting piece 4 is clamped with the first connecting piece 2;
the second bodies 3 are provided with a second plane, the second plane is parallel to the first plane, the second bodies 3 are provided with a first connecting end 31 and a second connecting end 32 which are perpendicular to the second plane, and the first connecting end 31 of one second body 3 is fixedly connected with the second connecting piece 4, and the second connecting end 32 of the other second body 3 is fixedly connected with the first connecting piece 2 in two adjacent second bodies 3.
Specifically, the first main body 1 is a steel keel with a hollow interior.
Specifically, the second body 3 is an aluminum plate.
During installation, only one worker is required to fixedly connect the first connecting end 31 of one second main body 3 with the second connecting piece 4, then fixedly connect the first connecting piece 2 on the first plane of the first main body 1, then fixedly connect the first connecting piece 2 with the second connecting piece 4, finally fixedly connect the second connecting end 32 of the other second main body 3 with the first connecting piece 2, and install a plurality of second main bodies 3 with the first main body 1 according to the above procedure, so that the installation of the curtain wall structure is completed, the process is completed by only one worker, the installation is completed without the joint of two workers, thereby improving the installation efficiency, saving the time and the labor cost.
In a preferred embodiment, the second connector 4 comprises:
a first connecting portion 41, where the first connecting portion 41 is perpendicular to the second plane and is fixedly connected to the first connecting end 31;
the second connecting portion 42 is perpendicular to the first connecting portion 41, and a first end of the second connecting portion 42 has a first clamping groove 43 extending along a vertical direction, and an opening of the first clamping groove 43 faces downward.
In a preferred embodiment, the first connector 2 comprises:
the third connecting part 21 is parallel to the first plane and fixedly connected with the first plane;
a fourth connecting portion 22, wherein the fourth connecting portion 22 is perpendicular to the third connecting portion 21, a first clamping portion 23 is connected to the fourth connecting portion 22, the first clamping portion 23 is perpendicular to the fourth connecting portion 22, and the first clamping portion 23 is clamped with the first clamping groove 43;
the fifth connecting portion 24, the fifth connecting portion 24 is perpendicular to the third connecting portion 21, the fifth connecting portion 24 is fixedly connected to the second connecting end 32, the fifth connecting portion 24 is provided with a second clamping groove 25 extending vertically, an opening of the second clamping groove 25 faces upwards, and the second clamping groove 25 is clamped to a second end of the second connecting portion 42.
In a preferred embodiment, a sixth connecting portion 26 is connected to an end of the fifth connecting portion 24 away from the third connecting portion 21, and the sixth connecting portion 26 is parallel to the third connecting portion 21 and is attached to the first main body 1.
In a preferred embodiment, a first space is formed between the first connecting end 31 of one of the second main bodies 3 and the second connecting end 32 of the other second main body 3 in two adjacent second main bodies 3, and the first space is filled with weather-proof glue 5 to perform a sealing and waterproof function, and simultaneously, the two adjacent second main bodies 3 can be supported, so that the installed curtain wall structure is more stable.
In a preferred embodiment, the first connecting portion 41 and the first connecting end 31 are fixedly connected by means of a blind rivet 6.
Specifically, the first connecting portion 41 is provided with a first through hole, the first connecting end 31 is provided with a second through hole corresponding to the first through hole, and the first through hole and the second through hole are connected by a pull rivet 6.
In a preferred embodiment, the third connecting portion 21 and the first plane are fixedly connected by a first screw.
In a preferred embodiment, the fifth connecting portion 24 and the second connecting end 32 are fixedly connected by a second screw.
In a preferred embodiment, the first body 1 is made of steel.
In a preferred embodiment, the second body 3 is made of aluminum.
The installation process comprises the following steps: the first connecting end 31 of one second main body 3 and the second connecting part 42 of the second connecting piece 4 are fixedly connected through the pull rivet 6, the third connecting part 21 of the first connecting piece 2 and the first plane are fixedly connected through a screw, the first clamping groove 43 and the first clamping part 23 are clamped, the second clamping groove 25 and the second end of the second connecting part 42 are clamped, the second end of the other second main body 3 is fixedly connected through the screw and the fifth connecting part 24, a plurality of second main bodies 3 and the first main body 1 are connected according to the above process, and finally weather-proof glue 5 is filled into the first space to complete the installation of the curtain wall structure.
The foregoing description is only of the preferred embodiments of the present application and is presented as a description of the principles of the technology being utilized. It will be appreciated by persons skilled in the art that the scope of the utility model referred to in this application is not limited to the specific combinations of features described above, but it is intended to cover other embodiments in which any combination of features described above or equivalents thereof is possible without departing from the spirit of the utility model. Such as the above-described features and technical features having similar functions (but not limited to) disclosed in the present application are replaced with each other.

Claims (10)

1. A curtain wall construction for ease of installation comprising:
a first main body (1), wherein the first main body (1) is provided with a first plane, and a first connecting piece (2) is fixedly connected to the first plane
The second connecting piece (4) is clamped with the first connecting piece (2);
the second main bodies (3) are provided with second planes, the second planes are parallel to the first planes, the second main bodies (3) are provided with first connecting ends (31) and second connecting ends (32) which are perpendicular to the second planes, two adjacent second main bodies (3) are provided with one first connecting end (31) of each second main body (3) and each second connecting piece (4) which are fixedly connected, and the other second connecting end (32) of each second main body (3) is fixedly connected with each first connecting piece (2).
2. A curtain wall construction facilitating installation according to claim 1, wherein the second connection piece (4) comprises:
the first connecting part (41), the first connecting part (41) is vertical to the second plane and is fixedly connected with the first connecting end (31);
the second connecting portion (42), second connecting portion (42) with first connecting portion (41) are perpendicular, the first end of second connecting portion (42) has first draw-in groove (43) along vertical extension, the opening of first draw-in groove (43) is down.
3. A curtain wall construction facilitating installation according to claim 2, wherein the first connection element (2) comprises:
the third connecting part (21), the third connecting part (21) is parallel to the first plane and fixedly connected with the first plane;
a fourth connecting portion (22), wherein the fourth connecting portion (22) is perpendicular to the third connecting portion (21), a first clamping portion (23) is connected to the fourth connecting portion (22), the first clamping portion (23) is perpendicular to the fourth connecting portion (22), and the first clamping portion (23) is clamped with the first clamping groove (43);
the fifth connecting portion (24), fifth connecting portion (24) with third connecting portion (21) are perpendicular, fifth connecting portion (24) with second link (32) fixed connection, have on fifth connecting portion (24) along second draw-in groove (25) of vertical extension, the opening of second draw-in groove (25) up, second draw-in groove (25) with the second end looks joint of second connecting portion (42).
4. A curtain wall construction according to claim 3, wherein the end of the fifth connecting portion (24) remote from the third connecting portion (21) is connected with a sixth connecting portion (26), and the sixth connecting portion (26) and the third connecting portion (21) are parallel and are attached to the first main body (1).
5. A curtain wall construction according to claim 1, characterized in that in two adjacent second bodies (3), a first space is provided between a first connection end (31) of one of the second bodies (3) and a second connection end (32) of the other second body (3), said first space being filled with weather-resistant glue (5).
6. A curtain wall construction according to claim 2, wherein the first connection portion (41) and the first connection end (31) are fixedly connected by means of a pull rivet (6).
7. A curtain wall construction according to claim 3, wherein the third connection portion (21) and the first plane are fixedly connected by means of a first screw.
8. A curtain wall construction according to claim 3, wherein the fifth connection (24) and the second connection end (32) are fixedly connected by means of a second screw.
9. A curtain wall construction convenient to install according to claim 1, characterized in that the first body (1) is of steel material.
10. A curtain wall construction convenient to install according to claim 1, characterized in that the second body (3) is of aluminium.
CN202321986972.3U 2023-07-26 2023-07-26 Curtain wall construction convenient to installation Active CN220301591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321986972.3U CN220301591U (en) 2023-07-26 2023-07-26 Curtain wall construction convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321986972.3U CN220301591U (en) 2023-07-26 2023-07-26 Curtain wall construction convenient to installation

Publications (1)

Publication Number Publication Date
CN220301591U true CN220301591U (en) 2024-01-05

Family

ID=89372093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321986972.3U Active CN220301591U (en) 2023-07-26 2023-07-26 Curtain wall construction convenient to installation

Country Status (1)

Country Link
CN (1) CN220301591U (en)

Similar Documents

Publication Publication Date Title
CN201649374U (en) Framework type curtain wall with decorative strip keels
CN111734940A (en) Bearing framework without damaging metal roof and installation method
CN108166655B (en) Waterproof curtain wall
CN202595970U (en) Combined curtain wall system
CN220301591U (en) Curtain wall construction convenient to installation
CN202073246U (en) Supporting system of photovoltaic solar energy
CN206815627U (en) Curtain wall installs node structure
CN109184107A (en) It is a kind of that firm anticreep wallboard is installed
CN209891530U (en) Prefabricated aluminum honeycomb panel's assembled furred ceiling
CN208415732U (en) Photovoltaic support structure for upright-lockstitching color steel tile roof
CN111608352A (en) Detachable glass wall surface installation system with frame
CN216948981U (en) Overlength honeycomb panel curtain wall construction
CN113756489B (en) Conversion structure of glass curtain wall and ceiling aluminum plate below vertical greening and construction method
CN215483890U (en) Waterproof connecting structure of open aluminum plate
CN211899109U (en) Reverse large decorative strip curtain wall system capable of being used for shear wall part
CN204290826U (en) Photovoltaic system flexible installing device
CN211597283U (en) Weave form aluminum plate and decorate curtain mounting structure
CN102270685A (en) Photovoltaic solar-powered support system
CN211313898U (en) Glass mounting structure for aluminum-clad wooden door and window frame
CN209975818U (en) Glass curtain wall node structure of diamond body daylighting top
CN209011424U (en) The mounting structure of windproof hasp and solar power generation watt
CN211744391U (en) Installation structure of car shed solar panel
CN211313032U (en) Novel polycarbonate hollow plate assembling structure
CN216664817U (en) Hanging structure for artistic wall panel of enamel plate without folding edge
CN220896576U (en) Photovoltaic connecting assembly for color steel tile roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant