CN218715137U - Large building frame construction structure capable of rapidly clearing and retreating materials - Google Patents

Large building frame construction structure capable of rapidly clearing and retreating materials Download PDF

Info

Publication number
CN218715137U
CN218715137U CN202222976704.5U CN202222976704U CN218715137U CN 218715137 U CN218715137 U CN 218715137U CN 202222976704 U CN202222976704 U CN 202222976704U CN 218715137 U CN218715137 U CN 218715137U
Authority
CN
China
Prior art keywords
clearing
channel
retreating
construction structure
large building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222976704.5U
Other languages
Chinese (zh)
Inventor
黄长福
祝国梁
王成龙
黄洪楷
杨涛
吴阿强
陈明法
李海涛
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Original Assignee
China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Bureau Construction and Development Co Ltd filed Critical China Construction Fourth Engineering Bureau Construction and Development Co Ltd
Priority to CN202222976704.5U priority Critical patent/CN218715137U/en
Application granted granted Critical
Publication of CN218715137U publication Critical patent/CN218715137U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a large building frame construction structure capable of rapidly clearing and retreating materials, which comprises a frame body, wherein the bottom of the frame body is provided with a clearing and retreating channel; the frame body comprises a plurality of vertical rods which are arranged vertically and in an array, the vertical rods are connected by a plurality of cross beams which are staggered mutually and arranged horizontally, and two rows of vertical rods which are adjacent to the side wall of the clearing and retreating channel are connected by a plurality of diagonal rods; the top of the clearing channel is provided with a top main keel consisting of I-shaped steel, the upper end surface of the top main keel is paved with a template, the bottom of the clearing channel is paved with a protection plate, and the upper end surface of the protection plate is paved with a thick steel plate. The turnover material turnover period in the large-scale building can be reduced, the working hours for cleaning building rubbish and disassembling the template supporting system are reduced, the demand of workers is reduced, and the construction cost is effectively saved.

Description

Large building frame construction structure capable of rapidly clearing and retreating materials
Technical Field
The utility model relates to a support body structure technical field when the main structure of large building constructs the construction especially relates to a can clear away large building support body construction structures who moves back the material fast of putting up of main application and large-scale factory building.
Background
The template support system consists of a top plate template support combined structure, a frame column template support combined structure and a shear wall template support combined structure, and can be recycled for more than 300 times.
At present, the construction period of a large building is required to be short, the size of the large building is large, the input amount of turnover materials is large, and on the premise that the input amount of main materials such as reinforcing steel bars and concrete is basically fixed, the total input amount of the turnover materials is controlled as much as possible so as to control the project cost. Meanwhile, labor loss caused by excessive consideration of turnover is avoided as much as possible, and further, the influence on the performance of the project period is caused. In addition, the untimely material turnover can cause the overuse of the material and increase the cost.
However, in the process of large-scale building construction, the vertical rods are arranged densely, and materials can be cleared and returned only by a cart by workers, so that the efficiency is extremely low, and the requirement of workers is large.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a can clear away large-scale building support body construction structures of material fast, the utility model discloses a realize like this:
a large building frame construction structure capable of quickly clearing and retreating materials comprises a frame body, wherein each layer of the frame body is provided with a clearing and retreating channel enough for two forklifts to pass in parallel;
the rack body comprises a plurality of vertical rods which are arranged vertically and in an array, the vertical rods are connected by a plurality of cross beams which are staggered mutually and arranged horizontally, and two rows of vertical rods which are adjacent to the side wall of the clearing and retreating channel are connected by a plurality of diagonal rods;
the top main keel formed by I-shaped steel is arranged at the top of the clearing channel, the template is laid on the surface of the upper end of the top main keel, the protection plate is laid at the bottom of the clearing channel, and the thick steel plate is laid on the surface of the upper end of the protection plate.
As a further improvement, the inclination directions of two adjacent diagonal draw bars in the same vertical plane are opposite.
As a further improvement, the periphery of the vertical rod is sleeved with a plate buckling frame at intervals.
As a further improvement, the lamp strip is hung at the top of the clearing channel, and the reflective strips are adhered to the periphery of the vertical rod on the side wall of the clearing channel.
As a further improvement, the width of the clearing and retreating channel is 4.5m, and the height of the clearing and retreating channel is not less than 3m.
Preferably, the thickness of the thick steel plate is 10mm.
The beneficial effects of the utility model reside in that:
1. set up clear the passageway that moves back in the bottom of support body promptly when putting up template support system, guarantee to have enough spacious passageway to supply two fork trucks to be parallel, by fork truck with the turnover material of building depths, building rubbish etc. transport, compare traditional artifical shallow manual transportation, compressed a large amount of time limit for a project, shortened turnover material turnover cycle, practiced thrift a large amount of manpower resources simultaneously.
2. Connect by a plurality of diagonal draw bars between the adjacent two poles of pole settings of lateral wall that move back the passageway clearly, clear top that moves back the passageway sets up the top main joist of constituteing by the I-steel, and top main joist upper end surface is laid the template, has realized moving back the inside protection of passageway clearly when upper concrete has not solidified, can demolish fast after the concrete solidifies in order to guarantee to move back the smooth and easy of passageway clearly. In addition, the strength of the clearing channel can be enhanced, and meanwhile, workers are prevented from being injured by falling objects above the clearing channel.
3. The protection shield is laid at the bottom of the clear passageway that moves back, and the thick steel plate is laid on the upper end surface of protection shield, has realized guaranteeing the stability of fork truck when going in clear passageway that moves back, avoids piling up building materials rubbish or constructing the emergence that the uneven dangerous condition such as fork truck turned on one's side, collided because of ground leads to.
Drawings
Fig. 1 is a side view of the local shaft of the frame body provided with the clearing channel of the utility model.
Fig. 2 is a partial front view of the frame body provided with the clearing channel of the utility model.
Fig. 3 is a schematic diagram of the layout of clearing and retreating channels in one layer according to one embodiment of the present invention.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
In the description of the present invention, the terms "first", "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or as implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
The floor area of a large-scale factory building is large, so that construction is usually carried out from inside to outside during construction, and after the concrete inside is solidified and the safety coefficient reaches the standard, the turnover material is removed and applied to subsequent or other corresponding construction of construction sites. In order to facilitate the turnover and transportation of turnover materials, the utility model provides a construction structure of a large building frame body 1 capable of rapidly clearing and withdrawing materials, which comprises a frame body 1, wherein each layer of the frame body 1 is provided with a clearing and withdrawing channel 2 which is enough for two forklifts to run in parallel;
the frame body 1 comprises a plurality of vertical rods 11 which are arranged vertically and in an array, the vertical rods 11 are connected by a plurality of cross beams 12 which are staggered mutually and arranged horizontally, and two rows of vertical rods 11 which are adjacent to the side wall of the clearing and retreating channel 2 are connected by a plurality of diagonal draw bars 13;
clear top main joist 21 that forms by the I-steel that sets up of moving back the top of passageway 2, template 22 is laid to the upper end surface of top main joist 21, clear bottom of moving back passageway 2 is laid protection shield 23, thick steel plate is laid to the upper end surface of protection shield 23.
As a further improvement, the two diagonal members 13 adjacent to each other in the same vertical plane have opposite inclination directions.
As a further improvement, the peripheral spacer sleeve of the upright rod 11 is provided with a coil buckling frame.
As a further improvement, a lamp strip is hung at the top of the clearing and retreating channel 2, and a reflective strip is adhered to the periphery of the upright rod 11 on the side wall of the clearing and retreating channel 2.
As a further improvement, the width of the purge and retreat channel 2 is 4.5m, and the height is not less than 3m.
Preferably, the thickness of the thick steel plate is 10mm.
For easy understanding, the utility model discloses to the concrete construction flow who provides a can clear 1 construction structures of large building support body of moving back material fast demonstrates, included following step:
s1, dividing a construction area;
s2, designing a plurality of clearing and retreating channels 2 according to the divided areas, wherein the minimum distance between each construction area and the clearing and retreating channel 2 is not more than 2/3 of the length of the short side of the boundary of the construction area;
and S3, dismantling materials for the construction area which meets the requirements of bearing conditions and stress, and clearing from the clearing channel 2.
Specifically, step S1 specifically includes:
dividing the frame body 1 into N layers including L10 and L20.. LN0 from bottom to top, and dividing each layer into a plurality of construction areas according to the construction molding requirements; the periphery of each layer of support body 1 is provided with transport platform and platform of unloading, and the turnover material of lower floor is transported to the transport platform of high one-storey on by the transport platform, and the building rubbish of each layer or the turnover material that can not reuse are moved to the earth's surface by the platform of unloading.
Wherein, the transfer of the turnover materials or the building materials on the carrying platform or the unloading platform is lifted by the matching of a truck crane, a tower crane and other hoisting equipment.
As a further improvement, both ends of the clearing and retreating channel 2 in the step S2 are respectively connected with the carrying platform or the discharging platform. Specifically, as shown in fig. 3, it is a schematic top-view engineering diagram of one of the layers of the embodiment of the present invention in practical application.
As a further improvement, in step S3, in order to ensure that the clearing and retreating channel 2 is smooth, the formwork support material of the clearing and retreating channel 2 is firstly removed in each partition, and before removal, it is required to ensure that the concrete in the clearing and retreating channel 2 is completely solidified.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A large building frame construction structure capable of quickly clearing and retreating materials is characterized by comprising a frame body, wherein each layer of the frame body is provided with a clearing and retreating channel enough for two forklifts to pass in parallel;
the rack body comprises a plurality of vertical rods which are arranged vertically and in an array, the vertical rods are connected by a plurality of cross beams which are staggered mutually and arranged horizontally, and two rows of vertical rods which are adjacent to the side wall of the clearing and retreating channel are connected by a plurality of diagonal rods;
clear top main joist that the setting at the top of moving back the passageway comprises the I-steel, the template is laid on the upper end surface of top main joist, clear bottom of moving back the passageway is laid the protection shield, the steel plate is laid on the upper end surface of protection shield.
2. A large building frame construction structure capable of rapidly clearing and withdrawing materials according to claim 1, wherein the inclination directions of two adjacent diagonal members in the same vertical plane are opposite.
3. A large building frame construction structure capable of rapidly clearing and withdrawing materials according to claim 1, wherein a disc fastener frame is sleeved on the periphery of the vertical rod at intervals.
4. The construction structure of a large building frame body capable of rapidly clearing and removing materials according to claim 1, wherein a lamp strip is hung at the top of the clearing and removing channel, and a reflective strip is adhered to the periphery of the vertical rod on the side wall of the clearing and removing channel.
5. A large building frame construction structure capable of rapidly clearing and retreating materials according to claim 1, wherein the width of the clearing and retreating channel is 4.5m, and the height is not less than 3m.
6. A large building frame construction structure capable of rapidly removing materials according to claim 1, wherein the thickness of the thick steel plate is 10mm.
CN202222976704.5U 2022-11-04 2022-11-04 Large building frame construction structure capable of rapidly clearing and retreating materials Active CN218715137U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222976704.5U CN218715137U (en) 2022-11-04 2022-11-04 Large building frame construction structure capable of rapidly clearing and retreating materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222976704.5U CN218715137U (en) 2022-11-04 2022-11-04 Large building frame construction structure capable of rapidly clearing and retreating materials

Publications (1)

Publication Number Publication Date
CN218715137U true CN218715137U (en) 2023-03-24

Family

ID=85610734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222976704.5U Active CN218715137U (en) 2022-11-04 2022-11-04 Large building frame construction structure capable of rapidly clearing and retreating materials

Country Status (1)

Country Link
CN (1) CN218715137U (en)

Similar Documents

Publication Publication Date Title
CN110206144B (en) Construction method of steel reinforced column beam column joint
CN112343064A (en) Construction method for dismantling large-section annular concrete support beam of deep foundation pit
CN218715137U (en) Large building frame construction structure capable of rapidly clearing and retreating materials
CN212103528U (en) Assembly module for temporary road
CN210597037U (en) Pre-compaction structure of super high beam support
CN111058619A (en) Temporary support system for post-cast strip of reinforced concrete beam plate and application method
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN209799360U (en) combined movable steel formwork
CN212151347U (en) Simple template transport vehicle
CN210313376U (en) Prefabricated section is handling device in batches
CN206538997U (en) Operating platform
CN218840756U (en) Simple carrying device after scaffold is dismantled
CN221298699U (en) A demolish auxiliary system for top floor
CN111074800A (en) Drainage box culvert pouring supporting structure
CN218252673U (en) A handling frame that is used for prefabricated post steel reinforcement cage ligature of big cross-section
CN215672241U (en) Cast-in-place medium plate of assembled travelling bogie
CN212828427U (en) Reinforcing steel bar framework transport tool
CN217205320U (en) Zero-contact rapid formwork supporting and dismounting system for isolation layer of underground water plant
CN212561569U (en) Slope concrete lattice template
CN212427198U (en) Reusable mid-partition wall replacing support and basement board folding system
CN219196714U (en) Integral lifting template and template system thereof
CN217151219U (en) Template capable of enabling settlement joint floors to pour concrete simultaneously
CN219753293U (en) Efficient retaining wall skeleton structure free of form removal
CN214005298U (en) Prefabricated assembled road plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230713

Address after: 5 / F, building B, No. 16, Keyun Road, Tianhe District, Guangzhou City, Guangdong Province 510000

Patentee after: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Patentee after: China Construction Fourth Engineering Bureau Construction Development Co.,Ltd.

Address before: Unit 801, 889 fanghubei 2nd Road, Heshan street, Huli District, Xiamen City, Fujian Province, 361000

Patentee before: China Construction Fourth Engineering Bureau Construction Development Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240418

Address after: Unit 801, 889 fanghubei 2nd Road, Heshan street, Huli District, Xiamen City, Fujian Province, 361000

Patentee after: China Construction Fourth Engineering Bureau Construction Development Co.,Ltd.

Country or region after: China

Address before: 5 / F, building B, No. 16, Keyun Road, Tianhe District, Guangzhou City, Guangdong Province 510000

Patentee before: CHINA CONSTRUCTION FOURTH ENGINEERING DIVISION CORP.,LTD.

Country or region before: China

Patentee before: China Construction Fourth Engineering Bureau Construction Development Co.,Ltd.